State and local · OpenGov
Mobile Surveillance Camera Trailer for Transit Centers
Description
Cincinnati Metro seeks to procure a mobile surveillance camera trailer system to provide temporary security, safety monitoring, and asset protection at transit centers, park-and-ride facilities, construction sites, maintenance locations, and other agency-owned properties. The system will support pre-construction, active construction, and post-construction operations by providing real-time and recorded video surveillance to deter criminal activity, protect agency assets, document incidents, and promote a safe environment for employees, contractors, customers, and the public. Mobile Surveillance Camera Trailer Pricing should include all freight, setup/configuration, and Cellular Data. Mobile Surveillance Trailer Optional Generator Please include tank size and fuel requirement (diesel/gas) Optional Generator Scope of Work Objective The camera trailer shall: Provide temporary and rapidly deployable video surveillance coverage. Protect metro property, equipment, vehicles, materials, and infrastructure during construction and special projects. Enhance situational awareness for security personnel and project managers. Document activities occurring on-site for investigative, safety, and liability purposes. Assist in preventing theft, vandalism, trespassing, and unauthorized access. Support safety monitoring to identify hazardous conditions and help ensure individuals are not injured on agency property. Integrate with the agency's existing Genetec Security Center video management platform. The vendor shall provide all labor, equipment, software, licenses, training, support, and related services necessary to furnish a fully operational mobile surveillance camera trailer system System Requirements Trailer Platform Portable trailer design suitable for deployment at transit centers and construction sites. DOT compliant for transportation on public roadways. Stabilizing outriggers or leveling jacks. Weather-resistant and vandal-resistant construction. Lockable equipment compartments. Ability to remain operational in all seasonal weather conditions. Camera System The trailer shall include: Minimum of four (4) high-definition IP cameras. Minimum 1080p resolution, with preference for 4MP or greater. Pan-Tilt-Zoom (PTZ) camera capability for remote monitoring. Infrared or low light/night vision capability. Minimum 360-degree site coverage. Capability to monitor large open areas, parking lots, construction zones, and pedestrian areas. Video analytics capabilities, including motion detection and object detection. Remote camera control and viewing. Recording Requirements Local onboard video recording capability. Minimum 30 days retained storage at full operational settings. Ability to export video evidence in standard formats. Secure storage of recorded video. Genetec Integration Requirements The surveillance trailer system shall be fully compatible with the agency's existing Genetec Security Center 5.14 environment. The vendor shall provide: Native integration with Genetec Security Center. ONVIF compatibility or certified Genetec-supported camera integration. Live video streaming to Genetec Security Center. Recorded video accessibility through Genetec. Alarm and analytics event integration with Genetec. Configuration and commissioning support to ensure successful integration. Documentation identifying all licensing requirements and associated costs. Communications The trailer shall support secure remote connectivity through one or more of the following: Cellular LTE/5G communications. Wireless broadband connectivity. VPN-secured remote access. Remote health monitoring and diagnostics. The system shall provide: Real-time live viewing capabilities. Remote management capabilities. Automated health and status monitoring Power Requirements The trailer shall include: Solar-powered charging capability. Battery backup system. Ability to operate continuously without external power. Optional generator support, if required. Automated notifications for low battery or power failures. Alerting and Analytics The system shall provide automatic notification capabilities for: Motion detection after hours. Unauthorized entry into designated areas. Loitering detection. Equipment tampering or trailer movement. Camera obstruction or loss of video signal. Alerts shall be capable of being transmitted via: Email Text message Genetec alarms/events Deployment and Operational Requirements The trailer shall: Be deployable by agency personnel with minimal setup. Requires no permanent infrastructure. Be capable of operation at multiple transit facilities on a temporary basis. Support relocation between sites as the project needs to be changed. Typical deployment locations include: Transit centers Construction staging areas Bus parking facilities Administrative facilities Park-and-ride locations Temporary event sites Training The vendor shall provide training for agency personnel including: System setup and deployment. Genetec integration and operation. Live monitoring functions. Video retrieval and export procedures. Basic maintenance and troubleshooting Warranty and Support The vendor shall provide: Minimum one-year manufacturer warranty. Technical support during normal business hours. Replacement or repair procedures for failed equipment. Software and firmware update support. Deliverables The vendor shall provide: Mobile surveillance camera trailer(s). Installation and configuration services. Genetec integration services. User and administrator training. System documentation and manuals. Warranty information. Recommended maintenance procedures. Performance Expectations The mobile surveillance camera trailer solution shall provide reliable, temporary security coverage that enhances the transit authority's ability to: Protect public assets and infrastructure. Deter theft, vandalism, trespassing, and unauthorized activity. Monitor construction and pre-construction activities. Improve safety for employees, contractors, customers, and visitors. Maintain visual documentation of incidents and site conditions. Support investigations and risk management efforts. Ensure transit properties remain safe, secure, and operational throughout project lifecycles. Introduction Summary Background Contact Information Timeline Instructions to Bidders Bid Preparation Cost SORTA will not reimburse proposers for any costs incurred in the preparation and submittal of proposals or participation in the evaluation and negotiation process. Questions Concerning This Solicitation Any questions regarding this solicitation shall be submitted through the e-Procurement Portal no later than 2:00 pm on Friday, November 13, 2026 (EST). Telephoned questions will not be accepted. Proposers shall not contact any other SORTA personnel regarding any aspect of this solicitation. Any proposer found to have had such contact shall be barred from participation in this solicitation and any subsequent contract, either as a prime contractor or subcontractors. SORTA anticipates that responses to questions submitted will be provided to all known proposers by 4:00 pm on Thursday, November 19, 2026 . If the responses materially alter the terms of this solicitation, they will be incorporated in an amendment to the solicitation. No communication by SORTA or any of its Trustees, officers, employees, agents or representatives shall alter the terms of this solicitation or bind SORTA in any manner, unless incorporated in such an amendment. Revisions and Amendments to the Solicitation SORTA reserves the right in its absolute discretion to revise or amend this Solicitation, including the Scope of Work, up to the time set for receipt of Bids. Any such revision or amendment, if any, will be sent via email to all Bidders who have downloaded a copy of this Solicitation from the e-Procurement Portal . Bidders shall acknowledge any and all addenda electronically via the e-Procurement Portal as part of their bid package. Bid Preparation The complete bid package for this solicitation consists of an electronically completed Bid Pricing Form with the documents specified here: Bid Pricing Form The Bidder shall complete the Bid Pricing Form, including submittal of pricing in the spaces provided. Use of any other form or format shall disqualify the bidder unless otherwise noted in this solicitation. The prices submitted within the Bid Pricing Form shall include everything necessary to complete the project in accordance with the Scope of Work and the General Terms and Conditions set forth in this RFQ Certification Forms Certification Regarding Debarment, Suspension and Other Responsibility Matters Personal Property Tax Affidavit Certification of Restrictions on Lobbying Proposals must be received no later than 2:00 pm on Monday, November 30, 2026 (EST). Late proposals will not be accepted, except as described below. Submission of Bids Bid package must be received by SORTA via the e-Procurement Portal website ( https://procurement.opengov.com/portal/go-metro ) no later than the bid submission due date and time specified in the Introduction section or as amended. The Southwest Ohio Regional Transit Authority (SORTA) will accept only electronic submittals through the e-Procurement Portal at https://procurement.opengov.com/portal/go-metro in response to this solicitation. No hard copy submittals will be accepted. Any required notarizations shall be done by a licensed notary or by an online notary pursuant to Ohio Revised Code Section 147.60 et seq.; a listing of such notaries may be found on the Ohio Secretary of State website: Online Notary Search Bid Modification or Withdrawal Prior to the bid submission due date, Bids may be modified or withdrawn by the Bidder electronically via the e-Procurement Portal. Any such modification must be delivered in the manner for submission of Bids as set forth above, and received by SORTA by no later than the bid submission due date and time specified in the Introduction Section. If withdrawal is timely received, SORTA shall acknowledge the request for withdrawal of Bid. If a modification is timely received by SORTA prior to the date and time set for the receipt of Bids, then that modification will be considered by SORTA as a part of the original Bid. Late Bids Any bid modification, or revision, that is received through after the exact time specified for receipt of bid is “late” and will not be considered. Any submission received after the exact date and time specified will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition; and there is acceptable evidence to establish that an error occurred while attempting submission prior to designated time for receipt of bids; or it was the only bid received. However, a late modification of an otherwise successful bid that makes its terms more favorable to SORTA, will be considered at any time it is received and may be accepted. Any bid that is received outside of the e-Procurement portal https://procurement.opengov.com/portal/go-metro. for the receipt of such bids after the exact time specified is will not be considered, unless: Acceptable evidence to establish an error occured prior to the time of receipt and shows electronically the bid being uploaded in the e-Procurement Portal was unsuccessful due to system error If an emergency or unanticipated event interrupts normal SORTA processes, so that bids cannot be received in the SORTA e-Procurement portal designated for receipt of proposals by the exact time specified in the solicitation and urgent SORTA requirements preclude amendment of the solicitation closing date, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the date to be determined by SORTA. Bidders may withdraw a bid or modification thereof electronically via the e-Procurement Portal at any time prior to the time specified for receipt of proposals or modifications. A bid or modification may be resubmitted prior to the time specified for receipt. Vendor Diversity Mission Statement The Southwest Ohio Regional Transit Authority (SORTA) has established a Small and Disadvantaged Business Enterprise program that encourages diversity and inclusion on all contracts. It is the policy of SORTA to promote equal opportunity and fairness in all its procurement matters, in accordance with state and federal laws, so that small and disadvantaged businesses have an equal opportunity to receive and participate in all contracts. It is also our policy to: A. Ensure nondiscrimination in the award and administration of contracts; B. Create a level playing field on which small and disadvantaged businesses can compete fairly for SORTA contracts; C. Help remove barriers to the participation of small and disadvantaged businesses in SORTA contracts; and D. Assist the development of firms that can compete successfully in the marketplace outside of SORTA’s small and disadvantaged business program. SORTA is committed to fostering small and disadvantaged business participation in contracting opportunities. As such, bidders/proposers are expected to make reasonable efforts to support inclusivity in staffing and subcontracting, to support SORTA’s mission. Verification of Proposer Responsibility SORTA may undertake such investigations as it deems necessary to determine the ability of each Proposer to perform the work, and the Proposer shall furnish to SORTA all such information and data as SORTA may request for this purpose. SORTA reserves the right to reject any proposal if the evidence submitted by, or investigation of, such proposer fails to satisfy SORTA that such proposer is properly qualified to carry out the obligations of the contract and to complete the work required, hereunder. SORTA may require the proposer to submit any of the following information as part of the evaluation process: (1) proposer’s performance record; (2) proposer's certified, audited financial statements for up to three (3) prior years; and (3) such additional information as will satisfy SORTA that the Proposer is adequately prepared to fulfill the contract. SORTA also reserves the right to verify a proposer’s indirect cost rates, such as provisional overhead (burden) and General & Administrative (G&A) rates, before or after award of a contract. In this connection, SORTA may request the proposer to provide copies of undisputed audits of the proposed by (1) other FTA grantees; (2) the federal government; or (3) state government. Award The Bidder’s compliance with contract terms; The Contract will be awarded to the responsible Bidder submitting the lowest responsive price. SORTA reserves the right to accept or reject any or all bids in their entirety or in part, to waive informalities and minor irregularities and to contract as the best interest of SORTA may require. A responsive bid conforms, in all material respects, to the requirements of the solicitation. Bids will be evaluated to determine the responsible bidder submitting the lowest responsive bid. In determining responsibility, the following elements shall be given consideration in addition to price: The character, integrity, reputation, judgment, and efficiency of the bidder; The bidder is neither debarred nor suspended from Federal, State or local programs; The bidder is in compliance with the Common Grant Rules’ affirmative action and FTA’s Disadvantaged Business Enterprise requirements or another State or local programs as they apply; The bidder is in compliance with the public policies of the Federal Government, as required by 49 U.S.C. Section 5325(j)(2)(B) or other State or local policies as they apply; The bidder has the necessary organization, experience, accounting, and operational controls, and technical skills, or the ability to obtain them, in compliance with 49 U.S.C. Section 5325(j)(2)(D) or as required in the Work Scope to perform the service or work; The bidder is in compliance with applicable licensing and tax laws and regulations; The bidder has, or can obtain, sufficient financial resources to perform the contract, as required by 49 U.S.C. Section 5325(j)(2)(D); The bidder has, or can obtain, the necessary production, construction, and technical equipment and facilities, The bidder is able to comply with the required delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments, and; The bidder is able to provide a: Satisfactory current performance record, and Satisfactory past performance record in view of its records of long-time performance or performance with a predecessor entity, including: Sufficient Resources. Key personnel with adequate experience, a parent firm with adequate resources and experience, and key subcontractors with adequate experience and past performance, Adequate Past Experience. Past experience in carrying out similar work with particular attention to management approach, staffing, timeliness, technical success, budgetary controls, and other specialized considerations as described in the recipient’s solicitation, and Any Past Deficiencies Not the Fault of the Bidder. A prospective bidder that is or recently has been seriously deficient in contract performance is presumed to be non-responsible, unless SORTA determines that the circumstances were properly beyond the bidder’s control, or unless the bidder has taken appropriate corrective action. Past failure to apply sufficient tenacity, perseverance, and effort to perform acceptably is strong evidence of non-responsibility. Failure to meet the quality requirements of a contract is a significant factor to consider in determining satisfactory performance. The Bidder’s compliance with contract terms; Such other information as may be secured having a bearing on whether the bidder is responsible and has submitted a responsive bid. Protests SORTA’s policy and procedure for the administrative resolution of protests is set forth in §3.10 of SORTA’s Procurement Procedures Manual (PPM). The PPM contains rules for the filing and administration of protests. SORTA shall furnish a copy of §3.10 upon request. The policy and procedure is available on SORTA’s website at Microsoft Word - Metro Protest Procedure (9.23) An interested party wishing to protest a matter involving a proposed procurement or contract award, shall file a written submission with the Director of Procurement by certified mail or other delivery method by which receipt can be verified. Electronic submission of protests is not acceptable unless an original signed copy of the protest is received by the Director within 24 hours (not including weekends and holidays) after receipt of the electronic copy. The Director may, however, permit the electronic provision of supplemental information after the initial protest submittal. The protest shall include, at a minimum: The name and address of the protesting party and its relationship to the procurement sufficient to establish that the protest is being filed by an interested party; Identity of the contact person for the protestor, including name, title, address, telephone, fax and e-mail addresses. If the contact point is a third party representing the protester, the same information must be provided, plus a statement defining the relationship between the protester and the third party; Identification of the procurement; A description of the nature of the protest, referencing the portion(s) of the solicitation involved; Identification of the provision(s) of any law, regulation, or other governance upon which the protest is based; A compete discussion of the basis for the protest, including all supporting facts, documents or data; A statement of the specific relief requested. The protestor is solely responsible for the
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Extended Answer deadline to 11/19/2026 2 4:00 p.m. (EST) Updated pricing sheet. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Updated General Terms and Conditions. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #4 · 4
Question and Answer Report
Public questions and answers
Section 3.10 states the contract will be awarded to the responsible bidder submitting the lowest responsive price. Section 6 states award will be made to the proposal “most advantageous to SORTA, cost and all other factors considered.” Please confirm which award method applies.
Price is not the only consideration for award. For example, availability and lead time will also be a consideration for award.
Are there specific video analytics that SORTA requires beyond motion and object detection, such as loitering, intrusion detection, line crossing, or vehicle/person classification?
The system shall provide automatic notification capabilities for: Motion detection after hours. Unauthorized entry into designated areas. Loitering detection. Equipment tampering or trailer movement. Camera obstruction or loss of video signal.
The RFQ requires a minimum of four HD IP cameras and PTZ capability. Does SORTA intend for the PTZ camera to count toward the four-camera minimum, or are four fixed cameras plus a separate PTZ camera required?
Yes, four cameras with PTZ capability.
Does SORTA have a preferred cellular carrier, minimum bandwidth requirement, or existing network standard that must be used for connectivity?
Yes, the carrier for this effort will be AT&T FirstNet.
Should cellular connectivity and data usage be priced as part of the initial purchase price, or should these costs be identified separately as recurring expenses?
They should be included in the initial purchase price.
The RFQ identifies a one-year contract term. Is SORTA purchasing the trailer outright, or does the one-year term include ongoing software licensing, cellular connectivity, maintenance, monitoring, or other recurring services?
This is a purchase; the one-year term includes the warranty and software licensing.
The Vendor Questionnaire item titled “Project Completion” (Section 7.2.6 in the RFQ PDF) asks bidders to confirm they can meet “the required delivery/completion date as specified in this solicitation.” We could not find a delivery or completion date anywhere in the solicitation. Please provide the required delivery date, or the number of calendar days after award allowed for delivery, configuration and training.
There is not a specified "project completion" date; however, a section to add the "estimated delivery date" has been added to the pricing sheet.
The Federal Clauses, under Access to Records and Reports, item 1(a), include a bid guarantee of five percent of the bid price. This language follows 2 CFR 200.326(a), which applies to construction or facility improvement contracts. A bid guarantee is not listed in Section 3.4 or in the Vendor Questionnaire. Please confirm whether a bid guarantee is required for this RFQ. If it is, please confirm how it is to be submitted through the e-Procurement Portal.
A bid guarantee is not required for this solicitation.
The Federal Clauses, under Buy America Requirements, state that bids not accompanied by a completed Buy America certification will be rejected as nonresponsive. The Vendor Questionnaire has no upload for this certification. Please clarify the following: a. Is a Buy America certification required with the bid? If so, please provide the form and say where it should be uploaded. b. The clause cites both the manufactured products rule (49 CFR Part 661) and the separate rolling stock requirements (49 CFR 661.11). Will SORTA treat the mobile surveillance trailer as a manufactured product or as rolling stock, and which Buy America certificate should bidders submit? c. The Federal Clauses, under Simplified Acquisition Threshold, state that Buy America’s requirements “apply to any procurement in excess of $150,000,” citing 49 U.S.C. 5323(j)(13). If a bidder’s total bid price is $150,000 or less, please confirm that the small purchase waiver applies, and which Buy America certificate, if any, the bidder should submit.
Buy America is not required for this project under the small purchase waiver, however, to be responsive a Buy America form must be completed with the submission of your quote. The Buy America form has been added to section 2.8 of the Vendor Questionnaire.
Section 3.5 states that notarizations “shall be done by a licensed notary or by an online notary pursuant to Ohio Revised Code Section 147.60 et seq.” Please confirm that SORTA will accept a Personal Property Tax Affidavit notarized by a notary commissioned in a state other than Ohio.
Yes, SORTA will accept a notary that is commissioned from a different state.
Section 7.3.2 requires a detailed cost breakdown and states that an exported OpenGov price sheet will not be accepted. Is there a required format or template, or is a bidder-prepared document (PDF or Excel) acceptable?
There is not a required format.
Question – Are there any requirements for shore power capability to recharge batteries? There is no mention of that functionality.
Solar Power is the preferred shore power for the trailer.
In Section 2.5 – Power Requirements - Question #1 – It outlines an optional generator, if required. For a generator is there a preference on gas or diesel? Also is there a size of fuel tank such as 5-gallon, 20-gallon, 40-gallon?
It is optional, if required. Gasoline is preferred no preference on tank size. An additional pricing table has been added to include the generator.
In Section 2.4 – Communications - Question – Will the Southwest Ohio Regional Transit Authority be providing the cellular SIM card required for the cellular LTE-5G communications? If so, do you know the carrier.
Yes, the carrier will be AT&T FirstNet.
Question #2 – There is no mention of height of mast or overall size of trailer, when deployed. Are there any requirements for either?
Trailer Range Trailer length 8-12 ft Trailer width 5-7 ft Overall width with outriggers deployed 8-12 ft Trailer deck height 18-30 in Mast height (deployed) 20-30 ft Mast height (transport/stowed) 8-12 ft Weight 1,500-4,000 lbs
• In Section 2.2 – System Requirements – Camera System - Question #1 – It highlights the fact that you there is a minimum of four (4) high-definition IP cameras. It also mentions a minimum of 360-degree site coverage. Are we required to install 4 cameras if we can capture 360-degree in a single camera with four (4) lenses within the same camera? Our trailers are typically installed with a PTZ camera and a multi-sensor (4 lens) 360-degree camera. This reduces the impact on the batteries.
Yes, 360-degree multi-image camera 4 lens will work.
Can you provide your Genetec GSC # so we can quote the required Genetec licenses to be added to this account.
This information will be provided to the awarded vendor.
General Terms and Conditions Sections 1.18 and 1.19 assign ownership of all work products to SORTA and state that no written material produced under the contract may be copyrighted. Please confirm these provisions do not apply to the manufacturer’s existing software, firmware, manuals and documentation, which are licensed rather than produced under this contract.
Confirmed.
Section 2.9 requires a minimum one-year manufacturer warranty but does not state when it begins. General Terms and Conditions Section 1.23 warrants all equipment for one year from the date of final payment. Please confirm whether the manufacturer warranty must also run from the date of final payment, or may run from delivery or acceptance.
The warranty period would begin upon delivery.
Please provide the delivery address for the trailer. Will SORTA personnel take delivery, or should the vendor deliver to a specific transit facility?
The trailer will be delivered to the Walnut Hills Transit Center and setup for operation 2624 Gilbert Ave., Cincinnati, OH.
Section 2.5 lists “Optional generator support, if required.” Should a generator be included in the base price, priced separately, or left out?
The Pricing Sheet has been updated with a separate table for the generator.
Can you provide more details on the Genetec integration? Will Genetec integration be done over SORTA’s existing VPN or network infrastructure? If so, will SORTA provide the VPN endpoint, IP addressing and firewall configuration needed for commissioning?
Access will be arranged with the awarded vendor.
Does SORTA have a preferred cellular carrier, or a carrier with existing coverage at its facilities that the trailer should use? Also do you have any need for use of satellite communication or secure point-to-point solutions pricing?
AT&T FirstNet will be our cellular carrier. No satellite or point to point solution is needed.
Section 2.1 requires the vendor to provide all licenses. Does this include the Genetec Security Center 5.14 licenses needed to add the trailer cameras to SORTA’s existing system, or does SORTA have available licenses for them? Video feeds can be sent via RTSP to Genetec or other VMS.
The vendor should supply any needed licensing.
The Bid Pricing Form states that pricing should include cellular data. For what period should cellular data be included: the one-year contract term, the warranty period, or another period?
The vendor should supply any needed licensing.
Section 2.10 refers to “trailer(s).” Does SORTA anticipate purchasing additional units during the one-year contract term?
No, we do not.
Must the insurance certificates uploaded with the bid under Section 7.2.1 already name SORTA as additional insured, or is that required only after award per General Terms and Conditions Section 1.6?
Documents naming SORTA as additional insured would be due within 10 days after award.
General Terms and Conditions Section 1.6 has a blank bullet after the Automobile requirement. Is an additional coverage type missing from that list?
No.
Section 7.2.1 requires certificates for Crime Coverage and Professional Liability/Errors and Omissions Insurance. General Terms and Conditions Section 1.6 does not list Crime Coverage and mentions Professional Liability only “if required,” with no limits for either. Please state the minimum limits required for each.
Crime Coverage and Professional Liability/Errors and Omissions Insurance will not be required for this contract.
General Terms and Conditions Section 1.6 states the awarded vendor must meet additional insurance requirements in “Attachment E-Right of Entry Application and Attachment F-Additional Insurance Requirements.” The solicitation includes only Attachments A and B. Please provide Attachments E and F. Please also confirm whether the “Attachment E” cited in Section 1.14 is the DBE Participation Plan form provided in the Vendor Questionnaire.
Please see the updated General Terms and Conditions released in Addendum #3.
OpenGov categories
- 541 · Professional, Scientific, and Technical Services
- 5419 · Other Professional, Scientific, and Technical Services
- 54192 · Photographic Services
- 54199 · All Other Professional, Scientific, and Technical Services