State and local · OpenGov
Lift Repair and Inspection
Description
Volusia County is seeking bids for annual inspections and repair of our 2 and 4 post automotive lifts, 4 post heavy truck lifts, and mobile column lifts. Vendors shall only bid on lifts that they are a manufacture authorized service provider for. Scope of Work Automotive Lift Repair and Inspections Volusia County is seeking bids for annual inspections and repair of our 2 and 4 post automotive lifts, 4 post heavy truck lifts, and mobile column lifts. Vendors shall only bid on lifts that they are a manufacture authorized service provider for. Location All inspection and repairs will be done at our 4 locations: 1270 Indian Lake Road Daytona Beach, FL 32124 2415 Tomoka Landfill Road Port Orange, Fl 32128 112 Carswell Ave, Holly Hill FL.32117 200 SR 415 Osteen, Fl.32764 1344 Tractor Way Orange City, Fl 32763 Lift Inspection All inspections shall be conducted in accordance with ANSI/ALI ALOIM (current edition) Safety Requirements for the inspection and maintenance of automotive lifts. Parts, Service and Repair of Automotive Lifts All materials and parts received shall be of “first use”, free of any breaks, cracks, splits, wear, corrosion, and all other defects. All materials and parts furnished shall be guaranteed for not less than ninety (90) days from the date of receipt or installation of item (s) in satisfactory working condition. All repairs shall be guaranteed for not less than ninety (90) days from the date of receipt or repair of item (s) in satisfactory working condition. Service Vendor shall have a field service technician with service vehicle equipped to perform inspections and repair of automotive lifts, the technician shall have the ability to perform warranty and non-warranty repairs in the field when necessary. B. Vendor shall supply a labor rate for field service, travel time and mileage if applicable. The rate provided shall include all costs associated with the rate. C. All repairs are to be covered by parts and service warranty. D. Vendor shall respond to calls for service within three (3) working days. E. Vendor shall not respond to calls for service after hours unless has prior approved by Operations Manager. Pricing Award will be made based on the Yearly Inspection Pricing and Labor Rates as deemed in the best interest on the County. Bidder(s) do not need to complete all items to be considered responsive. Vendor shall provide pricing for OEM parts at MSRP minus a fixed % percent discount. The % percent discount shall remain fixed through the term of the contract. Vendor may provide pricing for Non-OEM parts. Non-OEM parts shall be priced at a cost plus a fixed % percent mark up. The % percent mark up shall remain fixed through the term of the contract. The use of non-OEM parts shall be approved by the County project manager. OEM Parts/Non-OEM parts percentages will not be used for award purposes. Report and Certification Defects found during the inspection and tests are classified for degree of severity and printed on a computerized report. If the inspection reveals that repairs or rework are required by the customer, details of the work will be outlined on the report. The Contract Vendor’s technician will review the initial report with the County Project Manager. A signed and dated copy of the initial test report listing any defects is left with the County Project Manager. I f repairs or rework need to be completed before the equipment is certified, the Contract Vendor will provide any additional inspections needed for the equipment to be certified. The final test is reviewed by the Contract Vendor’s staff engineers and the final report is mailed to County Project Manager. The Contract Vendor retains a copy of the test report on file. The final test/inspection report must be mailed to the County Project Manager within 30 days of the final inspection. Introduction Summary Background Contact Information Timeline Special Terms and Conditions Closing Date and Pre-Solicitation Conference A. Invitation to Bid (ITB) Closing Date Response must be received through the County's eProcurement Portal before 3:00 pm on Thursday, December 17, 2026 . Responses received after this time will not be considered. B. No Pre-solicitation Conference will be held. Authorized Official The Solicitation response and all required forms must be submitted/signed by an official authorized to legally bind the Respondent to all Solicitation provisions. A Memorandum of Authority may be submitted to document that the individual is authorized to commit the firm to a contract. Definition of Responsive and Responsible for this Solicitation Each Response shall be evaluated for conformance as responsive and responsible using the following criteria: Proper submittal of ALL documentation as required by this Invitation to Bid (ITB) . (Responsive) The greatest benefits to Volusia County as it pertains to: (Responsible) Cost; Award will be made based on the Yearly Inspection Pricing and Labor Rates as deemed in the best interest on the County. Bidder(s) do not need to complete all items to be considered responsive; Vendor shall respond to calls for service within 3 working days. Past Performance. In order to evaluate past performance, all Respondents are required to submit a list of three (3) references / relevant projects completed within the last three (3) years that are the same or similar in magnitude to this Solicitation. The County of Volusia shall not be listed as a reference; All technical specifications associated with this Invitation to Bid (ITB) Financial Stability: All Respondents shall be prepared to supply a financial statement upon request, preferably a certified audit of the last available fiscal year. Respondents are reminded that award may not necessarily be made to the lowest Response. Rather, award will be made to the lowest responsive, responsible, Respondent whose Response represents the best overall value to the County when considering all evaluation factors. Local Preference Availability This project is not funded by monies that prohibit the local preference provision and local preference does apply per the General Terms and Conditions section Local Preference. Payment Terms 1. The County will remit full payment on all undisputed invoices within forty-five (45) business days from receipt by the appropriate person(s) (to be designated at time of Agreement) of the invoice(s) or receipt of all products or services ordered. 2. Pursuant to Chapter 218, Florida Statutes, the County will pay interest not to exceed one percent (1%) per month on all undisputed invoices not paid within thirty (30) days after the due date. 3. The County has the capability of Electronic Funds Transfer (EFT). List any discounts for prompt payment and/or willingness to accept Electronic Funds Transfer (EFT) and the discount to be applied to such payments. Contractor s offering prompt payment discounts, for example 1% - net 10, the discount shall be taken if the check issue date is within specified time period from date of invoice. By submitting a Response to the County of Volusia, Florida, the Respondent expressly agrees that, if awarded an Agreement, the County may withhold from any payment monies owed by the Respondent to the County for any legal obligation between the Respondent and the County, including, but not limited to, real property taxes, personal property taxes, fees, and commissions. Award Term The County is looking to promote partnership relationships within the policies and procedures of public procurement. Pursuant toward that end, the successful Respondent shall be awarded an Agreement for an initial three (3) year term with the option for two (2) subsequent one (1) year renewals . All renewals will be contingent upon mutual written agreement and, when applicable, approval of County Council. Price Redeterminations Once each year during the term of the Agreement, including any extension or renewal periods thereof, the awarded Respondent may, but is not obligated to, petition the Director of Purchasing and Contracts for one or more price redeterminations where such price redetermination(s) is/are necessitated by documented increases in the cost of wages, fuel, or materials. Petitions for price redeterminations shall be made within thirty (30) days of the anniversary date of the Agreement (i.e., the calendar day and month when the Agreement became effective) and only after the Agreement has been in effect for at least one year. Any such petition shall be made pursuant to the provisions of this section and only for those price redetermination categories specified herein. Unless otherwise expressly set forth in this Agreement, no other price redeterminations shall be allowed. All price redeterminations, once issued, shall be prospective from the date of approval unless otherwise approved by a duly executed amendment to this Agreement. Basis for Price Redeterminations The awarded Respondent may petition the Director of Purchasing and Contracts for price redetermination based on the increased costs of wages, fuel, or materials. Price redeterminations will be based solely upon changes in pricing or costs documented by either the Employment Cost Index (ECI) or Producer Price Index (PPI), whichever is applicable, as published by the Bureau of Labor Statistics. The base index number for the ECI will be for the quarter in which the Invitation to Bid (ITB) opens. The base index number for the PPI will be for the month the Invitation to Bid (ITB) opens. Any subsequent price redeterminations will use the last price redetermination approved for that price redetermination category as the “base index number.” The County shall have the right to audit the awarded Respondent’s records, including, but not limited to, payroll, materials, and fuel cost records, to verify or otherwise investigate the validity of any price redetermination request. Wage Price Redetermination When requesting a price redetermination based upon an increase in wage costs, the awarded Respondent shall refer to and utilize the Employment Cost Index, Total Compensation, Private Industry, Index Number and Occupational Group as prepared by the Bureau of Labor Statistics in the U.S. Department of Labor https://stats.bls.gov/data/. The base figure will be tied to Installation, maintenance, and repair under the heading Service Providing Industries. Wage price re-determination increases shall be granted only by reason of wage increases associated with the awarded Respondent’s employees or Subcontractor performing work or services pursuant to the Agreement. Minimum Wage Price Redetermination. If the minimum wage increases during the term of the Agreement, including any renewal or extension period thereunder, the awarded Respondent may petition the Director of Purchasing and Contracts for price redetermination for those job categories where the pay to the awarded Respondent ’s employee(s) is the current minimum wage. Upon verification of the information provided, the County will grant an increase of exactly the amount of the minimum wage increase (not the percentage increase). The awarded Respondent must increase the pay to the employee(s) by the amount the awarded Respondent has requested, which shall not exceed the amount of the minimum wage increase. The amount paid to the awarded Respondent will be the increase plus any written and documented increase in FICA, Medicare, and Workers' Compensation insurance. The awarded Respondent must supply written documentation of any other increase that is beyond the scope and control of the awarded Respondent. All written documentation must satisfy the reasonable expectations of the Director of Purchasing and Contracts and Internal Auditor. Example: Minimum wage increases from $7.31 to $7.56 per hour. The awarded Respondent may petition for an increase of $0.25 per hour to be paid to the affected employee(s) and shall provide written and documented cost increases for FICA, Medicare and Workers' Compensation. The resulting increase in costs shall be incorporated into fees/rates billed to the County. If the awarded Respondent bills the County at a higher price according to any price redetermination granted by the County, and the awarded Respondent fails to increase the hourly rate paid to the employee for the same period, the awarded Respondent will be considered in Agreement default and the Agreement will be immediately terminated. Fuel Price Redetermination If/when the price of fuel increases by a minimum of ten (10%) percent, the awarded Respondent may petition the Director of Purchasing and Contracts for a fuel price redetermination. As a condition of petitioning for a fuel price increase, the awarded Respondent shall be required to petition for a fuel price redetermination decrease if/when the price of fuel decreases by a minimum of ten (10%) percent. Failure to make such petition may be grounds for Agreement termination and shall entitle the County to a refund of the cumulative increase in pay to the awarded Respondent due to any prior fuel price redetermination increase(s). Fuel price redetermination must be based solely upon changes as documented by the Producer Price Index (PPI) for the commodities “Unleaded Gasoline - WPU057104” or “#2 diesel fuel - WPU057303,” as such may be applicable to the awarded Respondent’s operations in connection with the awarded Respondent’s performance of the Agreement. Materials Price Redetermination At the anniversary date of the Agreement, the awarded Respondent may petition the Director of Purchasing and Contracts for a materials price redetermination. As a condition of petitioning for a materials price increase, the awarded Respondent shall be required to petition for a materials price redetermination decrease if/when the price of materials used by the awarded Respondent in connection with the Agreement decreases. Failure to make such petition may be grounds for Agreement termination and shall entitle the County to a refund of the cumulative increase in pay to the awarded Respondent due to any prior materials price redetermination increase(s). Materials price redetermination must be based solely upon changes as documented by the Producer Price Index (PPI) for the commodity “ N/A ", as published by the Bureau of Labor Statistics. Price Redetermination Calculation All Price Redeterminations shall be calculated as follows: Example: awarded Respondent indicated on the Submittal Form that thirty percent (30%) of the cost to provide the product/service is directly attributed to the redetermination category (wages, fuel, or materials). Current applicable PPI $200.50 Base index PPI -$179.20 PPI increase dollars $21.30 PPI increase percentage ($21.30 / $179.20 = .1189) 11.9% Unit cost of the service is $100.00 30% of $100.00 is directly attributed to the redetermination category $30.00 $30.00 × 11.9% $3.57 New unit price for the product/service is ($100 + $3.57) $103.57 Expiration Upon Failure to Agree to Price Redetermination If the County and the awarded Respondent cannot agree to a price redetermination pursuant to the terms and conditions of this section, then the Agreement will automatically expire without penalty or further expense to either party after a period of six (6) months following the awarded Respondent’s initial request for such price redetermination. Requests for price redeterminations not made in accordance with the provisions of this section shall be deemed null and void and shall not be a valid reason or pretext for expiration or termination of the Agreement. If the Agreement expires pursuant to the terms and conditions of this section, the County reserves the right, at no expense, penalty, or consequence to the County, to award any remaining tasks thereunder to the next available most responsive and responsible Respondent. Termination County may terminate this Agreement upon at least thirty (30) days prior written notice to awarded Respondent. Awarded Respondent may terminate this Agreement upon at least one hundred twenty (120) days prior written notice to County. Upon receipt of notice of termination by the County from awarded Respondent or upon delivery of notice of termination from the County to Contractor , awarded Respondent shall: Stop Work under the Agreement on the date and to the extent specified in County’s Notice of Termination; Inform County of the extent to which performance is completed; Place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work/Services under the Agreement as is not terminated and with the prior approval of the County; and, Assign to the County, in the manner, at the times, and to the extent directed by the County, all of the right, title and interest of the awarded Respondent under the orders and subcontracts so terminated. For all undisputed outstanding invoices submitted to the County prior to the effective date of the termination and subject to Section Award Term, Section Payment Terms and this Section Termination, the County shall cause payments to be made to awarded Respondent within twenty (20) business days of receipt of invoice. Awarded Respondent shall invoice the County for any sums awarded Respondent claims to be owed by County under this Agreement for Work performed from the last invoice to the effective date of termination. County shall review such invoice for payment and County shall pay any undisputed amount within twenty (20) business days. With the approval of the County and to the extent required by the County, the awarded Respondent shall, upon termination, settle all outstanding liabilities and all claims arising out of such termination. County's approval of such settlements shall be final for all the purposes of a termination under this Section Termination. In addition, awarded Respondent shall transfer title and deliver to the County, in the manner, at the times, and to the extent, if any, directed by the County, Deliverables, work-in-progress, reports, models, studies, and other materials produced as a part of, or acquired in connection with the performance of the Work/Services terminated. If awarded Respondent fails to cure a breach within ten (10) calendar days after receipt of notice from the County of said breach, the County may take over the Work/Services and complete the Work/Services, and the awarded Respondent shall be liable to the County for any increased cost of the Project reasonably incurred by the County to complete the awarded Respondent's unfinished Work/Services. As such, the County may apply unpaid Compensation due and owing to the awarded Respondent prior to the default as a set off against the costs incurred by the County for taking over such Work/Services. The right of termination provided to the County and the awarded Respondent herein shall be cumulative of all other remedies available at law. All provisions of this Agreement which impose or contemplate continuing obligations on a party will survive the expiration or termination of this Agreement. New Material Unless otherwise provided for in this specification, the awarded Respondent represents and warrants that the goods, materials, supplies, or components offered to the County under this Agreement are new, not used or reconditioned, and are not of such age or so deteriorated as to impair their usefulness or safety and that the goods, materials, supplies, or components offered are current production models of the respective manufacturer. If the awarded Respondent believes that furnishing used or reconditioned goods, materials, supplies, or components will be in the County’s interest, the awarded Respondent shall so notify the County Procurement Analyst in writing by the deadline for questions in accordance with section Revisions, Addenda, Questions & Answers. The
OpenGov categories
- 07544 · Lifts and Hoists, Floor Type: Electric, Hydraulic, or Pneumatic
- 92947 · Lifts and Hoists, Maintenance and Repair