State and local · OpenGov
MARYVALE POOL AND TWO SPLASH PADS AT MARIVUE AND HOLIDAY PARKS (GO BOND) CONSTRUCTION MANAGER AT RISK SERVICES
Description
The City of Phoenix is requesting qualifications for MARYVALE POOL AND TWO SPLASH PADS AT MARIVUE AND HOLIDAY PARKS (GO BOND) CONSTRUCTION MANAGER AT RISK SERVICES . Qualifications are to be submitted via the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix before 12:00 pm on Friday, December 18, 2026 . REQUEST FOR QUALIFICATIONS CM at Risk MARYVALE POOL AND TWO SPLASH PADS AT MARIVUE AND HOLIDAY PARKS (GO BOND) CONSTRUCTION MANAGER AT RISK SERVICES OPENGOV ID NO. PA75200758 The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the MARYVALE POOL AND TWO SPLASH PADS AT MARIVUE AND HOLIDAY PARKS (GO BOND) CONSTRUCTION MANAGER AT RISK SERVICES project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The project site is located at Maryvale Park (4420 N. 51st Ave), Marivue Park (5625 W. Osborn Rd), and Holiday Park (4560 N. 67th Ave). The estimated construction cost is $13.4 million. Project Description The primary purpose of this project is the development of a new pool at Maryvale Park to include a lap pool and dive area, a family pool with beach entry, water slides, spray play elements, larger deck areas, shade structures, utility adjustments/additions, and relocated pool equipment and support spaces. Also, the two splash pads at Marivue and Holiday Parks include gated accessible entries, small hardscape areas at access points, chilled drinking fountains, utility adjustments/additions, site furnishings, shade structures, water play features, recirculating splash pad pump system with chemical treatment, and possible landscaping with irrigation. The selected CMAR will provide comprehensive services throughout all phases of the project, including preconstruction, Guaranteed Maximum Price (GMP) development and contract transition, construction, project closeout, and warranty period services. Scope of Work CM at Risk The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City’s subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format o r it will not be accepted. A. Preconstruction phase services by the CMAR may include the following: Collaborate with the Owner and Design Team during the design phase of the project Attend all project and team meetings as necessary to maintain the project objectives Support project team efforts for timely submit/retrieval of permits/approvals from various agencies Prepare and distribute all daily, monthly and weekly reports to executives and stakeholders Perform all preconstruction services for design phase which may consist of multiple package(s) Provide pre-construction services team to deliver a complete project including integrated technology specialties Coordinate work with Owner and Design Team to secure all permits and approvals from federal, state, county, and local utility authorities Collaborate with Owner and Design Team to validate and synchronize the scope, budget, and schedule Investigate and assess existing conditions and project constraints. Recommend additional investigative techniques to further identify and locate unforeseen existing conditions if necessary. Develop Guaranteed Maximum Price (GMP) Proposal package strategy and present alternate strategies to optimize sequence of construction Develop and implement in-house quality control procedure for review/approval of monthly progress payments by CMAR accounting department before submitting for City review Validate LEED goals and incorporate Parks and Recreation Department sustainability initiatives into to the construction Collaborate with Design Team to prepare necessary exhibits for presentations to stakeholders including regulatory agencies Coordinate with Owner and Design Team on communication plan and studies to lead to solutions for decision making process Perform design/constructability review of design documents at milestone review period Respond to Stakeholder design/constructability comments from milestone reviews Prepare construction cost estimates for all design phases and validate milestone deliverables Reconcile with 3rd party construction cost estimate(s) for each design phase milestone Perform value engineering / cost reduction efforts to optimize project budget Develop and update the project schedule in collaboration with Owner and Design Team to optimize sequence of work and mitigate impact to on-going Parks operations Assist Design Team with efforts to identify private and public utility easements Perform pre-construction services to assure conformance with requirements of Title 34, Arizona Revised Statutes B. Construction phase services by the CMAR may include: Coordinate preparation and print production of construction documents with Design Team Manage process to pick up, scan and distribute copies of the permitted construction documents to prescribed project team members Consult with the City to meet all project requirements Develop, refine, and implement subcontractor selection plan and Construction Management Plan Prepare time-scaled logic construction schedule, submit for City and Design Team review/comment, and update throughout project course Craft and issue with solicitation the subcontractor instructions to bidders Solicit subcontractor bid proposals, validate offers, and prepare bid tabulation for review Prepare and distribute Guaranteed Maximum Price (GMP) Proposal for City and Design Team review and approval Evaluate operational impacts and work with stakeholders to minimize or eliminate disruptions Conduct CMAR construction progress meetings and other project meetings to prosecute the work Develop clear and concise Requests For Information (RFI) with corresponding construction documents as backup which clearly defines the nature of the request(s) Develop construction submittal schedule in coordination with Design Team and Stakeholders consolidate input and prepare master submittal log for project Provide support role related to Design Team preparation of Construction Change Directives (CCD) and Proposal Requests (PR) as needed and provide cost proposals Upload and archive of all project related documentation into the City’s Project Management System – Unifier – which shall be used for ALL project record keeping and file transferring and sharing of record Obtain required As-Built documentation to establish existing conditions and conduct field surveys, as needed Participate in meeting(s) and provide any supporting documentation, as required Perform reviews and provide input on sustainability evaluation criterion relative to City standards and Parks Department goals Perform field inspection and prepare reports to ensure compliance with the project plans and specifications Prepare and submit progress payments in line with the monthly progress of the work Provide support role relative to the project LEED report confirming construction practices comply with contract documents and specifications (if applicable) Provide itemized cost detail as required in support of proposed potential change notifications and change orders and submit recommendations to City Participate in weekly cost/credit change review meetings with City 3 rd party estimators Prepare and submit punch list and record documents for Design Team review/approval Prepare Closeout submittal Log with metrics, as directed by the City, to provide comprehensive list of closeout documentation for City record archive. Participate in the 11 ½ month warranty inspection Maintai Small Business Enterprise (SBE) Requirements CM at Risk Only firms whose physical business is located within Maricopa County are eligible to meet the SBE subcontracting goal, which will be set prior to construction of this project. The final goal will be based on SBE subcontractor availability. Pre-Submittal Meeting A pre-submittal meeting will be held at 11:00 am , Phoenix time on Tuesday, December 8, 2026 , at Phoenix City Hall, 200 West Washington Street, 5th Floor, Conference Room 5 West AND via Teams . At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist. Pre-Submittal Meeting Teams Information: https://teams.microsoft.com/meet/2564130123654395?p=o0FjdZezfwRuDBfC6f Meeting ID: 256 413 012 365 439 5 Passcode: AQ7f4ZW Statement of Qualifications Evaluation Criteria A firm will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required. Submittal Requirements Design Build / CM at Risk / JOC Electronic Submittal Process : Firms interested in this project must submit a Statement of Qualifications (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix . Submittal requirements are as follows: Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the SOQ. Information on how to register with the City is available at: https://www.phoenix.gov/financesite/Pages/EProc-help.aspx If your firm is already registered with the City of Phoenix’s Procurement system, visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation. Submittals: Experience Modification Rate (EMR) – provide current rating; the awarded company will be asked to provide verification upon contract execution. Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted. Clearly display the firm legal name, vendor number, project title, and project number on the cover of the SOQ. A maximum of 20 pages is permitted to address all content in the SOQ submittal. (Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet.) Submit electronically the Statement of Qualifications by 12:00 pm , Phoenix time, on Friday, December 18, 2026 . Page size must meet requirements of 8½” x 11”. Font size must not be less than 10 point. Content count: Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above. Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above. Front and back covers, information sheet, Table of Contents pages, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel. Information Sheet : Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name) , address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information. Evaluation Criteria : Address the SOQ evaluation criteria. Bonding Statement: As a separate PDF attachment , include a statement of the firm’s bonding capacity from a Surety Company (A- or better for the prior four quarters). This bond statement will not be counted towards the maximum number of pages . Additional Content : Resumes and other information may be included ( content shall be included within the permitted maximum page limit ). Note: All pages exceeding the specified maximum page limit will be removed from the submittal and not considered in evaluating a submitted SOQ. Grounds for Disqualification CM at Risk Please be advised that the following will be grounds for disqualification, and will be strictly enforced: Submitting a Statement of Qualifications for a different project. Violating the “Contact with City Employees” policy contained in this RFQ. Failure to provide additional documents due at time of submittal. Failure to provide bonding statement. Selection Process and Schedule CM at Risk / JOC The successful firm will be selected through a qualifications-based selection process. Interested firms will submit a Statement of Qualifications (SOQ). A Selection Panel will evaluate each SOQ according to the criteria set forth in Statement of Qualifications Evaluation Criteria above. The City will select a firm based on the SOQs received; no formal interviews will be conducted.] The City may conduct a due diligence review on the firm receiving the highest evaluation. The City expects to create a final list of at least one, but not more than three firms for this project. The City will enter into negotiations with the selected firm and execute a contract upon completion of negotiation of contract terms for City Council approval. The following tentative schedule has been prepared for this project. The Pre-submittal meeting is not mandatory. Pre-submittal Meeting 11:00 am on Tuesday, December 8, 2026 SOQs Due 12:00 pm on Friday, December 18, 2026 Selection Notification Mid-January 2027 Scope Meeting End of January 2027 If the City is unsuccessful in negotiating a contract with the best-qualified firm, the City may then negotiate with the next most qualified firm until a contract is executed, or the City may decide to terminate the selection process. Once a contract is executed with the successful firm, the procurement is complete. The firm selected for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s Procurement Portal: https://procurement.opengov.com/portal/phoenix General Information On-Call / CM at Risk / Professional Services Citywide Capital Improvement Projects . Consulting and contractor services supporting the City’s Capital Improvement Projects are procured under the authority of the City Engineer, currently located within the Street Transportation Department. Design and Construction Procurement coordinates the citywide consulting and construction contracting procurement processes. Changes to Request for Qualifications . Any changes to this Request for Qualifications (RFQ) will be in the form of a Notification . The City of Phoenix shall not be held responsible for any oral instructions. Notifications are available on both the Current Opportunities and City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix . It shall be the responsibility of the registered RFQ holder to determine, prior to the submittal of the Statement of Qualifications, if a Notification has been issued . Registered RFQ holders may refer to the web page or call the Contracts Specialist (listed below) to ascertain if a Notification has been issued for this project. Alternate Format . For more information or a copy of this publication in an alternate format, contact O'cie Hendricks at (602) 534-1423 - Voice or TTY 711. Requests will only be honored if made within the first week of the advertising period. Release of Project Information/Public Records Request . The City shall provide the release of all public information concerning the project, including selection announcements and contract awards. Those desiring to release information to the public must receive prior written approval from the City. To submit a Public Records Request, visit phoenix.gov/prr . City Rights . The City of Phoenix reserves the right to reject any or all Statements of Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received. Contact with City Employees . This policy is intended to create a level playing field for all Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT VIOLATE THIS POLICY WILL BE DISQUALIFIED . Beginning on the date the RFQ is issued and until the date the contract is awarded or the RFQ withdrawn, all persons or entities that respond to the RFQ, including their authorized employees, agents, representatives, proposed partner(s), subcontractor(s), joint venture(s), member(s), or any of their lobbyists or attorneys (collectively the Proposer), will refrain from any direct or indirect contact with any person (other than the designated Contract Specialist) who may play a part in the selection process, including members of the evaluation panel, the City Manager, Assistant City Manager, Deputy City Managers, Department heads, the Mayor and other members of the Phoenix City Council. As long as the RFQ solicitation is not discussed, Proposers may continue to conduct business with the City and discuss business that is unrelated to this RFQ solicitation with City staff. Commencing on the date and time a solicitation is published, potential or actual proposers (including their representatives) will only discuss matters associated with the solicitation with the Mayor, any members of City Council, the City Manager, any Deputy City Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated procurement officer) at a public meeting, posted under the Arizona Revised Statutes, until the resulting contract(s) are awarded or all offers or responses are rejected and the solicitation is cancelled without any announcement by the procurement officer of the City’s intent to reissue the same or a similar solicitation. Proposers may discuss their proposal or the RFQ solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the Contract Specialist (listed below), conducted in person at 200 W. Washington, Phoenix, Arizona 85003, and are posted as open meetings with the City Clerk at least twenty-four (24) hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate. Conflict of Interest . The City reserves the right to disqualify any Proposer on the basis of any real or apparent conflict of interest that is disclosed by the proposal submitted or any other data available to the City. This disqualification is at the sole discretion of the City. Any Proposer submitting a proposal herein waves any right to object now or at any future time, before any body or agency, including but not limited to, the City Council of the City of Phoenix or any court. Protest Procedures . Firms responding to disqualification or a procurement outcome are referred to the Code of the City of Phoenix Chapter 2, Article XII, Section 2-187 to 2-190.4, which governs protest procedures utilized throughout the selection process. The procedures may be reviewed through the City of Phoenix website at: http://www.codepublishing.com/az/phoenix/ A copy of the Protest Policy is also available online at: https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html Questions - Questions pertaining to this se