State and local · OpenGov
MOA Irrigation Improvements & Well Decommissioning
Description
Ben Franklin Transit (BFT) headquartered at 1000 Columbia Park Trail in Richland, WA, is the primary provider of public transportation services in the Benton and Franklin County region. BFT’s service area spans 624 square miles and includes the cities of Kennewick, Pasco, Richland, West Richland, Benton City, and Prosser, as well as surrounding unincorporated areas. The agency plays a vital role in connecting communities, supporting regional mobility, and ensuring access to essential services throughout the Mid-Columbia region. BFT is soliciting bids from qualified contractors to provide irrigation system improvements and decommissioning of two existing irrigation wells at its Maintenance, Operations, and Administration (MOA) facility in Richland, Washington. The project includes installation of a new irrigation water service and meter, connection to the existing irrigation system, permanent decommissioning of two existing wells, associated utility and electrical work, surveying and easement documentation, and site restoration in accordance with the project plans and specifications. Scope of Work Project Description and Contract Requirements The Contractor shall provide a complete, functioning City-water-fed irrigation service and permanently decommission two existing irrigation wells. Work includes utility connections, a new water meter assembly, irrigation tie-in, electrical isolation, well closure, surveying and easement documentation, turf restoration, testing, coordination and all incidental work shown on the contract drawings or reasonably necessary for completion. The Contractor shall coordinate specialty subcontractors, including a Washington-licensed well driller, appropriately licensed electrical personnel and a professional land surveyor. Verify all existing conditions, dimensions, depths, buried utilities, well configurations and connection points before ordering materials or excavation. Notify BFT and the Engineer of discrepancies before proceeding. Maintain BFT operations, traffic circulation and access with minimal disruption. Coordinate construction sequence, shutdowns, inspections and service activation with BFT and City of Richland personnel. Schedule a preconstruction conference with City personnel before utility work. Arrange public and private utility locates; contact 811 at least two business days before excavation. Protect existing buildings, pavement, walks, trees, landscaping, utilities, backflow assembly and irrigation piping. Repair damage at Contractor expense. Perform work in accordance with applicable City of Richland standards, approved permits and inspections, the 2021 International Building Code as referenced on Sheet C002, and applicable state well requirements. Obtain required approvals and coordinate City-reserved utility work. BFT will pay City of Richland permit and fee charges as stated in the irrigation SOW; Contractor shall obtain and administer permits and include all other applicable costs and regulatory well-decommissioning fees unless otherwise stated in the contract. City Water Service and Irrigation Meter Locate the existing 8-inch PVC City water main and construct a hot-tap connection for the new 2-inch service in accordance with City Standard Detail W2 and Sheet C501. Coordinate tapping and inspection requirements with the City. Install a 1-1/2-inch City irrigation meter assembly per City Standard Detail W4 and Sheet C501, using the depicted 2-inch meter assembly arrangement and reducers on both sides of the 1-1/2-inch meter to connect to the 2-inch line. Confirm meter supply, installation responsibilities and final configuration with the City before procurement. Furnish and install the new 2-inch Schedule 40 PVC irrigation line, fittings, valves, meter enclosure and appurtenances shown or required. Provide minimum 30-inch pipe cover unless otherwise indicated; provide appropriate bedding and compact backfill in loose lifts not exceeding 12 inches to a nonyielding condition. Type L copper water service, where used, shall comply with ASTM B88. Flush, inspect and test the new service as required by the City. After the meter is installed, measure and report available flow and pressure to BFT before connecting the new service to the existing irrigation system. Obtain City authorization before activating the service. Connection to Existing Irrigation System Connect the new 2-inch PVC line to the existing isolation valve shown on C002 (Keynote 3); field verify dimensions, fitting requirements and valve condition. Disconnect the existing well-fed irrigation supply to prevent cross-connection with the new City service. Cut and remove the existing well supply line back to the well vault and cap as indicated by C002 Keynote 4. Arrange testing of the existing double-check backflow assembly by a certified tester accepted by the City; provide results to BFT and the City. Confirm whether the existing assembly is acceptable for the new service before activation. Demonstrate irrigation system operation and water delivery through the existing system. Correct leaks and deficiencies and provide full irrigation coverage in disturbed areas. Decommission Two Existing Irrigation Wells A Washington State licensed well driller shall permanently decommission both wells in accordance with RCW 18.104, WAC 173-160 (including WAC 173-160-381), Ecology requirements and applicable local requirements. C002 Keynote 6 identifies both wells. Available well information is preliminary and shall be field verified: Well 1 is described as approximately 12-inch steel casing and 165 feet deep, with casing about 12 inches above grade; Well 2 is described as approximately 8–10-inch steel casing, approximately 55 feet deep, in a concrete vault with pump and metal cover. A well log was identified for Well 1 but not Well 2 in the source SOW; the referenced log and photo attachments must be included in the final solicitation if available. Prepare and submit the required Ecology Notice of Intent and applicable fees, meeting the minimum advance notice stated in the irrigation SOW (72 hours) and any longer period required by Ecology. Coordinate notice and start date with BFT. Inspect and document actual depth, casing, water level, screen, obstructions and equipment. Report material discrepancies or conditions requiring a different closure method before proceeding. Remove pumps, drop pipes, wiring, wellhead fittings and removable equipment to the extent practicable. Remove obstructions and sediment needed for effective sealing; dispose of materials lawfully. Submit proposed sealing materials, mix, estimated quantities, casing perforation and pressure-grouting method for review. Perforate steel casing and pressure-place approved grout to seal the annular space, then seal the well interior by tremie or another compliant method. Follow the specific casing perforation and placement requirements of WAC 173-160-381 as applicable to verified construction; do not rely on capping alone. Record actual perforation interval and pattern, grout type, mix, volume, placement depth, pressure/returns, discrepancies and final seal. Cut off or terminate casing below grade as required and restore the surface without creating a depression or infiltration pathway. After well closure, fill the existing concrete well vault with crushed rock to the bottom of the lid as shown in C002 Keynote 5; coordinate this work with final casing termination and the required vault condition. Prepare and submit Ecology decommissioning reports within the required reporting period and give BFT copies and evidence of filing. Electrical Isolation and Equipment Removal At the well vault, remove pump power conductors and conduit back to the edge of the vault and cap as shown by C002 Keynote 8. Locate the associated conductors and breaker in the maintenance building electrical panel, safely disconnect and make safe at the breaker, and abandon conductors in place only as permitted by the plans and applicable electrical code. Perform this work using appropriately licensed personnel. Coordinate shutdowns with BFT and document the final condition. Survey and City Water Easement Locate and survey the existing City water main and the proposed easement alignment depicted on C002. Provide a Washington professional land surveyor-prepared, signed/stamped legal description and exhibit for the proposed 10-foot-wide water line easement centered on the existing water line, suitable for City review and recording. Provide surveyed as-built information for water improvements and any other items required by the City under C002 Site Utilities Note 6. BFT/City shall review easement documents before recording; Contractor shall correct survey/document errors. Landscape, Grading and Site Restoration Remove the entire lawn within the area identified by C002 Keynote 9, not merely the trench footprint. Evenly regrade topsoil, protect the existing irrigation system and replace the full designated lawn area with new sod. Protect and maintain existing trees to remain. Restore disturbed soil, walks, pavement, gravel and landscape features in kind; remove unsuitable material and construction debris. Adjust sprinkler heads to final grade. Repair, reconfigure or supplement irrigation as necessary to restore full operational coverage of turf and landscaped areas within project limits; irrigation adjustments are Contractor design-build work per C002. Water and maintain newly sodded areas until healthy, uniform turf is established and accepted by BFT. Correct settlement, erosion and unsuccessful establishment before final acceptance. Quality Control, Submittals and Closeout Before construction: schedule and utility coordination; applicable permits/notifications; well-driller credentials; well-closure method and grout information; meter and pipe product information; survey approach; and proposed shutdown/inspection sequence. During construction: maintain inspection records, field changes, well closure/grout logs, photos, utility test results and as-built measurements. Notify BFT before concealed work is covered when inspection is required. Closeout Package: at closeout, provide the following: Provide one (1) tabbed three-ring binder and one (1) searchable PDF with matching bookmarks. Also provide one (1) full-size hard copy and a full-size PDF of the record drawings. The binder shall include: Contact list for the Contractor, subcontractors, suppliers, well driller and surveyor. Contractor's one-year warranty letter (starting at Final Acceptance) and all manufacturer warranties. Product data and O&M information for installed materials, and sod watering/establishment instructions. City permit final, inspection sign-offs, and receipts for the meter and connection fees. Flow/pressure test results, flushing/testing records, and the backflow assembly test report. Ecology decommissioning reports and proof of submission for each well, grout logs, and electrical safe-off documentation. Stamped easement legal description and exhibit. Record drawings showing both wells, the new meter, piping, valves and the irrigation tie-in. Submit a draft package at Substantial Completion and the final package within 30 days after Substantial Completion. Incomplete packages will be returned. Final payment will not be released until BFT accepts the complete Closeout Package. Final acceptance requires compliant well closure, operational City water irrigation service, satisfactory tests and inspections, completed easement documentation, restored site and accepted sod, and BFT acceptance of the complete Closeout Package. Bid and Payment Basis Provide one comprehensive lump-sum price for the complete project, including subcontractors, mobilization, labor, materials, equipment, well decommissioning, electrical isolation, City water service, meter assembly, tie-in, testing, survey/easement documentation, lawn restoration, waste disposal and closeout. Separately identify the cost of well decommissioning and irrigation improvements for BFT evaluation, without excluding either from the total. Identify proposed exclusions and assumptions in the bid. No extra work or changes in compensation shall proceed without BFT written authorization. The lump sum includes reasonably necessary sealing material quantities and ordinary incidental construction work. Contract Document Coordination The contract drawings C001, C002 and C501 form part of the technical scope. The Contractor shall notify BFT and the Engineer of conflicts or omissions before proceeding; this SOW does not authorize unilateral changes to the engineered design. Where City standards or Ecology requirements control a regulated activity, obtain required agency approvals. Introduction Ben Franklin Transit, (hereinafter referred to as BFT), a municipal corporation of the State of Washington, located at 1000 Columbia Park Trail, Richland, WA 99352, is soliciting bids from qualified firms to provide the following services listed below. BFT is soliciting sealed electronic bids in response to Invitation for Bid (IFB) 26-25 MOA Irrigation Improvements & Well Decommissioning . Interested Contractors shall create a Free account with OpenGov Procurement by signing up at: procurement.opengov.com . Once you have completed account registration, browse back to: https://procurement.opengov.com/portal/bft and click on "Submit Response", then follow the instructions to submit the electronic bid by the bid due date. Bids are due on Tuesday, December 22, 2026 no later than 1:00 pm Pacific Daylight Time (PDT). If a Contractor would like to submit a bid via sealed hard copy, please send your request to the Procurement Specialist II and a pdf version of the IFB will be emailed to you in order to then submit your sealed bid via mail or in person. It is the Contractors responsibility to make aware to the Procurement Specialist II that they prefer these notifications via email. Summary Background Contact Information Timeline Bid Information Non-Mandatory Pre-Proposal Meeting BFT will hold a non-mandatory pre-bid walk through Wednesday, December 2, 2026 at 1:00 pm PDT, at BFT's Main Campus located at 1038 Columbia Park Trail, Richland, WA 99352 . Please bring a safety vest for walking the site. Submission of Bids BFT prefers electronic submission of bids. Please submit electronic responses via the BFT’s e-Procurement Portal: https://secure.procurenow.com/portal/bft . Contractor shall "follow" the project in order to receive all notifications. By way of the e-Procurement Portal, responses will be locked and digitally encrypted until the submission deadline passes. The preferred method of sealed electronic bids will be received for 26-25 MOA Irrigation Improvements & Well Decommissioning through the BFT’s e-Procurement Portal located at https://secure.procurenow.com/portal/bft . BFT’s preference for electronic submissions of quotes shall not influence the evaluation of the bid. Mail-in responses will be accepted and must be accompanied by an electronic copy on a USB key included in the response envelope. If mailing a hard copy response, please send 2 response(s) to: BEN FRANKLIN TRANSIT IFB 26-25 Joe Willis , Procurement Specialist II 1000 COLUMBIA PARK TRAIL RICHLAND, WA 99352 If your company would like to hand deliver the bid, please schedule an appointment with the Procurement Specialist II in order to do so. If, after reviewing this document, Contractor chooses not to submit a bid, Contractor is encouraged to complete the "No Bid" option within OpenGov. Bids will be publicly opened at the bid due date. Bid Security All bids shall be accompanied by a suitable bid security in the amount of 5% of the bid amount. Suitable security shall mean cash, cashier's check, or bond from a firm licensed to do business in the State of Washington. Contractor shall complete the required Bid Bond form under the Vendor Questionnaire. Postponement of Opening BFT reserves the right to postpone the date and time of bid submission at any time prior to the date and time established herein. Instructions for Bid Preparation Response to this IFB shall be made in strict conformance with the following requirements. Failure to conform therewith may be cause for rejecting the bid submitted. BFT reserves the right to waive minor discrepancies at its sole discretion. BFT also reserves the right to reject all bids, or to award a Contract without discussions with Contractors. In the IFB, BFT seeks solid information about the Contractors capacity to provide the Scope of Work and any other requirements. Vague and lengthy discussions are not desired, nor is a bulky display of irrelevant information. BFT seeks comprehensive information regarding the Contractors capacity to provide the required Scope of Work. Economy of Preparation - Bids should be prepared simply and economically, providing a straightforward, concise description of the Contractor ability to meet the requirements of the IFB. Fancy bindings, colored displays, promotional material, etc. are not desired. Emphasis should be placed on completeness and clarity of content. Questions and Answers Bidders shall submit all inquiries regarding this bid via BFT’s OpenGov Procurement Portal, located at https://secure.procurenow.com/portal/bft . Please note the deadline for submitting inquiries is Friday, December 11, 2026 by 10:00 am PDT. All answers to inquiries will be posted on BFT’s OpenGov Procurement Portal or in an Addenda. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the responsibility of the bidder to check the website for answers to inquiries. Acceptance or Requests for Contract Terms and Conditions By submitting a bid, the prospective Contractor accepts the Terms and Conditions listed in IFB 26-25 that is included in this bid package and any addenda’s. If prospective Contractor does not agree to the terms and conditions, prospective Contractor shall submit a request for clarifications or modifications to BFT prior to the questions and modifications due date of Friday, December 11, 2026 . Failure to follow this procedure may cause BFT to Award a Contract to the next highest rated prospective Contractor, due to the added cost BFT may incur due to the change in Terms and Conditions. Communications with Ben Franklin Transit Upon release of this solicitation document, all Bidders communications concerning this acquisition must be directed only to: Ben Franklin Transit Joe Willis , Procurement Specialist II 1000 Columbia Park Trail, Richland, WA 99352 E-Mail: jwillis@bft.org Phone: (509) 734-5187 Unless authorized by the Director of Contracts & Purchasing, no other BFT official or employee is empowered to speak for BFT with respect to this IFB. Bidders who seek to obtain information, clarification or interpretations from other BFT officials or employees are advised that such material is used at the Bidder’s own risk and that BFT shall not be bound by any such representations and such action may result in rejection of the bid. Public Disclosure Except to the extent permitted by Washington State public disclosure laws RCW Chapter 42.56, BFT will regard bids as public records which will be available for public inspection and/or copying following contract award, regardless of any markings or notices contained in the bid documents. Information will not be released by BFT prior to contract award in order to protect the integrity of the procurement process, unless otherwise required by law. All bids will remain confidential until a contract is awarded and fully executed by all parties involved. If a Contractor considers portions of its bid to be protected under Washington State Law, the Contractor shall clearly identify and mark such portions as “CONFIDENTIAL” or “PROPRIETARY” and submit such portions in a sealed envelope separate from the rest o
OpenGov categories
- 33500 · Fertilizers And Soil Conditioners
- 51500 · Lawn Maintenance Equipment And Accessories (See Class 020 For Agricultural Types)
- 59500 · Nursery (Plants) Stock, Equipment, And Supplies
- 65000 · Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 67500 · Pesticides And Chemicals: Agricultural And Industrial
- 69000 · Power Generation Equipment, Accessories, And Supplies
- 69100 · Power Transmission Equipment (Electrical, Mechanical, Air And Hydraulic)
- 79000 · Seed, Sod, Soil, And Inoculants
- 89000 · Water Supply, Groundwater, Sewage Treatment, And Related Equipment (Not For Air Conditioning, Steam Boiler, Or Laboratory Reagent Water)
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 91000 · Building Maintenance, Installation And Repair Services
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91400 · Construction Services, Trade (New Construction)
- 95900 · Marine Construction And Related Services; Marine Equipment Maintenance And Repair
- 96800 · Public Works And Related Services
- 98800 · Roadside, Grounds, Recreational And Park Area Services