State and local · OpenGov
MATERIAL RECOVERY PROCESSING FOR RESIDENTIAL & COMMERCIAL RECYCLING
Description
The Public Works Resource Recovery and Recycling Division (City) is seeking proposals to provide processing for the City’s residential and commercial commingled recyclable materials with a capacity of 50 tons per day. The recycling stream includes, but is not limited to, newspaper, mixed paper, cardboard, paperboard, brown paper bags, junk mail, magazines, phone books, glass, aluminum cans, tin cans, and plastic containers. The City currently generates an estimated 7,900 tons of commingled recyclable material annually. Scope of Work RESIDENTIAL CURBSIDE & COMMERCIAL RECYCLING 1. SCOPE OF SERVICES: a. The Public Works Resource Recovery and Recycling Division (City) is seeking proposals to provide processing for the City’s residential and commercial commingled recyclable materials with a capacity of 50 tons per day. The recycling stream includes, but is not limited to, newspaper, mixed paper, cardboard, paperboard, brown paper bags, junk mail, magazines, phone books, glass, aluminum cans, tin cans, and plastic containers 1 through 5. The City currently generates an estimated 7,900 tons of commingled recyclable material annually. b. The City provides collection, removal, and disposal services for solid waste generated by all single-family residences and multi-family residential properties with four or fewer units. Each eligible residential property is provided with three separate wheeled carts for the collection of recyclable materials, yard trimmings, and residual waste. The City of Pasadena utilizes a bundled refuse service model in which residential rates are based on the size of the mixed-waste container selected by each household. Pasadena’s bundled refuse program incorporates the Pay-As-You-Throw (PAYT) principle, allowing households to select a mixed-waste container size that best reflects their disposal needs, with rates corresponding to the selected service level. This rate structure encourages waste reduction, recycling, and responsible materials management by providing customers with a financial incentive to reduce the amount of mixed waste they generate. c. The Contractor shall provide all labor, equipment, processing capacity, permits, licenses, and other resources necessary to continuously receive, process, recover, market, and properly manage recyclable materials delivered by the City throughout the term of the Contract. d. Quantities identified in the solicitation are estimates only and do not guarantee the amount of material the City will deliver. Actual quantities may increase or decrease based on collection volumes, seasonal conditions, customer participation, changes in City programs, or other operational factors. 2. LOCATION PROXIMATE TO PASADENA: a. To maintain efficient collection operations, minimize travel and turnaround time, control fuel, labor, vehicle maintenance and overtime costs, and ensure the timely return of City collection vehicles to their assigned routes, the proposed processing facility shall be located within 30 road miles of the City of Pasadena City Yard, located at 233 West Mountain Street, Pasadena, CA 91103. The distance requirement is intended to support reliable and cost-effective collection operations by limiting the amount of time City vehicles spend transporting recyclable materials to and from the processing facility. 3. MINIMUM DIVERSION RATES: a. The City has established minimum diversion rate of 75% for residential material and commercial recycling commingled material. The selected contractor will be required to demonstrate to the City, on a monthly basis that it has recycled and not disposed of at a landfill. 4. REPORTING: a. The selected contractor shall provide the City with a monthly report indicating the amount of tonnage of materials recycled. Each report shall document the market value of the materials, processing costs and include a breakdown of material types: Aluminum, Polyethylene , terephthalate (PET) and non-PET, Glass, Tin (or metals), High Density Polyethylene (HDPE), Mixed Plastics, Newspaper, Mixed Paper and Old Corrugated Cardboard (OCC). The selected contractor shall also provide specialized reporting related to special City events including but not limited to New Year’s Day activities. 5. UNLOADING TIME: a. The selected contractor shall be responsible for directing the unloading of City trucks upon arrival at contractor’s facility and shall commence such work within 15 minutes of arrival. 6. MINIMUM VOLUME REQUIREMENTS: a. In order to be considered responsive to the requirements of these Specifications, the proposal must include a document of a demonstrated ability to accept and process an average of 50 tons of recyclable materials per day in a safe and sanitary manner and in accordance with all applicable federal, state and local laws and regulations including but not limited to those established by Cal-OSHA. 7. PAYMENT FOR RECYCLABLES: a. Payment for recyclable material, if applicable, shall be made to the City by the 25th of the month following collection. 8. CONTINGENCY PLANNING: a. Within 30 calendar days of award of a contract the selected contractor shall provide the City with a written contingency plan for processing materials in the event the Contactor facility becomes unavailable during the term of the contract. b. The contingency plan shall identify alternative processing arrangements, including backup facilities where available, procedures for notifying the City, anticipated impacts to City collection operations, and the actions the Contractor will take to maintain uninterrupted service. c. The Contractor shall immediately notify the City of any facility closure, equipment failure, regulatory action, emergency, or other condition that may materially affect its ability to receive or process City materials. 9. PROPOSAL REQUIREMENTS a. Ability to accept and process an average of 50 tons of recyclable materials per day in a safe and sanitary manner and in accordance with all applicable federal, state and local laws and regulations including but not limited to those established by Cal-OSHA. b. Ability to provide the City with a monthly report indicating the amount of tonnage of materials recycled. c. ability to consistently recycle a minimum of 75%. d. the proposed processing facility shall be located within 30 road miles of the City of Pasadena City Yards at 233 W. Mountain St., Pasadena, CA 91103. Introduction Summary Background The City of Pasadena is an ethnically diverse community that is home to approximately 142,017 people. Pasadena is the ninth-largest city in Los Angeles County. It is one of the primary cultural centers of the San Gabriel Valley. The City covers approximately 22.5 square miles, with an average of ten residents per acre. The median age of its residents is approximately 36.9 years. There are over 100,000 jobs in a wide variety of industries in the City of Pasadena. Contact Information Deadline for Questions The deadline to submit questions related to this solicitation is Monday, November 30, 2026 , prior to 12:00 pm . Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. Timeline General Instructions NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses to this Request for Proposal (RFP) accepted by the City of Pasadena (City) shall become the exclusive property of the City. At such time as the City Manager recommends a contractor to the City Council, and such recommendation, with any recommended contract appears on the Council agenda, all proposals accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof. Electronic Submission and Delivery Instructions Parties interested in responding are required to submit proposals electronically through the City of Pasadena's eProcurement Portal no later than 3:00 pm on Monday, December 14, 2026 . Please upload sufficiently early electronically through the city's eProcurement Portal before the time and day listed in the Notice Inviting Proposals. Proposals must be received in the system prior to the deadline. The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The "Technical Proposal," "Additional Data," and "Statement of Qualifications" can be no more than 50 grand total pages. The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ #Proposer's Submittals/Checklist .” The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and #Proposer's Submittals/Checklist . No Pricing shall be included in this part. Proposals received after the Proposal Deadline may not be accepted by the City. Technical Proposal The proposal must be prepared in two parts: a "Technical Proposal" and a "Price Proposal." Each of the parts shall be separate and complete in itself so evaluation of one may be accomplished separate from the evaluation of the other. The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and Submittals/Checklist . No Pricing shall be included in this part. Separate Price Proposal The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ Submittals/Checklist .” Parties interested in responding are required to submit their Price Proposal with their Technical proposal through the City's eProcurement Portal. The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The price proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies. The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Costs shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The City will not separately reimburse costs not included in the proposal. Reference PRICE PROPOSAL. Reimbursable cost schedules shall depict only those expenditures that are exclusive to and in support of the scope of services. The proposed reimbursable cost schedule shall include a detailed list of reimbursables. Each Proposer must submit a PRICE Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s lump-sum price shall include, without limitation: all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work); performance of each and every portion of the work all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena; all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena; all taxes, duties, permits, and other fees or royalties incident to the performance of the SCOPE OF WORK; payment of all salaries, wages, benefits, and expenses of the Proposer’s employees; compensation for all risks, liabilities, and contingencies assigned to the Proposer; and all other costs needed or incurred to complete the Project. all ProForma Submission Requirements (if required) Pre-Proposal Meeting See the "Timeline" in the Introduction section ( #Introduction) . If there is a Mandatory pre-proposal meeting, bidders/proposers are required to attend at the time, date, and location included in the Timeline. If there is a Non-Mandatory pre-proposal meeting, bidders/proposers are not required to attend. Each bidder/proposer will have the opportunity to clarify and ask questions regarding the Specifications. The Pre-Proposal Meeting will be held at the time, date, and location in the Timeline of this solicitation. Definitions The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this RFP, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract. General Requirements Standard terms and conditions Prior to the award of any work hereunder, City and contractor shall enter into a written contract in substantially the form attached hereto with such revisions thereto as the City may determine necessary and appropriate. PROPOSERS responding to this RFP are strongly advised to review all the terms and conditions of the contract, and shall be deemed to have accepted them. Firm commitment of availability of service Once a proposal is opened, a PROPOSER is expected to maintain an availability of service as set forth in its proposal for at least four months after date for opening proposals. Reservations The City reserves the right to reject any or all bids or proposals and any item or items therein, and to waive any non conformity of proposals with this RFP, whether of a technical or substantive nature, as the interest of the City may require. Documents to be construed together The Request for Proposal (RFP), the Proposal, the Non Collusion Affidavit, and all documents referred to in the complete specifications and the Contract to be entered into between the Contractor and the City, and all modifications of said documents, shall be construed together . Patent fees; patent, copyright, trade secret and trademark fees Each PROPOSER shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work. PUBLIC CONTRACT CODE SEC. 9204 NEW PUBLIC WORKS CLAIMS PROCEDURE Observe attached details regarding Public Contract Code Section 9204. AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities. Request for Proposal (RFP) quantities: The quantities contained in the RFP documents are approximate only and are for the sole purpose of comparing proposals. The City may, in accordance with the specifications, request additional services as necessary at the City's sole discretion, as increased by the unit price noted and payment will be made for the amount of services actually provided as determined by the City and accepted at the unit prices noted in the proposal. Price Adjustment Clause At the conclusion of the first contract year and prior to the commencement of the second contract year or any subsequent contract extension period, the contractor may request unit price increases. Under no circumstances shall the City accept price increases, which exceed the rate of the then current Consumer Price Index (C.P.I.) "All items in Los Angeles-Long Beach-Anaheim, CA, all urban consumers, not seasonally adjusted" for the latest available preceding 12 month period. The percentage increase shall be a 12 month percentage increase for the first month of the subsequent contract year(s). CHANGE ORDER MANAGEMENT CHANGE ORDER MANAGEMENT Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City Project Manager in writing before work is started. Taxpayer Protection Act Under the provisions of the City of Pasadena Taxpayer Protection Act ("TPA"), the Contractor/Organization will be considered a "recipient of a public benefit." The full provisions of the TPA are set forth in Pasadena City Charter, Article XVII. Under the TPA, City public officials who approve this Contract are prohibited from receiving specified gifts, campaign contributions or employment from Contractor for a specified time. As well, if this Contract is to be approved by the City Council, Councilmembers or candidates for Council are prohibited from receiving campaign contributions during the time this Contract is being negotiated (from the due date for an RFP response until award of a contract; this restriction does not apply to competitive and noticed low bid contracts). This prohibition extends to individuals and entities that are specified in the TPA and includes Contractor/Organization and its trustees, directors, partners, corporate officers and those with more than a 10% equity, participation, or revenue interest in Contractor/Organization. Contractor/Organization understands and agrees that: (A) Contractor/Organization is aware of the TPA; (B) Contractor/Organization will complete the forms provided by the City to identify all of the recipients of a public benefit specified in the TPA; and (C) Contractor/Organization will not make any prohibited gift, campaign contribution or offer of employment to any public official who negotiated and/or approved this Contract, and will not make any prohibited campaign contribution during the time this contract is being negotiated. The Contractor shall submit a copy of the completed TPA form to the City Clerk’s Office if the contract is to be awarded by the City Council via e-mail: OfficialRecords-CityClerk@Cityofpasadena.net or by fax: (626) 744-3921, and submit a copy with the response package. For more information please go to: https://www.cityofpas
Published attachments
- Master Services Contract
- REQUIRED FORMS - AAs - SIG-LEGAL-STATUS - DECLARATION OF NONCOLUSION 08022024 v2
- DISQUALIFICATION_DISCLOSURE (4)
- CONFLICT_OF_INTEREST (5)
- Pasadena_Taxpayer_Protection_Amendment_Disclosure (2)
- DESIGNATED REPRESENTATIVESdocx
- MATERIAL_RECOVERY_PROCESSING_FOR_RESIDENTIAL_&_COMMERCIAL_RECYCLING.pdf
OpenGov categories
- 5622 · Waste Treatment and Disposal