Main Street Concrete Curbing, Sidewalk, and Driveways.
Description
The City of Bartow is seeking bids from qualified and experienced contractors to provide all necessary labor, materials, equipment, supplies, and supervision to complete concrete work for a street project located on Main Street in the City. This work includes new curbing, sidewalks, and driveways. This project starts at Hwy 60 west of town and goes east to the RxR just east of Hwy 17. This street improvement project is for the City of Bartow. SCOPE OF WORK Overview The City of Bartow is seeking bids from qualified and experienced contractors to provide all necessary labor, materials, equipment, supplies, and supervision to complete concrete work for a street project located on Main Street in the City. This work includes new curbing, sidewalks, and driveways. This project starts at Hwy 60 west of town and goes east to the RxR just east of Hwy 17. This street improvement project is for the City of Bartow. Project Background & Site Conditions The City has completed a comprehensive assessment of existing roadway conditions within the project area and has determined that improvements are necessary to address pavement deterioration, pedestrian accessibility, and compliance with current roadway standards. The project generally consists of full roadway repaving along the designated limits of Main Street, including the installation and/or replacement of concrete curbing, sidewalks, driveways, and other related roadway improvements necessary to provide a safe, functional, and durable transportation facility. The successful bidder will be required to furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the proposed improvements in accordance with the requirements established in the bid documents. All work shall be performed in accordance with applicable federal, state, and local requirements, recognized industry standards and best management practices, and the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction, 2026 Edition, including applicable FDOT standards, specifications, and regulations. Project Timeline The Contract Time is as follows: 120 CALENDAR DAYS The contract time for this project is 90 calendar days from Notice to Proceed to reach Substantial Completion a nd 30 calenda r days from Substantial Completion for Final Completion. Completion of the contract will have been achieved once Final Completion has been reached and all final documentation, including final application for payment, has been received and processed. Qualifications Bidders must meet the following minimum qualifications to be considered responsive and responsible: The Contractor submitting a bid must have been in business under the same name & TIN/FEIN number for the past three (3) years. Contractor shall be appropriately licensed to perform the services offered and shall possess, at the time of bid opening, all required licenses and certifications. Copies of all licenses and certifications shall be submitted with the response. The Contractor shall hold a valid Florida Commercial Builder license and MOT License . The Contractor must be familiar with the FDOT Index for Roads and Bridges. In order to do business with the City of Bartow, businesses based within the City limits of the City of Bartow shall furnish a copy of the most recent City of Bartow Business/Occupational License in which can be obtained from https://www.cityofbartow.net/departments-services/city-clerk-public-records/business-tax-receipt-occupational-licenses-applications-payments . For businesses based outside the City limits of the City of Bartow but are based in Polk County or those businesses based outside Polk County shall furnish a copy of the most recent Polk County Business/Occupational License in which may be obtained from https://www.polktaxes.com/services/local-business-taxes/ . The Contractor shall provid e three (3) referen ces of similar completed projects from within the last four (4) ye ars including project summaries where the Contractor acted as the Prime contractor with other government /Municipality. Please refer to the Reference Form provided under Section 8: Vendor Submittal Forms. The Contractor shall not be permitted to use alternative materials or supplies for this Project unless expressly authorized in writing by the Project Manager. The Contractor shall not subcontract any portion of the work without the prior written approval of the Project Manager. Note: Contractors are to review, complete and upload Qualifications Statement of the Bid Document as it relates to this section. Minimum Required Services To be considered responsive, the Contractor must be capable of performing all work required to successfully complete the Main Street Concrete Improvements Project, including but not limited to the following: Concrete Curbing and Gutter Installation Concrete Sidewalk Construction (ADA‑Compliant) Concrete Driveway Construction (6‑Inch Thickness) Clearing, Grubbing, and Existing Infrastructure Removal Subgrade Preparation and Compaction Maintenance of Traffic (MOT) Concrete Placement, Finishing, and Curing Testing and Inspection Coordination Protection of Existing Utilities and Structures Site Cleanup and Restoration Compliance with All Applicable Regulations Detailed Scope of Work – Main Street Concrete Improvements Main Street Concrete Curbing, Sidewalk, and Driveways, beginning at Highway 60 and continuing east to the railroad crossing just east of Highway 17. The Contractor shall perform all concrete work in accordance with Attachment A (2026 PH 9 Paving & Curbing Map), Attachment B (FDOT Curb & Gutter 300), and Attachment C (FDOT Sidewalk 310). The work described in this section corresponds directly to the line items in the Pricing Table. Quantities shown in the Pricing Table are for bidding and comparison purposes and represent the estimated amounts for mobilization, MOT, clearing and grubbing, curbing, 4" concrete sidewalk (ADA), and 6" concrete driveways. Contractors shall review the Pricing Table in conjunction with this Detailed Scope to ensure accurate unit pricing and full understanding of the required work. 1. General Requirements a. The Contractor shall provide a qualified superintendent who is responsible for daily operations and communication with the City. b. The Contractor shall protect all existing utilities, structures, and property. c. The Contractor shall maintain access to residences and businesses at all times. d. The Contractor shall coordinate with the City for inspections, testing, and staging activities. e. All disturbed areas shall be restored to original or better condition. Work Hours The regular working hours for the City are Monday – Friday, 7:00 AM to 7:00 PM. Permission to work outside of the regular work hours must be requested in writing a minimum of 2 working days in advance from the Contractor’s Project Manager. Permission to work on City holidays must be requested in writing a minimum of 2 working days in advance from the Contractor’s Project Manager. The Contractor shall not work outside the regular hours without the prior written consent of the City Project Manager. Clearing, Removal, and Site Preparation The Contractor shall: Remove existing sidewalk, curb, curb and gutter, driveways, and other concrete features as shown on the plans. Remove vegetation, roots, debris, and unsuitable soils to prepare the work area. Perform excavation, grading, and subgrade shaping required for new concrete installations. Properly dispose of all removed materials in accordance with federal, state, and local regulations. Proof‑roll and compact all subgrade areas following FDOT Section 120 requirements. Concrete Curbing, Gutter, and Concrete Features (FDOT Section 520) The Contractor shall construct concrete curb, curb and gutter, valley gutter, and other concrete roadway features in accordance with FDOT plans and specifications, including: Installation of wood or metal forms Concrete placement using approved mix designs Consolidation and finishing to required lines and grades Installation of contraction and expansion joints Achieving required slope and elevation tolerances Curing and protection of concrete Backfilling and compaction after curing All curb elements must meet cross‑slope accuracy, alignment, and finish requirements. 4-Inch Concrete Sidewalk (ADA‑Compliant) The Contractor shall construct ADA‑compliant concrete sidewalks per FDOT Section 522, including: Excavation and grading to required subgrade elevation. Compaction and proof‑rolling of subgrade. Installation of forms and reinforcing (if applicable). Placement of 4-inch concrete sidewalk sections. ADA‑compliant slopes and cross‑slopes (maximum 2%). Installation of detectable warning surfaces where shown. Finishing (broom finish unless otherwise specified). Saw‑cutting or forming of joints. Curing per FDOT specifications. 6-Inch Concrete Driveways The Contractor shall construct concrete driveways at locations shown on the plans, including: Removal of existing driveway surfaces Excavation and subgrade preparation Compaction and proof‑rolling Placement of 6‑inch thick concrete Installation of reinforcement (if specified) Finishing and curing Ensuring proper transitions to public streets and private property The Contractor must maintain driveway access during construction. Maintenance of Traffic (MOT) The Contractor shall: Prepare and submit an MOT plan for City approval before beginning work. Install signage, barricades, cones, and devices per FDOT and MUTCD requirements. Maintain two‑way traffic flow where possible, unless authorized otherwise. Provide access for emergency vehicles at all times. Maintain safe pedestrian accommodations throughout the project. Prevent hazards or obstructions after working hours. No work may begin until the MOT plan is approved in writing. Testing and Inspections The Contractor shall: Provide 48‑hour notice before inspections or testing. Perform all required material testing (concrete strength, density, etc.). Provide certificates, mix designs, and required documentation. Remove and replace any non‑conforming work at no cost to the City. Cooperate fully with City inspectors and representatives. Erosion Control and Environmental Protection The Contractor shall: Implement erosion and sediment control as needed. Prevent contamination from fuel, oil, or concrete washout. Immediately repair any environmental damage caused by construction activity. Cleanup and Site Restoration During and after construction, the Contractor shall: Keep work areas clean and free of debris. Sweep and maintain roadway surfaces daily. Restore disturbed grassed areas, driveways, and sidewalks. Remove all temporary facilities, equipment, and waste. Deliver a fully restored, clean project site at Final Completion. Final Acceptance The project will not be accepted until: All punch‑list items have been completed. All testing results and documentation are submitted. The site is fully restored and cleaned. A final inspection confirms compliance with all specifications. Supervision of Work by Contractor: The Contractor shall provide all services to properly complete the work described in this Bid Document, including but not limited to all labor, materials, supervision, equipment, tools, transportation, and supplies. The Contractor is required to have a qualified superintendent assigned to the job site. The Contractor will provide the superintendent's contact information to the City Project Manager before work commences on the job site. The contact information shall include the superintendent’s cell phone number and e-mail address. If the City determines that a job site is not being adequately supervised, a deficiency letter will be issued to the Contractor, which may affect the Contractor’s performance rating and the Contractor's ability to bid on future City work. Except: As amended in this Bid Document, all work shall conform to the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction; the FDOT Standards Plans; and the Manual of Uniform Traffic Control Devices, current editions. Projects Planned: The project work order location within the Main Street location in the City. Projects that are currently planned to be constructed using this Bid include the following: a. MAIN STREET CONCRETE CURBING, SIDEWALK, and DRIVEWAYS. Out of Scope Work: When preparing a preliminary estimate, if it is known or reasonably anticipated that there are necessary items of construction that are not included on the price sheets of the bid or, during the course of executing a work order, the City Project Manager determines that there are necessary items of construction that are not included on the price sheets of the bid, then the City Project Manager will request a cost proposal from the Contractor(s) for the “out of scope” work. The City shall not be obligated for payment over the amount identified in the work order. The “out of scope” services shall not be greater than twenty percent (20%) of the “in-scope” services. Testing and Inspections: a. The Contractor is responsible for all required testing on the project except when this Bid Document, laws, ordinances, rules, regulations, or orders of any public authority having jurisdiction specifically require any Work to be inspected or tested by someone other than the Contractor. For these inspections and testing, the Contractor shall give the City 48-hours’ notice to prepare for the required inspections or testing. b. For all required inspections, tests and approvals on any Work prepared, performed or assembled away from the site, the Contractor will furnish the City Project Manager with the required Certificates of Inspection, testing or approval. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials (ASTM) or such other applicable organizations as may be required by law or this Bid Document. c. Material or Work in place that fail to pass acceptability tests shall be removed and reconstructed according to this bid requirements at the Contractor’s expense. d. No work shall be performed, or materials used, without supervision and/or inspections by a representative of the City. The City representative shall have the authority to test and reject any materials and suspend the subject work at any time. Emergencies: In the event of an emergency, the Contractor shall immediately call 911 and notify the City Project Manager. Contamination: Any equipment that is leaking fuel, lubricant, coolant, hydraulic fluid or any other hazardous material shall immediately be repaired by the Contractor to stop the leak. The Contractor shall clean up and dispose of any leaked fluids according to all applicable laws, ordinances, rules and regulations within 24-hours of occurrence. All repairs, removal, clean-up and/or disposal shall be at no cost to the City. Work Area Clean Up Requirements: a. During the progress of the Work, the Contractor shall keep the premises and maintained travel lanes free from accumulations of waste, discarded or surplus material, rubbish and other debris or contamination resulting from the Work. Any waste discarded or surplus materials, rubbish and other debris or contaminants shall be properly disposed of. b. Following completion of the Work, Contractor shall remove all waste material, rubbish and debris from and about the premises as well as all tools, appliances, construction equipment, machinery and surplus material. The Contractor shall leave the site clean and ready for occupancy by the City at completion of the Work. Suspension or Stopping Work by the Contractor: The Contractor shall not stop work on any project work order without written consent of the City Project Manager. Work Stoppage: From time to time, it may be necessary for the Contractor to stop a portion of the work or all work to accommodate a civic function. If the Contractor will be required to stop work, the City Project Manager shall notify the Contractor a minimum of five (5) Working Days before any requested work stoppage. Following the resumption of work, the Contractor and the City Project Manager shall agree to and document the number of additional Days to be added to the project completion time to accommodate the requested work stoppage. Warranty: The vendor shall warrant against all defects in material and workmanship for a period of one year after acceptance of the Work by the City. MEASUREMENT AND PAYMENT A. Where the Contract or Work Assignment provides that all or part of the Work is to be unit price work, initially, the Work Assignment price will be deemed to include an amount equal to the sum of all the unit prices bid for each separately identified item times the estimated quantity of each item as indicated in the Unit Price Schedule. B. The estimated quantities of items of unit price work are not guaranteed and are solely for comparison of Bids. Determinations of the actual quantities and classifications of unit price work performed by the Contractor will be made by the City and based on the approved actual quantities installed in the Work Assignment. C. Each unit price will be deemed to include an amount considered by the Contractor to be adequate to cover the Contractor’s total expenses required to complete each item in the Unit Price Schedule, including all overhead, profit, and direct and indirect expenses for each separately identified item. D. The Contractor shall not be allowed an adjustment in the Work Assignment price if the quantity of any item of unit price work performed by the Contractor differs materially and significantly from the estimated quantity of such item indicated in the Unit Price Schedule. E. Final payment will be issued as approved by the City, to reflect actual amounts due the Contractor for approved Work covered by unit prices, and the final Work Assignment price shall be correspondingly adjusted. F. The bidding contractor should do a site visit and measure all line items before bidding and issue in writing any deficiencies in the quantities for this project. MOBILIZATION: GENERAL A. Contractor shall mobilize as required for the proper performance and completion of each Work Assignment in accordance with the Contract Documents. B. Mobilization shall include, but not be limited to, the following items, as applicable to each Project: 1) Move plant and equipment onto the Project Site necessary for Contractor's operation 2) Install temporary power, wiring, and lighting facilities 3) Establish fire protection system 4) Provide field office complete with furnishings, equipment, and utility services 5) Provide On-Site communication facilities 6) Provide On-Site sanitary facilities and potable water facilities 7) Arrange for storage yard 8) Obtain required permits 9) Post OSHA required notices and establish safety programs 10) Contractor's superintendent shall be on Site full time 11) Obtain Performance and Payment Bond when applicable 12) Obtain Builders Risk Installation Floater when applicable 13) Provide submittals 14) Install/remove silt fencing as necessary in unstabilized areas. 15) Install/remove soil tracking prevention devices per FDOT Index 106 in unstabilized areas. PAYMENT FOR MOBILIZATION A. The costs of bonds, permits, and any additional required insurance over and above the Contractor’s standard insurance as specified in Contract, and any other pre-construction expense necessary for the start of the Project, excluding cost of construction materials, shall also be included in Mobilization. B. No separate payment will be made for mobilization. Mobilization is considered incidental to other work to be performed in the Work Assignment and the costs shall be included in those identified bid items as described in S ection 01026 Measurement and Payment.
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Would the City consider extending the bid due date by one week, since November 25 falls on the Wednesday before Thanksgiving?
At this time, the City has no intention of extending the bid.
What is the budget for this project?
The project budget, including contingency, totals $400,000.00.
What is the engineers estimate for this project?
There is no engineer’s estimate associated with this bid. The scope is limited to removal and replacement; therefore, an engineer’s estimate is not applicable.
Will there be a pre-bid meeting?
There will not be a pre-bid meeting. The construction site is open to the public and may be accessed at any time for viewing. If there are any questions, they may be submitted through the formal question process by the deadline of Tuesday, November 17.
The specifications for clearing and grubbing state that clearing is to be performed from ROW to ROW. However, to clarify, is removal only required in the areas where concrete is being replaced?
This clearing and grubbing shall be limited to the areas where the existing concrete will be removed and replaced as part of this project.
Could you please clarify if a separate line item for concrete removal should be included in the bid, or if removal costs should be incorporated into the pricing for bid items 5 and 6?
No, the removal costs should be incorporated into the pricing for Bid Items 5 and 6.
Would the City consider adding removal of existing concrete as a pay item per SY. That would cover all the concrete sidewalk, driveways and curbing only. That way the City would receive a much more competitive bid with a clearer define scope.
No. The City will not be adding a separate pay item for the removal of existing concrete. Costs associated with the removal, disposal, and replacement of existing concrete should be reflected within the applicable bid items identified in the Pricing Table.
Please clarify the unit of measure for line items 3 and 4. It is listed as "Per Feet". Is this per linear foot, square foot, etc?
The unit of measure for Items 3 and 4 is linear feet (LF). Pricing shall be provided on a per-linear-foot basis. Price sheet updated.
The existing asphalt is covering a large portion of the existing curbing in numerous areas of the job. How will the asphalt reconstruction be paid for ?
The existing asphalt covering portions of the curb and gutter will be removed as part of the curb replacement work. The Contractor will not be responsible for replacing the resulting asphalt gap between the new curb and the existing asphalt pavement. Restoration of these areas will be performed by the City.
Since bid items 5 ( 4" Sidewalks ) and 6 ( 6" Sidewalks ) per addendum # 1 shall include the removal and disposal of sidewalks in those pay items. Does the Curbing pay item need to include removal and disposal as well in the Curbing unit price ? Or will the clearing and grubbing item be paid per LF of curb removed and hauled off site ?
Item 3, "Clearing and Grubbing," will be paid per linear foot (LF) for the removal and disposal of existing concrete curbing materials.
Please provide the City's intent of the curb replacement. Will it be start at one end of the job then remove and replace continuously to the extend of the funds available ? Or is it to have the contractor do numerous small 10' minimum curb replacement sections on Main Street from SR 60 to S.10th Avenue. This will have an impact on bidding prices for all the Contractors to figure as new continuous or moving around the City making small curb repairs as needed.
Curb removal and replacement will begin at Hwy 60 west of town and proceed east along Main Street to S. Floral Avenue. Work will then continue from N. Jackson Avenue east to S. 10th Avenue. The area between S. Floral Avenue and N. Jackson Avenue is not included in the curb replacement portion of this project.
OpenGov categories
- 15012 · Cement, Concrete, Lime and Plaster Mixes, Sacked (LTL Quantities) (See Class 750 for Bulk Cement, Concrete and Lime)
- 15015 · Concrete, Polymer, All Types
- 15016 · Curing Mixtures, All Types (For Curing Concrete)
- 15035 · Hardeners, Concrete and Plaster
- 15060 · Recycled Builder's Supplies Incl. Sacked Cement, Concrete, Lime and Plaster
- 15081 · Ties, Wall and Rafter (Not Concrete Form)
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 90921 · Building Construction, Industrial (Warehouse, etc.)
- 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
- 90923 · Building Construction, Residential (Apartments, etc.)
- 90924 · Building Construction, Commercial and Institutional
- 90925 · Building Construction, Prefabricated (All Types)
- 90926 · Building Construction, Agricultural
- 90927 · Building Construction, Educational
- 90928 · Building Construction, Medical
- 90929 · Building Construction, Religious
- 90930 · Building Construction (Not Otherwise Classified)
- 90931 · Building Construction, Sustainable (Green)
- 91115 · C.I.P., Construction/Rehabilitation, Other than Buildings
- 91116 · C.I.P., Construction/Rehabilitation, Buildings
- 91117 · C.I.P., Construction, Roads
- 91118 · C.I.P., Construction Testing
- 91347 · Construction, Sidewalk and Driveway (Includes Pedestrian and Handicap Ramps)
- 91382 · Maintenance and Repair, Sidewalk and Driveway (Including Removal)
- 96118 · Concrete Resurfacing Services (Swimming Pools, Driveways, Patios, etc.)