Lead Service Replacement - Street Resurfacing Blocks
Description
The City of Aurora, IL, invites qualified contractors to submit bids for the full replacement of lead water service lines, from the water main to the water meter, including restoration and all other miscellaneous appurtenances, in accordance with the project specifications. This project will focus on replacing lead water services on a block-by-block basis along streets identified in the City’s resurfacing program, coordinating water service replacements with planned roadway resurfacing activities. SCOPE OF WORK INDEX TO SPECIAL PROVISIONS Provision Number Title ADMINISTRATION SP A.1 – ALTERATIONS TO PROJECT BY ENGINEER SP A.2 – ITEMS ORDERED BY ENGINEER SP A.3 – RESPONSIBILITY OF WORK SP A.4 – PUBLIC SAFETY AND CONVENIENCE SP A.5 – COMPLETION DATE SP A.6 – PERFORMANCE GUARANTEE OF WORK SP A.7 – WORKDAYS AND HOURS SP A.8 – INCIDENTAL WORK SP A.9 – PRE-CONSTRUCTION MEETING SP A.10 – NOTIFICATION SP A.11 – CONTROL OF MATERIALS SP A.12 – RECORD DRAWINGS SP A.13 – LICENSED PLUMBER SP A.14 – CONTRACTOR REQUIREMENTS AND LETTERS OF RECOMMENDATION SP A. 15 - IDOT PREQUALIFICATION REQUIREMENT SAFTEY SP S.1 – TRAFFIC CONTROL AND PROTECTION SP S.2 – RESPONSIBILITY FOR CONSTRUCTION SAFETY, SHORING AND CONSTRUCTION METHODS SP S.3 – LOCATION OF UTILITIES SP S.4 – BARRICADES, TYPE 2 W/ STEADY BURN LIGHTS SP S.5 – ADVANCED WARNING SIGNS HOUSEKEEPING/SOIL EROSION & SEDIMENT CONTROL SP H.1 – SOIL EROSION CONTROL SP H.2 – DUST CONTROL AND DIRT ON PAVEMENT SP H.5 – DISPOSAL OF DEBRIS AND EXCAVATED MATERIAL SP H.6 – HAZARDOUS SPILL REMEDIATION SP H.7 – TRUCKING SPOILS FROM CITY PAD GENERAL SP G.1 – MOBILIZATION SP G.2 – WATER FOR CONSTRUCTION PURPOSES SP G.3 – SURFACE RESTORATION SP G.5 – TRENCH BACKFILL, PIPE BEDDING, AND COVER SP G.6 – COMPACTION REQUIREMENTS SP G.12 – REMOVE AND PLUG ABANDONED WATER SERVICE SP G.13 – TREE TRIMMING STORM SEWERS SP ST.8 – DRAIN TILE REPAIR SANITARY SEWERS SP SN.5 – SANITARY SERVICE CROSSINGS WATER MAIN SP W.2 – WATER SERVICE/WATER SERVICE RELOCATION RESTORATION SP R.1 – SAW CUTTING SP R.2 – TEMPORARY DRIVEWAY SURFACE, AND TEMPORARY PAVEMENT SURFACE SP R.3 – HOT MIX ASPHALT PAVEMENT REMOVAL AND REPLACEMENT SP R.5 – PCC DRIVEWAY PAVEMENT REMOVAL & REPLACEMENT SP R.6 – HOT MIX ASPHALT DRIVEWAY PAVEMENT REMOVAL & REPLACEMENT SP R.7 – COMBINATION PCC CURB AND GUTTER SP R.8 – PCC SIDEWALK REMOVAL AND REPLACEMENT, 5” AND DETECTABLE WARNINGS SP R.10 – SEEDING – AURORA MIX Detailed Scope of Work This project will focus on replacing lead water services on a block-by-block basis along streets identified in the City’s resurfacing program, coordinating water service replacements with planned roadway resurfacing activities. SPECIAL PROVISIONS - Administration Revised 01/2026 The following Special Provisions supplement the Instruction to Bidders, the City of Aurora General Specifications, the Illinois Department of Transportation’s Standard Specifications For Road and Bridge Construction (herein after called the Standard Specifications), the City of Aurora’s Standard Specifications for Improvements, the Supplemental Specifications and Recurring Special Provisions, the Standard Specifications for Water And Sewer Main Construction in Illinois, Seventh Edition, the Standard Specifications for Traffic Control Items, Part 890 of the Illinois Plumbing Code (77 IL Admin Code 890.1150) and the latest edition of the Manual on Uniform Traffic Control Devices for Streets and Highways and the Illinois Supplement to the National Manual on Uniform Traffic Control Devices in effect on the date of invitation for proposals. These special provisions apply to and govern the proposed improvement designated as the Lead Service Replacements - Street Resurfacing Blocks and in case of conflict with any part or parts of said specifications; these Special Provisions shall take precedence and shall govern. SUMMARY OF 2026 MAJOR SPECIAL PROVISION REVISIONS: WORKING DAY AND HOURS WATER SERVICE/WATER SERVICE RELOCATION SP A.1 – ALTERATIONS TO PROJECT BY ENGINEER The Engineer reserves the right to alter the Plans and details, extend or shorten the improvement, add such work as deemed necessary, increase or decrease the quantities of work to be performed, and/or eliminate entire pay items all in accordance with Section 104 of the Standard Specifications, except that the Contractor shall not be entitled to additional compensation or lost profits in the event that quantities are reduced below the original contract quantities, or in the event pay items are deleted entirely. SP A.2 – ITEMS ORDERED BY ENGINEER When additional work not included in the Contract, is requested in writing by the Engineer, this additional work shall be measured and paid for in accordance with Sections 104 and 109 of the IDOT Standard Specifications, as modified by these special provisions. Payment for all additional work ordered by the Engineer in writing, which is deemed by the Engineer to be eligible for payment and is not covered by the Contract, shall be made from the allowance included in the contract under ITEMS ORDERED BY ENGINEER. The Contractor shall not be entitled to any additional compensation in the event that utilization of this allowance, either in whole or in part, is not required to complete the work. SP A.3 – RESPONSIBILITY OF WORK During the progress of the work the Contractor shall assume total risk and liability, and will be responsible for any and all damages to the work, or to persons, or to public or private property caused by, or in any way resulting from doing the work, including actions of Subcontractors or Material Suppliers. SP A.4 – PUBLIC SAFETY AND CONVENIENCE The Contractor shall maintain driveways, entrances, and side roads along the proposed improvement to allow emergency and local vehicle access to all adjacent properties. This access should not allow the passage of non-local vehicular traffic, which should abide by the approved traffic control plan. Interference with traffic movements and inconvenience to abutting property owners and the public shall be kept to a minimum. The Contractor shall also keep the sidewalk and curb ramps clear of debris and equipment whenever possible. The Contractor shall maintain at least one lane open to traffic at all times for emergency vehicles on all streets affected by the construction of these improvements. Adequate use of flaggers and other traffic control devices shall be used to permit such arrangements during working hours. The Contractor shall remove and reinstall all street signs/posts in conflict with the proposed improvements and the Contractor will be responsible for the replacement of signs/posts damaged during this process. All signage required for the proper control of traffic (i.e.: stop signs, yield signs, etc.) must be maintained on a temporary basis until the permanent sign can be reinstalled. If the project is located in a business district, then business open signs provided by the Contractor shall be posted and maintained during construction. This work shall not be paid for separately but shall be considered incidental to the appropriate traffic control pay item. SP A.5 – COMPLETION DATE The Contractor agrees to execute a Contract and a contract bond satisfactory to and in the form prescribed by the City in the penal sum of the full amount of the contract, guaranteeing the faithful performance of the work in accordance with the terms of the contract within ten (10) days after Notice of Award of the Contract. The Contractor further agrees to begin work no later than ten (10) calendar days after the execution and approval of the contract and Contract bond, unless otherwise provided, and to prosecute the work in such a manner and with sufficient materials, equipment, and labor as will ensure its completion within the time limit specified herein, it being understood and agreed that the completion within the time limit is an essential part of the Contract. The Contractor shall schedule their construction operations in such a manner so as to meet the following completion deadlines: Obtain Substantial completion of the entire project within 365 calendar days. Obtain Final completion of the entire project within 365 calendar days. Substantially complete shall mean the completion of all work except for the installation of the final HMA surface and minor punch list items. Final completion shall be obtained when all the work in all respects has been completed; including the final HMA surface course, punch list work, and landscaping. Special attention is called to Article 108.10 of the Standard Specifications for Road and Bridge Construction and shall be strictly adhered to in the eve SAFTEY SP S.1 – TRAFFIC CONTROL AND PROTECTION Traffic control shall be in accordance with the applicable sections of the Standard Specifications for Road and Bridge Construction, the Recurring Special Provisions and Supplemental Specifications, the Manual on Uniform Traffic Control Devices for Streets and Highways and the Illinois Supplement to the National Manual on Uniform Traffic Control Devices, and any special details and Highway Standards contained herein and in the Traffic Specifications or Highway Specifications. Special attention is called to Article 107.09 of the Standard Specifications for Road and Bridge Construction. All orange signs used shall be fluorescent orange in color. Deteriorated, damaged, or signs with non-original material on the front surface will not be allowed . Prior to the start of work the Contractor shall have a sufficient number of barricades, signs, and flaggers at the jobsite for the scheduled work. If satisfactory traffic control as determined by the Engineer is not in place, the Engineer shall order the work to be halted. Traffic control devices shall not be removed without prior written notice and approval of the Engineer. The Contractor shall obtain, erect, maintain, and remove all signs, barricades, flaggers, and other traffic control devices as may be necessary for the purposes of regulating, warning, or guiding traffic. The supplying, installation, and maintenance of traffic control and protection shall be paid for at the contract unit price per DAY for ARROW BOARDS, BARRICADES, TYPE 2 W/ STEADY BURN LIGHTS, and/or ADVANCED WARNING SIGNS and at the contract unit price per HOUR for FLAGGER pay items. SP S.2 – RESPONSIBILITY FOR CONSTRUCTION SAFETY, SHORING AND CONSTRUCTION METHODS The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions for the safety of; and shall provide the necessary protection to prevent damage, injury or loss to: All employees on the work and other persons who may be affected thereby. All work and materials or equipment to be incorporated therein, whether in storage on or off the site. Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designated for removal, relocation, or replacement during construction. The Contractor shall be responsible for complying with all applicable laws, ordinances, rules, regulations, and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury, or loss. The Contractor shall be responsible for erecting and maintaining, as required by the conditions and progress of the work, all necessary safeguards for its safety and protection, including tight sheeting or shoring of the trench. He shall notify owners of adjacent utilities when prosecution of the work may affect them. All damage, injury, or loss to any property referred to in paragraph (a) or (b) caused, directly or indirectly, in whole or in part, by any Contractor or Subcontractor or anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, shall be remedied by the Contractor. The Contractor's duties and responsibilities for the safety and protection of all work shall continue until such time as all the work is completed and acceptable. Any damages shall be repaired in a timely manner. Any and all interruptions of essential utilities such as water, electricity, or gas shall be corrected that same day and before the foreman leaves the site. (See Guarantee & Maintenance of Work for time of acceptance.) The Contractor shall be responsible for coordinating with utility companies regarding the bracing or relocating of utility poles, and the relocation of any underground facilities. The Engineer shall not be responsible for determining the Contractor’s construction means or methods. SP S.3 – LOCATION OF UTILITIES The Contractor, before submitting a Bid, shall carefully examine the Proposal, Plans, Details, Specifications, and Special Provisions. The successful Bidder shall inspect in detail the site of the proposed work and be familiar with all the local conditions affecting the proposal and the detailed requirements of construction. When existing structures, services, utilities, pipelines and improvements (both above and below ground) are shown on the Plans, the locations shown are approximate only and are not guaranteed. Obstructions and improvements in addition to those shown on the Plans may also be encountered in carrying out the work. The Contractor shall be responsible for carrying out all work under this contract without additional compensation for whatever condition is found above or below ground. The Contractor shall notify all utility companies including the City of Aurora’s electrical division and water and sewer division, local electric companies, local telephone and communications companies, local natural gas companies, and local cable TV companies, and appropriate school districts, a minimum of two (2) working days (forty-eight hours) prior to beginning any construction or preliminary borings. The Contractor shall have the responsibility to determine from the public utility companies and the City of Aurora Departments the locations of underground pipes, conduits, cables, or other surface or subsurface improvements adjoining or crossing the construction area. The depth and alignment of the existing water mains and sewers are approximate and may vary in both alignment and depth between manholes and valves. The Contractor shall not be due any additional compensation in the event that the alignment of the sewers and water mains vary from what is shown on the Plans. The call outs shown on the Plans for the existing water mains are approximate and not guaranteed. The Contractor shall be responsible for coordinating with utility companies regarding the bracing or relocating of HOUSEKEEPING/SOIL EROSION & SEDIMENT CONTROL SP H.1 – SOIL EROSION CONTROL If the size of the project warrants a Storm Water Pollution Prevention Plan (SWPPP), then the Contractor and their Subcontractors shall sign the necessary certification forms and follow the requirements of the SWPPP. The Contractor shall coordinate with the Engineer on correcting any deficiencies identified during inspections or Incidents of Non-compliance and shall notify the Engineer of any changes to the SWPPP’s Erosion Control Plan. This work shall consist of the supply and installation of soil erosion and sedimentation control devices in accordance with Article 280 of the Standard Specification for Road and Bridge Construction, the City of Aurora’s Standard Specifications for Improvements, the Kane-DuPage Soil and Water Conservation District, the Illinois Environmental Protection Agency – Division of Water Pollution Control’s NPDES Permit No. ILR10, and with the details within the construction drawings. Prior to starting any excavation, the Contractor shall be required to place Engineer approved inlet protection such as an inlet basket sized to fit that particular frame, or equal, in all curb structures in accordance with the Soil Erosion and Sediment Control Plan. In the event that ground water is encountered during excavation, the Contractor shall provide dewatering filtration bags for each pump discharge line. The filtration bags shall be as manufactured by Dandy Products or approved equal. Erosion and Sedimentation Control shall not be paid for separately but shall be considered incidental to the contract. The supply and installation of inlet baskets shall be paid for at the contract unit price for EACH (EA) for INLET PROTECTION. All material used for erosion and sedimentation control shall be disposed of off-site along with all debris collected within the control devices. Disposal shall not be paid for separately and shall be considered incidental to the Contract. SP H.2 – DUST CONTROL & DIRT ON PAVEMENT The Contractor shall at all times be responsible for maintaining dust-free conditions. The Contractor shall clean the pavement of all dirt and debris at the end of each day’s operations, and at other times as directed by the Engineer by means of high pressure washing or by mechanical sweeping. The Contractor shall provide for the control of dust as specified in Section 24 of the Standard Specifications for Water and Sewer Construction in Illinois, or by the uniform application of a dust control agent approved by the Engineer. If City water is used for dust control, the Contractor must have a water meter and hoses on site prior to the start of any excavation. If the Contractor does not meet the requirement of controlling dust and/or cleaning the pavement, within three (3) hours of notification by the Owner, the Owner shall make the necessary arrangements to control the dust and clean the pavement(s). The cost of such action will be deducted from any monies due or to become due to the Contractor. Additionally, the City will deduct $750.00 per day from monies due, or to become due, for each day that the Contractor fails to comply with this special provision. In addition, the Contractor will pay any penalties resulting from any Illinois Environmental Protection Agency, NPDES for Construction violations issued to the Owner. Such sum to be charged not as a penalty but as liquidated damages. The parties agreeing that actual damages to the City of Aurora would be uncertain and difficult to calculate and the amount of such liquidated damages is a reasonable estimate of the supervision costs likely to be incurred by the City of Aurora as a result of the Contractor’s failure to control dust and clean the pavement(s) as required. Dust control and pavement cleaning shall be considered incidental to the cost of the contract and will not be paid for separately. SP H.5 – DISPOSAL OF DEBRIS AND EXCAVATED MATERIAL Excavated spoils shall be delivered to the City of Aurora Public Works Facility at 2100 E New York Street. In the event that the City obtains CCDD clearance for spoil disposal prior to starting a lead service replacement, the contractor shall transport the spoils directly to the CCDD. CCDD tipping fees shall be paid as follows: In the case where the CITY HAS NOT OBTAINED clearance for disposal at a CCDD facility prior to onsite excavation, the contractor shall be responsible for transporting the spoils to the City’s Public Works Facility spoils transfer pad located at 2100 E New York Street, Aurora, Illinois. The City will have the spoils on the transfer pad tested for clearance at a CCDD facility. After the City has obtained CCDD clearance, these spoils at the transfer pad will be hauled away and disposed of by the contractor per the TRUCKING SPOILS FROM CITY PAD special provision. During this separate trucking operation for CCDD disposal, the contractor shall be paid for the CCDD
Published attachments
- Attachment 3 - Typical Domestic Water Service (EXHIBIT III-C-6) 02-01-11
- Attachment 1 - Typical Water Service Replacement From BBox to Water Meter Detail
- Attachment 2 - Typical Water Service Replacement From Water Main to Water Meter Detail
- Typical Details
- Lead_Service_Replacement_-_Street_Resurfacing_Blocks_(Addendum_#1_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
The Spec book refers to the drawings, are there any to be supplied?
There are only details, no drawings.
If the existing main needs to be flushed and cleaned in order to access the sewer with the lateral camera, is the city of Aurora going to supply a vac truck to clean the existing sewer?
We can coordinate with Water & Sewer division to clean the mainline of the sanitary sewer, if needed.
Will the city provide staff and equipment to load all trucks at the transfer pad for disposal and hauling of spoils for Line Item #’s 45, 46, and 47?
Per SP H.7 - TRUCKING SPOILS FROM CITY PAD, "The City shall provide staff and equipment to load the trucks at the transfer pad for the disposal and hauling of these spoils."
Can asphalt, concrete, etc. be dumped at the city pad for Line Item # 45 or is the contractor responsible to haul these items directly to the CCDD facility? If the contractor is responsible to haul these items directly to the CCDD facility, will the city cover the cost of any required testing, if any?
It would be ideal for concrete, asphalt, and spoils to be separated but disposal of excavated materials, including asphalt and concrete, is the contractor’s responsibility and is considered part of the contractor’s means and methods. Per SP H.5 - DISPOSAL OF DEBRIS AND EXCAVATED MATERIAL "...This project is eligible for free CONCRETE DISPOSAL ONLY at the Heartland Recycling Facility at 213 Mettel Road, Aurora, IL (Heartland) when they are open and accepting concrete materials. PCC shall be in segments no larger than two foot in any one dimension. PCC taken to Heartland shall be transported separately from all other materials. Failure to comply with the material acceptance procedures at Heartland could result in the assessment of “hard to handle” fees; the Contractor will not be compensated for any such fees should they be assessed." The City will test spoils for CCDD clearance and will most likely have CCDD clearance prior to the start of the project.
Is the contractor responsible for any permits or permit fees?
No
How many arrow boards are we to include in Line Item # 29?
Per SP S.1 - TRAFFIC CONTROL AND PROTECTION, "The Contractor shall obtain, erect, maintain, and remove all signs, barricades, flaggers, and other traffic control devices as may be necessary for the purposes of regulating, warning, or guiding traffic." The amount of arrow boards is to the contractor's discretion.
J & S would like to know the exact location of the water services to be replaced, what neighborhood, what streets?
We do not know the streets yet.
Are all the water service installations anticipated to be by directional bore method? If so, what are the open cut copper water service bid items for?
We anticipate all the services to be directional drilled but there are cases where it is not feasible and open cutting will be needed.
OpenGov categories
- 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
- 91115 · C.I.P., Construction/Rehabilitation, Other than Buildings
- 91164 · C.I.P., Utilities
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91345 · Construction, Sewer and Storm Drain
- 91381 · Maintenance and Repair, Sewer and Storm Drain (Including Removal)
- 96800 · Public Works And Related Services