State and local · OpenGov
North South Building Food Service and Food Courts Renovations
Description
NOTICE IS HEREBY GIVEN that Orange County, Florida, henceforth referred to as the County is accepting sealed bids for North South Building Food Service and Food Courts Renovations ( Y27-706 ) Sealed offers for furnishing the above will be accepted up to 4:00 pm EST on Thursday, December 17, 2026 . The Estimated Cost for this project is $36,113,597.00 NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers. Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected. Important Instructions for Electronic Submittal The County is ONLY accepting electronic bid submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid. It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. OpenGov Technical Support For Technical Support, respondent's can reach the OpenGov Service Desk: Chat (preferred): Click the button in the lower right hand corner of the portal Email: procurement-support@opengov.com Phone: 1 (650) 336-7167 Hours: Mon-Fri 7am - 10pm EST Timely Questions Regarding this Solicitation The question and answer module of OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, November 16, 2026 at 4:00 pm EST. Respondents are instructed not to contact the initiating division directly. Any questions regarding Good Faith Effort or the SBE directory should be directed to the Business Development Division rather than Procurement. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division. Answers for timely questions will be addressed in the OpenGov question and answer module or as an addenda to this solicitation depending on volume, participants are encouraged to subscribe as a follower and monitor all notifications. Beyond questions and answers, any and all modifications, clarifications, interpretations and supplemental instructions will be in the form of a written addendum which, if issued, will be available for download. All addenda and questions/answers so issued shall become part of the Contract Documents and receipt shall be acknowledged as specified herein. This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email gerson.vazquezgonzalez@ocfl.net . Critical clarifications may be made via addenda, however, untimely questions may not be considered. Scope of Services / Specifications Location of Solicitation Documents OVERVIEW: The primary objective of this project is the comprehensive renovation of the Food Courts and Restaurants of the N-S Building. This encompasses enhancements to interior finishes, flooring, ceilings, walls, and furniture seating areas. Beyond the aesthetic upgrades, the scope extends to the modernization of critical elements such as plumbing, Variable Air Volumes (VAVs) for mechanical systems, electrical components, energy-efficient lighting, kitchen equipment, hoods, and hood controls. Existing building systems must be protected and remain online during construction. New life safety equipment and building systems to be integrated into the existing system. Please refer to the section titled #Solicitation Documents to access all necessary technical documentation and attachments related to this solicitation. Introduction & Submittal Instructions Summary Background Contact Information Orange County Procurement Point of Contact Timeline Solicitation Terms and Conditions Mobilization Mobilization is defined as construction start-up costs required for performance of preparatory work and operations in mobilizing for beginning work on the project. Such costs are necessary for the movement of personnel, equipment, supplies and incidentals to the project site and for the establishment of temporary offices, buildings, safety equipment, first aid supplies, sanitary and other facilities. Include the cost of bonds, insurance and any other preconstruction expense necessary for the start of work. Mobilization costs are not part of the physical construction. The Contractor shall retain adequate documentation to support all mobilization costs. The County may at its discretion verify reasonableness of actual mobilization costs and make an equitable adjustment to contract price if deemed necessary. The total cost of mobilization shall not exceed 2.5% of the Estimated Total Base Bid. For purposes of calculation of maximum allowable mobilization, the “Estimated Total Base Bid” is defined as the total of all line items specified to be included in the mobilization calculation, exclusive of any alternates or options, and exclusive of the Mobilization line item. Failure of the Respondent to comply with this limitation shall result in a reduction of the line item price for Mobilization; or, in the alternative, the bid may be found non-responsive, at the County’s option. References Each similar project listed should be listed with complete information as specifically provided on County’s provided reference form. The specific information on references must be provided on the reference form. Do not attach listings of reference information. All Respondents should submit the requisite number of similar projects. Each such project must be verified by the county in order to be deemed responsible under this “references” section. Failure to provide reference information as requested may result in the rejection of your bid. RESPONDENTS ARE ADVISED TO CONFIRM THAT: a. Each reference provided by the Respondent has up to date contact persons and contact information; b. The contact person provided for each reference is someone who has personal knowledge of the Respondent’s performance during the referenced project; and c. The contact person for each reference has been contacted by the Respondent regarding this specific bid submittal and such person confirmed their willingness to serve as a reference. THE COUNTY WILL CONTACT THE REFERENCES PROVIDED AND WILL REJECT ANY AND ALL REFERENCES FOR SIMILAR PROJECTS THAT IT IS UNABLE TO INDEPENDENTLY VERIFY. Notwithstanding anything to the contrary herein, without assuming any obligation to do so, the County reserves the right to follow up with – at minimum – the three (3) lowest Respondents for supplemental submission of references/similar projects. Any such opportunity to supplement or correct granted to a respondent by the County under this provision shall expire at 11:59pm county local time on the second full county business day after the day on which such respondent received the County’s request for supplementation. There will be no additional time or consideration granted by the County thereafter. Respondents found responsible under this “REFERENCES” section may still ultimately be deemed to be not responsible by the County due to other considerations including, but not limited to, other information provided in the Respondent’s bid submittal, as well as any history the Respondent may have of negative performance on previous County project(s). ULTIMATELY, THE DETERMINATION OF WHETHER A RESPONDENT IS DEEMED RESPONSIBLE SHALL BE AT THE SOLE DISCRETION OF THE COUNTY. Joint Venture Requirements Respondents submitting as a Joint Venture shall submit documentation as an attachment to their bid response. If applicable, failure to timely submit (1) the required Information for Determining Joint Venture Eligibility Form AND (2) a fully executed copy of your joint venture agreement may result in disqualification. The Information for Determining Joint Venture Eligibility form can be found at on the County's Forms and Resources website ( https://www.ocfl.net/vfr ). County paid Licenses / Permits and Fees Orange County will bear the cost of all permits, licenses, and fees imposed on the work/project by agencies of the Orange County Board of County Commissioners. This does not alleviate the selected Respondent from obtaining and procuring the permits, as required by the County. In compliance with the Public Bid Disclosure Act, Section 218.80, Florida Statutes, each permit, license, and/or fee applicable to this work/project (before and during construction) will be paid by the selected Respondent or may be furnished by the Orange County Board of County Commissioners, as specified below: The Orange County Government Fee Directory, incorporated herein by reference, contains a list of licenses, permits and fees that may apply to this project. The fee directory link “Fees” is available at: http://www.orangecountyfl.net/portals/0/resource%20library/open%20government/FeeDirectory.pdf Licenses, permits and fees which may be required by the State of Florida, State Agencies or by other local governmental entities or agencies other than Orange County Board of County Commissioners. Respondents shall review all applicable licenses, permits and fees and contact the applicable agency if there are any questions. The selected Respondent shall procure and pay for all permits and licenses, charges and fees and give all notices necessary and incidental to the due and lawful prosecution of the work. The cost of all permits, fees, etc. shall be included in the bid price except where noted otherwise in the specifications or other bid documents. Project Fee Schedule Unless the Bid Item Schedule specifies otherwise, unit prices shall include all incidental Project costs, including but not limited to, mobilization, maintenance of traffic, insurance, bonds, overhead and profit. The County reserves the right to itemize these expenses in the fee schedule. Trade Secret Information Orange County is subject to the State of Florida’s broad public records laws. Therefore, all documents, materials, records, data, or any other information submitted as part of a solicitation response are considered public records governed by the disclosure, exemption, and confidentiality provisions relating to public records in Florida law, including those found in Chapter 119, Florida Statutes. Section 815.045, Florida Statutes, makes trade secret information, as defined in Section 812.081, Florida Statutes, confidential and exempt from disclosure under Florida public records law. However, please note the following: A Respondent’s desire for privacy of particular information submitted to the County does not make such information trade secret information. Respondents cannot render public records exempt from disclosure as containing trade secret information merely by designating information it furnishes to the County as confidential. Only information that specifically meets the exemption in Section 815.045, Florida Statutes, should be designated as trade secret information by Respondents. Any Respondent who fails to designate information contained in its solicitation response as trade secret information at the time of solicitation response submittal has not taken the required measures or made reasonable efforts to maintain such information’s secrecy and has therefore waived any right to assert trade secret protections for such information. The County will therefore not consider any Respondent’s request to designate information in a solicitation response as trade secret information that is made after the time of solicitation submittal. The County is not soliciting, nor does it desire, the submission of any Respondent’s trade secret information as part of this solicitation response. Notwithstanding the foregoing, to the extent that a Respondent finds it necessary to designate certain information in its solicitation response as being trade secret information, the Respondent shall attach the following items to its solicitation response: Trade Secret Information Itemization Log . The Respondent shall create and attach to its solicitation response a “Trade Secret Information Itemization Log” that: Clearly itemizes any and all information that the Respondent designates as confidential trade secret information. Completes such itemization in the narrowest and least expansive manner (word, line, paragraph, page, etc.) necessary to protect the confidentiality of the Respondent’s trade secret information. Per item, provides the impacted submittal section/item number, a written explanation that comprehensively supports the Respondent’s classification of such information as trade secret information under state or federal law, and the legal citation under which such information is exempt and confidential from disclosure. Redacted Impacted Submittals. For each submittal that contains information designated by the Respondent as trade secret information, the Respondent shall attach a redacted copy of such impacted submittal. Such redactions must include notations containing cross-references to the itemized trade secret information as submitted in the Trade Secret Information Itemization Log. Redactions must be made in the narrowest and least expansive manner (word, line, paragraph, page, etc.) necessary to protect the confidentiality of the Respondent’s trade secret information. Each redacted submittal copy must have a cover page and page header that is clearly marked as “REDACTED COPY”. Respondents are advised that: They must only redact the specific information that they, using good faith, believe to be confidential and exempt under applicable state or federal law and should not submit documents that have been broadly marked “CONFIDENTIAL”. Exemptions to Florida’s broad public records law are narrowly construed and therefore, the County is unable to accept broad designations of confidentiality or exemption from disclosure. Consequently, any such broad classification of trade secret information made by a Respondent may lead to its solicitation response being deemed non-responsive. As a responsible steward of taxpayer funding and in the interest of transparency and accountability to the general public, the designation of the following information as trade secret information is not acceptable to the County and will therefore lead to a Respondent’s solicitation response being deemed non-responsive: Any proposed rates, fees, or prices; The total bid amount; The general nature of the services rendered or goods being provided; and Any information contained in the County’s solicitation documents, including the Respondent’s answers to any of the questions in the bid response form (not including any impacted submittals). Any Respondent that submits a solicitation response that in any manner asserts or suggests that information contained therein is the Respondent’s trade secret information hereby acknowledges and agrees to all of the following: To the extent the County deems necessary to effectively handle, process, review, evaluate, and maintain the Respondent’s solicitation response, the County and its officials, employees, agents, and representatives are hereby granted full rights to access, view, consider, and discuss any information designated by the Respondent as trade secret information. The County may make copies of, and distribute, the Respondent’s unredacted impacted submittals for the purposes of facilitating evaluation of such response. For auditing purposes, the County may disclose the Respondent’s unredacted impacted submittals to the Orange County Comptroller’s Office and the County’s internal and external auditors. Additionally, should funding for the award be in any part provided by the State of Florida or the Federal Government, the County may also disclos Bid Acceptance Period A bid shall constitute an irrevocable offer for a period of one hundred twenty (120) days from the public opening date or until the date of award. In the event that an award is not made by the County within one hundred twenty (120) days from the public opening date, the respondent may withdraw their offer or provide a written extension without modification. Proprietary/Restrictive Specifications If a prospective respondent considers the specification contained herein to be proprietary or restrictive in nature, thus potentially resulting in reduced competition, they are urged to contact the Procurement Division prior to submittal deadline. Specifications which are unrelated to performance will be considered for deletion via addendum to this solicitation. Debriefing of Respondents Not later than thirty (30) days after Board approval of an award, a Respondent may submit a written request to the applicable contracting agent for a debriefing on the evaluation of their submittal. The contracting agent will schedule a meeting with the Respondent for the debriefing. However, at the Respondent's request, the debriefing may be conducted virtually. The debriefing shall include the following minimum information: a. Key requirements of the solicitation. b. Deficiencies in the submittal in response to the requirements of the solicitation. c. If applicable, a summary of the rationale for award. d. Responses to any relevant questions of the proposer. Untimely debriefing requests will also be considered. Surety Requirements BID BOND A Bid, Payment and Performance Bond are a requirement when the offer/contract amount exceeds $200,000. Respondents shall attach an electronic copy of their bid bond for responsiveness. Submission of the bid bond, along with a certified and effectively dated copy of the power of attorney, shall be completed and signed by all required parties and submitted on the form provided in the solicitation. Submittal of a bid bond less than 10% of the total estimated contract amount for base period, shall result in the bid being deemed non-responsive. In order to be acceptable to the County, the Surety company issuing the Bid Bond shall meet and comply with the minimum standards described in #Bond Requirements , “Qualifications of Surety Companies”. Failure to submit a Bid Bond from a Surety Company meeting these minimum standards shall result in rejection of the offer. ALTERNATIVE SURETY In the alternative, a Certified Check, or a Cashier's Check shall be required to accompany each electronic offer in a stated dollar amount of not less than ten (10%) percent of the sum of the total estimated contract amount for the base period. Checks shall be submitted to the Procurement Division; Internal Operations Centre II, 400 E. South Street; 2nd Floor, Orlando, FL 32801 on or before the submission deadline of 4:00 pm EST, Thursday, December 17, 2026 .
Published attachments
- Project Scope
- OCCC N-S_FOOD SERVICE RENO_100CD_Specs
- _Drawings
- Project Special Provisions
- Construction Schedule 10-09-2026 rev.
- JCI Onsite Protocol Revised
- Fire Sprinkler System Draining and Refill Protocol 82826
- OCCC Fire Protection System Protocol - V2 082826
- PRE-BID MEETING NOVEMBER - Parking Pass
- North_South_Building_Food_Service_and_Food_Courts_Renovations_(Addendum_#2_Revision).pdf
Addenda and notices
Addendum #1 · 1
This addendum is hereby incorporated into the bid documents of the project referenced above. The following items are clarifications, corrections, additions, deletions, and/or revisions to, and shall take precedence over, the original documents. The bid submission due date has been extended to December 17, 2026. Second site visit on November 25, 2026, by 8:00 am The rest of the questions will be answered in the near future. QR Parking Pass will be uploaded in the near future. Reference Form Please use the See What Changed link to view all the changes made by this addendum.
Official Notice #1: Sign in sheet N-S Building Food Service / Food Courts Renovations · 1
Addendum #2 · 2
This addendum is hereby incorporated into the bid documents of the project referenced above. The following items are clarifications, corrections, additions, deletions, and/or revisions to, and shall take precedence over, the original documents. QR Parking Pass-Second site visit on November 25, 2026, by 8:00 am. North Lot map for reference. Note that the meeting will begin at the NA Restaurant. The rest of the questions will be answered in the near future.
Public questions and answers
The link to the reference form on page 96 of the IFB does not work. Please provide the document.
See addendum No.1 for the reference form
The demolition notes say, 'ALL EXISTING RACEWAY AND CONDUCTORS NOT BEING DEMOLISHED SHALL BE PRESERVED AND INSPECTED TO BE IN GOOD WORKING ORDER,' and that removed equipment has its raceway demolished back to the panel; the new-work plans draw homeruns from existing panels but never say whether an existing raceway may carry a new circuit. Confirm that no existing branch raceway may be reused for new circuits. If reuse is allowed, where?
New branch-circuit raceways shall be provided for new circuits unless suitable existing raceways are available for reuse. Existing raceways may be reused where available and suitable for the intended installation, provided they are inspected and verified to be in good working condition by the architect. All raceways and conductors associated with equipment designated for demolition shall be removed in accordance with the demolition notes.
Please also confirm which partitions the new raceway crosses are fire-rated.
Refer to the attached document, “2026-11-18_OCCC Food Services PreBid Response quest 3,” which shows the fire-rated partitions that the new raceway passes through. See addendum No.1
The power plans tag 175 receptacles 'GFI'. The E41 kitchen fixture power schedules list 67 GFCI rows. Which governs for GFCI: the 175 'GFI' tags on the power plans, or the 67 GFCI rows on the E41 schedules?
The E41 kitchen fixture power schedules identify GFCI protection for equipment and receptacles specifically associated with kitchen equipment. The electrical power plans identify all receptacles throughout the project, including equipment receptacles, general-purpose receptacles, and convenience receptacles. Therefore, the 175 GFI tags shown on the power plans govern the GFCI protection requirements for all receptacles indicated, while the E41 schedules provide additional detail for equipment-specific receptacles. The two documents are complementary and should be used together.
The E41 schedules call for 104 special-purpose 208/240 V receptacles (NEMA 6-20R, 14-20R, 6-30R, 6-40R, 6-50R, L6-20R, L6-30R, 15-50R, L5-20R) in kitchens on standard breakers. The code basis on the cover sheet is NEC 2020. Are the 104 special-purpose kitchen receptacles to be GFCI-protected per NEC 2020 210.8(B)? If so, should they be GFCI-protected by breakers in the panels or by the equipment?
The 208/240V kitchen receptacles shall be provided with GFCI protection in accordance with NEC 2020, Section 210.8(B)(2). GFCI protection may be provided by GFCI circuit breakers or listed GFCI devices installed within the supply circuit. Providing GFCI protection at the receptacle is preferred for consistency with the electrical design; however, either method is acceptable provided the installation complies with applicable NEC requirements.
The 1SLH panel schedule header reads 'FED FROM PANEL 1SLD - COOLER FCNA-105'. The 1SPC schedule shows circuit 8 as a new 225/400 A breaker labeled 'PANEL 1SLH'. Is panel 1SLH fed from 1SPC circuit 8 (new 225 A breaker) or from existing panel 1SLD?
Panel 1SLH is fed from Panel 1SPC, Circuit 8, via the new 225A breaker. The 1SLH panel schedule header incorrectly identifies Panel 1SLD as the source.
DLSB-E42 gives the one feeder size in the set: 2DLG '4#4/0, 1#4G, 2"C'. The other ten new feeders show only their breakers (225 A, 200 A, 100 A). Please give the conductor and conduit sizes for the ten new feeders other than 2DLG.
Feeder 2DLG is the only new feeder included in this scope of work, and its conductor and conduit sizes are indicated on the plans. All other feeders are existing and are identified by the grey linework on the electrical drawings. Therefore, no additional feeder conductor or conduit sizes are required for the remaining feeders.
Every panel schedule prints new work in bold, modified work in black, and existing work in grey, and says that existing power shall be disconnected and marked spare. A bold row doesn't indicate whether a new breaker is installed or a new load is added to an existing breaker. For bold (new) circuits in existing panels, must a new breaker be provided in every case, or can existing spare breakers be reused?
The same line-weight convention applies to the circuit breakers as indicated in the panel schedules. Breakers shown in bold indicate new breakers to be provided and installed. Breakers shown in black indicate existing breakers with modified loads, which are to remain in place. Breakers shown in grey indicate existing breakers and loads that are not being modified. Therefore, existing spare breakers shall not be reused for circuits identified as new (bold) in the panel schedules.
Finish note 6: 'ALL WALLS TO BE PAINTED P-04 FROM 14'0" AFF TO DECK'. The reflected ceiling plans give 13'-3" ceilings in the food courts. No section or note dimensions the deck or structure height. What is the height to the underside of the structure above the food-court ceilings?
The height to the underside of the structure above the 4 food courts is 19’-7” from the exhibit level slab, and for the 3 restaurants, it is 21’-7” from the concourse level slab.
RSA-ED11 tags 307 existing luminaires; the demolition linetype marks about 22 of them clearly as demolished. The ED21 power demolition plans tag only J-Boxes and GFI devices (224 removals). Please confirm which luminaires and devices to remove in each area (all existing luminaires in the renovated ceilings, or only those shown with bold-dashed lines), and the extent of raceway removal back to the panel.
On sheet RSA-ED11, all bolded luminaires within the renovated ceiling areas are to be demolished. The bold dashed linetype identifies luminaires designated for demolition; however, due to the size of some luminaire symbols, the dashed linetype may not be clearly visible because of graphic limitations. For this sheet, all bolded luminaires are to be demolished, which includes all luminaires within the renovated ceiling areas. On sheet RSA-ED21, the devices identified for demolition, including junction boxes and GFI devices, are to be removed as indicated on the demolition plans. Raceway and conductors associated with equipment and devices being removed shall be demolished back to the serving panel, as indicated in the demolition notes. Existing raceways and conductors not designated for demolition shall be preserved and inspected by the architect to verify they are in good working condition.
General Note 6: 'MOUNT ALL EQUIPMENT SAFETY SWITCHES / DISCONNECT SWITCHES WITHIN 6FT OR IN LINE OF SIGHT'. General Note 4 refers disconnects to the mechanical schedule, which lists none for the VAVs. Do the VAV terminal units and pumps ship with factory-mounted disconnects, or do we have to provide them?
VAV terminal units and pumps are not furnished with factory-installed disconnect switches. Disconnect switches shall be provided under this contract and installed in accordance with Electrical General Note 8.
Spec 26 05 33.13 calls for expansion fittings every 100 ft of straight run; FCNA-E00 general note 21 says every 200 ft. Which spacing governs for expansion fittings (100 ft per the specification or 200 ft per General Note 21), and where do new raceways cross building expansion joints?
The requirements of Specification 26 05 33.13 shall govern. Expansion fittings shall be provided at intervals not exceeding 100 feet of straight raceway run. New raceways crossing building expansion joints shall be provided with expansion fittings suitable for accommodating the anticipated building movement.
The luminaire schedule lists RL2 at 120 V; its catalog string contains '-277-'. Confirm that RL2 is 120 V and that the catalog's 277 V option code is an error.
RL2 is specified for 120V operation. The 277V option code in the catalog number is incorrect and shall be disregarded. The 120V voltage indicated in the luminaire schedule is correct.
PDL-6 is described as a 6-inch pendant cylinder but carries the catalog number AP50618_F11_D61_L411 — the 18-inch PDL-1 product. Is PDL-6 the 6-inch cylinder described, or the 18-inch cylinder?
PDL-6 is an 18-inch-tall pendant cylinder with a 6-inch diameter. The catalog number is correct
E22 general notes 5 and 6: 'KITCHEN EQUIPMENT WITH GAS SHALL BE EQUIPED WITH EMERGENCY SHUT-OFF FOR GAS VALVE. KITCHEN EQUIPMENT WITH MOTOR CONTROLS SHALL BE INSTALLED WITH EMERGENCY E-STOP DEVICE MOUNTED NEAR ON/OFF SWITCH.' No shut-off or E-stop is located or counted. Please locate the gas-valve emergency shut-offs and equipment E-stop devices.
Refer to the mechanical plans for the emergency gas shut-off and equipment E-stop requirements and associated control details.
Due to the Thanksgiving holiday will the owner consider a 2-week extension in order to ensure maximum subtrade participation?
The bid due date has been changed to December 17, 2026.
Is it possible to arrange a site visit to review conditions with subs? How do I go about arranging a time for this?
Yes. A second site walk has been scheduled for November 25, 2026, at 8:00 a.m. to allow subcontractors the opportunity to visit the site.
Seeing as to how this is a comprehensive bid with over 800 pages of drawings, with an additional 2100 pages of specs, will the bid due date be extended by a week or two?
Bid Due Date has been changed to December 17, 2026.
Can a second site walk be scheduled for next week so that our sub-contractors can walk the site?
Yes. A second site walk has been scheduled for November 25, 2026 by 8:00 am to allow subcontractors the opportunity to visit the site.
Section 5 of IFB Y27-706 sets the commercial general liability, business automobile liability and employer’s liability limits for contracts over $20,000,000 as “To Be Determined by the County.” The IFB lists the project’s estimated cost as $36,113,597.00, so this project falls in that tier. Before bid day, we would ask the County to confirm the following so respondents can price their insurance on the same basis: The minimum per-occurrence and aggregate limits for commercial general liability (Section 5.3). Please also confirm whether umbrella or excess coverage can be used to meet them, as Section 5.1 indicates. The minimum combined single limit for business automobile liability (Section 5.4). The minimum employer’s liability limits (Section 5.2).
Excess Liability coverage may be considered toward satisfying the required limits, provided that the insurance documentation demonstrates that the Excess Liability policy follows the applicable underlying coverage, and all other requirements are met (endorsements, carrier requirements, etc.) For example, a $3 million Excess Liability limit may be combined with a $2 million Commercial General Liability (CGL) per-occurrence limit to satisfy a $5 million per-occurrence requirement, provided that the Excess Liability policy is demonstrated to follow form over the underlying CGL coverage. General Liability: Each Occurrence Limit GL - $5,000,000 General Aggregate Limit - $10,000,000 Auto Liability: Combined Single Limit - $5,000,000 Worker's Compensation: Workers Compensation applies per statute EL Each Accident Limit - $1,000,000 EL Each Employee Limit - $1,000,000 EL Disease – Policy Limit - $1,000,000 Pollution: Pollution Per Occurrence Limit - $5,000,000 Builder's Risk: Builder's Risk Limit per Contract (project value)
Location: IFB 5.2, 5.3 and 5.4 (Schedules of Limits) Question: For contracts over $20 million, the Employer's Liability, Commercial General Liability and Business Automobile Liability limits are listed as "To Be Determined by the County." The County estimate exceeds $20 million. Recommendation: Please publish the required limits for each coverage by addendum so bidders can price insurance before bid day.
General Liability: Each Occurrence Limit GL - $5,000,000 General Aggregate Limit - $10,000,000 Auto Liability: Combined Single Limit - $5,000,000 Worker's Compensation: Workers Compensation applies per statute EL Each Accident Limit - $1,000,000 EL Each Employee Limit - $1,000,000 EL Disease – Policy Limit - $1,000,000 Pollution: Pollution Per Occurrence Limit - $5,000,000 Builder's Risk: Builder's Risk Limit per Contract (project value)