McIntosh Power Plant Security Barrier Wall
Description
The CITY OF LAKELAND is seeking bids from a qualified CONTRACTOR to perform all required activities to install a security wall unit approximately 3,916 feet long at McIntosh Power Plant (MPP) along the property boundary with East Lake Parker Drive in Lakeland Florida. The wall shall be constructed in accordance with the attachments to this RFP “Security Barrier Wall Technical Specifications” and design drawings “Lakeland Electric Security Barrier Wall Design Drawings”. Qualified bidders are to provide without limitation, all engineering, drawings, color renderings, permits, materials, equipment, labor, and supervision for the construction of said wall. The wall shall be constructed in the locations specified in the “Lakeland Electric Security Barrier Wall Design Drawings”. The height shall be set at 10’ as measured from the base and columns should generally be spaced approximately 20’ apart except as needed to avoid underground utility conflicts, accommodate entry gates and other features. The wall shall be constructed of precast concrete and be hurricane rated relative to the wind zone for the project area. The wall shall have finishes on both faces of the wall shall be visually appealing. A Geotechnical report for the project area is included as an attachment to this RFP. Firm lump sum price for all materials, equipment and labor to construct Security Barrier at McIntosh Power Plant SCOPE OF WORK Scope of Work Full Scope of work requirements and technical specifications are found in the attachments to this RFP, particularly the "Security Barrier RFP Document", “Lakeland Electric Security Barrier Wall Design Drawings” , and “Security Barrier Wall Technical Specifications” . The CITY OF LAKELAND is seeking bids from a qualified CONTRACTOR to perform all required activities to install a security wall unit approximately 3,916 feet long at McIntosh Power Plant (MPP) along the property boundary with East Lake Parker Drive in Lakeland Florida. The wall shall be constructed in accordance with the attachments to this RFP “Security Barrier Wall Technical Specifications” and design drawings “Lakeland Electric Security Barrier Wall Design Drawings”. Qualified bidders are to provide without limitation, all engineering, drawings, color renderings, permits, materials, equipment, labor, and supervision for the construction of said wall. The wall shall be constructed in the locations specified in the “Lakeland Electric Security Barrier Wall Design Drawings”. The height shall be set at 10’ as measured from the base and columns should generally be spaced approximately 20’ apart except as needed to avoid underground utility conflicts, accommodate entry gates and other features. The wall shall be constructed of precast concrete and be hurricane rated relative to the wind zone for the project area. The wall shall have finishes on both faces of the wall shall be visually appealing. A Geotechnical report for the project area is included as an attachment to this RFP. Schedule Work shall begin within 30 days of Purchase Order Issuance and be completed within 90 days of 1 st ground break. CONTRACTOR must provide in the bid submission a schedule of activities indicated major project milestones and anticipated project completion. Anticipated completion dates, schedule detail and thoroughness will be considered during the bid evaluation. Bid Instructions and Requirements Full scope of work, bid requirements, and conditions are listed in the attachment "Security Barrier RFP Document". In order for the OWNER to evaluate the Proposals to this specification, the Proposer shall supply: A total firm price for all work and materials outlined in all sections of this Specification. The Proposal shall also include unit prices where indicated. It must be clearly understood that this is a total firm price bid for work defined in this specification. Firm price shall include all possible contingencies that may be applicable e.g., poor soil foundation quality and inclement weather. Cost breakdown between materials vs labor. PROPOSER must provide Safety Performance Record including manhours used, recordable incidents, lost time injuries, fatalities, TRIR score over the past 5 years and OSHA Form 300A Logs from the past 5 years. Proposals should include the names of any subcontractors the CONTRACTOR intends to use (if any) as well as all information listed in Section 2.4.c. which would be required of the CONTRACTOR in this RFP (i.e. safety performance records). A detailed list of three (3) or more recently completed projects of similar scope and magnitude that have been completed by the CONTRACTOR in the last five (5) years. For each project listed, minimum information shall include: project description, location information, planned and actual project schedule information, names of project managers, costs and contact information (name, phone number) for the client and the project manager. Individuals listed must qualified to respond to questions concerning the Proposer's abilities, costs, schedules, etc. Detailed construction plan with schedule, including substantial completion and final completion. Plan should include a narrative supporting the time frame and project phases associated with the schedule. Construction plan and schedule should include sufficient detail to evaluate the benefits of the proposed plan with the cost of the submission (i.e. does plan entail removal of existing fence in the entire property line first versus in 200 foot sections, underground utility precautions). Project execution team qualifications, staffing plan. Detailed Stormwater Pollution Prevention Plan Submit detailed plan and quality management system to meet quality control criteria listed the technical specifications. Plans in the submission should indicate the how much area will be required for laydown, staging, and storage and what materials would be delivered to site, and confirmation that road closures would not be required for implementation. Proposers are requested to show earliest possible delivery date, expressed in calendar weeks, after receipt of purchase order. The wind zone ratings for the proposed products. Statement of performance guarantee, if any and descriptive literature, bulletins and other data covering proposed materials. If shipping materials through a third party is required proposer must arrange for separate billing by the freight carrier to the OWNER for the freight charges with the freight “FOB destination", or Proposer will ship the material “FOB destination" and pay the freight to the freight carrier. Bid Submission must include an acknowledgement and indicate intent to fulfill the Construction Bond requirements in accordance with Florida Statutes Chapter 255.05 after award and prior to onsite work. Clarifications Design drawings present options for certain items, such as post caps and wall style. For clarity: The wall shall be of precast panel construction. Construction Bond Requirements In accordance with Florida Statutes Chapter 255.05 the CONTRACTOR must “execute and record in the public records of the county where the improvement is located, a payment and performance bond with a surety insurer authorized to do business in this state as surety.” Bid submissions must include acceptance of this requirement and intent to execute all surety requirements listed within Florida Statute 255.05 upon being selected and to meet all requirements prior to beginning work. Instructions to Contractors- Evaluation Criteria: Each Proposal Submittal will be evaluated on a total score basis, with a maximum score of one hundred (100) points per Evaluation Committee member. Safety Performance Record (0 to 10 points) Safety Performance Record including manhours used, recordable incidents, lost time injuries, fatalities, TRIR score over the past 5 years and OSHA Form 300A Logs from the past 5 years. Bidder's Safety Performance Record (and any potential subcontractors) meets or exceeds Lakeland Electric's expectations with a TRIR averaged over the past 5 years of less than or equal to 1.0 Strength and relevance of references (0 to 10 points) Strength and relevance of references per RFP submittal requirements for all project phases. Prior experience successfully complete projects of similar scope and size. Quality of detailed Closure Construction Plan (0 to 25 points) Quality of detailed Closure Construction Plan, quality of proposed wall structure, and quality assurance (warranties, if any) providing maximum value and lowest scheduling, performance and cost risk. Pipes or stormwater flow structures appropriately included in sections required by RFP drawings or exceeds requirements. Conformance with contract language and unique contracting requirements (0 to 10 points) Conformance with contract language and unique contracting requirements included in RFP specifications and Exhibits providing maximum value and lowest scheduling, performance and cost risk. Suitability of proposed bidder contract template documents to meet RFP requirements. Project Implementation Plan Schedule (0 to 10 points) Project Cost (0 to 30 points) A total firm price for all work and materials outlined in all sections of this Specification. The Proposal shall also include unit prices where indicated. It must be clearly understood that this is a total firm price bid for work defined in this specification. Firm price shall include all possible contingencies that may be applicable e.g., poor soil foundation quality and inclement weather. Cost breakdown between materials vs labor. Team (0 to 5 points) Team (organizational) qualifications and strengths for all partners; company background and years in business. Strength of assigned team members years of prior experience in technical, project management and demonstrated track record similar of successful projects. NOTICE REQUEST FOR PROPOSAL McIntosh Power Plant Security Barrier Wall FOR THE CITY OF LAKELAND Tuesday, November 24, 2026 RFP No. 2026-RFP-138 Sealed proposals will be received electronically by the Purchasing Manager via OpenGov, the City’s e-Procurement Portal (“Portal”), until 3:30 pm – Tuesday, December 29, 2026 . Proposals received after this specified time and date will not be considered. The sealed proposals will be publicly opened and read aloud on the same date and time in the office of the Purchasing Manager for the following: RFP Documents may be accessed by visiting our Website at https://procurement.opengov.com/portal/lakelandgov or by contacting the City of Lakeland Purchasing Division @ (863) 834-6780. RFP Documents are Required for Submittal . Proposers are required to submit their response through the Portal. Proposers shall sign up on the Portal if an account does not exist. THE CITY OF LAKELAND IS SOLICITING SEALED PROPOSALS FROM QUALIFIED VENDORS TO PROVIDE: McIntosh Power Plant Security Barrier Wall . THE PROPOSALS SUBMITTED SHALL BE IN COMPLETE ACCORDANCE WITH, WITHOUT LIMITATION, THIS REQUEST FOR PROPOSAL, THE ATTACHED CITY OF LAKELAND SPECIFICATIONS, ALL CODES AND REQUIREMENTS REFERENCED THEREIN. All Questions regarding this request for proposals shall be in writing and submitted electronically via the Portal through the Question and Answer tab before 5:00 pm on Monday, December 21, 2026 . Responses will be released on the Question and Answer Tab. CLARIFICATION AND/OR EXCEPTIONS OF DOCUMENTATION Proposer requiring clarification or having a dispute with these documents must advise the City Purchasing Division of the nature of the required clarification or basis of the dispute, in writing, no later than 5:00 pm on Monday, December 21, 2026 via the Portal's Question and Answer tab. If no written contact has been made by this specified date, the Proposer waives the right to any future consideration and accepts the documents as published and/or revised by the City. Additionally, submitting a signed bid shall be construed as a total compliance statement. Note: Any use of brand names (manufacturer) in this invitation and specification is for Proposer convenience only and shall not limit this offering. Equal or better equipment and alternate bids may be given consideration. FLORIDA PUBLIC RECORDS LAW IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS: KELLY S. KOOS – CITY CLERK AT: PHONE: 863-834-6210, E-MAIL: cityclerk@lakelandgov.net , MAIL: ATTN: CITY CLERK 228 S. MASSACHUSETTS AVE., LAKELAND, FLORIDA 33801. In accordance with Florida Statute §119.0701, the Contractor shall keep and maintain public records required by the City in performance of services pursuant to the contract. Upon request from the City’s custodian of public records, Contractor shall provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided pursuant to Florida Statute Chapter 119 or as otherwise provided by law. Contractor shall ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. Contractor shall, upon completion of the contract, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform services pursuant to the contract. If the Contractor transfers all public records to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City’s custodian of public records, in a format that is compatible with the information technology systems of the City. EXPARTE COMMUNICATION Please note that to insure the proper and fair evaluation of a proposal the City of Lakeland prohibits exparte communication (i.e., unsolicited) initiated by the Proposer to the City Official or Employee evaluating or considering the proposals prior to the time a bid decision has been made. Communication between Proposer and the City will be initiated by the appropriate City Official or Employee in order to obtain information or clarification needed to develop a proper and accurate evaluation of the proposal. Exparte communication may be grounds for disqualifying the offending Proposer from consideration or award of the proposal, then in evaluation, or any future proposal. BONDING A certified check or bid bond shall accompany each submittal. The certified check or bid bond shall be for an amount not less than five percent (5%) of the price and shall be made payable to the Owner as a guarantee that the Proposer will not withdraw for a period of sixty (60) days after RFP closing time. In the event the contract is awarded to the Proposer, he/she will, within ten (10) days thereafter, enter into a written contract with the City of Lakeland, or accept a City of Lakeland purchase order. The successful Proposer shall also furnish within ten (10) days; a PUBLIC CONSTRUCTION BOND IN COMPLETE ACCORDANCE WITH SECTION 255.05 OF THE FLORIDA STATUTES in an amount equal to the contract price as a guarantee of good faith that the Proposer will execute the work in accordance with the terms of the contract and that the Proposer shall make payments for all labor, material and supplies used directly or indirectly for the work. Failure to do so will constitute forfeiture of the bid security as liquidated damages. The Public Construction Bond shall be secured from and countersigned by an agency of a surety company recognized in good standing, licensed and authorized to do business in the State of Florida and found to be acceptable to the City of Lakeland. INSURANCE AND SAFETY REQUIREMENTS All insurance shall be secured from or countersigned by an agent or surety company recognized in good standing and authorized to do business in the State of Florida. The Contractor shall, within ten (10) days of notification of award and prior to commencement of work, take out and maintain in full force and effect minimum insurance coverage as specified in the attached requirements. This insurance shall remain in force and effect throughout the duration of the contract. A certificate of existing insurance coverage should be submitted with the proposal as proof of insurability. If the current coverage does not meet the RFP requirements, then the Proposer should request an affidavit of insurability from the Proposer's insurance agent that certifies the requirements can and will be met. Failure to provide adequate insurance coverage may be cause for disqualification as non-responsive to the RFP requirements. The Contractor agrees to accept and abide by the City of Lakeland safety regulations in complete accordance with the attached requirements. INDEMNIFICATION AGREEMENT The Contractor agrees to indemnify and hold harmless the City of Lakeland in complete accordance with the attached requirements. This agreement shall be signed, notarized and returned with the RFP submittal. Failure to provide the Hold Harmless Indemnification Agreement may be cause for disqualification as non-responsive to the RFP requirements. HUMAN TRAFFICKING -- F.S. 787.06(14) In compliance with Section 787.06(14), Florida Statutes, the attached Affidavit must be completed by an officer or representative of a non-governmental entity that is executing, renewing, or extending a contract with the City of Lakeland, Florida (the “Governmental Entity”). This attests under penalty of perjury that the nongovernmental entity does not use coercion for labor or services when a contract is executed, renewed or extended between a governmental entity. DRUG-FREE WORKPLACE CERTIFICATION By submitting a proposal in response to this Request for Proposal, you are certifying that your company is a drug-free workplace in accordance with Florida Statute 287.087. SUSPENSION AND DEBARMENT CERTIFICATION By submitting a proposal in response to this Request for Proposals you are certifying that your company, pursuant to 49 CFR Part 29: (1) is not presently suspended or debarred as, and/or listed on the U.S. General Services Administration’s System for Award Management (SAM) as such; and (2) will at all times remain eligible to bid for and perform the services subject to the requirements set forth herein and other applicable laws. Proposer agrees that any contract awarded to Proposer will be subject to termination by the City if Contractor or its subcontractors fail to comply or maintain such compliance. PUBLIC ENTITY CRIMES A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a proposal on a contract to provide any goods or services to a public entity, may not submit a proposal on a contract with a public entity for the construction or repair of a public building or public work, may not submit proposals on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TW
Published attachments
- Indemnification 2026 Contractor
- Human Trafficking Affidavit
- Security Barrier Wall Technical Specificatons
- Security Barrier_RFP_Document
- CAD_Access_Instructions_FTP_FILE_ACCESS
- Lakeland Electric Security Wall Geotechnical Investigation
- 2026-11-11 - LAKELAND-PRELIM WALL_SIGNED
- McIntosh_Power_Plant_Security_Barrier_Wall.pdf