State and local · OpenGov
Milling & Paving of Still River Drive, Grove Street & Housatonic Avenue Bridge Decks - Rebid
Description
The Town of New Milford is soliciting competitive bids from qualified firms for bridge deck milling and paving services. The Town reserves the right to accept or reject any and all bids in part or in whole. IMPORTANT NOTE: A BID PROPOSAL FORM WILL ALSO NEED TO BE COMPLETED AND UPLOADED TO SECTION 7.7. THE BID PROPOSAL FORM CAN BE DOWNLOADED FROM SECTION 7.7 OR SECTION 8 - ATTACHMENTS. CUT BITUMINOUS CONCRETE PAVEMENT HMA S0.375 HMA S0.25 MATERIAL FOR TACK COAT SAWING AND SEALING JOINTS FINE MILLING OF BITUMINOUS CONCRETE (0” TO 4”) REMOVAL OF EXISTING WEARING SURFACE ASPHALTIC PLUG EXPANSION JOINT SYSTEM PARTIAL DEPTH PATCH MEMBRANE WATERPROOFING (WOVEN GLASS FABRIC) TRAFFICPERSON (MUNICIPAL POLICE OFFICER) - ESTIMATED AT $60,000.00. PLEASE ENTER $60,000 IN THE UNIT COST SECTION. TRAFFICPERSON (UNIFORMED FLAGGER) MAINTENANCE AND PROTECTION OF TRAFFIC SITES 1 & 2 MAINTENANCE AND PROTECTION OF TRAFFIC SITE 3 CONSTRUCTION SURVEYING PAINTED PAVEMENT MARKINGS 4” YELLOW PAINTED PAVEMENT MARKINGS (GENERAL) 4” YELLOW EPOXY RESIN PAVEMENT MARKINGS 6” WHITE EPOXY RESIN PAVEMENT MARKINGS EPOXY RESIN PAVEMENT MARKINGS, SYMBOLS & LEGENDS CONSTRUCTION SIGNS Scope of Work The bidder understands that, in addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the New Milford “Municipal Purchases” Ordinance, set forth in Article III, Section 2-92 (a) through (o) inclusive, of the Code of New Milford. Bid Documents The bid documents, including plans, can be found under Section 8 - Attachments. Notice Invitation to Bid Notice Sealed bids will be received via the Town’s e-Procurement Portal, OpenGov Procurement, until 3:30 pm , on Thursday, December 10, 2026 for Milling & Paving of Still River Drive, Grove Street & Housatonic Avenue Bridge Decks - Rebid . Bids will be opened publicly in the E. Paul Martin Room by the Purchasing Authority, Thursday, December 10, 2026 at 3:30 pm. Late bids will not be accepted through OpenGov Procurement and will be rejected. INTENT: The Town seeks a qualified construction firm for a Milling & Paving of Still River Drive, Grove Street & Housatonic Avenue Bridge Decks - Rebid project . Specifications and bid forms must be obtained online through OpenGov Procurement. The exclusive means by which all prospective bidders may obtain bid packages, direct inquiries, request and receive addenda and supplemental information, and submit bids and proposals, shall be through the Town of New Milford’s procurement portal. When applicable, state bids will be considered for this service. The Purchasing Authority reserves the right to reject any and all bids. In addition to the bid specifications, all bids are subject to the terms, provisions and conditions of the New Milford “Municipal Purchases” Ordinance, set forth in Article III, Section 2-92 (a) through (o) inclusive, of the Code of New Milford. By bidding on the proposed purchase, the bidder agrees to such terms, provisions and conditions. Any bidder found by the Purchasing Authority to be delinquent in the payment of taxes and/or sewer use charges due to the Town of New Milford shall be subject to the provisions of Section 2-92 (e) of the Code of New Milford. Copies of the Bid Ordinance may be obtained at the Office of the Town Clerk, Town Hall. Pete Bass, Mayor An Equal Opportunity/Affirmative Action Employer Introduction Summary Background Contact Information Timeline Instruction to Bidders Submission of Bids The Town of New Milford, CT (“Town” or “Municipality”) invites bids on the project and services described herein to be submitted via the Town’s Procurement Portal, OpenGov Procurement. Bids will be received until 3:30 pm on Thursday, December 10, 2026 and then publicly opened and read aloud. The Municipality reserves its right to consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all bids. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or the authorized postponement thereof. Any bid received after the time and date specified shall not be considered or accepted through OpenGov Procurement. No bidder may withdraw a bid within 45 days after the actual date of the opening thereof. The Municipality may accept or reject any or all bids or any portions thereof and take any action deemed to be in the best interest of the Town. Preparation of Bid Bids must be submitted exclusively via the Town’s Procurement Portal. All blank spaces for bid prices must be filled in, through the system. Pre-Bid Meeting There will not be a pre-bid meeting held for this project. Addenda and Interpretations No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally, either in person or via phone. All questions related to this bid shall be submitted in writing through the Question/Answer Tab via the Town's Procurement portal, on or before, Monday, November 30, 2026 by 8:00 am . Please be sure to enter each question separately (1 question per box) and include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. Bidders must clearly understand that the only official answer or position of the Town shall be the one stated in writing and posted in the Town's procurement portal. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on the Town's e-Procurement Portal. When asking questions, please be sure to enter each question separately (1 question per box). Any addenda shall be posted on the Town's Procurement Portal. Addenda notifications will be emailed to all persons on record as following this bid. Failure of any bidder to receive any such addenda or interpretation shall not relieve such bidder from any obligation under their bid as submitted. All addenda so issued shall become part of the contract documents. Qualifications of Bidder Bidders must have a minimum of five (5) years’ experience supplying to Municipalities. In determining the qualification of a Bidder, the Town may consider the record and the performance of any contracts for similar work, which may have been previously performed. The Town shall make such investigation as deemed necessary to determine the ability of the Bidder to perform the work. The bidder shall furnish to the Municipality all information and data for this purpose as the Municipality may request. Conditional bids will not be accepted. The Bidder shall complete the attached “Statement of Contractor’s Qualifications”. Withdrawal of Bids Bids may be withdrawn through the Town's Procurement Portal, the responding firm may “unsubmit” their proposal. After withdrawing a previously submitted proposal, the responding firm may submit another proposal at any time up to the deadline for submitting proposals by written request prior to the bid opening. The Bid Guaranty of any Bidder withdrawing their Bid in accordance with the foregoing conditions will be returned promptly. Pricing Proposal Terms and Conditions Delivery Upon receipt of the contract award the Contractor will meet with the Town to discuss a tentative schedule for the required work. Additionally, a pre-construction meeting may be held prior to the beginning of each Project in order to mutually agree upon a detailed schedule and to define the scope of the work for that Project. The project shall be substantially completed by May 14, 2027. The Town will withhold 5% of all invoices for a Project as retainage for a period of 60 days after the Project is accepted as substantially complete by the Town Engineer. During this 60 day period the Contractor shall complete any punch list items presented by the Engineer. The amount of one thousand dollars ($1,000) per day is agreed upon as liquidated damages and shall be paid by the Contractor for every day he does not meet the agreed upon substantial completion date for a Project or the 60 day punch list period, unless said delay is caused by weather or other unforeseen or unavoidable circumstances, or by approval by the Director of DPW. This sum shall be paid by the Contractor to the Town or withheld from final payment to the Contractor. The Contractor shall not work on more than one Town project at a time unless approved by the Engineer. No mobilizing costs will be paid by the Town of New Milford. Mobilization costs shall be included within the individual bid items. The contractor will be responsible for the coordination of his subcontractors in accordance with the project’s schedule. Work Hours & Limitations • Permitted Shifts: Sunday night through Friday morning. • Nighttime Window: 8:00 PM to 6:00 AM. • Weekend Restrictions: No work from Friday 6:00 AM to Sunday 8:00 PM. • Site Clearance: All lanes must be fully open to traffic by 6:00 AM each day. The Contractor must submit a detailed Progress Schedule and Night Operations Plan to the Engineer for approval before starting work. This plan must address traffic control shifts, emergency breakdown procedures, and daily site cleanup. On occasion, work may be required on Saturdays depending on traffic conditions. Proposed schedules, other than the work hours & limitations, must be submitted in writing and approved by the Director, in writing, PRIOR to the contractor working said hours or days. Failure to Enter Contract The successful bidder, upon failure or refusal to execute and deliver the contract, bonds and certificates of insurance required within ten (10) business days after receiving notice of the acceptance of its bid, shall forfeit their award. Bid Security; Failure to Enter Contract Each bid must be accompanied by a bid bond duly executed by the bidder as principal and having a surety thereon approved by the Municipality, in the amount of five percent (5%) of the bid. The successful bidder, upon failure or refusal to execute and deliver the contract, bonds and certificates of insurance required within ten (10) business days after receiving notice of the acceptance of its bid, shall forfeit to the Municipality, as liquidated damages for such failure or refusal, the security deposited with its bid. Security for Faithful Performance Simultaneously with its delivery of the executed contract, the Contractor shall furnish a one hundred percent (100%) surety bond or bonds as security of faithful performance of their contract and for the payment of all persons performing labor on the project under this contract and furnishing materials in connection with this contract, as specified herein. The surety on such bond or bonds shall be a duly authorized licensed Connecticut surety satisfactory to the Town, and listed in the Department of Treasury's Listing of Approved Sureties (Circular 570). Power of Attorney Attorneys-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their power of attorney in the form set forth under CT General Statute § 1-352. Insurance Requirements Contractors shall carry the following minimum insurance coverage’s and the provisions specified below must be met. Insurance carriers providing the required insurance coverage’s must have an A.M. Best’s financial rating of “A-VII” or better. The Town of New Milford, its officials, employees and volunteers, MUST be named as additional insured with reference to this project on a primary and non-contributory basis. The insurer shall waive all rights of subrogation against the Town of New Milford, CT, its officers, employees and volunteers arising from work performed by the Contractor. The policy endorsement evidencing this coverage must be provided with the certificate of liability insurance. Any changes in insurance coverage will require (30) thirty days of notice to the Town of New Milford by certified mail with return receipt requested. The contract should have a hold harmless indemnification agreement provision which protects the Town of New Milford to the greatest extent that Connecticut Law will allow. If Umbrella Liability is used to make up required limits, the policy shall not reduce or restrict coverage provided by the underlying Commercial General Liability or Automobile Liability insurance policies. Note that these limits are not all inclusive and are subject to change to reflect scope and cost of individual projects. These minimum required limits are not a limitation of contractor liability. a. Commercial General Liability (Form 1988 ISO Occurrence Form or equivalent) Limits of Liability shall be combined bodily injury & property damage. General Liability Aggregate $1,000,000.* Products & Completed Operations Aggregate $1,000,000. Personal Injury $1,000,000. Each Occurrence for Bodily Injury and Property Damage $2,000,000. Fire Damage (Any One Fire) $ 50,000. Medical Expense (Any One Person) $ 5,000. Umbrella Excess $2,000,000. Umbrella limits over General Liability limits may be used to make up the required limits. The additional insured coverage MUST be provided by the Umbrella to mirror the General Liability coverage. Automobile Liability Policies must include coverage for all vehicles utilized on the job including owned vehicles, hired vehicles and non-owned vehicles. Limits of insurance shall be combined single limit bodily injury and property damage $1,000,000. Umbrella limits over Automobile Liability limits may be used to make up the required limits. Statutory Workers Compensation and Employers Liability Policy coverage will include limits of $100,000 each accident, $100,000 Disease-each employee and $500,000 Disease-policy limit, or in accordance with the requirements of the State of Connecticut, whichever is greater. Laws and Regulations The bidders' attention is directed to the fact that all applicable state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over the construction of the project shall apply to the contract throughout, and they are considered included in the contract the same as though they were written out in full. Conditions: Obligation of Bidder Each bidder must inform themselves fully of the conditions relating to the construction of the project and the employment of labor thereto. Failure to do so will not relieve an awarded bidder of their obligation to furnish all material and labor required for executing the provisions of the Agreement. Insofar as possible, the Contractor executing the work must employ such methods or means as will cause the least interruption of or interference with the work of any other Contractor. At the time of the opening of the bids, each bidder will be presumed to have inspected the site and to have read and be thoroughly familiar with the plans and the contract documents (including all addenda). The failure or omission of a bidder to examine any form, instrument or document shall in no way relieve the bidder from any obligation with respect to their bid. Prevailing Wage The Bidder shall conform to Connecticut’s prevailing wage law codified in Connecticut General Statutes Sections 31-53 and 31-53a. The wages paid on an hourly basis to any person performing the work of any mechanic, laborer or worker on the work herein contracted to be done and the amount of payment or contribution paid or payable on behalf of each such person to any employee welfare fund, as defined in these sections, shall be at a rate equal to the rate customary or prevailing for the same work in the same trade or occupation in the town in which such public works project is being constructed. Any contractor who is not obligated by agreement to make payment or contribution on behalf of such persons to any such employee welfare fund shall pay to each mechanic, laborer or worker as part of such person's wages the amount of payment or contribution for such person's classification on each pay day. Wage rates and associated information can be found at CT DEPARTMENT OF LABOR–WAGE RATES . Retainage The Town shall retain five percent (5%) of each payment until final completion and acceptance of all work covered by the contract. Sub-Contracting The Contractor is prohibited from subcontracting unless it has obtained, in writing, the permission of the Town – specifically the Director of Public Works – to employ the specific subcontractors proposed to be used by the Contractor. The Contractor shall provide the Director of Public Works with the names and addresses of all proposed subcontractors at least five (5) business days prior to their engagement. Any agreement made in violation of this Section shall confer no rights on any subcontractor and shall be null and void. Non-Employment Relationship The Town and the successful bidder are independent parties. Nothing contained in the Contract shall create, or be construed or deemed as creating, the relationships of principal and agent, partnership, joint venture, employer and employee, and/or any relationship other than that of independent parties contracting with each other solely for the purpose of carrying out the terms and conditions of the Contract. The successful bidder understands and agrees that it is not entitled to employee benefits, including but not limited to workers compensation and employment insurance coverage, and disability. The successful bidder shall be solely responsible for any applicable taxes. Professional Standard of Conduct In providing services to or on behalf of the Town, the Contractor and their employees conduct reflects on the Town of New Milford. The Contractor is under an obligation to act lawfully, ethically and responsibly in all endeavors and to instruct its employees to abide by that standard. Activities and/or behavior by the Contractor or their employees that fails to comport with that standard may result in the termination of this contract and ejection from the project or supply chain. Disqualifying conduct includes, but is not limited to, criminal activity, unlawful sexual conduct, domestic violence, a serious motor vehicle violation, and public intoxication. Alternates The Town shall have the right to accept or omit any Alternate. Alternate bid items shall include the cost of all labor, materials, equipment, time extension or deletion, general conditions, general requirements, overhead, profit, insurance, for the work. Claims for extras resulting from the acceptance or rejection of any alternate item will not be allowed. The Drawings, Specifications and other Contract Documents shall be considered appropriately modified by either the acceptance or omission of any Alternates. The contract completion date (calendar days) will be adjusted if Alternates are added. Such adjustment must be memorialized in writing, signed by the Mayor and Director of Public Works, and attached in addendum to the Agreement. The additional days granted should be considered to perform the alternate work only and substantial completion based on base bid items and contract days. All costs associated with the above time extensions(s) are to be included in the Alternate Price. After award of the contract, one or more of the alternates for which funds are available may be added to the Contract in the discretion of the Owner. The adjustment to the bid price shall be solely based on the bid price for the alternate(s) added. The Contractor will be notified as to which alternates will be included in the Contract within fourteen (14) calendar days of the Award of Contract. Basis of Award The following factors will be considered in selecting a lowest qualified bidder: Prices bid. The ability, capacity and skill of the bidder to perform the work included. Whether the Bidder can perform the work within the specified contract
Published attachments
- SAMPLE AGREEMENT
- Special Provisions
- Plans - Milling & Paving of Still River Dr, Grove St & Housatonic Ave Bridge Decks
- Bid Proposal Form - Milling & Paving of Still River Dr, Grove St & Housatonic Ave Bridge Decks Rebid
- Prevailing Wages - Milling & Paving of Still River Dr, Grove St & Housatonice Ave Bridge Deck - Rebid
- Milling_&_Paving_of_Still_River_Drive,_Grove_Street_&_Housatonic_Avenue_Bridge_Decks_-_Rebid.pdf