State and local · OpenGov
Lighting Materials 2027
Description
The City is looking to purchase street lighting materials including fixtures/luminaires, drivers, standards/poles, and bollards to be used at various projects and locations throughout Aurora. This contract will be for the purchase and delivery of materials only and will not include installation. The final quantity of materials purchased may vary depending on unit pricing provided and may be purchased incrementally. The City reserves the right to award or exclude from the award, any quantity or individual line item for which costs are requested. The City also reserves the right to award any of the individual line items to separate bidders based on the lowest price provided for each individual item. The City is willing to consider alternative materials (such as other brands) which are generally equivalent to those being requested, but cut sheets/product specifications for any alternative must be submitted for preapproval prior to bidding. This does not apply to the four variations of GE Cobra Head fixtures requested, as these must be the exact product requested to maintain aesthetic and maintenance consistency throughout the city. The Contract shall commence on the Effective Date and shall remain in effect for an initial term of one (1) year (Jan 1 - Dec 31) . The City of Aurora reserves the right to renew the Contract under the same terms and conditions as the original Contract. The Contract shall not renew automatically, nor shall renewal occur solely at the option of the Proposer. The option to renew for two one-year periods (2028 and 2029) will be based on mutual agreement between the bidder and the City of Aurora. Cobra Head Fixtures GE Cobra Head - Gray GE Cobra Head - Gray GE Cobra Head - Black GE Cobra Head - Gray Drivers 39W Replacement Drivers 100W Replacement Drivers 150W Replacement Drivers Replacement Drivers Replacement Drivers Poles, Bollards, and Other Fixtures Valmont 12' Aluminum Pole Valmont Pole (1 Arm) Valmont Pole (2 Arm) Stresscrete Pole Spring City Decorative Pole LV Fixture Spring City Fixture Sentry Fixture Decorative Globe Fixture Lumec Fixture Valmont Breakaway Transformer Base Aluminum Valmont Breakaway Transformer Base Aluminum Pelco Transformer Base Aluminum Pole-Safe Transpro Breakaway Bolts Pole-Safe Transpro Breakaway Bolts Time of Delivery Lead Time SCOPE OF WORK Purchase and Delivery of Materials For this purchase, the City is willing to consider alternative materials (such as other brands) which are generally equivalent to those being requested but cut sheets/product specifications for any alternative must be proposed as a question by the deadline prior to bidding. This does not apply to the six variations of GE Cobra Head fixtures requested, as these must be the exact product requested to maintain aesthetic and maintenance consistency throughout the city. The products being requested include the following: Item Description/Spec GE Cobra Head - Gray ERL1008C540EGRAYIR (59W) GE Cobra Head - Gray ERL1005C740EGRAYIR (39W) GE Cobra Head - Black ERL2018C540DBLCKIR (130W) GE Cobra Head - Gray ERL2018C540DGRAYIR (130W) Replacement Drivers GE 35-225097R27 Replacement Drivers GED150MC/VDIP700S Replacement Drivers GED50MV11P600 Vega Drivers NPF-40D Vega Drivers NPF-60-42 Valmont 12' Aluminum Pole 120040404UB Brookhaven Valmont Pole (1 arm) DS210-950A400 –(1)-8’LMA-FP/GV-BK-HH-NC-LAB (no finial or banner bracket) Valmont Pole (2 arm) DS210-950A400 –(2)-8’LMA-FP/GV-BK-HH-NC-LAB (no finial or banner bracket) Stresscrete Pole E-250-APH-G (20’) Spring City Decorative Pole 12' Madison Aluminum Post LV Fixture LPBA-40 LED 4K-V-BK Spring City Central Park Fixture ALMPCL-LE040-EVX-2G2-30-CR3-YKSF-TR7P-CU Sentry Central Park Fixture SCP-OB-INC-120V-MOG-BPC Decorative Globe Fixture 88230ALEX3-9 Lumec Fixture RN30-80W48LED4K-g3-acdr-le3r-unv-dms-bktx (with photocell socket) Valmont Breakaway Transformer Base Aluminum TB1-17 Valmont Breakaway Transformer Base Aluminum TB5-9 Pelco Transformer Base Aluminum TB2N-1 Pole-Safe Transpro Breakaway Bolts SPM 4100 Pole-Safe Transpro Breakaway Bolts SPM 4125 DELIVERY Provide the city with an anticipated lead time for their delivery to the City's Public Works Facility at 2100 E. New York Street. The bidder agrees to provide the City with at least 48 hours notice of date and time window for delivery. Deliveries can only be made Monday- Friday between 7am - 5PM. Delivery will be coordinated with the Project Manager. The Bidder agrees to order the materials by no later than ten (10) calendar days after the execution and approval of the contract. Performance Guarantee of Materials If after the approval of final payment and prior to the expiration of 1 year after the date of approval of said final payment, or such longer period of time as may be prescribed by law or by terms of any applicable special guarantee required by the Contract Documents, any materials are found to be defective, the Bidder shall promptly, without cost to the Owner and in accordance with written directions of the Owner, replace it with non-defective materials to the satisfaction of the Engineer. Failure of the Bidder to complete or to remedy defective work within a reasonable time (not to exceed 30 days of notice to Bidder in any event) shall be deemed a default and the Owner may take steps as it deems necessary to complete or remedy said work and charge the cost thereof to the Bidder. GENERAL INFORMATION CITY OF AURORA, IL (Government) The City of Aurora (“City”) is a municipal corporation and unit of local government existing under the laws of the State of Illinois pursuant to the Illinois Municipal Code, 65 ILCS 5/1-1-1 et seq. (the “Code”). The City was established to provide municipal services and to promote the health, safety, and welfare of its residents and businesses within its jurisdiction. The City owns, operates, and maintains various public facilities and infrastructure, including municipal buildings, parks, and community centers located throughout Aurora, Illinois. INSTRUCTIONS TO BIDDERS SUMMARY The City is looking to purchase street lighting materials including fixtures/luminaires, drivers, standards/poles, and bollards to be used at various projects and locations throughout Aurora. This contract will be for the purchase and delivery of materials only and will not include installation. The final quantity of materials purchased may vary depending on unit pricing provided and may be purchased incrementally. The City reserves the right to award or exclude from the award, any quantity or individual line item for which costs are requested. The City also reserves the right to award any of the individual line items to separate bidders based on the lowest price provided for each individual item. The City is willing to consider alternative materials (such as other brands) which are generally equivalent to those being requested, but cut sheets/product specifications for any alternative must be submitted for preapproval prior to bidding. This does not apply to the four variations of GE Cobra Head fixtures requested, as these must be the exact product requested to maintain aesthetic and maintenance consistency throughout the city. The Contract shall commence on the Effective Date and shall remain in effect for an initial term of one (1) year (Jan 1 - Dec 31) . The City of Aurora reserves the right to renew the Contract under the same terms and conditions as the original Contract. The Contract shall not renew automatically, nor shall renewal occur solely at the option of the Proposer. The option to renew for two one-year periods (2028 and 2029) will be based on mutual agreement between the bidder and the City of Aurora. TIMELINE Release Project Date: October 20, 2026 Question Submission Deadline: October 23, 2026, 11:00am Question Response Deadline: October 30, 2026, 11:00am Response Submission Deadline: November 4, 2026, 11:00am Purchasing Division Definitions Award: The formal decision to select a vendor for a contract. Bid: A submitted response by a vendor in response to a bid document. Bidder: An individual, firm, or corporation formally submitting a proposal for the work contemplated, or any portion thereof, acting directly through an authorized representative. Change Order: A change to a contract or purchase order made after it has been approved by the city that alters the term of the contract, the contract price, or the obligations of the parties. Contract: A formal agreement between the City and a successful bidder outlining obligations, deliverables, timelines, and pricing. Cooperative Purchasing: When goods or services are purchased through shared contracts (mostly government entity contracts), to leverage buying power. Direct Purchase Method: The method in which, after bids are rejected or if no bids are received, the City Council by resolution may approve the work to be done by city personnel or authorize the purchase of goods or services involved to be purchased more economically on the open market without complying with the requirements of the Purchasing Division. Emergency Procurement: An expedited purchase that bypasses standard bidding due to immediate threats to public health, safety, or welfare. Encumbrance: Funds that are formally committed and set aside in the budget to pay for a specific future purchase. Evaluation Criteria: The standards and scoring factors used to assess bids or proposals. Formal Bid: For goods/services over $25,000, with well-defined requirements and structured bidder/proposal submissions. Informal Bid: For goods/services valued between $5,000 and $24,999, with well-defined requirements. Businesses are notified via web alerts. Invitation for Bid (IFB): A formal solicitation inviting vendors to submit competitive bids based strictly on price and predefined specifications. Invoice: A bill sent by a vendor/contractor/supplier for goods/services provided. Shows what was purchased, how much it costs, and payment due date. Local Bidder Preference: Policy that allows the City to give priority or scoring advantages to local businesses. Lowest Responsible Bidder: The lowest bidder whose offer best responds in quality, fitness and capacity to the requirements of the proposed work or usage. Payment Bond: The bond executed by the Vendor/Contractor and his surety guaranteeing the payment of all sums of money due for any labor, materials, apparatus, fixtures, or machinery furnished to such principal for the purpose of performing the contract work. Performance Bond: The bond executed by the Vendor/Contractor and his surety, guaranteeing complete execution of the contract. Piggybacking: An authorized purchase made by utilizing another government agency's existing, competitively awarded contract. Plans: All drawings, sketches, and detailed Plans or reproductions thereof pertaining to the construction involved. Procurement: The process by which a municipality acquires goods, services, or construction, including planning, soliciting offers, evaluating responses, awarding contracts, and managing vendor performance. Professional Services: Services that require specialized professional knowledge or expertise, such as accounting, architecture, engineering, law, medicine, surveying, or other fields defined by state law. Proposal: A bidder’s response to a solicitation that often includes technical details, methodology, pricing, and qualifications. Public Notice: Official announcement of a solicitation, typically published through OpenGov. Purchase/Procurement Card (P-card): A City issued charge card for the purchase of city-related goods/services. Purchase Order (PO): The formal authorizing document issued after an award. No work begins, or payment made, without a city-generated PO. Sent to Vendor/Contractor/Supplier. Quote: Request from vendors for pricing on goods or services or a combination thereof that may be verbal or in writing. Request for Proposals (RFP): A solicitation used when seeking a solution, goods, or service and evaluating vendors based on multiple criteria, not only price. Request for Qualifications (RFQ): A solicitation for qualifications, used especially for professional or consultative services. It does not result in a contract. Requisition: A request to create a PO for the purchase of goods/services. Stays internal. Responsible Bidder: Section 2-331(5) of the Aurora City Code requires that bidders for city contracts in excess of $25,000 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. Scope of Work (SOW): A detailed document outlining the specific tasks, deliverables, timelines, and quality standards required from the vendor. Sole Source: A non-competitive procurement used when only one vendor can provide the required goods or services. Specification: Any description of the physical or functional characteristics, or of the nature of a supply, service or construction item. A specification may include a description of any requirement for inspecting, testing, or preparing a supply, service, or construction item for delivery. Vendor/Contractor/Supplier: A company or individual that enters into a contract with the City to provide goods or services. ACCEPTANCE OF BID PROPOSALS a. Bidders intending to respond to this solicitation must create a free account with OpenGov Procurement . Registration is required to establish a communication link with the City. The Bidder, and not the City, is solely responsible for obtaining all addenda issued for this solicitation. Addenda and other relevant information will be posted through the City’s E-Procurement System. Notifications of issued addenda will be emailed to all persons registered as following this bid. Failure of any Bidder to receive any addendum or interpretation shall not relieve the Bidder of any obligation under its submitted Bid Proposal. All addenda issued shall become part of the Contract Documents. Paper submissions will not be accepted . b. Bids will be accepted only through the City’s E-Procurement System, OpenGov, up to the date and time specified in the solicitation. The official system clock within the City’s E-Procurement System shall govern all submission deadlines. Late submissions will not be accepted under any circumstances, including technical difficulties such as internet connectivity issues. The City strongly encourages Bidders to complete submissions well in advance of the deadline. All bids must include all requested information and all required forms, certificates, affidavits, and addendum acknowledgments to be considered responsive. c. A subcontractor may not submit a Proposal or otherwise serve as the PRIME VENDOR on behalf of another entity. Responses submitted solely on behalf of a subcontractor, third-party vendor, broker, or other entity that will not be the prime vendor under the resulting Contract will not be accepted. d. Bids shall be submitted on the forms provided and must include all required information and certifications. Bids submitted in any other manner, or failing to include all required information or certifications, may be rejected as non-responsive. Bids may be modified or withdrawn prior to the bid opening deadline through the City’s E-Procurement System. Each Bid shall include the legal name of the Bidder, complete mailing address, and electronic signature of a person legally authorized to bind the Bidder. The printed or typed name of the authorized signer shall also be provided. e. The City of Aurora reserves the right to accept or reject any or all bids, in whole or in part, to accept alternate bids, and to waive any immaterial defect, technicality, informality, or irregularity in any bid received. Unless otherwise specified, the City reserves the right to hold bids for ninety (90) days following the bid opening date. By submitting a bid, the Bidder agrees to accept a Notice of Award if issued within this ninety (90) day period. The City further reserves the right to cancel this solicitation at any time without liability for any costs incurred by any Bidder in preparing or submitting a Bid Proposal. Each Bidder assumes sole responsibility for all costs associated with preparation and submission of its Bid Proposal. f. While price is an important consideration, the City will also evaluate qualifications, experience, demonstrated capacity, responsiveness to the solicitation requirements, and overall ability to successfully perform the Work. No Bid Proposal will be considered unless the Bidder provides evidence satisfactory to the City demonstrating the necessary facilities, experience, equipment, personnel, and financial resources required to perform the Work. The Bid will be awarded to the lowest responsive and responsible Bidder. In determining responsibility, the City may consider factors including, but not limited to: Prior performance history Experience on similar projects Ability to work cooperatively with the City Adequacy of equipment and staffing Ability to complete the Work within required timeframes Reliability, reputation, competency, and available resources The City and its representatives may conduct any investigation deemed necessary to evaluate a Bidder’s qualifications. The Bidder shall furnish all information requested by the City for this purpose. RECEIPT OF BID PROPOSALS Bids must be submitted electronically , up to, but no later than the designated date and time as specified via the City’s E Procurement System, OpenGov. It is the sole responsibility of the Bidder to see that their Bid Proposal is received in the proper time. Bids must be submitted electronically via the City’s E Procurement System. There will be no exceptions! WITHDRAWAL OF BID PROPOSALS Bids may be withdrawn at any time prior to the submission deadline through the City’s E-Procurement System by “un-submitting” the proposal in OpenGov. After withdrawal, the Bidder may revise and resubmit its proposal at any time prior to the submission deadline. Bidders are strongly encouraged to carefully review their submissions before final submission. Negligence on the part of the Bidder in preparing a bid shall not confer any right to withdraw or modify the bid after the submission deadline. No bid may be withdrawn after bid opening without the written approval of the Director of Purchasing. Requests for withdrawal after bid opening must be submitted in writing by an authorized representative of the Bidder. Bid Proposals received after the date and time specified for submission will not be opened or accepted. AWARD It is the intent of the City to award the bid to one or more of the lowest responsive responsible bidder(s) meeting specifications. Award will be based on the following factors, but not limited to (where applicable): (a) adherence to all conditions and requirements of the bid specifications; (b) price; (c) qualifications of the bidder, including past performance, financial responsibility, general reputation, experience, service capabilities, and facilities; (d) delivery or completion date; (e) product appearance, workmanship, finish, taste, feel, overall quality, and results of product testing; (f) maintenance costs and warranty provisions; and (g) repurchase or residual value. The Bidder submitting a response to this solicitation must be the PRIME VENDOR and, if awarded, shall be the entity entering into the Contract with the City of Aurora. The prime vendor shall have overall responsibility for the performance of all contractual requirements and shall serve as the City's primary point of contact throughout the term of the Contract. If the Bidder modifies limits, restricts or subjects his bid proposal to conditions that would change the requirements of the bid, this would be considered a conditio
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Requesting substitution for the following items: FIXTURES: Alternate for LV LPBA - Q-2511053-1 Alternate for Spring City/Sentry Fixture ALMPCL or SPC - Q-2003031-1 or Q-2003031-2 Alternate for Lumec RN30 - K803 drawing BREAKAWAY DEVICES: Alternate for Valmont TB1-17 - Hapco TB1-17 - 70771 drawing Alternate for Valmont TB5-9 - Hapco TB5-9 - 79236 drawing Alternate for Transpo 4100 and 4125 - Hapco couplings - 85935 and 89253 drawings
FIXTURES: Alternate for LV LPBA - Q-2511053-1 drawing- NEED TO SEE IN PERSON (APPROVED, BUT MAY BE DISQUALIFIED UPON PHYSICAL INSPECTION) Alternate for Spring City/Sentry Fixture ALMPCL or SPC - Q-2003031-1 or Q-2003031-2 drawings- NO TO BOTH Alternate for Lumec RN30 - K803 drawing drawing- NO BREAKAWAY DEVICES: Alternate for Valmont TB1-17 - Hapco TB1-17 - 70771 drawing- APPROVED Alternate for Valmont TB5-9 - Hapco TB5-9 - 79236 drawing- APPROVED Alternate for Transpo 4100 and 4125 - Hapco couplings - 85935 and 89253 drawings- APPROVED
Can you provide cut sheets or any information on the Vega drivers, line items 8 & 9. Can not seem to find information on these.
cut sheet not available, but pic attached
Can you provide cut sheets or any information on the LV Fixture, line item 15. Can not seem to find information on these.
cut sheet not available, but product dimensional drawing attached
Will this alternate work for the "88230" decorative globe fixture, line item 18.
APPROVED
OpenGov categories
- 22014 · Energy Computerized Control Systems for HVAC, Lighting, Utilities, etc. Combination
- 28527 · Control Devices, Lighting (Including Photocells, Multiple Relays, Lighting Contactors)
- 28554 · Lighting Fixtures, Indoor: All Kinds and Parts (Including Lampholders and Recycled Types)
- 28555 · Lighting, Area, Pole or Standard Mounted (Parking Lots, etc.)
- 28556 · Lighting Fixtures, Outdoor: Floodlights, Spotlights, Yard Lights, and all other Weatherproof Fixtures (Except Streetlights) (Including Recycled Types)
- 28557 · Lighting, Solar Powered
- 28558 · Lighting Units, Emergency, Battery Operated; and Batteries
- 28576 · Street and Highway Lighting Luminaires, Accessories and Parts
- 55725 · Electrical Accessories and Parts (Not Lighting)
- 55750 · Lamps/Lighting, Lens, and Signals, Interior and Exterior
- 55955 · Lamps/Lighting, Interior and Exterior
- 91232 · Construction, Street Lighting
- 93153 · Lighting Fixtures Maintenance and Repair