Description
This project is intended to improve the reliability, resiliency, and operational performance of the City of Plant City’s wastewater lift station communication network. The City operates 55 lift stations and seeks to modernize the existing Remote Terminal Unit (RTU) communication platform to support enhanced system visibility, operational efficiency, and long‑term infrastructure resilience. This project will be partially funded through a Federal Emergency Management Agency (FEMA) grant awarded by the Florida Division of Emergency Management (FDEM). All work performed, expenditures incurred, and project related actions shall be conducted in accordance with the terms and conditions of the Sub-Recipient Agreement Checklist HMGP contract no. H1319, attached. Table 1: Lift Station Communication Materials (Site-Specific) Mobilization / Demobilization LS-001 RTU Material Only (panel) LS-002 RTU Material Only (panel) LS-003 RTU Material Only (panel) LS-004 RTU Material Only (panel) LS-005 RTU Material Only (panel) LS-006 RTU Material Only (panel) LS-007 RTU Material Only (panel) LS-008 RTU Material Only (panel) LS-009 RTU Material Only (panel) LS-010 RTU Material Only (panel) LS-011 RTU Material Only (panel) LS-012 RTU Material Only (panel) LS-013 RTU Material Only (panel) LS-014 RTU Material Only (panel) LS-015 RTU Material Only (panel) LS-016 RTU Material Only (panel) LS-018 RTU Material Only (panel) LS-020 RTU Material Only (panel) LS-021 RTU Material Only (panel) LS-022 RTU Material Only (panel) LS-023 RTU Material Only (panel) LS-024 RTU Material Only (panel) LS-025 RTU Material Only (panel) LS-026 RTU Material Only (panel) LS-027 RTU Material Only (panel) LS-028 RTU Material Only (panel) LS-029 RTU Material Only (panel) LS-030 RTU Material Only (panel) LS-031 RTU Material Only (panel) LS-032 RTU Material Only (panel) LS-033 RTU Material Only (panel) LS-034 RTU Material Only (panel) LS-035 RTU Material Only (panel) LS-036 RTU Material Only (panel) LS-037 RTU Material Only (panel) LS-038 RTU Material Only (panel) LS-039 RTU Material Only (panel) LS-040 RTU Material Only (panel) LS-041 RTU Material Only (panel) Table 2: Labor (Project-Wide) Field Technician I Field Technician II Field Technician III Supervisor/Foreman HMI/PLC/SCADA Engineer Scope of Services, Specifications, and Requirements Lift Station Communication Improvement Scope of Work The City of Plant City is soliciting qualified contractors to provide engineering design and implementation services for a comprehensive communication system upgrade for 54 wastewater lift stations. The selected contractor will develop a complete system design and furnish fully pre‑configured, pre‑packaged communication assemblies for each lift station. The scope includes deployment of a new cellular‑based communication network, replacement or integration of communication hardware, and all necessary configuration to ensure seamless connectivity with the City’s SCADA system. The contractor shall deliver a turnkey solution that meets the City’s expectations for performance, reliability, and redundancy, while supporting future scalability and system expansion. All work must be consistent with FEMA grant requirements, emphasizing system hardening, operational continuity, and improved disaster resilience. Field Remote Terminal Unit (RTU) components shall be able to be replaced without programming. Installation must be performed by a licensed electrical contractor. System startup shall be performed by an employee of the system supplier. This scope of Work supersedes the Scope of Work listed in the FEMA grant. The work not listed in the FEMA grant will be locally funded. Warranties The Contractor shall warrant all materials and labor furnished under this Contract for a minimum period of two (2) years from the date of City acceptance. During the warranty period, the Contractor shall, at no additional cost to the City, promptly repair or replace any defective materials, equipment, or workmanship discovered or reported. Any applicable warranty period shall commence only upon formal acceptance of the Work by the City. The Contractor shall perform all Work in full compliance with the manufacturer’s warranty requirements and in accordance with all applicable repair manuals and procedures. Project Summary Project Summary This project is intended to improve the reliability, resiliency, and operational performance of the City of Plant City’s wastewater lift station communication network. The City operates 55 lift stations and seeks to modernize the existing Remote Terminal Unit (RTU) communication platform to support enhanced system visibility, operational efficiency, and long‑term infrastructure resilience. This project will be partially funded through a Federal Emergency Management Agency (FEMA) grant awarded by the Florida Division of Emergency Management (FDEM). All work performed, expenditures incurred, and project related actions shall be conducted in accordance with the terms and conditions of the Sub-Recipient Agreement Checklist HMGP contract no. H1319, attached. NO VALUE Submittal Deadline and Bid Opening Bids may be received up to but not later than 2:00 pm local time on Thursday, December 3, 2026 via the City e-Procurement Portal located at https://procurement.opengov.com/portal/plantcitygov . The City e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The City of Plant City strongly recommends completing your response well ahead of the deadline. No Pre-Proposal Meeting There is no pre-proposal meeting for this RFP. Questions Plant City Procurement Department is the only staff designated and authorized to answer questions about this RFP. Bidders may rely only on written responses or interpretations from the Procurement Department. Verbal and/or written responses given by other City staff in response to RFP questions shall not be binding on the City. The deadline to submit questions is not later than 2:00 pm local time on Monday, November 16, 2026 . Bidders should submit all questions regarding this bid via the City's eProcurement portal, located at https://procurement.opengov.com/portal/plantcitygov. All answers to questions and addendums will be posted via the City's eProcurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to all questions. Submittal Instructions Submittal Location & Deadline Bids may be received up to but not later than 2:00 pm local time on Thursday, December 3, 2026 via the City e-Procurement Portal located at https://procurement.opengov.com/portal/plantcitygov . The City e-Procurement Portal Clock is the official clock for the determination of all deadline dates and times. The City of Plant City strongly recommends completing your response well ahead of the deadline. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. Valid Terms Responses shall be valid for no less than 90 days from the date the City opens the responses. Rejection The City reserves the right to reject any or all responses at any time and for any reason or no reason. Responses submitted after the deadline shall be rejected. Fax, e-mail, or telephone bids shall be rejected. Responses that are incomplete, unbalanced, conditional, obscure, or which contain terms or additions not called for, alterations or irregularities of any kind, or which do not comply with the contract documents, if applicable, may be rejected at the sole discretion of the City. Forms Submittals shall be made as described and required herein. Required forms shall be signed by the company owner or other legally authorized individual(s). Contract Term The contract resulting from this Request for Proposals shall become effective upon execution by the City and shall remain in effect through May 28th, 2028. Fee Fees shall be firm for the initial term of this agreement. Contract Documents The Contract attached hereto is a draft of the Contract required by the City to award the project described in this Request for Proposals. It is the Respondent’s responsibility to review and understand the Contract. If the Respondent requires any modifications or additional terms and conditions to the Contract, they shall detail the desired changes and submit them under the Tab, clearly titled “Additional Terms/Modifications”. That page then must be attached to the response form and submitted as part of the respondent’s proposal. Contract modification requests after the Request for Proposals has been submitted shall not be considered. Licenses The Contractor shall be properly licensed and qualified to perform all services included in the Work. At a minimum, the Contractor shall hold, or utilize properly licensed subcontractors holding, all licenses required by law, including a Professional Engineer (PE) license for design services, when applicable. The Contractor shall also obtain and maintain any other licenses, permits, certifications, or approvals required by federal, state, or local law for completion of the Project. Insurance Requirements In submitting a proposal the respondent affirms that if selected the following insurance will be provided as an attachment to their contract. Workers’ Compensation Insurance: Awardee shall procure and maintain during the life of this contract Workers’ Compensation Insurance for all of its employees to be engaged in work on the Project under this Contract, and in case any such work is sublet, Contractor shall require the Subcontractor similarly to provide Workers’ Compensation Insurance for all the Subcontractor’s employees to be engaged in such work unless such employees are covered by the protection afforded by Contractor’s Workers’ Compensation Insurance. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers’ Compensation statute, Contractor shall provide and shall cause each Subcontractor to provide adequate insurance for the protection of such of its employees not otherwise protected. Contractor shall indemnify and hold the City of Plant City harmless for any claim made by the Subcontractor for Workers” compensation. Note: If Contractor claims to be exempt from Workers’ Compensation Insurance, then a Certificate of Exemption from the State shall be produced upon request. Comprehensive Liability and Property Damage Insurance: Awardee shall procure and shall maintain during the life of this contract Comprehensive Liability Insurance in an amount satisfactory to Owner, but not less than $300,000.00 for injuries, including accidental death, to any one person, and subject to the same limit for each person, in an amount not less than $1,000,000.00, on account of one accident, and Property Damage Insurance in an amount not less than $1,000,000.00. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The City of Plant City shall be named as additional insured on the policy. Comprehensive Automobile Liability Insurance: Awardee shall procure and shall maintain during the life of this contract Comprehensive Automobile Liability Insurance in an amount of $500,000.00. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The City of Plant City shall be named as additional insured on the policy. Subcontractor’s Comprehensive Liability and Property Damage Insurance: The Awardee shall require each of its subcontractors to procure and maintain during the life of their contract Comprehensive Liability and Property Damage insurance coverage in amounts satisfactory to the contractor for its protection, with an insurance company or companies licensed to do business in the State of Florida. Professional Liability Insurance: Awardee shall procure and shall maintain during the life of this contract and for a period of three (3) years after the Project is completed, Professional Liability insurance in the amount of $1,000,000 for Consultant’s errors and omissions, exclusive of defense costs. If policy provides coverage on a claims-made basis, such coverage must respond to all claims reported within at least three (3) years following the period for which coverage is required, unless a longer period is indicated in the Contract. The certificate of insurance shall include as a certificate holder: City of Plant City Attn: City Manager 302 West Reynolds Street Plant City, FL 33563 Indemnification Section 1-15, Plant City Code, prohibits the City from indemnifying other parties to an agreement. Therefore, the City cannot indemnify respondents. All-Inclusive Cost Prices given by respondents shall include all costs associated with the product or service proposed. Preparation & Submittal Expenses The City shall not be responsible for any expense incurred by a respondent in reviewing, evaluating, preparing, or submitting a response. Respondents are solely responsible for the entire expense of responding to this solicitation. Proposal Format The respondent shall submit a proposal to the City meeting the minimum requirements identified. The requirements stated herein do not preclude the proposer from furnishing additional information as deemed appropriate. Submittal deviation from the minimum requirements stated herein may be cause for rejection from further consideration. Confidentiality If a Respondent wishes to claim confidentiality on any information provided in their response, any/all such information must be submitted with the their original bid through the city's e-Procurement system located at https://procurement.opengov.com/portal/plantcitygov . Additional Services The City may require additional goods and services outside the original scope for related services. The cost will be separately negotiated at the time of the request. Contract Execution & Bid Bond The selected bidder must sign and return the contract, any required bonds or letter of credit, insurance certificates, and all other required documents within 14 calendar days after the City sends the documents to the selected bidder. Once the City receives the signed contract and all other required documents back from the selected bidder, then the City’s authorized representative will sign the contract. Failure to sign and return the contract and all other required documents within 14 calendar days may result in the City calling the bid bond or cashing the cashier’s check submitted by the selected bidder with its proposal; barring the selected bidder from consideration on future projects; or both. The City may then select another bidder to perform the work or provide the goods/services specified in this bid. Payment and Performance Bond If Payment and Performance Bond is required, it shall be for the amount of the contract. The contractor shall be responsible for recording the payment and performance bond before commencing the work, the contractor shall provide to the City Clerk a certified copy of the recorded bond. As required by 255.05, Florida Statutes, the City may not make any payments to the contractor until the City Clerk receives the certified copy of the recorded bond. Respondent Responsibilities Proposal Response: Review Documents. Respondent must review all plans, specifications, and contract documents related to this RFP. Failure to review all plans, specifications, forms, contracts, addenda, or other documents shall not relieve Respondent from any obligations contained in this RFP or subsequent contracts with the City. Submittal of Proposals shall serve as Respondent’s acknowledgement that it has reviewed and understood all of the RFP requirements and documents. Fill-In Required Forms. Respondents submitting must accurately and completely fill-in the response forms included in the Vendor Requirements & Acknowledgements Section. Respondent must submit those forms along with other documents listed in this section and elsewhere in this RFP. Authorized signatures must be included on forms/documents. Incomplete or missing forms/documents may result in rejection of Respondent’s submittal. Legal Requirements. Respondents are required to comply with all provisions of federal, state, county and local laws, ordinances, rules and regulations that are applicable to the services being solicited in this bid. A respondent’s lack of knowledge shall in no way be a cause for relief from responsibility, nor shall it constitute a cognizable defense against the legal effects thereof. Submittal of a response shall constitute the respondent’s affirmation that they are familiar with and shall comply with all federal, state, and local laws, ordinances, rules and regulations which affect those engaged or employed in the provision of such services, or equipment used in the provision of such services, or which in any way affects the conduct of the provision of such services. No plea of misunderstanding shall be considered on account of the respondent’s ignorance thereof. If a respondent believes provisions in the solicitation are contrary to or inconsistent with any law, ordinance, or regulation, then the respondent shall promptly report those provisions in writing to the City. Performance Requirements: Unauthorized Alien(s) The vendor agrees that unauthorized aliens shall not be employed nor utilized in the performance of the requirements of this solicitation. The City shall consider the employment or utilization of unauthorized aliens a violation of Section 274A(e) of the Immigration and Naturalization Act (8 U.S.C. 1324a). Such violation shall be cause for unilateral termination of this Agreement by the City. As part of the response to this solicitation, the successful firm will complete and submit the attached form “AFFIDAVIT CERTIFICATION IMMIGRATION LAWS.” Employers may avail themselves of a program by the U.S. Immigration and Customs Enforcement called E-Verify. E-Verify is an Internet-based system operated by U.S. Citizenship and Immigration Services (USCIS), part of the Department of Homeland Security (DHS), in partnership with the Social Security Administration (SSA). E-Verify is currently free to employers. E-Verify provides an automated link to Federal databases to help employers determine employment eligibility of new hires and the validity of their Social Security numbers. If your company wishes to avail themselves of this program, you can register online for E-Verify at http://www.dhs.gov/how-do-i/verify-employment-eligibility-e-verify which provides instructions for completing the registration process. At the end of the registration process, you will be required to sign a Memorandum of Understanding (MOU) that provides the terms of agreement between you as the employer, the SSA, and DHS. An employee who has signatory authority for the employer can sign the MOU. Employers can use their discretion in identifying the best method by which to sign up their locations for E-Verify. To find out more about E-Verify, please visit E-Verify | USCIS or contact USCIS at 1-888-464-4218. Schedule of Subcontracting- Respondents who will be subcontracting any portion of the work shall state name, address and service discipline of proposed sub-contractor. The City reserves the right to accept or reject any proposed sub-contractor. Sub-contractor changes or additions during the performance of the resulting contracts for the RFP shall require prior approval by the
Published attachments
- Federally Funded Subaward and Grant Agreement - Utilities Dept. Communication Tower - Signed
- 2026-10-15_Lift_Station_Communication_Improvement_ - Revised
- LiftStation_Locations
- LSMAP_Locations
- SECTION012213_Measurement_and_Payment - Revised
- Pages from Draft SCADA Evaluation Rpt_Referenceonly
- Lift Station Location_2026
- SampleIO_LS2
- Lift_Station_Communication_Improvement_(FEMA)_(Addendum_#4_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum. The Questions Deadline has been changed to 11/16/26 by 2:00pm. The Receiving Date has been changed to 12/3/26 by 2:00pm. The 1st Committee Meeting has been moved to 12/21/26 at 11:00am. The 2nd Committee Meeting has been moved to 1/5/26 at 11:00am.
Addendum #3 · 3
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
Please use the See What Changed link to view all the changes made by this addendum. FEMA Attachment H - Debarment Form has been added to required documents. Lift Station Communication Improvement attachment has been revised. Measurement and Payment attachment has been revised. Language has been updated in Section - Ability to Furnish the Required Services.
Public questions and answers
What is the combined potential budget estimate of this project.
The total budget of Lift Station communication project is $479,400.
Is the desire to replace existing pump stations panels as well add new communications.
No. The pump station panel will be handled as a separate project.
IS the desire to have cell based installations back to a carrier cell gateway? Or is the desire to have a closed network?
Prefer cell based. Any recommendation shall be coordinated with the City's Information Technology (IT) Department and work with network standards and security protocols.
Will the City permit proposers to replace the existing DFS controllers and communications equipment with an alternative PLC/RTU platform, provided the proposed solution fully integrates with the City's existing SCADA system and meets all RFP requirements? Depending on the number of existing DFS controllers that would require replacement or modification to support cellular communications, implementing an alternative platform may offer a comparable or more cost-effective solution. Please clarify whether an alternative PLC/RTU platform may be proposed as part of the base bid or if it must be submitted as a separately priced alternate. Additionally, please confirm whether the City has any requirements or preferences regarding the continued use of DFS equipment.
The City intends to replace the existing DFS system at each lift station. For bid pricing, any physical equipment and materials required to replace the existing DFS system at an individual lift station shall be included under the applicable line item for that specific lift station. Any platform, hardware, software, integration, configuration, or other components required to enable the new DFS system to function across the system shall be included under Line Item No. 65 – Master Communication Equipment/Data Management. All labor cost should be included in the table 2.
What is the approximate budget, or estimate, for this project?
The total budget of Lift Station communication project is $479,400.
Given the scale, complexity, and remaining unknowns associated with this opportunity, would the City consider extending the proposal submission deadline by 30–40 days? We are very interested in this opportunity and want to provide a thorough, well-developed proposal with a scope, approach, schedule, and pricing the City can rely on. Additional time would allow us to assess the requirements more fully and prepare a responsive, high-quality submission.
The receiving date has been moved to December 3, 2026 at 2:00pm.
Will the city provide, to the winning consultant, current project drawings, panel schedules, IO lists, etc.?
The City can provide available record drawings for the lift stations. However, record drawings are not available for all. Bidders should be aware that the availability and completeness of record drawings may vary by site.
How many pumps are there per site?
The information is included in the attachment H.
For sites that have like-number of pumps (e.g., duplex), can it be assumed that the IO list is effectively identical among those?
Yes. Attached the existing IO screen as reference. City would like to maintain the same format.
Can you provide a representative IO list per site type.
Attached the sample IO screen as reference.
The RFP makes specific note that the scope of work described in the RFP document supersedes any scope described in the FEMA grant (assumed to mean the HMGP Agreement). Within Attachment A – Budget and Scope of Work of the HMGP Agreement, the following items are mentioned that are either not mentioned in the RFP or are counter to what is mentioned in the RFP. Please confirm that these items would not apply to the actual RFP: a. The provision and installation of, “one (1) permanent diesel generator with a capacity of 60 kW, an automatic transfer switch, concrete pad, and other related appurtenances at the communications tower located at the Plant City Utlities Facility.” No mention of generator and ATS in RFP. b. Installation of “a radio-SCADA controller communications system.” We are assuming that the RFP’s request for cellular communications supersedes the HMGP Agreement reference to radio. c. HMGP Agreement references 47 sites versus RFP reference to 55 sites.
a. The provision and installation of, “one (1) permanent diesel generator with a capacity of 60 kW, an automatic transfer switch, concrete pad, and other related appurtenances at the communications tower located at the Plant City Utlities Facility.” No mention of generator and ATS in RFP. – Generator replacement is not included as part of this bid. The generator replacement work will be procured and constructed under a separate bid package. b. Installation of “a radio-SCADA controller communications system.” We are assuming that the RFP’s request for cellular communications supersedes the HMGP Agreement reference to radio. – The project is looking for cellular communication to replace the radio. c. HMGP Agreement references 47 sites versus RFP reference to 55 sites. –The original project scope was developed approx. three years ago. Since that time, the City has added additional lift stations. To avoid the need for future procurements and to promote consistency across the system, the City elected to include additional lift stations in this RFP. Work associated with the additional lift stations beyond those included in the HMGP Agreement will be funded by the City if FDEM does not approve the proposed scope changes. Proposers should base their proposals on the full scope of 54 lift station sites as identified in the RFP. (54 is the correct number of lift stations)
Lift Stations 17 and 19 are missing from the LiftStation_Locations.xlsx spreadsheet.
Lift Stations 17 and 19 are excluded from this bid.
Site Type 9 is referenced in the LiftStation_Locations.xlsx spreadsheet but is not shown in the LS_ConstructionTypes.pdf document.
Type 9 is included in the attachment.
The HMGP Agreement makes references to “all project components [being] protected against a 500-year flood event….” If we are assuming to use existing or immediately adjacent locations for RTUs, can it be assumed that these locations satisfy the flood requirement. Reusing existing locations is more cost effective than investigating alternative locations further away from existing installations.
Yes
How does the existing “master” location communicate with plants and other facilities? Is there a basic network diagram available indicating plants and other major facilities and which of those facilities currently receive data from the lift stations?
A basin network diagram is not available. City is currently working with the consultant to develop. The existing communicates thru the communication tower located at 912 N Mobley St (adjacent to Water Reclamation Facility). The fiber is connecting between communication tower to the master PLC panel at the City’s water reclamation Facility.
Are there existing graphical displays or dashboards for the lift stations currently? If so, can these be provided. At which plant(s)/facilities are these located?
Attached the Pages from Draft SCADA Evaluation Rpt_Referenceonly. This is located at the City’s Water Reclamation Facility (1500 Victoria Street Plant City)
Regarding the programming in the existing DFS installations and would-be replacement PLCs, is there a functional description or control narrative write-up available to indicate strategies like runtimes, lead-lag operation, etc…?
Attached the sample IO screen as reference.
Proposal contents: Section 6 includes audit-specific requirements such as audit methodology, government auditing experience, CPA licenses, and quality-control reviews. These appear unrelated to the lift-station communication project. Will the City issue a corrected Section 6, and which proposal-content requirements will be evaluated?
Proposers shall update the Proposal Contents section as necessary to address the requirements of this RFP. Proposals must include all information and documentation required by Section 7, Evaluation Criteria.
The RFP describes 55 lift stations, but the location workbook appears to list 54 stations, and the pricing table omits several station numbers. Please confirm the complete list of sites and the required number of RTU panels.
The correct number is 54 lift stations.
Communications network: The RFP calls for a cellular-based network. Please specify the required carrier(s), cellular technology, coverage expectations, data plan and subscription term, and whether dual-carrier or other communications-path redundancy is required.
For reference, the City currently maintains communication service accounts with Spectrum, Verizon (for Water Treatment Plant No. 5), and SIMETRY for multi-carrier SIM services. The City is open to recommendations for alternative carriers or communication solutions if the proposer can demonstrate that the proposed approach provides the best overall value and performance for the system.
Redundancy and resilience: What performance and redundancy criteria must the proposed system meet, including expected availability, backup power duration, store-and-forward requirements, alarm delivery, and operation during cellular or utility-power outages?
Reliable communication, Local control capability, Automated control capability, Maintenance, Warranty, Capital Cost, Maintenance Effort, tech support, and security.
SCADA integration: Please identify the City’s existing SCADA platform, communications protocols, historian/HMI, and any required interfaces or cybersecurity standards. Is the contractor expected to modify central SCADA software, licensing, servers, or network infrastructure?
VT SCADA is the existing platform. Contractor may need to modify SCADA for lift station, but not licensing, servers, or network infrastructure.
Can you provide manufacture model of existing instrumentation such that we may optionally provide quotation on those services?
Instrumentations are not a part of this project.
Are solutions from Mission Communications, or OmniSite Crystal Ball, or similar, acceptable or are they considered proprietary?
The languages has been modified.
The RFP asks for an “all-inclusive annual cost,” while the pricing tables request site-specific materials and project-wide labor, and the draft contract is fixed-price through May 28, 2028. Please clarify the required pricing period and whether respondents should include recurring cellular service, software subscriptions, hosting, licenses, and post-completion maintenance in the base price.
Respondents shall not include recurring costs for cellular service, software subscriptions, hosting services, or software licenses in the bid price. The bid price shall include all labor, materials, equipment, system design, installation, commissioning, startup, training, and technical support required during the warranty period to provide a complete and fully functional system. However, respondents shall identify and provide a separate breakdown of any recurring costs associated with the proposed system, including cellular service, software subscriptions, hosting fees, licensing fees, maintenance agreements, and ongoing technical support. This information will be used by the City to evaluate and understand the projected annual operating costs of the proposed system.
Please clarify how bidders should price optional items such as separate enclosures, wiring, level transmitters, and power monitors, and how payment or contract adjustment will work if site conditions or quantities differ from the bid schedule.
Respondents may include optional items in their proposal for the City's consideration. However, these optional items shall not be included in the bid schedule and will not be considered as part of the base bid.
Schedule and grant deadline: The draft contract requires substantial completion within 450 calendar days after notice to proceed, while the contract term ends May 28, 2028. Which date controls if those provisions conflict? Please also identify the FEMA/FDEM project deadline and required milestones for grant-funded work.
May 28, 2028, is the FEMA project deadline to qualify for reimbursement.
Federal requirements: Please identify all federal grant clauses and documentation requirements that apply to contractors and subcontractors, including required labor standards, domestic-preference requirements, equipment eligibility, recordkeeping, and reimbursement documentation. Please provide the complete, searchable grant agreement and applicable attachments if available.
Please see the award grant in the attachments tab. The grant is listed under the Supporting Attachments A - Federally Funded Subaward and Grant Agreement - Utilities Dept. Communication Tower - Signed. The awarded contractor and any subcontractors must be in compliance with 2 C.F.R. 200.318 through 200.327.
Measurement and payment: Please reconcile the draft contract’s fixed-price language with the measurement-and-payment section’s unit-price materials and hourly labor. Which provisions govern, and are labor hours paid only when authorized by the City?
Attached the revised measurement and payment section.
The RFP says requested contract modifications must accompany the proposal and later requests will not be considered. Will the City provide a process for addressing material conflicts or ambiguities identified in the contract documents through the question-and-answer period?
Please submit your question and the City will determine if it can be answered prior to the receiving date.
Good Morning, We respectfully request a two-week extension to the proposal submission deadline for the City of Plant City’s Wastewater Lift Station Communication Network Project. The current due date is November 19, 2026, at 2:00 PM. We are requesting an extension to December 3, 2026, at 2:00 PM to allow additional time to thoroughly review the project requirements, coordinate with our team and suppliers, and prepare a comprehensive and competitive proposal. We appreciate your consideration of this request and look forward to your confirmation. Thank you for your time.
The receiving date has been moved to December 3, 2026 at 2:00pm.
Good Morning, As we review the requirements for the City of Plant City’s Wastewater Lift Station Communication Network Project, we would appreciate clarification on the following items to help us better understand the existing infrastructure and the City's expectations: 1. Existing SCADA Software: Please provide information regarding the SCADA software currently used by the City, including the platform and version, if available. 2. SCADA Replacement: Is the City open to replacing its existing SCADA software as part of this project? 3. Cloud vs. On-Premise SCADA: Would the City consider a Cloud-based SCADA solution as an alternative to an on-premise system? 4. Instrumentation and Sensors: Does the City have any existing assessments or documentation regarding the current condition of the sensors and instrumentation at the 55 lift stations? Any additional information or documentation the City can provide would be helpful in developing a proposal that aligns with the City's current infrastructure and long-term objectives. Thank you for your assistance. We appreciate your time and look forward to your response.
1 – VT SCADA 2 – NO 3 – Open to both options 4 – Attached the lift station inventory as reference.
The Q&A states that the total budget for the Lift Station Communication Project is $479,400, while the attached FEMA grant agreement identifies a total project cost of $569,751. Please clarify whether the City’s $479,400 budget is in addition to the grant-funded amount, or whether it represents the City’s total available budget for the RFP scope, inclusive of grant funding. If the amounts are separate, please confirm the total anticipated funding available for this project and how the grant and City funding will be allocated.
$479,400 has been allocated for this project. The remaining funds from the grant will be used in other projects to be determined by the City.
OpenGov categories
- 89066 · Sewer Lift Stations and Parts
- 91063 · Public Utilities: Water, Sewer and Gas Maintenance and Repair
- 91100 · Construction And Utilities, Higher Education
- 91164 · C.I.P., Utilities
- 91741 · Contracted Services, Utilities
- 91897 · Utilities: Gas, Water, Electric Consulting