Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Main Street Bridge No. 794004 Repairs - Cleaning and Painting

Description

The County of Volusia, Department of Public Works, Road & Bridge Division, is seeking a single, responsive and responsible bidder for Main Street Bridge (Bridge No. 794004) Repairs – Cleaning and Painting project in Daytona Beach, Florida. The project consists of the following: (1) clean and paint all structural steel on the bascule and flanking spans and select machinery, (2) install web repair plates, (3) replace bolt/rivets, (4) remove abandoned air buffers and strike plates, and (5) disassemble bearings, clean, re-pack with grease, and replace grease fittings at the auxillary drive for the span drive machinery. The lowest responsive and responsible bidder shall be responsible for all applicable permitting, labor, materials, equipment, tools, transportation, services, and incidentals necessary to complete all Work required by the specifications and as shown on the drawings. The Contractor shall provide a complete job, including all labor, materials, and equipment, removal and disposal of materials for cleaning, painting, machinery rehabilitation and reconditioning, and structural steel repairs, including but not limited to: traffic control, maintenance of channel traffic, pollution controls, environmental testing, functional checks including span balancing, O&M manuals, restoration and as-built surveys/drawings. Scope of Work Scope of Work The County of Volusia, Department of Public Works, Road & Bridge Division, is seeking a single, responsive and responsible bidder for Main Street Bridge (Bridge No. 794004) Repairs – Cleaning and Painting project in Daytona Beach, Florida. The project consists of the following: (1) clean and paint all structural steel on the bascule and flanking spans and select machinery, (2) install web repair plates, (3) replace bolt/rivets, (4) remove abandoned air buffers and strike plates, and (5) disassemble bearings, clean, re-pack with grease, and replace grease fittings at the auxillary drive for the span drive machinery. The lowest responsive and responsible bidder shall be responsible for all applicable permitting, labor, materials, equipment, tools, transportation, services, and incidentals necessary to complete all Work required by the specifications and as shown on the drawings The Contractor shall provide a complete job, including all labor, materials, and equipment, removal and disposal of materials for cleaning, painting and structural steel repairs, including but not limited to: traffic control, maintenance of channel traffic, pollution controls, environmental testing, functional checks including span balancing, O&M manuals, restoration and as-built surveys/drawings. The Contractor is to be aware that, in addition to General Note No. E below, the USCG Pre-Construction Form included within the solicitation shall be submitted to meet the required 60-day and 30-day advance notification deadlines. In addition to submitting a Pollution Prevention and Control Plan and Waste Containment Plan, the Contractor is required to submit a soil sample testing of the project laydown lot waste storage areas prior to construction and at the completion of the project. The two soil sample reports shall be a submittal at the end of the project with the required as-builts. Any laboratory testing required is incidental to this bid. A paint analysis report is included within the solicitation to establish a base line of potential existing contamination at the site for pre-vs-post construction readings. General Notes In the event that any standards or specifications as described herein are in conflict with each other, or in conflict with that shown in the plans or technical provisions, the more stringent criteria will apply at the sole discretion of the County Road & Bridge Director or his/her designee. Contractor shall notify the County Representative immediately and in writing should the criteria be unclear, for the County Road & Bridge Director's interpretation of the criteria to be used. In the event the Contractor discovers any errors or omissions in the plans, the Contractor shall immediately notify the County Representative. Aside from the bridge lane closures discussed in the Maintenance of Traffic section below, the bridge shall remain operable at all times to traffic. Machinery room preparations prior to painting will account for and prevent debris fouling of the main machinery room gears and racks. The main gears and racks will be fully degreased and regreased prior to commencement of the project to establish a certified pre-construction condition. This work will be performed by the County with a Contractor representative present to verify existing conditions before project commencement. During machinery room preparation and painting activities, all machinery equipment will be fully protected to prevent debris contamination of the gear and rack systems. Prior to returning the span to operation, the Contractor will perform a final degreasing, cleaning, and regreasing of the gears and racks under the supervision of a County representative. The span will not be placed back into operation until approval is granted by the County representative. Any modification to span operations will require prior approval from the United States Coast Guard in accordance with the requirements listed below. One span will always be in operation during the construction period and modification of opening restrictions will be limited to approval obtained by the United States Coast Guard. The Contractor shall be responsible for notifying the United States Coast Guard (USCG) no less than 60 days in advance of any work that could potentially affect the waterway traffic, including single leaf operations, and 30 days prior to the commencement of construction. The notifications shall be sent to the USCG District 7 bridge branch contacts and include the County’s Project Manager: Jennifer Zercher, (305)415-6740, Jennifer.N.Zercher@uscg.mil and USCG Jacksonville Sector Office, (904)714-7616, D07- DG-SECJAX-WATERWAYS@uscg.mil. Span Balance shall be performed at the completion of the work. The Contractor shall hire a certified bridge balance firm to perform this testing in accordance with Technical Specification T465-2. The equipment and electrical lockout/tagout (LOTO) process shall be submitted for review and approval prior to the commencement of work. Work in and around hazardous equipment may be required; therefore, to ensure adherence to safe working procedures, the Contractor shall properly initiate and implement tagout procedures in accordance with their approved process. A two-way radio shall be required at all times to communicate working conditions with the Bridge Tender via Channel 9. The days of contract completion provided under the contract include installation and commissioning time as well as shop drawing and material procurement time. If there are long lead times to receive materials in order to perform the work, the Contractor shall notify the County Representative immediately and provide in writing the expected delivery lead time for the materials. Contractor shall notify the County when the performance phase of the project is anticipated to begin. The plans are solely to assist the Contractor in assessing the nature and extent of the existing conditions and convey the intent of the construction plans. The Contractor is responsible for investigating the existing site conditions, including all surface and subsurface conditions, existing features and infrastructure, all available reports and records, the work required, and all other conditions that may affect the successful completion of the project prior to submitting a construction bid and again prior to commencement of construction activities. The Contractor shall give all notices and comply with all laws, ordinances, rules, regulations and permit conditions bearing on the conduct of the work, as drawn and specified. If the Contractor observes that the drawings and specifications are at variance therewith, he shall promptly notify the County Representative, in writing, and any necessary changes shall be adjusted, as provided in the agreement for changes in the work. The County Road & Bridge Director and/or his/her representatives and inspectors of other applicable government agencies having jurisdiction, shall at all times have access to the work site wherever and whenever it is in preparation or progress. The Contractor shall provide proper facilities for such access and inspections. The Contractor shall be responsible for meeting all inspection criteria and schedules and signing for said inspections. The Contractor shall comply with all legal load restrictions in the hauling of materials on public roads beyond the limits of the work. A special permit will not relieve the Contractor of liability for any damage that may result from the moving of materials and equipment. It is the Contractor's responsibility to take all reasonable and prudent precautions to ensure that all completed work, materials and equipment stored on site are safe and secured from unauthorized access or use. Such precautions may include installation of signs, fences, or posting of security guards. Contractor shall, at all times, utilize all normally accepted and reasonably expected safety practices and comply with all federal, state and local regulations, ordinances and guidelines pertaining to safe utilization of equipment or materials as published by manufacturer(s). The Contra Staging and Phasing Materials, equipment, and earthwork stockpiles may not be stored within the roadway clear zone or within 5 feet of a pedestrian facility. The Contractor is responsible for construction staging and storage areas and for maintenance of staging area(s). Purchase or lease of property for staging purposes is incidental to the cost of construction and at no additional cost to the County. Staging areas shall be surrounded by silt fence and accessed via a soil tracking prevention construction entrance(s). Construction entrance(s) shall be kept clean and free of accumulated sediment. The active phase of construction shall only be accessed via a soil tracking prevention construction entrance(s). The Contractor shall keep adjacent streets clean and free from construction debris and sedimentation. The Contractor shall immediately remove any sediment from adjacent roadways and sidewalks and maintain all adjacent infrastructure and facilities free and clear of debris and sediment at all times. The Contractor shall maintain continuous ADA accessible route through or around each phase of construction at all times. The Contractor shall provide temporary pavement consisting of full depth road base and an asphalt patch to trenched areas and other temporary excavations constructed within existing roadways, driveways, and sidewalks until permanent asphalt or concrete has been installed. The Contractor shall maintain at least one access entrance to all commercial, industrial, residential properties and businesses at all times. The Contractor shall maintain a clear path for all surface water, drainage structures, and ditches during all phases of construction. The Contractor shall install all erosion, sedimentation, and turbidity control measures prior to construction activities in each phase. Hazardous Materials Hazardous material means any substance: the presence of which requires investigation or remediation under any present federal, state or local statute, regulation, ordinance, rule, code, order, action, policy or common law, or which is or becomes defined as a "hazardous waste", "hazardous substance," pollutant or contaminant under any present federal, state or local statute, regulation, rule or ordinance or amendments thereto including, without limitation, the Comprehensive Environmental Response Compensation and Liability Act (42 U.S.C. Sections 9601 et seq.) and/or the Resource Conservation and Recovery Act (42 U.S.C. Sections 6901 et seq.), or which is toxic, explosive, corrosive, flammable, infectious, radioactive, carcinogenic, mutagenic, or otherwise hazardous and is regulated by any governmental authority, agency, department, commission, board, agency or instrumentality of the United States, the state in which the premises are located or any political subdivision thereof, or The presence of which on the premises causes or threatens to cause a nuisance upon the premises or to adjacent properties or poses or threatens to pose a hazard to the health or safety of persons on or about the premises, or which contains gasoline, diesel fuel or other petroleum hydrocarbons, or which contains polychlorinated biphenyls (PCBS), asbestos, lead or urea formaldehyde foam insulation. Contractor and its sub-Contractors shall use, handle, transport, and dispose of all hazardous materials (as defined herein) in compliance with all present federal, state and local environmental, health or safety law, including, but not limited to, all such statutes, regulations, rules, ordinances, codes, and rules of common law. Contractor further agrees that Contractor and its sub-Contractors shall not cause the discharge, release or disposal of any hazardous material created by its work on or about the job site. In the event of any spill, release or any other reportable occurrence, Contractor shall notify the appropriate governmental agency and shall take such action as may be necessary to minimize the deleterious effect of such spill on persons or property. Contractor and its sub-Contractors shall, upon completion of performance of all duties under this contract, remove all supplies, materials, and waste containing any hazardous material from the job site. Contractor shall bear full financial responsibility, as between the parties of this contract, for the compliance of Contractor and its sub-Contractors with the provisions as outlined herein. Contractor agrees to indemnify, defend, protect and hold the owner harmless from and against any claims including, without limitation, actual attorney's fees and any costs of investigation, soils testing, governmental approvals, remediation and cleanup arising out of or in any way connected with the failure of Contractor or its sub-Contractors, or their agents, employees, officers, or representatives, to comply with the terms as described herein. Should Contractor or its sub-Contractors discharge, release or dispose of any hazardous material on or about the job site in violation of this paragraph, Contractor shall immediately inform the owner in writing. In the event of any spill, release or any other reportable occurrence, Contractor shall notify the appropriate governmental agency(s) and shall take such action as may be necessary to minimize the deleterious effect of such spill on persons, property or the environment. In the event Contractor or its sub-Contractors encounter on the premises any pipeline, underground storage tank or other container, of any kind, that may contain a hazardous material, or encounter material reasonably believed to be a hazardous material, Contractor shall immediately stop work in the area affected and report the condition to the owner in writing. If Contractor or its sub-Contractors do not comply with the requirements as outlined herein, owner may, but is not obligated to, give written notice of violation to Contractor. Should Contractor or its sub-Contractors fail to comply with the requirements of the paragraph within twenty-four (24) hours from the time owner issues such written notice of noncompliance or within the time of an abatement period specified by any governmental agency, whichever period is shorter, and Contractor shall be in material default of this contract. All areas used for fuel storage shall have the property owner's prior approval and appropriate measures shall be taken to insure protection of groundwater and soil resources. Maintenance of Traffic (MOT) / Temporary Traffic Control (TTC) MOT/TTC activity on Main Street Bridge shall be limited to after 8:00 a.m. and before 5:00 p.m., Monday through Friday. Work on weekends or evenings requires prior notification and approval by the County. Periodic lane closures will be permitted provided they are performed in accordance with a Contractor submitted and County approved TTC lane closure plan (additional information provided below). The Contractor shall provide a schedule for the road closure, in writing, to Volusia County Road & Bridge a minimum of ten (10) days prior to the anticipated closing of the road. The signage for the road closure detour shall be installed by the Contractor per the County approved MOT/TTC plan provided on sheet BX-17 of the Construction Plans. Subject to approval by Volusia County Road & Bridge, the Contractor may request, in writing, additional road closure days for consideration. The following are dates during which road closures shall not be permitted and the bridge shall remain open to vehicular traffic: Biketoberfest: October 15 – 18, 2026 (and as yearly scheduled) Speedweek: February 17 – 21, 2027 (and as yearly scheduled) Bike Week: March 5 – 14, 2027 (and as yearly scheduled) If short term (those 20 minutes or less in duration) closures to vehicular traffic are required, the Contractor shall provide two (2) Variable Message Boards (VMB), one (1) placed on each side of the bridge, to alert traffic of the expected delay during the short-term closure period. The location of the VMBs and the messages displayed shall be approved by Volusia County Road & Bridge prior to the VMBs being set up on-site. Short-term road closures must be able to accommodate passage of emergency vehicles. The Contractor shall submit an MOT/TTC plan for review at least 2 weeks prior to implementation and may not proceed without approval by the County. Main Street and all side streets shall remain open to vehicular and pedestrian access at all times. The Contractor is solely responsible for MOT/TTC throughout construction including but not limited to all materials, equipment, staff, sub-Contractors, signage, barricades, or temporary works that may be required. MOT/TTC shall be in accordance with FDOT Index No. 102-600 series as applicable. Soil Erosion and Sedimentation Control The Contractor shall develop and implement a Stormwater Pollution Prevention Plan (SWPPP) according to EPA/FDEP NPDES criteria and Best Management Practices (BMPs) prior to and throughout construction activities to prevent erosion and sedimentation, and ensure proper functioning of storm water management systems upon completion of construction. In addition to meeting EPA/FDEP NPDES criteria, the SWPPP shall be submitted to and comply with all applicable agencies having jurisdiction. The Contractor shall provide a Notice of Intent (NOI) in accordance with criteria set forth in the NPDES permit requirements a minimum of 72 hours prior to commencement of any on-site activities. A copy of the approved SWPPP shall be kept on site at all times for review by the County Representative and by NPDES inspectors. The Contractor shall implement all Soil Erosion and Sedimentation Control (SESC) measures and utilize all Best Management Practices (BMPs) and take all steps necessary to prevent erosion and/or sedimentation from impacting roadways, sidewalks, private property, any areas outside of the project limits, and to prevent any adverse impacts to the general public. The SESC measures and BMPs including but not limited to silt fence, hay bales, check dams, inlet protection, and turbidity barrier shall be installed and maintained in all locations in which there is any possibility of stormwater runoff draining away from construction activities or potential for sediment transport outside the project limits. All erosion control measures shall be located within public Right-of-Ways, easements, or on County property. All SESC measures and BMPs shall be in place prior to the start of any clearing, demoli

Plain text

OpenGov categories

  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
  • 91313 · Construction, Bridge and Drawbridge (Includes Reconstruction/Rehabilitation)
  • 91366 · Maintenance and Repair, Bridges
  • 91367 · Maintenance, Repair, and Operation of Drawbridges