State and local · OpenGov
Navigation Boulevard Corridor Study
Description
H-GAC seeks a qualified contractor to conduct the Navigation Boulevard Corridor Study from January 2027 through July 2028 . The study will assess existing transportation, safety, land use, drainage, demographic, and multimodal conditions; engage the community and partner agencies; and develop practical recommendations to improve safety, mobility, connectivity, accessibility, air quality, and travel options in the Navigation Boulevard and East End District. Scope of Work Overview Overview The Houston-Galveston Area Council (H-GAC) has established a partnership with the East End District of Houston, Texas, to conduct a comprehensive, Boulevard Corridor Study (Approx 1.5 miles). The Navigation Boulevard Corridor Study will affect an approximate 6,500 residents. The goal of this study will a ssess current and future transportation needs along the Navigation Boulevard C orridor, identify practical ways to improve multimodal accessibility, reduce congestion, positively impact air quality and expand travel options to create a more connected network, support growth in the Navigation Boulevard and East End District, and i nclude robust public outreach and engagement to identify transportation priorities and recommendations within the study area with guidance from the local community and relevant agencies. The Selected Contractor(s) will develop a study that is creative, responsive to the unique needs of the Navigation Boulevard Corridor and tailored to achieving the study objectives. Proposals may include additional tasks, methodologies, engagement strategies, analyses, or other approaches that enhance the study and advance the goals of this effort. Note: This is a planning study; no engineering services or stamped drawings are required. Task 1 - Project Management and Coordination 1.1 Project Management/Quality Assurance/ Quality Control Plans Prepare a Project Management Plan (PMP) describing the overall approach and methodology to complete the Corridor Study. This includes identifying work organization, responsibilities, coordination / communication procedures, and quality assurance and quality control procedures. 1.2 Project Administration Conduct activities as detailed within the PMP. Progress reports, and updated project schedules must be submitted to H-GAC’s Project Manager monthly and are required regardless of if Contractor submits an invoice for that month. Monthly progress reports will include a summary of: Activities, ongoing or completed, during the reporting period. Activities planned for the following month. Problems encountered and remedial actions taken. Project status report detailing milestones completed and a tabulation of percent complete by task. Coordinate bi-weekly project update meetings (in person or via conference call) with H-GAC to discuss outstanding issues and necessary preparations for upcoming events and activities. Provide continuous quality assurance and quality control throughout the duration of the study. Monthly invoice procedures will be discussed at the Contractor kick-off meeting with H-GAC. Prepare and execute a Quality Assurance/ Quality Control (QA/QC) plan which provides continuous quality assurance and quality control throughout the life of the study. All documents must be submitted to H-GAC in an editable format (i.e. Word, Excel, Power Point, Geographic Information System (GIS), etc.) and will be reviewed and approved by H-GAC prior to distribution. 1.3 Sub-Contractor Management Execute and administer separate agreements with each subcontractor and must ensure that all subcontractor work is performed in accordance with the approved scope of work, schedule, and contract requirements. Monitor subcontractor performance, review and approve all subcontractor invoices, and include such invoices and supporting documentation as part of the Contractor’s monthly invoice submittal to H-GAC. H-GAC will have no direct contractual relationship with any subcontractor and will rely on the Contractor for all subcontractor management and payment administration. Provide H-GAC with copies of all executed subcontractor agreements within thirty (30) days of execution. Task 1 - Deliverables 1. Project Management Plan within 30 days of Contract execution date 2. Monthly Invoices 3. Monthly progress reports 4. Project schedule (Gantt Chart) updated as needed 5. Copy of subcontractor contracts within 30 days of execution 6. QA/QC plan Note: Final decision on project deliverables and content will remain with H-GAC. Task 2 - Public Outreach Based on the H-GAC Public Participa tion Plan ( PPP ), develop an ongoing Public Outreach Program and assist in executing outreach activities by recommending the appropriate number and types of meetings to successfully carry out a thorough public outreach program throughout the duration of the study. The C ontractor will: Utilize the Public Participation Plan (PPP) available on the H-GAC website to guide the development of the Public Involvement Plan (PIP). Develop and submit a Public Involvement Plan (PIP) within 45 days of contract execution date Recommend number and type of meetings needed to successfully develop a corridor study Provide a team with effective communication skills that can coordinate needed meetings via, but not limited to, email, phone, and flyer distribution, in English and Spanish at Contractor expense Provide a team with effective communication and presentation skills to engage a wide variety of audiences and facilitate meetings, in English and Spanish at Contractor expense Prepare meeting agendas, presentations, meeting materials, sign-in sheets, displays, handouts, comment cards, surveys, and meeting summaries, in English and Spanish at Contractor expense Develop content for project website, in English and Spanish Provide appropriate staffing, including translation services (Spanish) if necessary and other display materials as needed for each meeting at Contractor expense Develop and post notices for Public Meetings in English and Spanish at Contractor expense Duplicate all documents for each meeting, as required at Contractor expense Provide meeting materials to H-GAC at an established interval prior to all public meetings. H-GAC will review and approve all materials 1 week prior to meetings. H-GAC will print handout materials for all meetings at Contractor expense H-GAC will: (to assist with the program) Secure facilities for all meetings Distribute notices for Public Meetings, in English and Spanish, via social media or other local sources Host a project website, in English and Spanish, throughout the duration of the study effort Establish the Steering Committee with the assistance of the East End District and Contractor Review and approve all contractor developed content before posting or distributing Minimum Meetings to be Performed by the Contractor: A Steering Committee will be established by H-GAC to guide t he technical development of the corridor plan. The Steering Committee will be composed of non-elected state, local governmental, and non-governmental representatives. Steering Committee ( minimum of three) meetings will be held with additional meetings scheduled as needed. Public Meetings (minimum of two) as required by H-GAC PPP , to be held at key milestones during the study. The number of meetings will be recommended by the Contractor. Task 2 - Deliverables 1. Public Involvement Plan (PIP) with 45 days of contract execution date 2. Meeting summary for all meetings including handouts, exhibits/display boards, sign-in sheets, and presentation. 3. Survey tools and results. 4. TxDOT meeting exhibits forms updated monthly as needed. Task 3 - Existing Conditions Analysis Collect and review all data necessary to document and evaluate existing conditions within the Navigation Boulevard corridor study limits. Available data, including crash records, land use, demographics, most recent aerial imagery (to include adjacent redevelopment), traffic data, and other relevant information, may be available from H-GAC and/or obtained from other available sources. Review relevant previously published analyses and studies provided by H-GAC. Using the collected data, analyze and document existing transportation, traffic, safety, land use, demographic, drainage conditions, and multimodal conditions within the study area. The analysis will establish the baseline conditions used to identify corridor needs and opportunities under Task 4. Note: The requested datasets and detailed information will not be provided during the RFP process. Available datasets may be obtained from H-GAC’s website, and additional relevant information will be provided to the selected consultant following contract award Task 3 - Deliverables 1. An Existing Conditions Factbook (highly graphical) 2. Online data dashboard to be hosted by H-GAC 3. Shapefile format of data available 4. Data Appendix 5. Data collection summary 6. List or graphic of identified issues and needs in the study area Note: Specific data needs, including any additional data collection requirements, as well as the dashboard’s functionality and acceptance criteria, will be further discussed and coordinated with the selected Contractor during the project initiation phase. Task 4 - Needs Assessment and Opportunity Analysis Using the findings from Task 3, the Contractor will identify and assess transportation needs, issues, opportunities, and constraints within the Navigation Boulevard corridor. The assessment will provide the basis for identifying and evaluating potential multimodal improvements and alternatives. Catalog pre-identified issues Identification of existing and future transportation issues Create a narrative report highlighting key issues, opportunities, and constraints Assess the alternatives, anticipate each alternative’s impact on safety Summarize alternatives in an evaluation matrix that captures and compares the results of the multimodal analysis in terms of person delay (inclusive of all modes of travel) and corridor travel times as well as metrics related to safety, alternative modes, and other complete streets priorities. Task 4 - Deliverables 1. Existing condition and future no build condition traffic analysis summary tables 2. Summary of the alternative analysis based on performance measures with documentation on why the alternative was chosen or eliminated Task 5 - Recommendations and Implementation Strategy Identify quick wins (0-2 years), including a potential pilot opportunity, short-term (0-5 years), medium-term (6-10 years), and long-term (11+ years) mobility recommendations to address the needs and issues identified in Tasks 3 and 4. Develop an implementation plan for each of the corridor plan’s recommendations. Task 5 - Deliverables 1. One-page project sheet with ground-level and/or bird’s eye level artistic renderings and/or computer-generated photo simulations of improvement concepts to help the public visualize recommended improvements of significance for quick-win, short-, medium-, and long-term recommendations 2. Prioritized list of Recommendations – online database 3. Preliminary cost estimate 4. Detailed listing of funding strategies, and partners Task 6 - Final Report Provide all final deliverables in professional, publication-ready and editable formats. Deliverables must incorporate H-GAC comments and include all supporting data, analyses, GIS files, maps, graphics, photographs, and other project materials developed during the study. Task 6 Final Deliverables All deliverables must be submitted to H-GAC in an editable format (i.e., Word, Excel, Power Point, GIS, etc.) and will be reviewed and approved by H-GAC prior to distribution. Note: Contractor may provide additional deliverables as needed and must be noted in the response. 1. Standalone Executive Summary An executive summary of the final plan that captures the major concepts and recommendations of the plan 2. Online Interactive project map. 3. Project Tracker populated. H-GAC will provide the Project Tracker template, and the Contractor will populate content all study recommendations in the tracker. The recommendations will then be mapped and added to H-GAC’s Subregional Study Recommendations Database. 4. Printable Document that includes: Conceptual layouts (development of alternatives) and corridor development plan including Right of Way (ROW) impacts for Navigation Boulevard. Project Workbook Appendices 5. Flash Drive containing all data, GIS files, photos, graphics, and electronic copies of study workbook, executive summary, and appendices in editable and final format. Note: All final deliverables are subject to H-GAC review and approval. Inquiries and Clarifications Respondents must submit questions by the Questions deadline indicated in this Solicitation. Telephone/email inquiries are not accepted. H-GAC will respond as completely as possible to each question. Questions and answers will be posted as soon as available. The names of respondents who submit questions will not be disclosed. All clarifications will be available in the Question and Answer and/or Addenda Sections in OpenGov, only the information in these sections should be used in preparing a response; verbal communications and other written documents intended to clarify and interpret will not legally bind H-GAC. H-GAC does not assume responsibility for the receipt of any clarifying information. Respondent must carefully examine all Solicitation documents and become thoroughly familiar with all requirements before submission to ensure the response meets the intent of this Solicitation. Respondent is responsible for making all investigations and examinations that are necessary to ascertain conditions affecting the requirements of this Solicitation. Failure to make such investigations and examinations will not relieve the Respondent from the obligation to comply, in every detail, with all provisions and requirements of the Solicitation. Submission Requirements Submissions must be in PDF or Excel format ONLY where indicated and uploaded to the designated section. Documents uploaded into incorrect sections or other formats may be deemed non-responsive and the submission rejected. Additionally, zip files are not allowed. All responses and required documents must be submitted via the OpenGov system before the deadline. The system will close automatically at the specified time, and late or incomplete submissions will not be accepted. The OpenGov system will not transmit partial or incomplete submissions attempted after the deadline date and time specified in this solicitation. Recording of proposal submission time and date occur via OpenGov. To satisfy any required public opening, the respondent list is made available in the OpenGov Public Portal after the deadline. Respondents are strongly encouraged to submit proposals well in advance of any deadline to ensure all uploads and submissions are completed successfully before the cutoff time. Respondents are also encouraged to double-check all uploads to ensure the file is correct and the document is uploaded to the proper section of the response. Respondents may modify submissions that have already been submitted, before the deadline. The H-GAC Procurement and Contracts Department will not respond to emails from potential respondents related to the acceptance or consideration of incomplete, incorrect, or late submissions. Study Area/Service Region-Custom Map Study Area/Service Region Figure 1. Navigation Boulevard Corridor Study Map Approximately 1.5 Miles Additional Resources / Website Links Houston-Galveston Area Council (H-GAC) Website: https://www.h-gac.com/Home Additional Reference Documents An H-GAC Sample Contract with standard General Provisions is provided for review. The awarded contract will be the same or similar to the sample. H-GAC reserves the right to update the actual contract with any additional required terms and conditions as required for compliance to agency and funding source requirements. Exceptions to these standard terms and conditions are not allowed, and will not be reviewed. Any special provisions required of any H-GAC funding source will also become part of any subsequent contract. Budget Budget/Funding Funds will not exceed $0 total ($0* federal). 400,000 Contract Usage/Term Contract Term H-GAC estimates that the resulting contract will have an initial term of approximately twelve (12) months. This estimate is provided for planning purposes only, and the actual contract term will be established in the executed contract. The contract may be renewed by mutual agreement of the parties, subject to programmatic needs, funding availability, applicable laws and regulations, and any required Board approvals. H-GAC retains sole discretion regarding the exercise of any contract renewal option. Information contained in this Solicitation regarding contract term, renewal options, or other contractual matters is provided for informational purposes only and does not create any contractual obligation. In the event of any conflict or inconsistency between this Solicitation and the executed contract, the terms and conditions of the executed contract will control. Contract Terms Applicable to Software and Technology H-GAC anticipates that any resulting agreement for software, software-as-a-service (SaaS), licensing, subscription, hosting, maintenance, or technology support services may include an initial term of one (1) year with up to four (4) optional one-year renewal periods. This anticipated term structure is provided for planning purposes only, and the actual contract term and renewal options will be established in the executed agreement. H-GAC’s preference is to utilize its standard terms and conditions as the primary governing contract document. Contractor-developed agreements, subscription terms, licensing agreements, or similar documents may be incorporated as supplemental documents when necessary to address technology-specific requirements. H-GAC reserves the right to negotiate contractual provisions as needed to ensure compliance with applicable procurement requirements, funding requirements, and H-GAC contracting standards. In the event of any conflict or inconsistency between this Solicitation and the executed agreement, the terms and conditions of the executed agreement will control. No Automatic Renewals H-GAC does not permit automatic renewal provisions that extend the term of an agreement without affirmative action and approval by H-GAC. Any renewal must be expressly exercised by H-GAC in accordance with the executed agreement, applicable procurement requirements, funding availability, performance considerations, and any required approvals. Contractor terms providing for automatic renewal, evergreen extensions, or continuation of services beyond the approved contract term will not apply unless expressly accepted by H-GAC in a written amendment or renewal agreement. No Guarantee of Usage H-GAC makes no guarantee of volume or usage under any contract resulting from this Solicitation. Sample Contract and Standard General Provisions See "Additional Reference Documents" for Sample Contract Standard General Provisions. A Sample Contract with standard General Provisions is provided for review. The awarded contract will be the same or similar to the sample. H-GAC reserves the right to update the actual contract with any additional required terms and conditions as required for compliance to agency and funding source requirements. Exceptions to these standard terms and conditions are not allowed, and will not be reviewed. Any special provisions required of any H-GAC funding source will also become part of any subsequent contract. Pre-Award Audit Pre-Award Audit Due to the amount and type of funding programmed for this project, H-GAC requires that a pre-award audit be conducted before the execution of a contract. The information
Published attachments
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
OpenGov categories
- 55090 · Transportation Systems, Intelligent (An automated information system which provides traffic management, communications, and analysis of data as a minimum)
- 90664 · Planning, Urban (Community, Regional, Area wide, and State)
- 91892 · Urban Planning Consulting
- 91894 · Traffic Consulting
- 91896 · Transportation Consulting
- 92593 · Traffic and Transportation Engineering
- 92672 · Planning and Advisory Services, Environmental
- 95296 · Urban and Regional Development Services
- 96889 · Traffic Studies and Analysis Services