Description
The City of Pasadena is seeking proposals from qualified manufacturers to provide two mobile substations for Pasadena Water and Power. This project is needed to provide emergency power and support construction initiatives. The desired in-service date for the project is June 2029. The manufacturing firm is expected to propose designs based on the general descriptions contained in the Scope of Work. Mobile Substation 4kV Delivery Mobile Substation 4kV to the City of Pasadena One Week On-Site Startup Training 4kV Mobile Substation 17kV Delivery Mobile Substation 17kV to the City of Pasadena One Week On-Site Startup Training 17kV Scope of Work Scope of Work See attachment "PWP Mobile Substation General Specifications". Introduction Summary Background The City of Pasadena is an ethnically diverse community that is home to approximately 142,017 people. Pasadena is the ninth-largest city in Los Angeles County. It is one of the primary cultural centers of the San Gabriel Valley. The City covers approximately 22.5 square miles, with an average of ten residents per acre. The median age of its residents is approximately 36.9 years. There are over 100,000 jobs in a wide variety of industries in the City of Pasadena. Contact Information Deadline for Questions The deadline to submit questions related to this solicitation is Friday, October 23, 2026 , prior to 3:00 pm . Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. Timeline General Instructions NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses to this Request for Proposal (RFP) accepted by the City of Pasadena (City) shall become the exclusive property of the City. At such time as the City Manager recommends a contractor to the City Council, and such recommendation, with any recommended contract appears on the Council agenda, all proposals accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof. Electronic Submission and Delivery Instructions Parties interested in responding are required to submit proposals electronically through the City of Pasadena's eProcurement Portal no later than 1:00 pm on Monday, November 30, 2026 . Please upload sufficiently early electronically through the city's eProcurement Portal before the time and day listed in the Notice Inviting Proposals. Proposals must be received in the system prior to the deadline. The entire proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The "Technical Proposal," "Additional Data," and "Statement of Qualifications" can be no more than 80 grand total pages. The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ #Proposer's Submittals/Checklist .” The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and #Proposer's Submittals/Checklist . No Pricing shall be included in this part. Proposals received after the Proposal Deadline may not be accepted by the City. Technical Proposal The proposal must be prepared in two parts: a "Technical Proposal" and a "Price Proposal." Each of the parts shall be separate and complete in itself so evaluation of one may be accomplished separate from the evaluation of the other. The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and Submittals/Checklist . No Pricing shall be included in this part. Separate Price Proposal The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ Submittals/Checklist .” Parties interested in responding are required to submit their Price Proposal with their Technical proposal through the City's eProcurement Portal. The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The price proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies. The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Costs shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The City will not separately reimburse costs not included in the proposal. Reference PRICE PROPOSAL. Reimbursable cost schedules shall depict only those expenditures that are exclusive to and in support of the scope of services. The proposed reimbursable cost schedule shall include a detailed list of reimbursables. Each Proposer must submit a PRICE Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s lump-sum price shall include, without limitation: all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work); performance of each and every portion of the work all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena; all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena; all taxes, duties, permits, and other fees or royalties incident to the performance of the SCOPE OF WORK; payment of all salaries, wages, benefits, and expenses of the Proposer’s employees; compensation for all risks, liabilities, and contingencies assigned to the Proposer; and all other costs needed or incurred to complete the Project. all ProForma Submission Requirements (if required) Pre-Proposal Meeting See the "Timeline" in the Introduction section ( #Introduction) . If there is a Mandatory pre-proposal meeting, bidders/proposers are required to attend at the time, date, and location included in the Timeline. If there is a Non-Mandatory pre-proposal meeting, bidders/proposers are not required to attend. Each bidder/proposer will have the opportunity to clarify and ask questions regarding the Specifications. The Pre-Proposal Meeting will be held at the time, date, and location in the Timeline of this solicitation. Definitions The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this RFP, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract. General Requirements Standard terms and conditions Prior to the award of any work hereunder, City and contractor shall enter into a written contract in substantially the form attached hereto with such revisions thereto as the City may determine necessary and appropriate. PROPOSERS responding to this RFP are strongly advised to review all the terms and conditions of the contract, and shall be deemed to have accepted them. Firm commitment of availability of service Once a proposal is opened, a PROPOSER is expected to maintain an availability of service as set forth in its proposal for at least four months after date for opening proposals. RELEVANT EXPERIENCE Provide experience for three projects in which a mobile substation was produced for a United States electric utility. Complete and submit the attached Relevant Experience Form with your proposal to demonstrate experience with projects/contracts of similar scope and size to that which is to be performed. Reservations The City reserves the right to reject any or all bids or proposals and any item or items therein, and to waive any non conformity of proposals with this RFP, whether of a technical or substantive nature, as the interest of the City may require. Documents to be construed together The Request for Proposal (RFP), the Proposal, the Non Collusion Affidavit, and all documents referred to in the complete specifications and the Contract to be entered into between the Contractor and the City, and all modifications of said documents, shall be construed together . Patent fees; patent, copyright, trade secret and trademark fees Each PROPOSER shall include in the price bid any patent fees, royalties and charges on any patented article or process to be furnished or used in the prosecution of the Work. PUBLIC CONTRACT CODE SEC. 9204 NEW PUBLIC WORKS CLAIMS PROCEDURE Observe attached details regarding Public Contract Code Section 9204. AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities. Request for Proposal (RFP) quantities: The quantities contained in the RFP documents are approximate only and are for the sole purpose of comparing proposals. The City may, in accordance with the specifications, request additional services as necessary at the City's sole discretion, as increased by the unit price noted and payment will be made for the amount of services actually provided as determined by the City and accepted at the unit prices noted in the proposal. CHANGE ORDER MANAGEMENT CHANGE ORDER MANAGEMENT Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City Project Manager in writing before work is started. Taxpayer Protection Act Under the provisions of the City of Pasadena Taxpayer Protection Act ("TPA"), the Contractor/Organization will be considered a "recipient of a public benefit." The full provisions of the TPA are set forth in Pasadena City Charter, Article XVII. Under the TPA, City public officials who approve this Contract are prohibited from receiving specified gifts, campaign contributions or employment from Contractor for a specified time. As well, if this Contract is to be approved by the City Council, Councilmembers or candidates for Council are prohibited from receiving campaign contributions during the time this Contract is being negotiated (from the due date for an RFP response until award of a contract; this restriction does not apply to competitive and noticed low bid contracts). This prohibition extends to individuals and entities that are specified in the TPA and includes Contractor/Organization and its trustees, directors, partners, corporate officers and those with more than a 10% equity, participation, or revenue interest in Contractor/Organization. Contractor/Organization understands and agrees that: (A) Contractor/Organization is aware of the TPA; (B) Contractor/Organization will complete the forms provided by the City to identify all of the recipients of a public benefit specified in the TPA; and (C) Contractor/Organization will not make any prohibited gift, campaign contribution or offer of employment to any public official who negotiated and/or approved this Contract, and will not make any prohibited campaign contribution during the time this contract is being negotiated. The Contractor shall submit a copy of the completed TPA form to the City Clerk’s Office if the contract is to be awarded by the City Council via e-mail: OfficialRecords-CityClerk@Cityofpasadena.net or by fax: (626) 744-3921, and submit a copy with the response package. For more information please go to: https://www.cityofpasadena.net/city-clerk/disclosure-reportsax-payer-protection-act-tpa/ CONFLICT OF INTEREST STATEMENT REVIEW The proposing Consultant shall disclose any financial, business or other relationship with the City of Pasadena that may have an impact upon the outcome of the contract or any construction project. The Consultant shall also list current clients who may have a financial interest in the outcome of this contract or the construction project that will follow. The proposing Consultant shall disclose any financial interest or relationship with any construction company that might submit a bid on the construction project related to this solicitation. Proposers must complete and submit the following Form: Conflict of Interest Statement Compliance with the Levine Act (Government Code Section 84308) The Levine Act precludes an officer of a local government agency, including an elected official, from participating in the award of a contract if he or she receives any political contributions totaling more than $500 in the 12 months preceding the pendency of the contract award, and for 12 months following the final decision, from the person or company awarded the contract. Proposers should ensure their employees, agents, and consultants are aware of the requirements of the Levine Act before the proposal is submitted, so as to avoid inadvertent violations. Payment of Subcontractors, Suppliers, and Workers The Prime Contractor shall be solely responsible for the payment of all subcontractors, suppliers, laborers, and any other persons or entities employed in connection with the performance of this Contract. The City shall have no obligation to pay, or to ensure the payment of, any subcontractors, suppliers, or workers directly. The Prime Contractor shall ensure timely and full payment in accordance with all applicable laws, including but not limited to California Public Contract Code §§ 10262 and 10262.5 and Labor Code § 218.7. Failure to comply with this requirement may result in the withholding of payments, imposition of penalties, and/or other remedies available under the Contract and applicable law. The Prime Contractor shall also include in all subcontracts a provision requiring subcontractors to pay their lower-tier subcontractors and suppliers in a timely manner consistent with this section. City Requirements There are forms included in the section named Submittal/Checklist of these specifications which a bidder or proposer must complete to establish compliance with a number of City Requirements, including, but not limited to, equal employment opportunity and affidavit of non-collusion. These forms and their instructions should be considered an integral part of the specifications and failure to complete them may be grounds, in the sole discretion of the city, for rejection of any bidder or proposer. Pasadena Operating Companies If this solicitation is issued by an Operating Company of the City of Pasadena including the Pasadena Center Operating Company; or Rose Bowl Operating Company; or Pasadena Community Access Corporation: In this solicitation, any reference to the City, shall actually refer to the PCOC, PRHB, or RBOC, or PCAC, e.g. "City" shall refer to the Operating Company, "City Council" to its Board of Directors, and "City Manager" to its Chief Executive Officer. Equal Employment Opportunity in Contracting Policy - The City of Pasadena is committed to a policy of Equal Employment: Contracting. Contractors expressly agree to comply with the City’s ordinances and regulations regarding Equal Opportunity Employment as well as regulations that may be mandated by the source of the funds supporting this contract. Compliance – To the extent permitted by law, Contractor expressly agrees to establish compliance with the Equal Employment Opportunity Practices Provisions of Chapter 4.08 of the Pasadena Municipal Code, and the Rules and Regulations adopted pursuant to said ordinance. The successful bidder or proposer may be required to submit documentation during the term of the contract to evidence on going compliance with the City’s Equal Opportunity Practices Provisions. Such documentation may include, but not be limited to certified payroll records and Current Permanent Workforce Utilization reports. Required Forms – Each bidder or proposer must submit a completed Form AA-1. Failure to submit this form will result in automatic disqualification with no exceptions unless bidder or proposer has an approved Form on file with the City. Questions regarding Chapter 4.08 of the Pasadena Municipal Code and regulations adopted pursuant thereto should be directed to the Department of Finance, Purchasing Division 626.744.6755. Declaration of Non-Collusion by Contractor This form is only applied for formal solicitations $75,000 or more. The City requires that each bidder or proposer executes and submits to the City with the Bid/Proposal, the attached Declaration of Non Collusion in the section named "Submittals/Checklist." SAMPLE CONTRACT A sample of the contract the successful vendor will be required to enter into with the City is attached hereto and by this reference incorporated herein and made part of this solicitation. CHANGE ORDER MANAGEMENT Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City in writing before work is started. Local Preferences The City of Pasadena is committed to promoting the economic health and well being of its residents. To this end, contractor agrees to recruit Pasadena residents initially and to give them preference, if all other factors are equal, for any new positions that result from the performance of this contract and which are performed within the City. Pasadena Business License Awarded bidder or proposer may be required to obtain and pay for any required business license under Title 5 of the P
Published attachments
- PWP Mobile Substation General Specifications
- Master Services Contract
- RELEVANT EXPERIENCE FORM
- REQUIRED FORMS - AAs - SIG-LEGAL-STATUS - DECLARATION OF NONCOLUSION 08022024 v2
- DISQUALIFICATION_DISCLOSURE (4)
- CONFLICT_OF_INTEREST (5)
- Pasadena_Taxpayer_Protection_Amendment_Disclosure (2)
- DESIGNATED REPRESENTATIVESdocx
- Mobile_Substation_Project_(Addendum_#3_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Hi, we had a couple of questions regarding the RFP. We didn’t see any specific payment terms outlined in the documents, so we wanted to ask whether a proposed payment structure with progress/milestone payments during manufacturing, rather than payment only upon final delivery, would still be considered responsive and acceptable under this RFP. We also wanted to clarify the experience requirement. We have experience manufacturing and supplying substation and other electrical equipment projects, although we have not directly supplied a mobile substation project ourselves yet. Our manufacturing partner does have direct mobile substation experience, so we were wondering whether experience demonstrated through that manufacturing partnership would be acceptable for meeting the requirement. We believe we satisfy the other requirements of the RFP and are confident we can provide a strong , fully compliant proposal. Thank you.
1. Please see “Master Services Contract” document in the attachments section. 2. Submit your (or your manufacturing partner’s) experience per the specific requirements of Section 3.3.
Hello, Mobile Substations are rated with a single ODAF MVA Rating. Paragrpah 9 of the Mobile Specification calls out for an MVA range for each of the units. Mobile Transformer, ODAF. Can you please clarify the desired MVA? 9.1.1. 25 MVA to 30MVA for 17.2 kV LV 9.1.2. 9 MVA to 12.5MVA for 4.36 kV LV
The ratings in Section 2.2.9 refer to a range of proposed MVA values for each substation. The lower MVA value can be assumed to be the default value. Section 9 is not asking for a single unit with multiple MVA ratings or fan levels.
Due to current engineering and quote backlock, Delta Star is requesting an RFP due date extension to 12/16/2026 with a commensurate extension to the question deadline.
Please see Addendum #1.
Hello, Due to a miscommunication I posted an incorrect extension request due date of 12/16/2026. The correct date for the due date extension is November 2, 2026. Please disregard my earlier request and review the request for November 2, 2026 with a commensurate extension for questions. Thank-you
Please see Addendum #1.
Hello, We would like to request an extension to review and ensure we have addressed all of the technical requirements. Would you please consider a two-week extension? Thank you.
Please see Addendum #1.
Please confirm if a Bid Bond is required for this RFP.
No Bid Bond is required.
Will the auxiliary service voltages be supplied by an external source, or should we consider integrating an auxiliary service transformer?
An auxiliary/station service transformer mounted on the mobile substation should be considered.
Please confirm if SF6 Gas Insulated Switchgear is still acceptable for CA utility or whether SF6-free equipment is required.
Proposals with SF6 switchgear will be considered according to the appropriate phase out schedule. Proposer must provide all documentation for any necessary exemptions.
LV feeder ratings: For a total LV line current of 2,000 A and two LV feeder breakers, is a rating of 1,200 A per feeder acceptable? 17 kV side BIL: Will Burbank accept a 110 kV BIL instead of the specified 125–150 kV? This option will broaden the available component options, support a more compact substation design, and help us source the required equipment more quickly including the quotes for them needed for the current stage.
1. 1200A feeder positions are acceptable. 2. Per condition in question title “IF SF6-Free Equipment Required”: SF6-Free equipment is not required, see Question 8. See Section 2.2.3 through 2.2.5 for Vendor provisions to propose alternate equipment.
PASADENA WATER & POWER RFP 2026-RFP-0415 – Mobile Substation Project Audited Bidder Clarification Questions – Batch 1 Prepared by Jena Sustainable Development LLC (JSD) Purpose Qualification and key technical/commercial clarification Question deadline October 23, 2026 at 3:00 PM PT (working controlling schedule) Submission route Pasadena OpenGov / eProcurement Q&A function Jena Sustainable Development LLC (JSD) and its proposed project team are actively reviewing the solicitation and coordinating with a U.S.-based power-transformer/manufacturing resource regarding the proposed equipment. To ensure that our proposal structure and technical solution are fully responsive to Pasadena Water & Power's requirements, we respectfully request clarification on the following items. 1. Prime Offeror / Manufacturer / Team Experience Please confirm whether the relevant experience and three mobile-substation references required by the solicitation must have been performed by the Prime Offeror itself, or whether qualifying experience of the proposed mobile-substation manufacturer/OEM or another committed project-team member may be used, provided the proposal clearly identifies the organization that performed each referenced project, its scope and responsibilities on that project, and its substantive role in the proposed Pasadena project. 2. Prime Offeror / Manufacturer Structure Please confirm whether the Prime Offeror is required to be the actual manufacturer of the complete mobile substatio
1. See Question 1. 2. The manufacturer is not required to be the prime contractor. Where the Prime is not the manufacturer/OEM, the City may require documentation demonstrating the Prime’s authority or commitment from the proposed manufacturer/OEM. 3. See Question 2. 4. See Question 7. 5. Within the RFP Submittals/Checklist see Section 2.3 Technical Proposal and Section 2.6 Statement of Qualifications and Experience. In addition, see Section 2.3 of the “PWP Mobile Substation General Specifications” document. 6. See RFP Submittals/Checklist Section 2.3 Technical Proposal for instructions on timeline information to be included in the proposal. Alternative manufacturing/delivery schedules will be considered.
CITY OF PASADENA / PASADENA WATER & POWER RFP No. 2026-RFP-0415 – Mobile Substation Project FINAL BATCH-2 CLARIFICATION QUESTIONS Question 1 – Transformer Electrical Design Basis For each required mobile-substation configuration, please confirm the proposal design basis for: (a) transformer percent impedance and applicable MVA base; (b) required BIL/insulation levels; and (c) load-tap-changing (LTC) or de-energized tap requirements, including required tap range, where applicable. Where PWP has not prescribed a specific value or configuration, please confirm that the manufacturer may propose its standard compliant design, subject to satisfying the specified ratings, system requirements, and applicable standards. Question 2 – Available Fault Current and Equipment Short-Circuit Ratings Please provide the available fault-current levels and applicable X/R ratios to be used for proposal design at the anticipated 17-kV and 4-kV connection points. If final site-specific values will be established after award, please identify the minimum short-circuit and interrupting-duty criteria proposers should use for proposal pricing and selection of switchgear, breakers, bus, and associated equipment. Question 3 – Protection, Control, SCADA and Communications Please identify the protection, control, SCADA, and communications requirements that must be established at proposal stage, including any mandatory relay functions or equipment, communications protocols, time-synchronization requirements,
Question 1 – Transformer Electrical Design Basis a) Covered in “PWP Mobile Substation General Specifications” document. b) Covered in “PWP Mobile Substation General Specifications” document. c) Covered in “PWP Mobile Substation General Specifications” document. In the “Mobile Substation General Specifications” document see Sections 2.2.3, 2.2.4 and 2.2.5 for provisions for Vendor to propose alternate arrangements. Question 2 – Available Fault Current and Equipment Short-Circuit Ratings Per “PWP Mobile Substation General Specifications” document Section 2.2.10 a 40kA symmetrical interrupting 38kV breaker is specified. This value can also function as the available fault current. For the low side switchgears 25kA symmetrical should be considered. Question 3 – Protection, Control, SCADA and Communications See “PWP Mobile Substation General Specifications” document: 1. Section 2.2.13 for relay information. Note: PWP to program. 2. Section 2.4 for Sample Single Line Diagram 3. Section 2.5 for Sample Communications Diagram DNP3 is the desired communications protocol. Protection, Controls, and Metering parts numbers may be determined during detailed design. Question 4 – Transportation Envelope and Permitting See “PWP Mobile Substation General Specifications” document Section 2.2.7 for trailer dimensions/information. Delivery to the City of Pasadena and any necessary California transportation permits are the responsibility of the proposer (note line item 2 and 5 in the OPENGOV price p
OpenGov categories
- 335 · Electrical Equipment, Appliance, and Component Manufacturing
- 33521 · Small Electrical Appliance Manufacturing
- 335210 · Small Electrical Appliance Manufacturing
- 3353 · Electrical Equipment Manufacturing
- 33531 · Electrical Equipment Manufacturing
- 3359 · Other Electrical Equipment and Component Manufacturing
- 33599 · All Other Electrical Equipment and Component Manufacturing
- 335999 · All Other Miscellaneous Electrical Equipment and Component Manufacturing
- 42361 · Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers
- 423610 · Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers