Lincoln Sewer Program - Construction, Engineering & Inspection (CE&I) Request for Qualifications

Description

The City of Caldwell is seeking project-specific statements of qualifications for CE&I services for three separately evaluated construction packages. The City seeks the named people, technical judgment, inspection coverage, testing resources, and contract-administration practices needed to deliver an operable and fully documented sewer system. Consultants may respond to one, two, or all three packages. Caldwell reserves the right to award CE&I Services for more than one construction package to a consultant, but may also award each construction package to a different consultant. Separate rankings and professional-services agreements will be established for each awarded package. Introduction Summary Background Contact Information Timeline Request for Qualifications The City of Caldwell is seeking statements of qualifications to provide construction, engineering & inspection services for 3 large scale sanitary sewer projects. See attached RFQ for details. No particular fee level is anticipated or guaranteed by this solicitation. The City may assign multiple rostered consultants to team up on some tasks. The City reserves the right to assign tasks based on its judgement of the best qualified or suited to a particular task. Statements of Qualification are to be received through the City's procurement portal at: https://procurement.opengov.com/portal/cityofcaldwell before 8:00 am on Monday, December 14, 2026 . The City of Caldwell reserves the right to reject any and all consultants, to waive any irregularities in the Statements of Qualification received, and to accept the consultants for roster that are in the best interest of the City. See RFQ for all reservations made by the City. Instructions and Information General Requirements See the attached RFQ for all requirements pertaining the submittal. City Rights The City reserves the right to request clarification of information submitted or to request additional information about any Statement of Qualifications as it may be reasonable to require. The City reserves the right to require interviews. The City reserves the right to reject any and all Statement of Qualifications, to waive technicalities and to take whatever action is in the best interest of the City. The City reserves the right to withhold scoring information. However, feedback will be openly provided upon request. Nothing in this RFQ or the contract between the City and the successfully awarded consultant(s) shall prohibit the City from retaining the services of other consultants for engineering project assignments. Attachments Evaluation Phases Vendor Questionnaire

Published attachments
Public questions and answers
  • Is it the City’s intent for CE&I services to continue through the project warranty period?

    No

  • Under the Sewer Force Main – Package Risk and Public Response section, the RFQ references an I-84 crossing. Based on our review of the project, it does not appear that the work crosses I-84. Would the City please confirm whether the I-84 crossing reference is applicable to this project?

    See attachment: F - Design Package 5 - Triple Force Mains Routing Exhibit _ 11-13-26

  • Under the Criterion and Measurable Subcriteria, the Senior Project Manager category identifies 20 total possible points; however, the individual criteria appear to total 25 points. Similarly, the Lead Inspector category identifies 25 total possible points, while the individual criteria appear to total 30 points. Would the City please confirm the correct total possible points for each category?

    Disregard the individual criteria point breakdown. - Senior Project Manager category will be worth up-to a total of 20 points. - Lead Inspector will be category will be worth up-to a total of 25 points.

  • The RFQ requires individuals to have completed five similar projects within the past seven years. Given the limited number of comparable CE&I projects completed during that period, it may be difficult for an individual inspector or project manager to demonstrate five qualifying projects, particularly if the intent is to require participation from project start through completion. Would the City consider removing the seven-year timeframe while retaining the requirement for five similar completed projects?

    In place of the requirement for both the Senior PM & Lead Inspector to have 5 comparable projects in the last 7 years, SUBSTITUTE with the following: "Individuals (Senior PM & Lead Inspector) shall have completed at least 1 project of similar nature and scope in the last 7 years, and a total of 3 projects in similar nature and scope over their career.” All other requirements remain unaltered." All other requirements of the RFQ remain unchanged