Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Liquid Crack Filling

Description

The County of Wayne, NY is soliciting sealed responses for Liquid Crack Filling . Responses are due , on or before 1:00 pm prevailing time on Thursday, January 7, 2027 . Late responses will not be accepted. Liquid Crack Filling Polymer Modified Asphalt Joint & Crack Sealant (D6690) Fiber Reinforced Asphalt Joint & Crack Sealant (PG64-22) Project Details / Scope of Work Specifications - (Joint Crack fill - Non Fiber) This specification covers joint sealants of the hot-poured type intended for use in sealing joints and cracks in Portland cement concrete and asphalt concrete pavements. General The work shall consist of cleaning and sealing cracks and joints in the existing pavement. All sealant shall be an asphalt cement. The Contractor shall provide a listing of municipal and/or private projects where installation of ASTM D3450 or D6690 has occurred over the last two years. Before beginning the work the Contractor will be required to demonstrate to the satisfaction of the County Superintendent - Highways, compliance with the specification. Description The work to be done shall consist of performing all operations and furnishing all labor, equipment and materials for cleaning and sealing miscellaneous cracks and joints in the pavement using ASTM D3405. The work shall commence within 14 days’ notice from the County or as agreed upon between the vendor and the agency. Materials The material used shall meet the following requirements: ASTM Standard D6690 Testing Joint Sealants, Hot-poured, for Concrete and Asphalt Pavements. General Requirements The joint sealant shall be composed of a mixture of materials that will form a resilient and adhesive compound capable of effectively sealing joints and cracks in concrete and asphaltic pavements against the infiltration of moisture and foreign material throughout repeated cycles of expansion and contraction with temperature changes, and that will not, at ambient temperatures, flow from the joint or be picked up by vehicles tires. The material shall be capable of being brought to a uniform pouring consistency suitable or completely filling the joints without inclusion of large air holes or discontinuities and without damage to the material. It shall remain relatively unchanged at pouring temperature in the field. Physical Requirements Safe Heating Temperature. The safe heating temperature is the highest temperature to which the sealant can be heated and still conform to all the requirements specified herein. For purpose of testing as specified hereafter, the pouring temperature shall be the same as safe heating temperature. The safe heating temperature shall be set forth by the manufacturer and shall be shown on all containers and shall be provided to the testing agency before any laboratory tests are begun. Penetration at 77°F (25°C), 150g, 5s, shall not exceed 90. Flow at 140°F (60°C) shall not exceed 3.0mm. Bond. The sealant shall be tested at -20°F (-29°C) for three complete cycles. The development at any time during the test procedure of a crack, separation, or other opening that at any point is over ¼" (6.4mm) deep, in the sealer or between the sealer and mortar block, shall constitute failure of the test specimen. The depth of the crack, separation, or opening shall be measured perpendicular to the side of the sealer showing the defect. All three specimens must meet this requirement for bond. As an alternative to the bond test as specified, the specifying agency may permit testing at 0°F (17.8°C) in the alternative procedure. Methods D6690. Resilience. When tested at 77°F (25°C), the recovery shall be a minimum of 60%. Asphalt Compatibility. There shall be no failure in adhesion, formation of an oily exudate at the interface between the sealant and the asphaltic concrete, or softening or other deleterious effects on the asphaltic concrete or sealant when tested at 140°F (60°C). Packaging and Marking: The sealing compound shall be delivered in the manufacturer's original sealed containers. Each container shall be legibly marked with the name of the manufacture, the trade name of the dealer, the manufacturer's batch number or lot, the pouring temperature and the safe heating temperature. Test Methods: The physical requirements enumerated in this specification shall be determined in accordance with Methods D3407. Construction Details Heat, haul, deliver (in hot oil-heated, containerized, mobile tanks), clean cracks (air compressor with minimum 125 cfm), and seal cracks at the locations. Vendor to supply and operate all equipment, including that required to clean and seal cracks. Only well defined, single cracks shall be sealed. Sealing shall be limited to cracks not less than one eighth inch wide not more than one inch wide, at locations as directed by the Engineer or agency representative. Cracks with varying widths, portions of which are one eighth inch wide or greater, shall be sealed along their entire length. Longitudinal cracks in the travel lane shall be sealed, Centerline cracks, cracks between lanes, and edge or pavement cracks may be filled or sealed. Where secondary cracking exists, seal only the primary (widest) crack. Do not seal secondary cracks, or excessive material width and thickness will result. All cracks shall be thoroughly cleaned of dust, dirt, foreign material, sand and any other extraneous materials by high pressure air or a hot air lance. When using a hot air lance, care shall be taken so as not to burn, scorch or ignite the adjoining pavement to prevent recontamination of the crack. The crack sides shall appear thoroughly clean and dry immediately prior to sealing. The Vendor shall be ordered to re-clean cracks, if in the opinion of the agency representative, adequate cleaning and drying is not evident. Any cracks not sealed the same day shall be re-cleaned prior to sealing. Cracks shall be sealed by placing the applicator wand in or directly over the crack recess and carefully discharging the sealant just to fill the crack. The material shall be struck off flush with the pavement surface using a sealing shoe and/or "V" shaped squeegee pressed firmly against the roadway surface. Only a narrow, thin "film" or material shall be permitted on the pavement surface, no greater than two inches wide and one thirty-second inch thick. Sealant in excess of the specified thin "film" am Specifications (Joint Crack fill - Fiber) General: The work shall consist of cleaning and sealing cracks and joints in the existing pavement. All sealant shall be a fiber reinforced asphalt cement. The Contractor shall provide a listing of municipal and/or private projects where installation of asphalt cement sealant has occurred over the last two years. Before beginning the work the Contractor will be required to demonstrate to the satisfaction of the Associate Engineer - Highways, his competence in mixing and applying the fiber reinforced asphalt sealant in accordance with this specification. Description: The work to be done shall consist of performing all operations and furnishing all labor, equipment and materials for cleaning and sealing miscellaneous cracks and joints in the pavement using asphalt reinforced with polyester fiber. The work shall commence within 14 days’ notice from the County or as agreed upon between the vendor and the agency. Materials: The material used shall meet the following requirements: Asphalt cement shall be paving grade asphalt with a material designation 702 of the New York State Department of Transportation Specifications with a viscosity grade of PG 64-22. b. The fibers shall meet the following requirements: Material: Polyester. Length: 1/4" (one quarter inch). Tensile Strength: 75,000 psi + 5,000 psi (pounds per square inch). Specific Gravity: 1.32 to 1.40. Melt Temperature: 480 deg F. minimum. Elongation: 45%. The asphalt cement and fiber proportion shall be based on weight. The weight of the polyester fibers added to the asphalt cement shall be a minimum of 5% of the weight of the raw asphalt cement. The fiber reinforced asphalt cement shall be mixed at the temperatures recommended by the fiber manufacturers but shall not exceed 325 deg F. Blotting material shall be Black Beauty manufactured by H.B. Reed & Company, utility grade #1040 or approved equal. If the bidder is proposing an alternate material this must be clearly identified on the proposal page. CONSTRUCTION DETAILS: Surface Preparation - The Sealant shall be applied only when the joints and cracks and adjacent pavement surfaces are dry and free of dirt, vegetation, loose material, debris and loose sealant. Joints and cracks and adjacent pavement surfaces shall be cleaned by air blasting. Joints and cracks in excess of 1 inch width shall be repaired by the County before application of the sealant. Preparation of Asphalt Fiber Mixture - The sealant shall be mixed in a double jacketed kettle equipped with an agitator and re-circulating pump. The mixing unit shall be capable of maintaining the specified mixing temperature. Equipment - The asphalt kettle shall be a double jacket kettle with asphalt cement heated by transfer oil. The asphalt sealant shall be mixed by full sweep agitation. Application of Sealant - The pavement surface temperature shall be a minimum of 50 degrees F. during application. The sealant shall be pumped directly into the crack or joint from the mixing unit. The mixing unit shall have a distributor wand with a pancake design, with the applicator specifically designed to apply the sealant under pressure which compresses the sealant onto the pavement surface. The sealant shall overlap the crack at the pavement surface. The finished height of the sealant above the pavement surface shall be 1/8" to 3/16". Blotting Material - Blotting with fine aggregate shall directly follow sealant application if traffic is permitted immediately after crack sealing, within pedestrian areas or if the ambient temperature exceeds 75 degrees F. Demonstration - Before beginning the work the Contractor will be required to demonstrate to the satisfaction of the Associate Engineer - Highways, his competence in mixing and applying the fiber reinforced asphalt sealant in accordance with the specification. The working hours of construction may have to be restricted on arterial functional classification streets. In general, lane reductions may be prohibited during the peak rush traffic hours of 7:00 A.M. to 9:00 A.M. and 4:00 P.M. to 6:00 P.M. Monday through Friday. The Contractor shall exhibit the ability to maintain adequate traffic flows with a minimum of two lanes of traffic (1 lane in either direction) to the satisfaction of the Associate Engineer - Highways. Temporary no parking signs may be necessary to facilitate traffic flows or crack seal curb lanes. The Contractor shall provide these temporary signs. The construction material for these signs shall be on a light weight card board paper stock or as approved by the Associate Engineer - Highways. The temporary no parking signs shall be in accordance with Sign No. P1-2C of Part 221.5; Prohibition signs, of "The New York State Manual of Uniform Traffic Control Devices." Placement of signs will be as approved by the County Maintenance Supervisor - Roads on a per street basis. The Contractor must provide a minimum of one flag person at all times. The purpose of this flag person is to maintain directional vehicular and pedestrian traffic. An arrow board shall also be utilized to provide advance warning of lane changes and construction operations in addition to a flag person. Qualifications of Bidders All bidders will be required to have a minimum of 2 years’ experience installing hot fiber reinforced asphalt sealing similar to those specified in this contract. Within 3 working days of request by the County, The bidder must present evidence of experience as an asphalt sealant contractor for jobs equivalent to those of this contract and possessing financial standing, plant, machinery and equipment adequate to handle this project. The bidder must provide a list of contract work performed within the last 2 years. Roads to be Cracked Sealed Roads to be crack sealed will be designated by the Associate Engineer - Highways. Maintenance and Protection of Traffic The Contractor shall be responsible for the maintenance and protection of traffic in accordance with the current Manual of Uniform Traffic Control Devices (MUTCD) and supplements. The Contractor shall exhibit the ability to maintain adequate traffic flows to the satisfaction of the Associate Engineer - Highways. Work hours shall be 7 am to 430 pm Monday thru Friday. Temporary no parking signs may be necessary to facilitate traffic flows or crack seal curb lanes. The Contractor shall provide these temporary signs. The construction material for these signs shall be on a light weight card board paper stock or as approved by the Associate Engineer - Highways. The temporary no parking signs shall be in accordance with Sign No. P12C of Part 221.5; Prohibition signs, of the current Manual of Uniform Traffic Control Devices (MUTCD) and supplements. Placement of signs will be as approved by the County Maintenance Supervisor - Roads on a per street basis. The Contractor must provide a minimum of one flag person at all times. The purpose of this flag person is to maintain directional vehicular and pedestrian traffic. An arrow board may also be utilized to provide advance warning of lane changes and construction operations in addition to a flag person. Method of Measurement Non Fiber The quantity to be paid shall be the actual installed number of gallons of polymer modified crack sealant cement at 60°F. The gallons will be verified by delivery tickers and measurements of asphalt cement volumes in the kettle prior to additions of fibers. No payment will be made for wasted material. Fiber The quantity to be paid for shall be the actual installed number of gallons of asphalt cement at 60 degrees F. used within the fiber reinforced asphalt sealant. The gallons will be verified by asphalt cement delivery tickets and measurements of asphalt cement volumes in the kettle prior to additions of fibers. No payment will be made for wasted material. Expanded volume of the fiber reinforced asphalt sealant due to temperature and addition of fibers will be reduced by corresponding expansion when calculating waste materials. Basis for Payment The unit price bid shall be per gallon and include the cost of all maintenance and protecting traffic, labor, equipment and materials necessary to complete the work. Asphalt Price Adjustment The unit prices per gallon of liquid bituminous asphalt emulsions material purchased from any award based on this specification will be subject to adjustment based on the following formula: Price Adjustment Per Gallon = New Monthly Average (per English Ton) - Base Average Terminal Price X Total Allowable Asphalt & Fuel Allowance 235 Price adjustments allowed will be based on the November 1, 2026 average of the F.O.B. terminal price per English ton of unmodified PG 64S-22 binder without anti-striping agent (base average F.O.B. terminal price). The new monthly average terminal price will be determined by the New York State Department of Transportation based on prices of pre-approved primary sources of performance graded binder in accordance with the New York State Department of Transportation Standard Specification. NEW MONTHLY AVERAGE F.O.B. TERMINAL PRICE : The average F.O.B. terminal price for unmodified PG 64-22 binder without anti-stripping agent as determined by the New York State Department of Transportation per New York State Department of Transportation Standard Specification. BASE AVERAGE F.O.B. TERMINAL PRICE : The average F.O.B. terminal price of unmodified PG 64-22 binder without anti-stripping agent as determined by the New York State Department of Transportation. The November 1, 2026 average is $803.00 Total % Asphalt Plus Fuel by Material Type The Percentage of total allowable asphalt and fuel for each item is as follows: Item % Asphalt Fuel Allowance Total Asphalt & Fuel Allowance Type MC1 Binder Course 5.75 1 6.75 6.3 mm F2 Polymer Modified 6.7 1 7.7 Flexible Overlay (Smooth Seal) 7 1 8 Flexible Top 6.2 1 7.2 True & Leveling F9, Superpave HMA, (All ESAL) 1 * % Shim Course F9, Superpave HMA, (All ESAL) 8.25 1 9.25 Top Course 9.5 mm F2 Superpave HMA, (All ESAL) 6.2 1 7.2 Top Course 12.5 mm F2 Superpave HMA, (All ESAL) 5.5 1 6.5 Binder Course 19 mm F9 Superpave HMA, (All ESAL) 4.9 1 5.9 Binder Course 25 mm F9 Superpave HMA, (All ESAL) 4.5 1 5.5 Base Course 37.5 mm F9 Superpave HMA, ( 3 M ESAL’s) 4.0 1 5.0 Paver placed surface treatment ‘Novachip’ 7.00 0 7.00 % Asphalt Emulsions CMS-2 65 12.2 77.2 % CRS-2 65 3.2 68.2 % CRS-2p 65 3.2 68.2 % CSS-1 57 0.2 57.2 % CSS-1h 57 0.2 57.2 % RS-2 63 3.2 66.2 % RS-2p 63 3.2 66.2 % HFRA 65 5 70% HFMS-2 65 10.2 75.2 % HFMS-2gh 75 3 78 % HFMS-2h 65 3.2 68.2 % HFRS-2 63 3.2 66.2 % HFRS-2p 63 3.2 66.2 % HFMS-2h Tack coat 40 0.2 40.2 % RS-1h (Rapid breaking tack) 55 0.2 55.2 % CSS-1h Tack Coat 57 0.2 57.2 % PG 64-22 (AC-20 w/ fiber crack fill) 95 0 95 % 18-64 100 0 100 % Polymer Crack fill (ASTM D6690) 56 0 56 % MC 30 100 2 102% DEC 50 25 25 50% The conversion factor will be computed separately using the conversion factors for the individual mixture used EXAMPLE: Item Asphalt Polymer Crackfill (ASTM D6690) Base Average Price = $400.00 New Average Price = $500.00 Total % Asphalt plus Fuel = 56% $500.00 - $400.00 X 0.56 = +$0.24 per English Gallon 235 *Fuel Allowance represents allowance for energy (fuel, electricity, natural gas) used in the production of asphalt. It is a cost associated with the product and not intended to represent any trucking or hauling of product. NOTE: All materials with identical numbers preceding the decimal and identical first and second number after the decimal receive the price adjustment shown for the base material. Positive Price Adjustment number shall be added to original bid price per English ton. Negative Price Adjustment number shall be subtracted from original bid price per English ton. Price adjustments allowed by this contract shall be calculated and applied to the original prices. All price adjustments will be computed to three decimal places. Should these provisions result in a price structure which becomes unworkable, detrimental or injurious to the State or in prices which are not truly reflective of market conditions or which are deemed by the Commissioner to be unreasonable or excessive, and no adjustment in price is mutually agreeable, the Commissioner reserves the sole right upon ten days written notice mailed to the contractor to terminate any contract resulting from this bid opening. Price adjustment shall be published by the State and issued to all contract holders, whose responsibility will be to attach the appropriate state notification (based on when the work was performed) to the payment invoice submitted to agency. Work performed after the expiration of the contract, where no extension has been granted, resultant from purchase orders placed prior to expiration of the contract will receive the price adjustments in effect the last month of the contract. Price adjustment for any contracts that are extended will be based on the new average for the month in which the work is done applying the same base established for that contract. Asphalt Price Adjustments: Asphalt price adjustments will be made according to the provisions provided in the specifications. Notice Notice to Contractors (Physical Responses Only) Notice is hereby given that the County of Wayne is conducting a Request for Bids for Liquid Crack Filling Sealed responses may be submitted physically or by mail in a sealed envelope clearly identified and filed with the Superintendent of Public Works, 7227 Route 31, Lyons, New York 14489, 26 Churc

Plain text

OpenGov categories

  • 15010 · Construction Materials (Not Otherwise Classified)
  • 74500 · Road And Highway Building Materials (Asphaltic)
  • 74580 · Rubber Asphalt Crack Sealing Compound
  • 75510 · Asphalt Distributors, Levelers, Mixers, Crack Sealing Equipment, etc. (See 755-40 for Tools)