Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Linger Longer Drive Extension

Description

Dorchester County (the County) invites qualified firms to submit bids to provide Linger Longer Drive Extension . This Invitation for Bids (IFB) document provides background and general information for Respondents and should be used in the development of bids. SECTION ONE: SPECIFICATIONS General Description The Contractor shall furnish all labor, tools, materials, equipment, and supervision necessary to complete the Work found in Attachment A (Linger Longer Drive Extension Specification) and Attachment B (Linger Longer Drive Extension Drawings). This project will provide a secondary and signalized access to The Ponds subdivision to improve access and safety. Substantial completion must be achieved within Two Hundred and Seventy (270) Calendar Days from issuance of Notice to Proceed, with Final Completion Thirty (30) days thereafter. SECTION TWO: SPECIAL INSTRUCTIONS AND SOLICITATION-SPECIFIC TERMS Written Questions Deadline The last day and time for submittal of written questions shall be no later than Friday, December 18, 2026 at 8:00 am . Bid Submittal Process Bids must be submitted electronically through the OpenGov Procurement Portal. County Bids may be found by visiting the following link: https://procurement.opengov.com/portal/dorchestercountysc Bid Submittal Deadline Bids will be received until Tuesday, January 12, 2027 at 2:00 pm , after which time they will be publicly read. Late bids will not be accepted. Bidders are invited to attend the opening of this bid at the time stated above in the office of the Purchasing Services Division, located at 201 Johnston Street, 2nd Floor, St. George, SC 29477. Virtual attendance is also available using the instructions below. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2887587638548012?p=pUYSQWx5a0s4GAvWHf Meeting ID: 288 758 763 854 801 2 Passcode: bN9u7PM3 Need help? | System reference Dial in by phone +1 843-790-4118,,623400858# United States, Charleston Find a local number Phone conference ID: 623 400 858# Term of Agreement Substantial completion shall be achieved within Two Hundred and Seventy (270) calendar days from Notice to Proceed, with Final Completion within Thirty (30) days thereafter. Payment to Contractor Payment shall be due within thirty (30) days of approved invoices. Shipping Shipping terms shall be F.O.B. Destination. Permits and Licenses The successful Bidder shall, without additional expense to the County, be responsible for obtaining and maintaining all necessary licenses and permits required by the State of South Carolina, a municipality or the County or any other authority having jurisdiction. Security Required Bid Security Any bid over $25,000 must be accompanied by a bid bond acceptable to the County. Bid bonds must be issued by a corporate surety registered and authorized to do business in the State of South Carolina. Bid bonds shall be payable to the County, shall be for at least five (5%) percent of the total amount of the bid, and shall serve as a guarantee deposit that the bid will be carried out to the complete satisfaction of the County. County may request hard copies of electronically submitted bid bonds. Forfeiture of Bid Security Nonperformance by the successful Bidder, or its failure to execute the Contract and meet performance and payment bond requirements and insurance requirements within Five (5) Business Days after issuance of Notice of Award, shall result in its bid security being forfeited as liquidated damages, and the Notice of Award and Contract will be rescinded and awarded to another Bidder. Withdrawal of a bid after the opening date and time but prior to final award after the opening date, may also result in forfeiture of bid security. Return of Bid Security Bid security will be returned to all bidders after the successful Bidder has executed the Contract and delivered all required bonds and insurance certificates and endorsements. Bidders will not be entitled to any interest earnings on returned funds, and in the case of bid security by check, such will be returned to bidder. Payment and Performance Security The successful Bidder shall provide performance and payment bonds, in a form satisfactory to the County, in the following amounts: Payment Bond: 100% of the total amount of the Contract. Performance Bond: 100% of the total amount of the Contract. The aforesaid payment and performance bonds must be issued by a corporate surety, registered and authorized to do business in South Carolina, and must be counter-signed by a licensed, authorized South Carolina agent. Attorneys-in-fact who sign bid bonds or performance bonds must file with each bond a certified and effective, dated copy of their power of attorney. Bid Holding Time Bids must remain valid for at least sixty (60) days from opening. Additional Information Questions or clarifications concerning this invitation should be posted to the solicitation on the OpenGov Procurement portal at the link provided above, or directed by email to only Rebecca Dantzler at RDantzler@DorchesterCountySC.gov . Contact with other County personnel during the bid process may result in a determination of non-responsiveness for any bid submitted by your firm. SECTION THREE: TERMS AND CONDITIONS Preparation, Submission and Withdrawal of Proposals Bids for this solicitation must be submitted electronically through the County’s OpenGov Procurement Portal. No other method of submission is authorized. Bids shall not be submitted by email, fax, hand delivery, mail, courier, or any other means. Any bid or pricing information received outside of OpenGov — including bids emailed to County staff — will be considered an unauthorized and non-responsive submission and will not be opened, accepted, or considered. If bid security is required, it may be uploaded electronically through OpenGov. If a bid bond is uploaded electronically, the Purchasing Services Manager may, at their discretion, require the apparent low bidder to provide the original physical bond after bid opening. Dorchester County is not responsible for bids not received due to technical issues, user error, connectivity problems, or failure to complete the submission process in OpenGov prior to the deadline. Bids may be withdrawn by the Bidder prior to the time set for opening of bid, but not thereafter. Bidders shall promptly notify the Dorchester County Purchasing Office, in writing, and no later than the last date and time for the submittal of written questions, of any ambiguity, inconsistency or error which they may discover upon examination of the IFB documents or the project premises and local conditions. Bidders requiring clarification or interpretation of the IFB documents shall make a written request which must be received at the Dorchester County Purchasing Office no later than the last date and time for submittal of written questions. Any interpretation, correction or change of the IFB documents will be made by addendum. It is your responsibility to monitor the Purchasing Services website by selecting Procurement Portal at www.dorchestercountysc.gov/purchasing for any additional information, revisions, or addenda that may be posted. No substitutions will be considered after the Contract award except by amendment or change order. Failure to submit a bid on the form requested or inclusion of any alternates, unit prices, conditions, limitations or provisions not called for, will render the bid irregular; and shall be considered sufficient cause for rejection of a bid. Failure to complete entries in all blanks on the Bid Form shall be considered cause for rejection of a bid. Bidders shall complete all fields within the Bid Form, Schedule of Values, and any pricing tables provided by the County. No pricing line item, cell, or field shall be left blank. All pricing fields shall contain a numeric value. Where no additional charge applies, the Bidder shall enter '0'. Blank fields may be interpreted by the County as an incomplete response and may result in the Bid or Proposal being deemed non-responsive. The County reserves the right to seek clarification of apparent clerical errors; however, the County is under no obligation to do so. The Bidder/Proposer is solely responsible for ensuring that all required pricing information is provided and that the submitted pricing accurately reflects all costs necessary to perform the Work in accordance with the solicitation requirements. Interpretation of Bid Prices and Mathematical Errors The unit price shall prevail over the extended price. The sum of the corrected line item totals shall prevail over any stated subtotal or grand total. Words shall prevail over figures where both are provided for the same bid amount. The County reserves the right to correct obvious clerical or mathematical errors and may request written clarification when necessary. Clarification shall not permit modification of the bid or any change that would affect the bidder's competitive position. Non-Collusion Certification Requirements Each bid submitted in response to this solicitation shall include an electronic non-collusion certification. By submitting a bid, the Bidder affirms that its response is genuine and not collusive or sham and that the Bidder has not colluded, conspired, or agreed with any other bidder or person to fix prices, restrict competition, or otherwise undermine the competitive procurement process. The electronic submission of a bid constitutes the Bidder’s legally binding certification and execution of this requirement, and no notarized affidavit is required. Bidder Representations Each Bidder by submitting a bid represents that: The Bidder has read and understands this IFB (including all specifications and attachments) and that their bid is made in accordance therewith. The Bidder has reviewed the IFB, has become familiar with the local conditions under which the Work is to be performed, and has correlated personal observations with the requirements of the proposed Contract Documents. The bid is based on the terms, materials, systems and equipment required by this IFB, without exception. The Bidder is qualified to provide the services and equipment required under this IFB and, if awarded the Contract, will do so in a professional, timely manner using Bidder's best skill and attention. Local Vendor Preference Dorchester County has adopted a Local Vendor Preference in accordance with Chapter 2, Article VI, Division 10 of the Dorchester County Code of Ordinances. A bidder seeking consideration for the Local Vendor Preference must complete and submit the County's Vendor Preference Affidavit with its solicitation response. Failure to submit the completed affidavit with the solicitation response shall constitute a waiver of any claim for local vendor preference. The Local Vendor Preference applies only when authorized by the County's Procurement Ordinance and shall not apply where prohibited by state or federal law, regulation, grant requirements, or other funding restrictions. Award of Contract Award of Contract will be made to the lowest responsive and responsible bidder(s) whose bid, conforming to the IFB, is most advantageous to the County, price and other factors considered. The County reserves the right to make multiple awards based on the capacity of each Bidder, beginning with the Lowest Responsible Bidder. The County reserves the right to 1) reject any or all bids and any part of a bid; 2) waive informalities, technical defects, and minor irregularities in bids received; and 3) award the bid(s) received on the basis of individual items or groups of items or the entire list of items. The County reserves the right to accept or reject any alternates in any combination. Award may be made on the base bid alone or on the base bid plus or minus any alternates, whichever is determined by the County to be in its best interest. For purposes of award, the County will evaluate the combination of base bid and alternates selected by the County. The County shall be the sole judge of the suitability of the items or services to be provided pursuant to this IFB. The County reserves the right to request the contractor/vendor’s latest financial statements and other such additional information as may be reasonably necessary to determine whether the contractor/vendor should be awarded the contract. For debriefings, protests and appeals after the award of a contract, contractors are advised to consult the Procurement Policy Manual located on the Dorchester County website at: www.dorchestercountysc.gov/purchasing. Notice of Award of Contract The successful Bidder will be notified of acceptance of bid by a written Notice of Award of contract. The successful Bidder shall not undertake any work, and the County will not be responsible for payment for any work whatsoever undertaken by successful Bidder prior to execution of the contract by both parties. The successful Bidder shall be required to submit acceptable Insurance Certificate(s) and Endorsement(s) within Five (5) Business Days after the issuance of the Notice of Award. Contract Document The successful Bidder shall be required to execute a formal contract within Ten (10) business days after issuance of a Letter of Intent to Award. Said Contract shall be virtually identical in substance and form to the Sample Contract contained herein. The only anticipated changes will be to include additional exhibits, to fill in the blanks to identify the successful Bidder, and terms relating to compensation, or to revise the contract to accommodate corrections, changes in the scope of work, or changes pursuant to addenda issued prior to the bid opening. Because the signed contract will be substantively and substantially derived from the Sample Contract, Bidder is urged to seek independent legal counsel as to any questions about the terms, conditions or provisions contained in the Sample Contract, before submitting a bid. Again, the Sample Contract, contains important legal provisions and is considered part and parcel of this IFB. Bidders should raise any questions regarding the terms of the Contract, or submit requested changes in said terms, in the form of written questions or submittals, subject to the deadline for questions. Failure or refusal to sign aforesaid Contract shall be grounds for the County to revoke any Letter of Intent to Award which has been issued, for the bidder to forfeit their bid security, and for the County to award the Contract to another Bidder. Inspections and Testing Unless otherwise specified, Geotechnical and Special Inspection testing and SWPPP inspections / monitoring shall be by the Owner’s third-party agent and are not part of the Contract Sum. Inspections and tests not explicitly assigned to Owner are Contractor’s responsibility. Costs for retesting and reinspection construction that replaces or is necessitate by work that failed to comply with the Contract Documents will be charged to Contractor, and the Contract Sum will be adjusted by Change Order. Modification A. The County has defined this section in the Sample Contract. Notice to Proceed A Notice to Proceed will be issued after the successful Bidder has executed the Contract and has submitted acceptable performance and payment bonds (if applicable) to the County as well as other submittals specified herein as required to be delivered before the Notice to Proceed is issued. The successful Bidder shall not deliver any equipment to the work site or commence work until the successful Bidder has received a written Notice to Proceed from the Purchasing Services Manager. Bidder's Qualifications Before a bid is considered for award, the Bidder may be requested by the County to submit a statement providing additional information regarding their previous experience in performing comparable work. Subcontractors If any subcontractors will be used for this project, the successful Bidder shall provide to the Purchasing Services Manager a list of names of any of the intended subcontractors, the subcontractor's applicable license number(s), and a description of the work to be done by each subcontractor on the Subcontractor Data Report Form included herein. The successful Bidder shall not substitute other subcontractors without the written consent of the Purchasing Services Manager. The successful Bidder shall be responsible for all services performed by a subcontractor as though they had been performed by the successful Bidder. Responsibilities include, but are not limited to, compliance with any applicable licensing regulations. If at any time the Purchasing Services Manager determines that any subcontractor is incompetent or undesirable, the director shall notify the successful Bidder accordingly, and the successful Bidder shall take immediate steps for cancellation of the subcontract and replacement. Nothing contained in any contract resulting from this IFB shall create any contractual relationship between any subcontractor and the County. It shall be the successful Bidder’s responsibility to ensure that all terms required in the attached Contract are incorporated into all subcontracts. Indemnification The County has defined this section in the Sample Contract. Termination The County has defined this section in the Sample Contract. State and Local Taxes Except as otherwise provided, Contract prices shall include all applicable state and local taxes. The successful Bidder shall calculate that portion of the Contract which is subject to the seven percent (7%) sales and/or use tax, which amount shall be itemized and shown on all invoices, and shall be paid to South Carolina Department of Revenue (SCDOR) by Contractor. If the successful Bidder is a non-South Carolina company, the County will withhold said amount from all invoices and remit payment to the SCDOR, unless the Contractor furnishes County with a valid South Carolina Use Tax Registration Certificate Number. The successful Bidder shall indemnify and hold harmless the County for any loss, cost, or expense incurred by, levied upon or billed to the County as a result of the successful Bidder’s failure to pay any tax of any type due in connection with this Contract. The successful Bidder shall ensure that the above sections are included in all subcontracts and sub- subcontracts, and shall ensure withholding on out of state sub and sub- subcontractors to which withholding is applicable.

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

Plain text

OpenGov categories

  • 91371 · Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc)
  • 91395 · Paving/Resurfacing, Highway and Road
  • 92900 · Equipment Maintenance And Repair Services For Agricultural, Construction, Heavy Industrial, Material Handling, And Road And Highway Equipment
  • 92968 · Road and Highway Equipment (Not Otherwise Classified) Maintenance and Repair