Skip to content
← Back to search

State and local · OpenGov

Opportunityevaluation

Lincoln Leisure Center Plaster Repair

Description

The City of Bloomington, Illinois ("City") is accepting sealed bids for Bid #2027-17 , Lincoln Leisure Center Plaster Repair to be submitted via the City's e-Procurement Portal, OpnGov until Thursday, November 19, 2026 , 10:00 am CST. Please reference the scope of work and attachment(s) for the full details of this project. Base Bid - Bid #2027-17 Lincoln Leisure Center Plaster Repair Base Bid - North Stairwell - Repair all deteriorated plaster and repaint ceiling and walls North Stairwell - Repair all deteriorated plaster and repaint ceiling and walls. See attached specifications. Alternate Bid - Bid #2027-17 Lincoln Leisure Center Plaster Repair Alternate Bid - South Stairwell - Repair all deteriorated plaster and repaint ceiling and walls South Stairwell - Repair all deteriorated plaster and repaint ceiling and walls. See attached specifications. Scope of Work Project Description Location: Lincoln Leisure Center 1206 S Lee, Bloomington IL 61701 The City is seeking bids from qualified contractors to perform plaster repair and repainting in the North and South stairwells of the Lincoln Leisure Center. Work includes repairing deteriorated plaster surfaces and painting to match existing finishes. Repair all deteriorated plaster and repaint ceiling/walls in North stairwell. Repair all deteriorated plaster and repaint ceiling/walls in South Stairwell. Price as 2 separate jobs. Paint to match hallway colors. Contractors to supply all material. Contractors to supply dumpster and are responsible for proper disposal of all waste. Contractors shall protect surrounding areas, maintain a clean worksite, and ensure safe access for building occupants throughout the project. Working Hours: Monday – Friday 7:00AM – 3:00PM Note: This project is subject to Illinois Prevailing Wage requirements. Contractors are responsible for complying with all applicable prevailing wage laws, including certified payroll submission. Legal Notice Invitation to Bid - City of Bloomington, Illinois Sealed bids will be received via the City’s e-Procurement Portal, OpenGov ( https://procurement.opengov.com/portal/cityblm ), until Thursday, November 19, 2026 at 10:00 am Central time, at which time they will be publicly opened and read for the following: Bid #2027-17 Lincoln Leisure Center Plaster Repair A non-mandatory pre-bid meeting/site visit will be held on Tuesday, November 3, 2026 at 10:30 am central time, at: Lincoln Leisure Center 1206 S Lee Bloomington IL 61701 It is highly suggested that interested parties attend. This is the only time scheduled for a site visit. Bid documents are to be obtained from the City's e-Procurement Portal. Bidders/Consultants shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/signup . Once account registration has been completed, browse back to https://procurement.opengov.com/portal/cityblm , click on "Submit Response", and follow the instructions to submit the electronic bid. Only Bidders/Consultants following the project, with an active account, are eligible for the contract award. We encourage bidders and the public to participate remotely by watching/listening to the bid opening remotely via the City's livestream: www.cityblm.org/bidopening. The City of Bloomington reserves the right to reject any and all bids and to waive technicalities. Bid must be accompanied by a Bid guaranty which shall not be less than ten percent (10%) of the amount of the Bid. Bid guaranty may be a cashier’s check, money order, certified bank check, or a surety bond. All guaranties, except surety bonds, will be deposited and reimbursement checks and surety bonds will be issued to unsuccessful bidders following the bid award. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to 100% of the contract price, within ten (10) business days after the bid award. The City of Bloomington requires all Bidders/Consultants doing business with the City not to discriminate on the basis of race, age, color, religion, gender, ancestry, national origin, marital status, mental or physical disability unrelated to ability, familial status or sexual orientation. Erin Estes , Procurement Manager Wednesday, October 28, 2026 , Bloomington, Illinois Introduction Summary Background Contact Information Timeline The following projected timetable should be used as a working guide for planning purposes. The City reserves the right to adjust this timetable as required during the course of this statement process. Instruction to Bidders/Consultants Bid Submission Bidders/Consultants are required to submit sealed bids via the City's e-Procurement Portal, until Thursday, November 19, 2026 , 10:00 am CST. Definition "City" shall mean the City of Bloomington, Illinois. Pre-Bid Meeting A non-mandatory pre-bid meeting will be held on Tuesday, November 3, 2026 , commencing promptly at 10:30 am , and will be held: Lincoln Leisure Center 1206 S Lee Bloomington IL 61701 A site visit will be held immediately following the pre-bid meeting. The purpose of the pre-bid meeting is to allow an open forum for discussion and questioning with City staff regarding the ITB with all prospective bidders/consultants having an equal opportunity to hear and participate. Oral questions will receive oral responses, neither of which will be official, nor become part of the ITB. Only written responses to written questions will be considered official, and will be included as part of the ITB. All prospective bidders/consultants are strongly encouraged to attend. Questions All questions related to this Invitation to bid (ITB) shall be submitted in writing through the ProcureNow Question/Answer Tab via the City's e-Procurement portal, on or before, Tuesday, November 10, 2026 by 12:00 pm . Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders/consultants following this solicitation on the City's e-Procurement Portal. Addenda Any addenda shall be posted on the City's e-Procurement Portal. Addenda notifications will be emailed to all persons on record as following this ITB. Failure of any bidder/consultant to receive any such addenda or interpretation shall not relieve such bidder/consultant from any obligation under their bid as submitted. All addenda so issued shall become part of the contract documents. Withdrawal of Bid Bids may be withdrawn through the City's e-Procurement Portal, the responding firm may “unsubmit” their bid in ProcureNow. After withdrawing a previously submitted bid, the responding firm may submit another bid at any time up to the deadline for submitting bids prior to the bid opening. Except as otherwise provided by regulation, all decisions to permit the correction or withdrawal of bids following the bid opening, or to cancel awards or contracts based on bid mistakes, will be submitted in writing and will be supported by a written determination made by the Procurement Manager. Rejection of Bids The City of Bloomington reserves the right to reject any and all bids and to waive technicalities and to accept that bid which is to be considered to be in the best interest of the City. Any such decision shall be considered final. Bid Opening Telephone/Fax/Verbal Offers Will Not Be Accepted. Bids shall be publicly opened and read at the time and date set. It is the responsibility of the Bidders/Consultants/Contractors to see that the bid is submitted in the City's e-Procurement Portal, by the specified time and date. Bids received after the time and date will not be accepted. Pricing Proposal The City may award the Base Bid, any individual Alternate, any combination of Alternates, or no Alternates at all. Equal Opportunity Initiatives & Goals 6.1. § 16-414 [Ch. 16, Sec. 59] Equal Opportunity in City Contracts The City is committed to the following diverse workforce aspirational goals: (1) ensuring non-discrimination in the award and administration of City contracts; (2) encouraging a level playing field on which MBEs, WBEs, and DBEs can compete fairly for City contracts; (3) promoting the use of female and minority workers on City projects; (4) ensuring that female and minority participation goals are narrowly tailored in accordance with applicable law; and (5) providing appropriate flexibility to businesses in establishing and providing opportunities for female and minority workers. The complete City Code can be seen at: https://ecode360.com/34407491 For any questions regarding the Ordinance, City Code, or completing the required forms, please contact procurement@cityblm.org . Insurance Requirements Insurance - Public Works Projects Prior to the commencement of work governed by any contract between the CITY and any Third Party, the Third Party shall provide the CITY satisfactory evidence of insurance coverage via a valid Certificate of Insurance showing coverage provided by a carrier who has no less than an A- VIII rating with AM Best’s Rating. The Certificate must list the CITY, its employees, and officials as additional named insured’s. The Certificate must also list coverage as primary and non-contributory, include a waiver of subrogation, and include a thirty (30) days cancellation notice. All coverage, as follows shall be maintained through the life of the contract and include, as a minimum: General Liability – $2,000,000 per occurrence/$4,000,000 aggregate Bodily Injury and Property Damage Products & Completed – $2,000,000 Worker’s Compensation – $1,000,000 Each Accident/$1,000,000 Disease-Each Employee/$1,000,000 Disease-Policy Limit Automobile Liability – $2,000,000 with $5,000 medical payments Umbrella/Excess Liability – $5,000,000 Errors & Omissions – $2,000,000 Required for contracts with Consultants for Professional Services Crime & Theft Coverage – $2,000,000 Required when Third Party will have access to City property Insurance: Vendors providing a service or installing equipment on or about City property shall provide to the City Clerk evidence of Comprehensive, Liability, and Workman's Compensation insurance prior to commencement of work on City property. The vendor guarantees to save the City, its agents or employ-ees, harmless from liability of any nature or kind, for use of any copyright, composition, secret process, pa-tented or unpatented invention, articles or appliances furnished or used in the performance of the contract, or which the vendor is not the patentee, assignee, or licensee. Furthermore, the vendor hereby agrees to save and hold harmless and indemnify the City from and against all injury, death, damage, loss, claims and liability caused by or arising out of the performance of this agreement by the Vendor, its employees, agents or sub-vendors. This agreement extends to all claims, of any nature, whether made by the Vendor’s employees or third parties. Terms and Conditions No Bid Bidders/Consultants who are not able to submit a bid for this service, but wish to receive bid tabulation should "Follow" the project to receive automated notifications pertaining to this solicitation. Ex Parte Communication Please note that to insure the proper and fair evaluation of a proposal or bid, the City of Bloomington prohibits ex parte communication (i.e., unsolicited) initiated by the Bidder to a City Official (i.e. City Aldermen, Mayor, etc.) or Employee evaluating or considering the proposal/bid prior to the time a selection has been made. Communication includes but is not limited to fax, phone calls, email and personal visit. Communication between Bidder and the City shall be directed in writing to the Procurement Manager or designated contact person only. The Procurement Manager will obtain the information or clarification needed. Ex parte communication may be grounds for disqualifying the offending Bidder from consideration or award of the proposal/bid and repeat offenders may be disqualified from future projects. Delivery F.O.B. Bloomington, IL FREIGHT PREPAID. Delivery will be considered in making the award and the Bidders/Consultants shall state, in the spaces provided, expected delivery after receipt of Purchase Order. Failure to meet said delivery promises without prior consent of the City Procurement Manager may be considered a breach of faith. Full Pricing and Contingencies Please quote your best net price including delivery and discounts to meet the approval of the City. Prices shall be stated in units of quantity specified. No additional charges shall be passed to the City, including any applicable taxes, delivery or surcharges. Prices quoted shall be the final cost to the City. The City shall hold the successful Bidder/Consultant to the bid pricing. Additional charges for contingencies discovered by the Bidder/Consultant at any time after the date of the opening of this bid may not be considered for payment by the City. Payment Terms If payment terms are not indicated, terms of NET 45 days shall be applied by the City. Payment terms to apply after receipt of invoice or final acceptance of the products/services, whichever is later. Payment terms offering less than 20 days for payment will not be considered. Bid Evaluation Bids will be evaluated and awarded to the lowest responsible, responsive Bidder. The quality of the services, conformity with the specifications, suitability to the requirements, delivery terms including length of time for delivery, qualifications and references will be taken into consideration in making an award. The City will be the sole judge of acceptability of any products offered. Recourse for Unsatisfactory Materials Payment shall be contingent upon the City’s inspection of and satisfaction with completed work. Any defective work or materials, non-conformance to bid specifications, damaged materials, or unsatisfactory installation shall be corrected to the City’s satisfaction by the successful bidder/consultant at no additional charge. Proof of License, Permit, Etc. Consultants must provide proof of conformance with any applicable Federal/State/Local permits, licenses, certifications, etc., as stated in the scope of work/specifications section. It is the Consultant’s responsibility to inquire about requirements of performing the job with the requesting department contact person. Investigation Bidders must acquaint themselves with the policies of the City, and may do so by contacting the Procurement Manager. All questions as to the meaning of the scope of work must be resolved prior to the bid submission deadline. Bidder shall examine the plans and specifications for the work, and also the ground, and judge for themselves all circumstances affecting the cost and nature of the work, and must also examine the maps, plans, profiles and specifications as provided for in this solicitation. Bidder is required to inform themselves fully of the conditions relating to construction and labor under which the work will be or is now being performed. The Contractor must employ, insofar as possible, such methods and means in carrying out the work as will not cause any interruption or any interference with any other contractor. Any interpretation of the specifications will be made only by addendum duly issued and a copy of such addendum will be e-mailed to each person on record as following this project. The City will not be responsible for any explanation or interpretation other than the addendum. It is the Bidder’s responsibility to check the City's e-Procurement Portal prior to submitting their bid to ensure that they have received all Addenda issued. Bid Form The entire package shall be electronically returned complete and intact with all information requested and all questions answered. Failure to do so may be considered grounds for rejection of the bid. The amount of the bid shall be stated in the pricing table within ProcureNow. Specifications The Specification may, in some areas, be unique to a particular brand of product or type of service. If this situation exists, equal consideration will be given to all Bidders/Consultants whose items, in the opinion of the City, meets or exceeds performance in these areas. Equals or Substitutes Or Equal Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the Contract Price has been based upon Contractor furnishing such item as specified. The specification or description of such an item is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or equal” item is permitted, Contractor may request that Engineer / Project Manager authorize the use of other items of material or equipment, or items from other proposed suppliers under the circumstances described below. If Engineer / Project Manager in its sole discretion determines that an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, Engineer / Project Manager shall deem it an “or equal” item. For the purposes of this paragraph, a proposed item of material or equipment will be considered functionally equal to an item so named if: In the exercise of reasonable judgment Engineer / Project Manager determines that: 1. It is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2. It will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; 3. It has a proven record of performance and availability of responsive service; and 4. It is not objectionable to Owner. Contractor certifies that, if approved and incorporated into the Work: 1. There will be no increase in cost to the Owner or increase in Contract Times; 2. It will conform substantially to the detailed requirements of the item named in the Contract Documents. Contractor’s Expense: Contractor shall provide all data in support of any proposed “or equal” item at Contractor’s expense. Engineer / Project Manager’s Evaluation and Determination: Engineer / Project Manager will be allowed a reasonable time to evaluate each “or-equal” request. Engineer / Project Manager may require Contractor to furnish additional data about the proposed “or-equal” item. Engineer / Project Manager will be the sole judge of acceptability. No “or-equal” item will be ordered, furnished, installed, or utilized until Engineer / Project Manager’s review is complete and Engineer / Project Manager determines that the proposed item is an “or-equal”, which will be evidenced by an approved Shop Drawing or other written communication. Engineer / Project Manager will advise Contractor in writing of any negative determination. Substitutes Unless the specification or description of an item of material or equipment required to be furnished under the Contract Documents contains or is followed by words reading that no substitution is permitted, Contractor may request that Engineer / Project Manager authorize the use of other items of material or equipment under the circumstances described below. To the extent possible such requests shall be made before commencement of related construction at the Site. Contractor shall submit sufficient information as provided below to allow Engineer / Project Manager to determine if the item of material or equipment proposed is functionally equivalent to that named and an acceptable substitute therefor. Engineer / Project Manager will not accept requests for review of pro

Published attachments
Addenda and notices
Public questions and answers
  • Please confirm all work is to be completed during normal hours. If off hour work is required please clarify hours / days.

    Please see Addendum #2.

  • Please confirm that work area can be temporary closed during work.

    Please see Addendum #2.

  • Is there a paint material spec you can provide?

    Please see Addendum #2.

  • Is there a plaster material spec you can provide?

    Please see Addendum #2.

  • Please confirm it is the intent to begin work immediately.

    Please see Addendum #2.

  • Are we to include painting 100% of area including ceiling?

    Please see Addendum #2.

  • Please confirm that for bidding purposes we should assume no hazardous materials. If hazardous materials are present please provide copy of environmental report.

    Please see Addendum #2.

  • Can contractor use owners toilet facilities or should we provide their own.

    Please see Addendum #2.

Plain text