Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Lehman Rd Pump Station Improvements

Description

The City of Kyle's Lehman Pump Station and Ground Storage Tank Improvements project consists of the construction of a new ground storage tank, pump station, associated facility building, and supporting infrastructure to increase the City's water storage and pumping capacity. The improvements will include advanced instrumentation and control systems, on-site emergency power generation, and associated facilities necessary to support reliable and efficient water distribution operations. The project is intended to address increasing water demands within the City's southeastern service area, particularly Pressure Plane 1 (PP1), while improving overall system reliability, operational flexibility, pressure management, and fire protection capabilities. The improvements will also support the consolidation of pumping operations and provide additional system redundancy to maintain dependable water service. Upon completion, the upgraded Lehman facility will serve as a critical component of the City's water distribution system, providing the pumping and storage capacity needed to accommodate projected demands through 2038. The project will also establish infrastructure capable of supporting future expansion as the City continues to grow. Contract Price Mobilization Site and Right-of-Way Preparation, complete in place as detailed and specified Provide site retrofit and decommissioning of existing booster pump station facilities, including removal or abandonment in place of existing buildings, equipment, piping, valves, electrical systems, controls, foundations, and associated appurtenances as indicated in the Contract Documents; disconnection and capping of existing utilities; lawful removal and disposal of demolished materials; backfilling, grading, and restoration of disturbed areas; and all incidental work required for a complete site retrofit and decommissioning, complete. Site excavation and embankment including topsoil management, rock and soil excavation, grading,compaction, debris removal and disposal, complete Provide and install concrete improvements, including pavement, sidewalks, curb and gutter, equipment pads, subgrade preparation, base materials, compaction, testing, pavement markings, and all associated appurtenances and incidental work, complete. Provide and install yard piping within property limits, including fittings, valves, connectors, trench excavation, vaults, backfill, compaction, DI and steel piping, complete Provide and install sanitary sewer piping outside of facility limits, including gravity sanitary sewer pipe, manholes, cleanouts, fittings, connections, appurtenances, trench excavation, bedding, backfill, compaction, testing, and connection to the existing City of Kyle sanitary sewer system at the property cleanout, including all associated work required for a complete and operational sanitary sewer installation, complete. Connectionsto offsite DI water mains, one 30-inch, one 16- inch, one 8-inch, complete with fittings, adapters, trench excavation and backfill, compaction, complete Provide and install a 3.0-million-gallon prestressed concrete ground storage tank in accordance with AWWA D110, Type III, and ACI 318, complete with foundation design and construction, internal piping, valves, flexible expansion joints, overflow piping and fittings, stairs and ladders, roof access hatches, vents, safety railing, level monitoring instrumentation, interior and exterior coating systems, hydrostatic testing, disinfection and chlorination, appurtenances, and all incidental work, including a two-year warranty, complete. Provide and install a complete active mixing system within the new 3.0-million-gallon ground storage tank, including mixer equipment, supports, mounting hardware, required tank connections or penetrations, electrical and controls coordination, SCADA coordination, testing, startup, appurtenances, and all incidental work required for a complete and operational system, including a two-year warranty, complete. Provide high-service pump station building, including doors, HVAC, restroom, interior crane system, electrical, complete Provide and install a high-service pump station consisting of three (3) horizontal split-case centrifugal pumps and motors in a dry-pit configuration, including suction and discharge manifold piping, isolation and control valves, flexible expansion joints, and all associated appurtenances. Work shall also include a complete control valve assembly including control valve, piping, fittings, and air release valves;two (2) electronic flow meters; start-up services; calibration, testing, and adjustment; disinfection; electrical power connections; integration with SCADA and communications systems; and all incidental work required for a fully operational system, including a two-year warranty on parts, labor, and equipment, complete. Provide and construct concrete foundation for high-service pump station, including excavation, backfill, compaction, complete Provide and install a complete on-site sodium hypochlorite generation and chemical-feed system within the disinfection room, including water softening equipment, brine generation, storage, and feed equipment, salt storage, electrolytic generation equipment, sodium hypochlorite storage tanks, chemical metering pumps, analyzers, process and chemical piping, valves, fittings, drains, ventilation equipment, instrumentation, electrical and control connections, safety equipment, testing, startup, training, and all associated appurtenances and incidental work required to provide a complete and operational disinfection system, including a two-year warranty, complete. Provide the complete GBRA SCADA interface system, including furnishing, mounting, programming, testing, and commissioning the GBRA RTU panel at the new pump station building. Provide a nominal 24-inch-high by 20-inch-wide by 8-inch-deep enclosure mounted on the exterior building wall, including required power, communications, interfaces with the facility control system, coordination, and all incidental work required for a complete and operational GBRA SCADA interface, complete. Provide and install SCADA equipment, including conduits, cables and conductors, control panels, switches, disconnects and programming, including testing and adjustments as directed by City of Kyle during start-up, complete Provide and install facility electrical, controls, emergency backup generator, diesel fuel system, and associated equipment for the pump station, including generator and on-site fuel tank, controls, monitoring equipment, automatic transfer switch, panels, conduits, conductors, cables, fittings, switches, disconnects, equipment connections, trench excavation and backfill, compaction, concrete foundations for generator and fuel tank, containment structure, permits and approvals, testing, start-up, and all incidental work required to provide emergency backup power and fully operational electrical and control systems for the pump station, complete. Storm drainage system including detention pond, piping riprap, including tank overflow, headwalls, trench excavation and backfill, compaction, tests, complete. Site security fencing, manual access gate, and automatic access gates, including concrete mow strip,security card readers, lighting, cameras, connections to SCADA including testing and adjustments, City of Kyle signage, complete. Provide revegetation of disturbed areas, including temporary irrigation, plants, seeds, mulch, fertilization, etc., complete. Provide pre-startup, testing, commissioning, and disinfection forthe complete project facilities, including tanks, yard piping, high-service pump station, pumps, motors, valves, meters, disinfection systems, mixing systems, electrical systems, generator, controls, SCADA, communications, and all associated equipment and appurtenances. Work shall include manufacturer representative start-up services, pump performance testing, calibration, functional testing, operational testing, disinfection, coordination with the City of Kyle during startup, adjustments, documentation, and all incidental work required to place the completed facilities into fully operational service, complete. Bid Alternate #1 Contract Price Mobilization Site and Right-of-Way Preparation, complete in place as detailed and specified Provide and install a complete active mixing system within the existing 0.5-million-gallon steel ground storage tank, including mixer equipment, supports, mounting hardware, required tank connections or penetrations, localized structural and coating repairs resulting from installation, electrical and controls coordination, testing, startup, appurtenances, and all incidental work required for a complete and operational system, including a two-year warranty, complete. Rehabilitate the existing 0.5-million-gallon welded steel ground storage tank in accordance with AWWA D100, including surface preparation, interior and exterior coating system rehabilitation, repairs to steelshell, roof, and appurtenances as required, replacement or refurbishment of piping, valves, vents, access hatches, ladders,safety railing, level monitoring instrumentation, overflow piping and fittings, hydrostatic testing (as applicable), disinfection and chlorination, appurtenances, and all incidental work, including a two-year warranty, complete. To include 2” overlay of asphalt pavement driveway and roadway. SCOPE OF WORK Scope of Work FOR THE DEVELOPMENT OF A 3.0 MG CONCRETE GROUND STORAGE TANK, PUMP STATION, AND DISINFECTION ROOM, ALONG WITH THE REHABILITATION OF AN EXISTING 0.5 MG GROUND STORAGETANK. ASSOCIATED IMPROVEMENTS INCLUDE BASE AND PAVEMENT, GRADING, DRAINAGE, UTILITIES, SITE RESTORATION, AND RELATED APPURTENANCES. INSTRUCTIONS REQUEST FOR PROPOSALS Invitation The City of Kyle's Lehman Pump Station and Ground Storage Tank Improvements project consists of the construction of a new ground storage tank, pump station, associated facility building, and supporting infrastructure to increase the City's water storage and pumping capacity. The improvements will include advanced instrumentation and control systems, on-site emergency power generation, and associated facilities necessary to support reliable and efficient water distribution operations. The project is intended to address increasing water demands within the City's southeastern service area, particularly Pressure Plane 1 (PP1), while improving overall system reliability, operational flexibility, pressure management, and fire protection capabilities. The improvements will also support the consolidation of pumping operations and provide additional system redundancy to maintain dependable water service. Upon completion, the upgraded Lehman facility will serve as a critical component of the City's water distribution system, providing the pumping and storage capacity needed to accommodate projected demands through 2038. The project will also establish infrastructure capable of supporting future expansion as the City continues to grow. Documents This Request for Proposals (“RFP” or “Solicitation”) is composed of all documents listed in the Attachments section of the Solicitation. Process The process described in this RFP is the Competitive Sealed Proposals process. This process is procedurally compliant with the competitive proposal processes prescribed by Texas Local Government Code Ch. 252 and Ch. 271. Changes The City may change or revise any of the contents of this Solicitation through the issuance of a written Addendum. Any explanation, clarification, interpretation or change to the Solicitation made in any other manner is not binding upon the City, and Offerors shall not rely upon such explanation, clarification, interpretation, or change. Oral explanations or instructions given before the award of the Contract are not binding. Review of Documents Offerors shall review the entire Solicitation, as revised. Offerors shall notify the Authorized Contact Person(s) listed on the Solicitation Cover Sheet in writing of any omissions, ambiguities, inconsistencies or errors in the Solicitation prior to Thursday, December 17, 2026 at 2:00 pm . Offerors shall also notify the City of any Solicitation contents the Offeror believes may be unreasonably restrictive. Cancellation The City reserves the right to cancel this Solicitation at any time for any reason and to resolicit the goods and services included in this Solicitation. COMMUNICATIONS AND MEETINGS Authorized Contact Persons The names and contact information for the authorized contact persons for this Solicitation. Tyron Wallace twallace@cityofkyle.com Questions Offerors shall submit any questions concerning this Solicitation in writing via the OpenGov eProcurement Portal . The City will respond to all questions received by Wednesday, December 2, 2026 at 12:00 am . The City will publish one or more Addenda displaying all timely received questions and the City’s responses to each for any information not already contained in the solicitation. Pre-Offer Conferences The City may hold one or more pre-offer conferences to review the Solicitation and to receive verbal questions. If a Pre-Offer Conference is planned, the date, location, time, and any other necessary information regarding this meeting will be displayed in the Solicitation Timeline. Attendance at any Pre-Offer Conference will be recorded and will be included in an Addendum published following the meeting. As the Solicitation is subject to changes (See Solicitation Instruction, Changes.) Offerors shall not rely on verbal exchanges that may occur at a Pre-Offer Conference. Offerors shall continue to submit all questions in writing. (See Solicitation Instructions, Questions.) Site Visits The City may hold one or more site visits to allow prospective Offerors to inspect the location(s) where work under any resulting contract will be performed and to receive verbal questions. If a Site Visit is planned, the date, location, time, and any other necessary information regarding this meeting will be displayed in the Solicitation Timeline. Attendance at any Site Visit will be recorded and will be included in an Addendum published following the meeting. As the Solicitation is subject to changes (See Solicitation Instruction, Changes.) Offerors shall not rely on verbal exchanges that may occur at a Pre-Offer Conference. Offerors shall continue to submit all questions in writing. (See Solicitation Instructions, Questions.) OFFER PREPARATION Offer Submittals Offerors intending to respond to this Solicitation must complete the PRICING PROPOSAL , VENDOR QUESTIONNAIRE and Technical Offer, as applicable. Offer Acceptance Period All Offers are valid for a period of one hundred and eighty (180) calendar days subsequent to the RFP closing date, unless a longer acceptance period is offered in the proposal. Proprietary and Confidential Information All Offers received and opened by the City are subject to the Texas Government Code, Ch. 552, and will be made available to the public. Offerors seeking to keep any portions of their Offer confidential shall mark each such portion as “Proprietary.” The City will, to the extent allowed by law, endeavor to protect such information from disclosure. The City may request a review and determination from the Attorney General’s Office of the State of Texas, of any Proposal contents marked as “Proprietary.” A copyright notice or symbol is insufficient to identify proprietary or confidential information. Cost of Offer Preparation and Participation Offerors are responsible for all costs related to the preparation of their Offer and incurred while participating in this Solicitation process. OFFER SUBMISSION Electronic Submissions Electronic Offers (electronic documents) shall be submitted to the City of Kyle using the OpenGov eProcurement Portal, available through https://procurement.opengov.com/portal/cityofkyle . To submit Electronic Offers using the OpenGov platform, Offeror’s must first be registered as a vendor with OpenGov eProcurement. All Offers in response to this solicitation may be submitted by visiting https://procurement.opengov.com/portal/cityofkyle/projects/320776 . Due Date and Time for Offers Offers in response to this Solicitation shall be submitted by Thursday, December 17, 2026 at 2:00 pm . Withdrawing Offers Offers submitted in response to this Solicitation may be withdrawn, revised, and resubmitted any time prior to Thursday, December 17, 2026 at 2:00 pm . Withdrawn offers may be resubmitted, with or without modifications, up to Thursday, December 17, 2026 at 2:00 pm . Late Offers Offers submitted after Thursday, December 17, 2026 at 2:00 pm will not be accepted. OFFER EVALUATION Basis of Competition The City may compare Offers based on groups or categories and will choose the basis of competition that best meets the City’s needs for the resulting contracts. The basis of competition for each RFP will be described in section "Evaluation of Offers" below. Minimum Responsiveness Proposals are Minimally Responsive when they include all of the Submittals listed in this Solicitation, completed and with sufficient detail in each to evaluate the Proposal in accordance with the Solicitation’s Instructions. Proposals that are not Minimally Responsive may be deemed non-responsive and rejected. Responsibility An Offeror is responsible if they have the financial and practical ability, resources, expertise, past performance, and positive compliance history with all City ordinances. An Offer may be rejected if an Offeror is determined to not be responsible. Clarifications Any time after the opening of Proposals, the City may contact Offerors to ask questions about their Proposal’s contents in order to better understand these contents as-written. Responses to clarification questions, whether done verbally or submitted in writing, do not change the Proposal’s contents. Clarifications are not to be confused with Discussions as described herein. Evaluation Offers that are Minimally Responsive will be evaluated based on the Evaluation Factors listed in Section "Evaluation of Offers" of the Solicitation Instructions. Evaluation Factors correspond to their specified Submittals and shall indicate their respective weighting next to each. Offer submittals not identified as Evaluation Factors will be evaluated on a pass/fail basis in accordance with the Solicitation’s Instructions and any further instructions within each Solicitation. Although minimum responses are required in all Submittals, the Submittals identified as Evaluation Factors will be used to differentiate the Offers and to identify which Offer(s) represent the Best Value to the City. The City’s evaluation may be made without Clarifications or Discussions with Offerors. Offers should, therefore, include the Offeror’s most favorable terms. Interviews/Presentations The City may require that one or more Offeror submitting the highest rated Offers participate in interviews and/or presentations. CONTRACT AWARD AND EXECUTION Award Determination City staff will recommend Contract award to the Offeror(s) submitting the highest rated Offer(s) based on the Evaluation Factors set forth in this Solicitation. The Award Determination will be published and notice will be sent to all Offerors subscribed to the Solicitation. Multiple Awards If the City determines that multiple contracts are needed, the City will award one or more additional contracts to the Offeror(s) submitting the next highest rated Offer(s). Contract Execution Contracts within the City Manager’s authority will be awarded and executed simultaneously. Contracts above the City Manager’s authority will be executed following their authorization by the Kyle City Council. ADMINISTRATIVE MATTERS Solicitation File All documents included in this Solicitation, and all timely recei

Published attachments
Addenda and notices
Public questions and answers
  • In the instruction to bidders for the project above it only mentions bid bonds for the bid guaranty. Would we be able to use a cashier's check in lieu of a bid bond?

    The Instructions to Bidders currently identify a bid bond as the required form of bid guaranty. Since the solicitation does not identify a cashier's check as an acceptable alternative, the City will require bidders to submit the bid guaranty in the form specified in the solicitation.

  • Do you have an engineer's estimate for this project?

    The OPCC is $22,969,000.

  • Is there a CAD File be available for this project?

    The CAD file will be reserved for the contractor that is awarded the contract.

  • Would you please post the Prebid Sign in Sheet?

    This has been added to the official notices.

  • Would Rolls-Royce MTU and/or Gillette be considered approved manufactures if we meet or exceed all specifications?

    Product compliance with the specified structural, testing, and warranty requirements will be reviewed through the standard submittal process following contract award. Any formal substitution requests must follow the procedures outlined in Section 01 25 00 and be submitted by the awarded Contractor after the contract begins.