State and local · OpenGov
McClintock Roofing Replacement- IFB #27- 016CH- 27IFB
Description
The Tempe Union High School District #213 would like to invite you to submit a bid for the McClintock High School Roofing Replacement. Bids are to be submitted through the Procurement Portal at https://procurement.opengov.com/portal/tuhsd , prior to 2:00pm local time on December 9, 2026. Scope of Work Scope of Work The purpose of this solicitation is to establish a contract with a qualified contractor for the Roof Replacement at McClintock High School. Objective Tempe Union High School District is requesting bids for the Roofing Replacement project at McClintock High School, in accordance with the plans and specifications included herein. This project is contingent upon funding approval by the Arizona School Facilities Oversight Board, Division of School Facilities (DSF) and/or Arizona Department of Administration and the District Governing Board. ADM Group is the design firm managing this project. Architechnology will provide the District's independent Quality Assurance and Quality Control (QA/QC) provider. Contractors are required to have the appropriate license(s) to perform the work as determined by the Arizona Registrar of Contractors (ROC). Additional site visits may be conducted with prior District approval from the Procurement Officer, Kayla Amado kamado@tuhsd.k12.az.us. Once approved in writing, additional visit shall be made by appointment only with Antonio Payan, Director of Plant Operations via phone (480) 839-0292 ext. 16021 or email apayan@tuhsd.k12.az.us . Clarification questions as a result of the additional site visit, must be submitted in writing via OpenGov by the question deadline. Only questions answered in a formal addendum will modify/clarify the scope of work. Plans and Specifications The plans are incorporated herein and attached separately in PDF below with a total of ten (10) pages. These drawings are provided for reference and shall not be considered to scale. Contractor is responsible for field verification. The Specifications Manual is 178 pages in PDF. Specifications and specific requirements are included in the attachments for this Invitation for Bid. Items showing brand name or approved equal will permit Bidders of other brands to Bid them as alternates. Alternate product submittals must be received by November 12, 2026 @ 12:00pm. However, the District will reserve the right to decide if alternates are equal. Bidder must indicate in the space provided if their product is an alternate by submitting name and detailed specifications of item Bid upon. Otherwise, it will be understood that the item Bid meets our specifications. Samples may be requested by the District for evaluation purposes. Samples will be provided at no charge. The District reserves the right to decide if alternates are equal and satisfy the District’s needs. Alternate Bid must include a listing of all areas where the item bid varies from the item specified, the manufacturer’s name, catalog literature, and detailed specifications on the item Bid. Failure to include the required information on an alternate Bid may result in the Bid being rejected as non-responsive. The decision of the District as to whether an alternate or substitution is in fact “equal” shall be final. Work Schedule The project timeline requires the project shall be substantially complete within a total of 270 days from notice to proceed. Final completion shall be no later than 60 days after substantial completion. A detailed schedule is to be submitted within one week of contract award, which must encompass considerations for lead time, installation, clean-up operations, and finalizing activities. Failure to meet either deadline shall result in an assessment of liquidated damages. Utilities Contractor shall provide all of its own power, tools, and staff to successfully perform the work. The District shall not incur any additional expenses for the successful completion of this project. Contractor will also provide and maintain in clean order, temporary toilet facilities for use throughout the project duration. The District shall approve locations. Additional information regarding Temporary Facilities and Controls can be found in Project Manual Section 015000 . Cleanup The contractor shall repair, rebuild, or otherwise acceptably restore any property on or adjacent to the worksite that was damaged during the course of work on the project. Such restoration shall be at the contractor's expense and is not subject to reimbursement by the District. Awarded firm shall remove all old equipment, trash/waste from the worksite as a result of their efforts. Site Restoration Upon completion of the project, the school campus site shall be made whole. Contractor shall repair, rebuild, or otherwise restore any property on or adjacent to the worksite area that was damaged during project work. Restoration is considered part of the Scope and is not subject to reimbursement to the Contractor. Contractor to properly dispose of all materials not retained by the District. Meetings Contractor will be required to participate in meetings for the successful completion of the contract. These meetings, if any, will be at the discretion of the District. The Contractor will be notified in advance of any meeting times, frequency for future meetings and locations to ensure all appropriate representatives attend. The District reserves the right to decline conference call attendance or participation. Additional requirements regarding Meetings is found in Project Handbook Section 013100-Project Management and Coordination subsection 1.8 Project Meetings . A preconstruction meeting will be scheduled after award and issuance of a District Purchase Order prior to the commencement of work to outline procedures, schedules, and other specific details during the Project Construction Phase. Introduction In accordance with School District Procurement Rules in the Arizona Administrative Code (A.A.C.) promulgated by the State Board of Education pursuant to A. R. S. 15-213, bids for the material or services specified will be received by the Tempe Union High School District electronically through OpenGov. Bids received by the correct time and date shall be opened and the vendor’s who submitted shall be publicly read. After the bids submitted in response to an invitation for bids are opened and the award is made the governing board shall make available for public inspection all information, all bids and all findings and other information considered in determining whose bid conforms to the invitation for bids and will be the most advantageous with respect to price, conformity to the specifications and other factors to be selected for the award. Summary Background Contact Information Timeline Please note the Bid Submission Deadline time. Bids will not be accepted after this programmed time. For example: If the Bid Submission Deadline time is 10:00am the deadline is a hard cut-off. The system will not allow you to click "Submit" at 10:00:00:00:00 (and so on). A submission at 10:00:01 is late and will not be accepted. Also note the submission time is Local Arizona time. We do not observe Daylight Savings time. It is the vendors responsibility to ensure that all required documents are submitted and accepted by OpenGov. Once you have completely submitted your response you will receive a confirmation email from OpenGov. Documents Referenced DOCUMENTS REFERENCED: You may access a copy of the documents referenced within this proposal at the following web addresses: Arizona Revised Statutes (A.R.S.) is available at: www.azleg.state.az.us/ArizonaRevisedStatutes.asp. The Arizona School District Procurement Rules in the Arizona Administrative Code is available at: www.azsos.gov/rules/arizona-administrative-code I.R.S W-9 Form (Request for Taxpayer I.D. Number) is available at: www.irs.gov/pub/irs-pdf/fw9.pdf. Code of Federal Regulations is available at: http://www.ecfr.gov Uniform Instructions to Offerors Definition of Terms As used in these instructions, the terms listed below are defined as follows: “Attachment” means any item the Solicitation requires a Bidder or Offeror to submit as part of the Offer. “Award” means a determination by District that it is entering into a contract with one or more Bidders or Offerors. “Bid” means a response to an invitation for bids and includes an offer to contract with District. “Bidder” means a person submitting a Bid in response to an invitation for bids. "Contract" means a legally binding contractual agreement, regardless of what it may be called, for the purchase of materials, services, construction or construction services, or the disposal of materials by District. “Contract” includes the combination of the Solicitation, including the Uniform and Special Instructions, the General and Special Terms and Conditions, and the Specifications and Statement or Scope of Work; the Offer and any Best and Final Offers; and any Solicitation Addendums or Contract Amendments; and any terms applied by law. A Contract does not include a contract or agreement prepared and requested by Contractor unless it contains a provision that expressly states that it will be deemed part of the Contract, identifies what provisions of the Contract, if any, are superseded by the Contract or agreement, and is signed by the District Representative. “Contract Amendment” means a written document that is authorized by the District Representative and issued by District for the purpose of making changes to the Contract. “Contractor” means any person who has a contract with District. An Offeror or Bidder who has been awarded a Contract by District is a Contractor of District. “Days” means calendar days unless otherwise specified, and time measured in days in which an act is required to be done shall be computed according to A.R.S. §1-243. “District” means Tempe Union High School District . “District Representative” means Cindi Hostetler , Director of Purchasing and Warehouse . “Exhibit” means any item labeled as an Exhibit in the Solicitation or placed in the Exhibits section of the Solicitation. “Gratuity” means a payment, loan, subscription, advance, deposit of money, services, or anything of more than nominal value present or promised, unless consideration of substantially equal or greater value is received. “Offer” means Bid, Proposal, or quotation. “Offer Deadline” means the exact date and time when no Offer submitted thereafter may be considered or accepted by District. “Offeror” means a person submitting a Proposal in response to a request for proposals. “Proposal” means a response to a request for proposals and includes an Offer to contract with District. “Purchase Order” means a document issued by District, in writing or electronically, and identified as a Purchase Order that authorizes Contractor to proceed with fulfillment of all or part of an awarded Contract by delivery of materials or services in quantities and at times and locations specified in the Purchase Order. "Responsible Bidder or Offeror" means a person who at the time of Contract Award has the capability to perform the Contract requirements and the integrity and reliability which will assure good faith performance. “Responsive Bidder or Offeror" means a person who submits an Offer that reasonably and substantially conforms to all material requirements of the Solicitation. "Solicitation" means an invitation for bids, an invitation to submit technical offers, a request for proposals, a request for qualification, or any other invitation or request by which District invites a person to participate in a procurement. A Solicitation includes, in addition to the Invitation for Bid or Request for Proposal, the Uniform Instructions for Offers, General Terms and Conditions for Contract, Special Terms and Conditions for Contract, Statement of Scope of Work/Specifications, Solicitation Addendums, and Solicitation Exhibits and Attachments. “Solicitation Addendum” means a written document that is authorized by the District Representative and issued by District for the purpose of making changes, clarifications, or additions to the Solicitation. “The Solicitation Contact Person” for the Solicitation is the procurement specialist supervisor designated on the first page of the Solicitation. “Subcontract” means any Contract, express or implied, between Contractor and another party or between a subcontractor and another party delegating or assigning, in whole or in part, the making or furnishings of any material or any service required for the performance of the Contract. Pre-Offer Inquiries Duty to Examine. It is the responsibility of the Bidder or Offeror to examine the entire Solicitation, seek clarification in writing, and check its Offer for accuracy before submitting the Offer. Lack of care in preparing an Offer shall not be grounds for withdrawing the Offer after the Offer Deadline. Solicitation Contact Person. Any inquiry related to a Solicitation, including any requests for or inquiries regarding standards referenced in the Solicitation shall be directed solely to the Solicitation Contact Person. The Bidder or Offeror shall not contact or direct inquiries concerning the Solicitation to any other employee unless the Solicitation specifically identifies a person other than the Solicitation Contact Person as a contact. Submission of Inquiries. The Solicitation Contact Person may require that an inquiry be submitted in writing. Any inquiry related to a Solicitation shall refer to the appropriate Solicitation number, page, and paragraph. Requests for Exceptions. A Bidder or Offeror may submit to the Solicitation Contact Person a written request for an unsubstantial, nonmaterial exception or deviation to a specific term, condition, or other provision in the Solicitation. Requests for an exception must identify the specific condition, term, or other provision to be excepted or modified and clearly state any proposed substitutions or modifications thereto. A requested exception that substantially or materially alters a term, condition, or other provision shall be rejected. The District Representative or designee shall determine, in his or her sole discretion, whether an exception is substantial or material and advise the Bidder or Offeror of the decision. Submission of the Bidder’s or Offeror’s preprinted contract in place of the General or Special Terms and Conditions of a Solicitation shall be rejected. A request for exceptions must be submitted with your response. A request for exceptions shall not be accepted, in whole or in part, unless accepted in writing by the Solicitation Contact Person or District Representative. Timeliness. Any inquiry shall be submitted as soon as possible and no later than the Friday, November 13, 2026 at 3:00 pm . Failure to do so may result in the inquiry not being answered. No Reliance on Verbal Responses. Any inquiry that results in changes to the Solicitation shall be answered solely through a written Solicitation Addendum. A Bidder or Offeror may not rely on verbal responses from the Solicitation Contact Person to inquiries. Pre-Offer Conference. If a pre-Offer conference has been scheduled under the Solicitation, the date, time, and location shall appear on the Solicitation cover sheet or elsewhere in the Solicitation. A Bidder or Offeror should raise any questions it may have about the Solicitation at the conference and in the question and answer tab of the project. Persons with a disability may request a reasonable accommodation, such as a sign language interpreter, by contacting the Solicitation Contact Person. Requests should be made as early as possible to allow time to arrange for the accommodation. Verbal responses to questions raised at the conference shall not amend the Solicitation. If an issue is raised at the conference that results in a decision by District to amend the Solicitation, the Solicitation may be amended only by issuance of a written Solicitation Addendum. A Bidder or Offeror may not rely on any verbal responses to questions at the conference. Offer Preparation Forms: No Facsimile or Physical Mail (USPS, FEDEX, UPS, etc ) Offers. An Electronic Offer shall be submitted either on the forms provided in the Solicitation or their substantial equivalent. Any substitute document for the forms provided in the Solicitation must be legible and contain the same information requested on the form. A facsimile, physical mail, or mailgram offer shall be rejected. Typed or Ink; Corrections. The Offer must be typed or in ink. Erasures, interlineations, or other modifications in the Offer must be initialed in ink by the person signing the Offer. Modifications shall not be permitted after Offers have been opened except as otherwise provided under applicable law. Acknowledgement and Acceptance Question: The Acknowledgement and Acceptance of Terms and Conditions of Solicitation question must be submitted with the Offer and acknowledged by a representative of the Bidder or Offeror. All exceptions or modifications requested by the Bidder or Offeror, regardless of whether District previously accepted the requested exceptions or modifications requested by the Bidder or Offeror, must be clearly set forth in the Acknowledgement and Acceptance of Terms and Conditions of Solicitation question. Any exceptions or modifications set forth in the question that have not been previously accepted by District, may be rejected if District determines, in its sole judgment, that the a requested exception or modification would substantially or materially alters a term, condition, or other provision of the Solicitation. Unacceptable exceptions or modifications shall remove the Offer from consideration for award. Offer and Acceptance. The Offer and Acceptance Form within the Solicitation must be submitted with the Offer and signed by authorized representative of the Bidder or Offeror. The signature shall signify the Bidder’s or Offeror’s intent to be bound by the Offer and the terms of the Solicitation and that the information provided is true, accurate, and complete. Failure to submit verifiable evidence of intent to be bound, such as a signature, may result in rejection of the Offer. Subcontractors. A Bidder or Offeror shall clearly list any proposed subcontractors and the subcontractor’s proposed responsibilities in the Offer. Cost of Offer Preparation. District will not reimburse a Bidder or Offeror for the cost of responding to a Solicitation. Solicitation Addendum. Unless otherwise stated in the Solicitation, each Solicitation Addendum shall be acknowledged electronically by the person acknowledging the Offer, and shall be submitted no later than the Offer Deadline. Failure to acknowledge a Solicitation Addendum will result in non submission of Offer. Tax Identification Numbers. A Bidder or Offeror must provide his or her Arizona Transaction Privilege Tax number and/or Federal Employer Identification number, if applicable, in the space provided on the Offer and Acceptance question and provide the tax rate and amount, if applicable, on the Cost Form. Taxes. Prices stated in a Solicitation shall not include applicable state and local taxes. District is exempt from paying federal excise tax and state property taxes. District is not exempt from state and local transaction privilege (sales) taxes. The amount of any applicable transaction privilege or use tax of a political subdivision of the State is not a factor in determining the lowest Bidder. Shipping/Delivery. Terms and conditions relating to shipping and delivery are “FOB Destination, Freight Prepaid and Allowed.” The shipping and delivery terms are further describe
Published attachments
- 2024-04-12 McClintock HS Roofing Renovation
- McClintock 2026-10-13
- Offer_and_Acceptance_Form
- Non-Collusion_Affidavit
- Vendor Registration Form FILLABLE
- W-9 (2024) FILLABLE
- Vendor_Reference_Listing
- Forced_Labor_of_Ethnic_Uyghurs_Ban
- Amendment_Acknowledgment
- 23-422409.1 Limited ACM Survey McCHS-Asbestos
- Question & Answer Report
- TUHSD McCHS Roof Addendum 1 summary
- Section 075701
- A5-7 ENLARGED SITE PLAN
- A5-4 ENLARGED SITE PLAN
- McClintock_Roofing_Replacement-IFB_#27-016CH-27IFB_(Addendum_#1_Revision).pdf
Addenda and notices
Addendum #1 · 1
Addendum #1 is issued to answer the Q&A received within the portal and also questions asked at the project walk through. Additionally there are updated documents based on some of the answers received. The IFB is due December 9, 2026 at 2:00pm Arizona Time.
Public questions and answers
Does this project have a specific Coating and spray foam manufacture scoped?
No. This is a performance specification.
The IFB states a B-1 license is required. We hold Arizona ROC 344916 (KB-2 Dual), and the roofing work would be performed by an Arizona-licensed roofing subcontractor under our prime contract. Does the District accept a KB-2 prime on that basis, or is a B-1 prime license mandatory?
It depends. The KB-2 has a limit of 2 million on their license for commercial work so if the job is over that, the license would not be valid for the project and the bidder would be considered non-responsible without the B-1 License. If the job is under 2 million then it should not be problematic, however license verification will be evaluated at bid opening to verify all bidders meet the proper qualification.
On the insurance limits ($2M/$5M CGL and $5M umbrella): will the District accept a commitment to bind the required limits upon award, with certificates provided at contract execution?
Vendors are required to provide a Certificate of Insurance as part of the bid specifications. Failure to provide adequate proof of insurance may result if a non-responsive determination.
The portal header shows bids due December 4, 2026 at 2:00 PM; the project summary states December 9. Please confirm the governing date and time.
The Bid Due Date is December 9, 2026 Ay 2:00pm Arizona Time.
Section 5 references Mesa Unified School District, including the bond obligee. Please confirm those references should read Tempe Union High School District.
The document has been updated to reflect TEMPE UNION HIGH SCHOOL DISTRICT #213