Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Northgate Village Rehabilitation Re-Bid

Description

PROJECT NAME: Northgate Village Rehabilitation Re-Bid, MS27-053 The City of Victorville is requesting bids for the Northgate Village Rehabilitation Re-Bid Project, MS27-053. This will include the roof replacement of various apartment complex buildings, installation of water heaters, and repair of wood rotted stair landings. This is a federal Home Investment Partnership Program (HOME) funded project. SCOPE OF WORK SCOPE OF WORK: 1. Replace existing flat roofing material on four multifamily housing unit buildings, Includes building 1, 15, 16, and 17 only. Repair/correct all low or poor drainage area, install new Built-up Bituminous Roofing. (Substitute roofing system may be offered by bidding contractor. Substitute material must be better than or equal to scoped material.) Tear off, remove, and haul away existing flat roofing and/or roof system, associated metal base flashing down to the existing wood deck. All tear off and removed material need to be disposed properly according to local, state and federal regulations. All removal, hauling, and disposal procedures shall be performed by a certified contractor and must meet or exceed all requirements set forth by local, state, and federal agencies governing these procedures. Correct/Repair all existing low and/or poor drainage areas to insure proper water runoff from roof. Repair and/or replace any damaged or missing metal and/or wood decking as required. All replaced decking shall match the size and type of the existing deck and shall be installed per local building code requirements. Remove all HVAC systems to allow all repairs to roof. Once all repairs have been made, reinstall HVAC systems, including but not limited to reattaching ducting, reattaching electrical and any other essential items that fall under the HVAC system. Ensure that HVAC system is running and operating properly. Replace all condensation lines with the proper size line; properly secure them to the roof and paint. All work shall comply with all local, state, and federal codes. All parapet walls and equipment curbs shall be fully covered with roof system. The membrane shall be adhered to the walls and curbs per the Roofing Manufacturer's standard written and detailed requirements (no mechanically attached and/or loose-laid wall and curb flashings will be allowed). Provide and install all new galvanized flashing and required roof metal, minimum 24 gauge. Shall be installed in accordance with the manufacturer’s installation instructions and any applicable code requirements. Install three-ply, built-up, bituminous roofing system, as specified herein and as needed for a complete and proper installation. The membrane shall be installed directly over the barrier board and shall be attached per roofing manufacturer's application requirements. Provide and install new redwood sleepers and pipe supports. The new sleepers and pipe support shall be installed per the roofing manufacturer's standard written and detailed requirements. Perform all flashing and detail work in strict accordance with the roofing manufacturer’s standards. Provide 15-year manufacturer’s warranty. *CITY OF VICTORVILLE PERMIT REQUIRED 2.Tear off and replace all shingle roofs at all multifamily housing buildings. Total of 18 buildings. Install 30-year Fiberglass based Composition CRRC rated shingles. Install per manufactures specifications. Owner’s choice of color. Contractor is required to have a Pre-Re-Roof Inspection. When stripping of old roofing material is required. Install two layers Type 1 (#15) asphalt saturated high-performance polyester (HPP) underlayment and 30 year Fiberglass based Composition shingles. Use double course of shingles at eaves. Place shingles in straight coursing pattern with required weather exposure so as to produce double thickness over entire roof area. Extend shingles 3/4 inch over eaves and 1/2 inch over gable end fascia boards. Valleys: Close cut/woven pattern. Cap hips and ridges with individual shingles, maintaining weather exposure. Place so as to avoid exposed nails. Complete installation to provide weather tight roofing system. Provide drip edge at eaves and gables of shingle roofs. Install shingles in accordance with manufacturer’s instructions. Owners’ choice of color. Prior to call for Final Roof Inspection # 299 Magnetically clean sweep yard, walkways, roof areas, and drive for nails, staples and related debris. Note: The roofing material shall be “Cool Roof” to meet all current California Energy Codes. Form CF-1R-ALT-RE-ROOF shall be completed and submitted prior permit issuance and form CF-6R-ENV-01 shall be completed and provided for the Building Inspector at final inspection. The “Cool Roof” shall have a minimum three year aged solar reflectance of 0.20 and a minimum thermal emittance of 0.75 for roofing products that have a density of less than 5lb/ft2. *CITY OF VICTORVILLE PERMIT REQUIRED 3.Repair wood rot at 3 stair landings. Includes landings at buildings 8, 12, and 16. Remove stair stringers as needed and save for re-use. Demo stucco and decking as needed to expose dry rot wood for replacement. Replace all dry rot wood with same nominal size. Replace decking as needed, waterproofing at deck and stucco. Paint stucco and any exposed wood to match surrounding as close as possible. Reinstall stair stringers with new hardware. 4. Remove and dispose of and install a total of 10 new Natural Gas Water Heaters. The minimum capacity for water heaters shall be in accordance with 2013 CPC Ch. 5, General 501.0 and Table 5-1 First Hour Rating; the First Hour Rating shall be 54 gallons for a 2-bedroom 2-bathroom home. To include seismic straps installed on the upper and lower 1/3 rd of the heater with the bottom being a minimum of 4 in. above the controls. Insulation wrap for the in and out water lines with a minimum insulation value of R-4, from point of connection for a minimum of 5 ft. in length. Install new flexible water lines (24 in. maximum length) on Hot and Cold water lines, new approved flexible gas line and fittings. To include: new full-way shut-off valve on cold water side and one vinyl covered ¾ “plywood layer overlay on closet floor and install corrosion resistant pan (Smitty Pan) with ¾ inch drain line piped to an approved location (T&P line may NOT drain to Smitty Pan). *Ensure the double wall “B INTRODUCTION Summary Background Contact Information Timeline NOTICE INVITING BIDS PROJECT TITLE AND SUMMARY: The City of Victorville is requesting bids for the Northgate Village Rehabilitation Re-Bid Project, MS27-053. This will include the roof replacement of various apartment complex buildings, installation of water heaters, and repair of wood rotted stair landings. This is a federal Home Investment Partnership Program (HOME) funded project. BID SUBMISSION: The City of Victorville (“City”) will accept sealed bids for the above-referenced Project via the City's eProcurement Portal located at https://procurement.opengov.com/portal/victorvilleca , until 4:00 pm PST on Tuesday, December 8, 2026 , at which time the bids will be publicly opened and the bids received will be available for viewing. Contract Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal. Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda. MANDATORY PRE-BID MEETING: A MANDATORY pre-bid meeting and job walk has been scheduled for all prospective bidders. The meeting will be held on Tuesday, November 17, 2026 , at 9:00 am PST, at 17251 Dante Street, Victorville, CA 92394 . Mandatory Site Job walk to follow. Prospective bidders are encouraged to address questions, problems, and other issues regarding this project. In no event shall failure to inspect the site constitute grounds for a claim after contract award. A bid received from a Contractor who is not represented by a duly authorized agent at the pre-bid meeting and job walk shall be considered non-responsive and rejected from further contract award consideration. The participant agrees that they are attending the job walk and assumes responsibility for their safety. BID GUARANTY AND BONDS: Bid Proposal submission must include all the Required Bid Documents and Proposal Forms and be accompanied by a certified or cashier’s check, or by a corporate surety bond (Bidder’s Bond) on the form included therein. Such check or Bidder’s Bond is the Bidder’s guarantee that he/she/it shall, if an award is made in accordance with the terms of his/her/its Bid Proposal, promptly secure the insurance and endorsements, Faithful Performance and Payment Bonds and Guarantee required by the Contract Documents and execute a Contract for the work on the required forms (see sample Construction Agreement attached). Said check or bidder’s bond shall accompany and be enclosed in the same envelope with the Bid Proposal. Said Bidder’s Bond shall be in an amount not less than ten percent (10%) of the total amount of the Bid Proposal payable to The City of Victorville (City) , as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of at least forty-five (45) days from the date of the bid opening. Please scan and upload a copy of your bid bond/cashier's check as part of your bid submission. In addition, Bidders are required to either HAND DELIVER OR MAIL the original bid guarantee. Bid guarantee must be “POSTMARKED” within (48) forty-eight hours after the bid submission due date. The bid guarantee must be hand delivered or mailed to the following address: City of Victorville 14343 Civic Drive Victorville, CA 92392 Attn: Finance Dept./Purchasing Division Please have the Bidder Name, Project Number and Title listed clearly on the outside of the envelope. The Faithful Performance and Payment Bonds shall be for amounts not less than one hundred percent (100%) of the total amount of the Bid Proposal price named in the Contract. Bonds shall be issued by responsible corporate sureties, licensed, and authorized to issue surety bonds in California. The City reserves the right to reject any bond if, in the opinion of the Department Director, the Surety’s acknowledgement is not in the form included in the Contract Documents or in another form substantially as prescribed by law. The successful Bidder shall also execute a Guarantee Form to warranty the work done and material provided for the period of one (1) year to ensure the Contractor repairs or replaces any defective or faulty work or materials. DIR REGISTRATION;COMPLIANCE MONITORING: Pursuant to Labor Code Section 1771.1, the City may not accept a Bid Proposal from or enter into a Contract with any Bidder, without proof that the Bidder and its prospective subcontractors are registered with the DIR to perform public work pursuant to Labor Code Section 1725.5, subject to limited legal exceptions. This project is subject to compliance monitoring and enforcement by the DIR and the submission of electronic certified payroll records to the California Labor Commissioner in the manner set forth in Labor Code Section 1771.4. Exceptions to the registration requirement: The contractor registration requirement does not apply to contractors working solely on public works projects awarded prior to April 1, 2015. Some exceptions allow contractors to bid on federally funded projects or submit joint venture bids without first being registered, as long as the contractors that are parties to the joint venture and the joint venture are registered at the time the contract is awarded. Contractors who work exclusively on small public works projects are not required to register as a public works contractor or file electronic certified payroll reports for those projects. However, small public works project Contractors are still required to maintain certified payroll records on a continuous basis, and provide them to the Labor Commissioner’s Office upon request. Additionally, awarding agencies are not required to submit the notice of contract award through DIR Public Works website services on projects that fall within the small project exemption. The small project exemption applies for all public works projects that do not exceed: $25,000 for new construction, alteration, installation, demolition or repair $15,000 for maintenance FEDERAL FUNDING: This Project is funded in whole or in part by the HOME Investment Partnerships Program Act ( HOME ) at title II of the Cranston-Gonzalez National Affordable Housing Act, as amended, 42 U.S.C. 12701 et seq., administered by the United States Department of Housing and Urban Development ( HUD ) and constitutes a public work under California Labor Code Section 1720 et seq . The Contractor and all subcontractors shall comply with the prevailing wage requirements of the Davis-Bacon and Related Acts (42 U.S.C. 5310) as well as California State prevailing wage laws enforced by the Department of Industrial Relations ( DIR ). Where there is a difference between the federal Davis-Bacon wage determination and the California state prevailing wage determination for any trade or classification, the higher of the two rates shall be paid . Additional federal funding requirements are detailed in the Instructions to Bidders Section. IN-USE OFF-ROAD DIESEL-FUELED FLEET CERTIFICATE OF REPORTED COMPLIANCE: Valid CARB Certificates of Reported Compliance as described in California Code of Regulations, Title 13, Section 2449(n) for fleets of vehicles subject to 13 CCR section 2449 are required for this Project. CONTRACTOR'S LICENSE: The successful bidder and/or specified subcontractor(s) must possess a valid California Contractor’s License Class B , not later than the time of the award of this contract, to complete the work as described. INSTRUCTIONS TO BIDDERS BID SUBMISSION The City's eProcurement Portal Clock is the official timekeeper for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as a poor internet connection. The City of Victorville strongly recommends completing your response well ahead of the deadline. Bidders take full responsibility for the City's receipt of its bid. Project Documents pertaining to this Project solicitation are available at the City’s eProcurement Portal, https://procurement.opengov.com/portal/victorvilleca . Only those who download Contract Documents from the portal will be included in a plan holders/followers list and may receive notices such as revisions to the plans or addenda. SUBMISSION DOCUMENTS: All portions of the proposal forms contained in Section 6 Bid Proposal Form - Submission Certification checklist contained in this bid package must be completed to include signed addenda (if any) before the bid is submitted. Failure to do so may result in the bid being rejected as non-responsive. CONTRACT DOCUMENTS: Bidders may download the Contract Documents associated with this Project from the City's eProcurement Portal. Those registered will be included in a plan holders (followers) list and may receive notices such as delta revisions to the plans or addenda. PROJECT QUESTIONS AND ADDENDA: Bidders shall submit all inquiries regarding this bid via the City’s e-Procurement Portal, located at https://procurement.opengov.com/portal/victorvilleca . Please note the advertised deadline for submitting inquiries is on Wednesday, November 25, 2026 , at 2:00 pm PST. All answers to inquiries will be posted on the City’s e-Procurement Portal. As a registered bidder, you will also receive addenda notifications to your email by clicking “Follow” on this project. Oral explanation or instructions given before the award of a Contract will not be binding. Any information given a prospective Bidder concerning solicitation will be furnished promptly to all prospective Bidders as an addendum to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective Bidders. PLEASE NOTE: Oral explanation or instructions, or written explanations given by personnel other than purchasing staff are not valid and will not be binding. BEGINNING OF WORK AND TIME OF COMPLETION The Contractor shall begin work by the date specified in the City's Notice to Proceed informing him/her that the contract has been executed and shall diligently prosecute the work so that all the work shall be completed before the expiration of SIXTY (60) CALENDAR DAYS , including the specified starting date. LIQUIDATED DAMAGES The Contractor shall pay the City the sum of $ 100.00 per day f or each and every calendar day delay in finishing the work as outlined in the Scope in excess of the SIXTY ( 60) CALENDAR DAYS specified above as Liquidated Damages. The City withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work. PERMITS AND INSPECTIONS: The Contractor and/or subcontractor(s) shall obtain all required permits and licenses prior to commencing work and shall submit the work in progress to periodic inspection by the appropriate Inspector of the City and shall honor all correction notices issued by same. All contacts, regarding inspections, shall be made to the appropriate department within the City. PREVAILING WAGE: Payment of State Wages Required when Higher . Payment of State prevailing wage rates, when higher than Federal Davis-Bacon prevailing rates, are required whenever federally funded or assisted projects are controlled or carried out by California awarding bodies of any sort. The City of Victorville is considered a California awarding body. Therefore, the higher of State Prevailing Wage and Federal Davis-Bacon Wage rates shall apply to and be paid by all Contractors and subcontractors performing work on this Project. Federal – The general Federal prevailing rate of wages, as determined by the Secretary of Labor are included as part of the attachments of the Contract Documents (General Federal Wage Decision); provided, that if there is any difference between the State or Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates. The General Federal Wage Decision that is in effect on the date of the bid opening, as long as the Contract is awarded within ninety (90) days of said date, locks in that Federal Wage Decision for the entire duration of the Project. If the contract is not awarded within such ninety (90) day period, the date of the execution of the Contract would be the date used in determining the applicable Federal Wage Decision. Revisions to the General Federal Wage Decision, up to fourteen (14) calendar days before bid opening, shall be identified by the issuance of addenda, and the final Contract between the City of Victorville and the contractor will physically include the applicable General Federal Wage Decision as revised by addenda, if any such addenda have been issued. Both the prime contractor and all subcontractors are required to pay their laborers and mechanics employed under this contract a wage not less than the highest wage applicable for their work classification, as specified in the Federal General Wage Decision that can be downloaded from https://sam.gov/wage-determinations . State – In accordance with the provisions of California Labor Code Sections 1720, 1770-1776, 1810, 1813, and 1815, as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem w

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Mandatory Job Walk Sign-in Sheet and Agenda and Updated Federal Funding language

  • Official Notice #1: NOTICE OF EXTENSION · 1

    This is to formally notify all bidders that the deadline for submission of questions and the bid submission deadline for the above referenced Request for Bids has been extended. Original Question Deadline: November 25, 2026, at 2:00pm PST New Question Deadline: December 2, 2026, at 4:00pm PST Original Bid Submission Deadline: December 8, 2026, at 4:00pm PST New Bid Submission Deadline: December 16, 2026, at 4:00pm PST

  • Addendum #2 · 2

    Addendum #2

Public questions and answers
  • I'm reviewing the bid documents for MS27-053, Northgate Village Rehabilitation Re-bid. Could you please let me know whether the City has a current project budget, engineer's estimate, or funding limit that can be shared with bidders? I came across a prior funding allocation related to Northgate Village, but I'm not sure whether it applies to this re-bid. If a current estimate or funding limit is unavailable for disclosure, I understand and would be grateful for any guidance you're able to provide.

    Good morning Rodolfo, The current budget for this project is $550,000.00.

  • Would the City of Victorville consider reducing the Pollution Liability insurance requirements from $2,000,000 per claim/occurrence and $4,000,000 aggregate to $1,000,000 per claim/occurrence and $2,000,000 aggregate, given that the total project value is less than $1,000,000? Please confirm whether the reduced coverage limits would be acceptable for this project.

    Good morning David, The insurance requirements listed are from the City's Risk Manager. We would not be able to reduce coverage limits at this time.

  • Is there a certain manufacturer that is required for the roof shingles? What kind of warranty does the City of Victorville require for the roofing? Can we use a self adhere rolled roofing for the flat roofs in lieu of a torch down?

    Good afternoon, There is no specific manufacturer required for the roof shingles. Please make sure you have reviewed the bid package. The warranty information is listed in Section 4, Scope of Work. Item #1 lists a 15 year manufacturer's warranty and item #2 is a 30 year comp shingle. The awarded contractor will be asked to provide a Guaranty Bond; this will cover the installation warranty for one year. Please review the scope of work. Item #1 states substitute roofing system may be offered by bidding contractor. Substitute material must be better than or equal to scoped material.

Plain text

OpenGov categories

  • 13574 · Tile, Roof, Clay, Burnt Type (See 770-64 for Concrete Roofing Tile)
  • 14560 · Roofing
  • 15086 · Trusses, Roof, Wooden
  • 21016 · Concrete Beams, Channels, Roof Decks, Bollards, etc., Prestressed
  • 67089 · Water Heaters, Residential
  • 77000 · Roofing Materials And Supplies
  • 77053 · Primers, Roofing
  • 77059 · Roofing, Asbestos-Cement: Corrugated, etc.
  • 77062 · Roofing, Composition: Rolls
  • 77064 · Roofing, Concrete Tile (See 135-74 for Clay Roofing Tile)
  • 77070 · Roofing Repair Kits
  • 77072 · Roofing Supplies (Not Otherwise Classified)
  • 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
  • 90923 · Building Construction, Residential (Apartments, etc.)
  • 91066 · Roofing, Gutters, and Downspouts Maintenance and Repair
  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)