State and local · OpenGov
Notice Inviting Prequalifications RFQ2701A
Description
California Assembly Bill (AB) 1565 went into effect on January 1, 2014. AB 1565 requires ALL General Contractors and M/E/P Subcontractors (licensed pursuant to Section 7058 of the Business and Professions Code, specifically holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 licenses) be prequalified, if the contract is valued at $1 million or more and funded whole or in part with State Facility Bond funds. On June 10, 2024, AB1433 was amended and requires all General Contractors and M/E/P Subcontractors to be prequalified, if the contract is valued at $1 million or more and funded in whole or in part with State General Funds, inclusive of LCFF funds. Therefore, notice is hereby given that, beginning June 10, 2024, the William S. Hart Union High School District (“District”) shall require all general contractors and, if utilized, all electrical, mechanical, and plumbing subcontractors (collectively “Contractors”) on public works governed by Public Contract Code Section 20111.6 to be pre-qualified prior to submitting bids for certain public works. It is mandatory that all Contractors who intend to submit bids fully complete the prequalification questionnaire, provide all materials requested herein, and be approved by the District to be on the final bidders list. No bid will be accepted from a Contractors that has failed to comply with these requirements. If two or more business entities submit a bid on a project as a Joint Venture, or expect to submit a bid as part of a Joint Venture, each entity within the Joint Venture must be separately qualified to bid. Prequalification applications may be submitted four times each year: (1) from January 1 through January 10; (2) from April 1 through April 10; (3) from July 1 through July 10; and (4) from October 1 through October 10. Contractors who submit a complete prequalification package will be notified of their qualification status, such notice to be mailed no later than fifteen business days after submission of the information. Answers to questions contained in the attached questionnaire, information about current bonding capacity on an aggregate and per project limit, notarized statement from surety, and the most recent reviewed or audited financial statements, with accompanying notes and supplemental information, are required. The District will use these documents as the basis of rating Contractors. The District reserves the right to check other sources available. The District decision will be based on objective evaluation criteria. Prequalification approval will remain valid for one (1) calendar year from the date of notice of qualification. While it is the intent of the prequalification questionnaire and documents required there with to assist the District in determining bidder responsibility prior to the submission of bids and to aid the District in selecting the lowest responsible bidder, neither the fact of prequalification, nor any prequalification rating, will preclude the District from a post-bid consideration and determination on a specific project of whether a bidder has the quality, fitness, capacity and experience to satisfactorily perform the proposed work, and has demonstrated the requisite trustworthiness. Contractors are encouraged to submit prequalification packages as soon as possible, so that they may be notified of prequalification status well in advance of upcoming projects. The prequalification packages (questionnaire answers and financial statements) submitted by Contractors are not public records and are not open to public inspection. All information provided will be kept confidential to the extent permitted by law, although the contents may be disclosed to third parties for the purpose of verification, investigation of substantial allegations, and in the process of an appeal hearing. Each questionnaire must be signed under penalty of perjury in the manner designated at the end of the form, by an individual who has the legal authority to bind the Contractor on whose behalf that person is signing. If any information provided by a Contractor becomes inaccurate, the Contractor must immediately notify the District and provide updated accurate information in writing, under penalty of perjury. The District reserves the right to waive minor irregularities and omissions in the information contained in the prequalification application submitted and to make all final determinations. Contractors will be allowed to appeal a negative pre-qualification determination in accordance with California Public Contract Code 20101.d. There is no appeal from a refusal for an incomplete or late application, but re-application during one of the designated periods is permitted. A Contractor may appeal the District’s decision with respect to its request for prequalification by giving written notice to the Assistant Superintendent Business Services no later than 4:00p.m. of the fifth business day after receipt of notice of its qualification status. Without a timely appeal, the contractor waives any and all rights to challenge the decision of the District, whether by administrative process, judicial process or any other legal process or proceeding. In Conjunction with this pre-qualification policy, the District hereby established a bidder pre-qualification appeals panel. The sole issue before the appeals panel shall be the scoring of the contractor. The decision of the appeals panel shall be the District's final administrative decision. The District shall act upon properly filed requests within ten calendar days from the date of receipt of such request. If after review, the District again rejects the contractor's application, the contractor may request an administrative hearing with the appeal panel. At the hearing, the contractor may present oral testimony concerning the contractor's ability and responsibility. The District shall notify the contractor of his decision within five business days following the hearing. The decision of the panel is final. The date for submission and opening of bids for a specific project will not be delayed or postponed to allow for completion of an appeal process. Note: A Contractor may be found not prequalified for bidding on a specific public works contract to be let by the District, or on all contracts to be let by the District until the Contractor meets the District’s requirements. In addition, a Contractor may be found not prequalified for either: (1) Omission of requested information or (2) Falsification of information. NOTICE: TO CONTRACTORS WHO ARE USING SUBCONTRACTORS FOR ANY JOB, PLEASE BE ADVISED THAT THE DISTRICT ALSO REQUIRES, THE PREQUALIFICATION OF ALL ELECTRICAL, MECHANICAL, AND PLUMBING SUBCONTRACTORS. THE DISTRICT WILL MAKE AVAILABLE A LIST OF PREQUALIFIED ELECTRICAL, MECHANICAL, AND PLUMBING SUBCONTRACTORS. The qualification of subcontractors in the following crafts or trades, following acceptance of your bid, but before the award is made: Pre-qualification of all subcontractors. Pre-qualification of subcontractors in certain crafts. Post-bid qualification review. ANNOUNCEMENT OF PREQUALIFICATION PROCEDURES AND OPEN DATES FOR QUARTERLY PREQUALIFICATION ANNOUNCEMENT OF PREQUALIFICATION PROCEDURES PURSUANT TO PUBLIC CONTRACT CODE SECTION 20111.6 AND OPEN DATES FOR QUARTERLY PREQUALIFICATION Summary Background Contact Information Timeline CONTRACTOR PREQUALIFICATION INSTRUCTIONS Notice is hereby given by the William S. Hart Union High School District (“District”) that all general contractors and mechanical, electrical, and plumbing (“MEP”) subcontractors (as defined in Public Contract Code Section 20111.6) planning to participate in bidding on certain public projects to be undertaken by the District, must be pre-qualified prior to submitting bids for such public projects. Pursuant to Public Contract Code Section 20111.6, bidders on all public projects using funds received under the Leroy F. Greene School Facilities Act of 1998 or any funds from a future state school bond, any projects funded with State General Funds, or LCFF Funds with an expenditure of one million dollars ($1,000,000) or more, must be pre-qualified. MEP subcontractors (licensed pursuant to Section 7058 of the Business and Professions Code, specifically holding C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, and C-46 licenses) must also meet pre-qualification requirements on all projects using funds received pursuant to the Leroy F. Greene School Facilities Act of 1998 or any funds from a future state school bond, any projects funded with State General Funds, or LCFF Funds with an expenditure of one million dollars ($1,000,000) or more. Link to law: http://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?sectionNum=20111.6.&lawCode=PCC To get started, please review the following instructions. Pre-qualification To start a new questionnaire, Contractor should click on the Draft Response button and begin answering all questions in the Vendor Questionnaire. Pre-Qualification: Contact information auto-populates from sign up information. Input license number and as many license classifications as needed. Select business certifications if applicable. Answer pre-qualification ‘disqualifier’ questions. If any question(s) is incomplete, question(s) will be highlighted in red and Contractor cannot proceed to the next step. Note: Contractor can save application at any point and return later to complete. Project History Enter project history information for six (6) public works projects and three (3) private construction projects, including references. Finish & Submit Contractor: If items are incomplete, an error message will appear. Once incomplete items are corrected, Submit your application. Email notification will be sent when the district approves, returns, or rejects the application. Contractor will be able to un-submit and re-submit to make changes to the Application, if needed Questions Contractor: Technical Support using OpenGov Platform: Contractors may access the Help Center for vendor training guides provided by the Software Administrator. Respondents may also contact the Software Administrator using the real-time chat function on the Portal (located in lower right-hand corner of the screen), or via email at procurement-support@opengov.com for support. General Q&A: Contractors may submit questions to the District in writing primarily via the Q&A tab (will be made public) in the Portal prior to the scheduled due date and time for submission. Questions about the status of an application or the pre-qualification process (which documents are suitable, etc.), Contact Leigh Hansen , Director of Purchasing & Warehouse at lhansen@hartdistrict.org . Timeline The District currently accepts pre-qualification applications on a quarterly basis, between the following dates: (1) January 1 through January 10; (2) April 1 through April 10; (3) July 1 through July 10; (4) October 1 through October 10. Pre-qualification approval will remain valid for up to one (1) calendar year from the approval notification date. In order to submit a valid bid for any public project requiring pre-qualification, contractors must submit the pre-qualification questionnaire at least ten (10) business days prior to the date fixed for the public opening of sealed bids. All contractors must be deemed pre-qualified to bid at least five (5) business days prior to that date. Financial Statement & Surety Statement In addition to completing the online questionnaire, each contractor must upload its most current reviewed or year- end audited financial statement with accompanying notes and supplemental information, which has been prepared by a certified public accountant within twelve (12) months of the application submission. In the event the reviewed or year-end audited financial statement is older than three (3) months, also upload a current financial statement prepared within three (3) months of the application submission. Provide a signed separate letter verifying that the accountant has complied with the Certificate’s specified requirements in reviewing or auditing the contactor’s financial statements. Finally, each contractor must submit a notarized statement from an admitted surety insurer (approved by the California Department of Insurance and authorized to issue bonds in the State of California) stating the contractor’s current bonding capacity. The notarized statement must be from the admitted surety insurer itself and not from a broker, agent, or other entity not the admitted surety. Public Contract Code section 20101(e) exempts from this requirement a contractor who has qualified as a small business pursuant to Government Code section 14837(d)(1), if the bid is “no more than 25 percent of the qualifying amount provided in section 14837(d)(1).” As of January 1, 2001, the qualifying amount is $10 million, and 25 percent of that amount, therefore, is $2.5 million. Submission Confidentiality Questionnaire answers and financial statements submitted by contractors are not public records and are not open to public inspection. Evaluation by the District The District will evaluate the application information provided and issue contractors a rating of “Pre-qualified,” or “Not pre-qualified”. The District’s decision will be based on the accuracy of the required information requested and the answers to the Essential Criteria Questions The District reserves the right to amend the pre-qualification packet at any time. Additionally, a determination by the District that a contractor is pre-qualified does not amount to a final determination that such contractor is responsible or responsive for purposes of bid evaluation. The District may, in accordance with applicable law, reject a pre-qualified contractor’s bid, and the District may additionally reject all bids if it determines such action is in the best interest of the public. Appeals A contractor who has timely submitted a completed application form, and who receives a rating of “Not pre- qualified” from the District may appeal that determination. There is no appeal from a finding that a contractor is not pre-qualified because of a late application or a failure to submit required information. A contractor may appeal the District’s decision with respect to its request for pre- qualification, by giving written notice to the District no later than five (5) business days after receipt of notice of its qualification status. Notice shall be sent to the attention of Leigh Hansen , Director of Purchasing & Warehouse , Planning and Construction at prequalify@hartdistrict.org , or 21380 Centre Pointe Parkway, Santa Clarita, CA 91350. Unless a contractor files a timely appeal, the contractor waives any and all rights to challenge the District’s pre-qualification decision, whether by administrative process, judicial process, or any other legal process or proceeding. The date for bid submission and opening for a specific project and any subsequent contract award will not be delayed or postponed to allow for an appeals process completion. The District, in its sole discretion, may conduct a hearing regarding the contractor’s timely appeal. If such a hearing is conducted, the contractor consents to the District’s Superintendent, Chief Administrative Officer, and/or Chief Financial Officer to hear and oversee the appeals proceedings. PREQUAL QUESTIONNAIRE SCORING WORKSHEET INTRODUCTION AND OVERVIEW OF THE 1999 LAW AND ITS APPLICATION (DIR) IMPORTANT PROVISIONS OF THE 1999 LAW In 1999, the Legislature enacted a law that allows many public agencies to require licensed contractors that wish to bid for public works jobs to “pre-qualify” for the right to bid on a specific public works project, or on a public works project undertaken by a public agency during a specified period of time. Public Contract Code section 20101 has the relevant provisions; it was enacted as part of Assembly Bill 574. The law applies to all cities, counties, and special districts but does not apply to K-12 school districts (which have similar authority to create pre-qualification procedures, described in Public Contract Code section 20111.5, which was enacted in 1997).1 The law does not require any public agency to adopt a pre-qualification system. Instead, it authorizes every public agency to adopt a pre-qualification system, and describes certain requirements that must be met (described below), if a public agency chooses to adopt such a system. In fact, the 1999 law allows a public agency to establish two different kinds of pre qualification procedures for public works projects. The law allows a public agency to establish a pre qualification procedure linked to a single project (Section 20101[d]). Or, the public agency may adopt a procedure by which a contractor may qualify to bid on projects which are put out for bid by that agency for a period of one year after the date ofinitial pre-qualification. (Section 20101[c]). The law requires every public agency that creates either kind of pre-qualification procedure to: (1) use a “standardized questionnaire and financial statement in a form specified by the public entity”(Section 20101[a]); (2) adopt and apply a uniform system of rating bidders on objective criteria, on the basis of the completed questionnaires and financial statements (Section 20101[b]); (3) create an appeal procedure, by which a contractor that is denied pre-qualification may seek a reversal of that determination. (Section 20101[d]). ROLE OF THE DEPARTMENT OF INDUSTRIAL RELATIONS AND THE LABOR COMMISSIONER Assembly Bill 574 required the Department of Industrial Relations (DIR) to “develop model guidelines for rating bidders, and draft the standardized questionnaire.” It required DIR to “consult with affected public agencies, cities and counties, the construction industry, the surety industry, and other interested parties.” From January through October 2000, DIR held a series of meetings in Sacramento with representatives of public agencies and other interested parties. Each meeting was attended by more than 25 representatives of interested parties. All told, more than 60 people participated in at least one such meeting, and most representatives participated in more than one. Contractors, public agencies both large and small, and associations of each were well represented throughout the series of meetings. DIR’s initial draft of a questionnaire was revised after each meeting, and each revised draft was discussed at the next meeting, leading to additional revisions. Eventually, there was widespread consensus that the model questionnaire offered a system of rating bidders based on objective criteria, and a useful and appropriate series of questions. In addition, DIR, in compliance with the 1999 legislation, created model guidelines for rating bidders. Throughout 2016 and part of 2017 the Labor Commissioner held a series of meetings with key stakeholders, representatives of public agencies, unions, contractors, and other interested parties in order to update and enhance the model questionnaire and rating system. The Labor Commissioner engaged with many representatives of the construction industry through individual meetings with stakeholders and public agency representatives, as well as by attending public agency pre-bid meetings and conferences of industry associations attended by over 100 people. The updated model questionnaire and rating system included in this packet was revised to offer a more effective system of rating bidders based on the input provided during these meetings. APPEAL PROCEDURE Section 20101(d) requires every public agency that requires prospective bidders to pre qualify pursuant to this law to establish &ldq
Published attachments
Public questions and answers
"Prequalification applications may be submitted four times each year: (1) from January 1 through January 10; (2) from April 1 through April 10; (3) from July 1 through July 10; and (4) from October 1 through October 10. " This RFQ has been released outside of the stated windows for prequalification. If we have already been approved via the last open window of submission, do we need to submit again for this one or is this for a different qualified list than the formal prequalification that is submitted between January 1-10, April 1-10, July 1-10, and October 1-10?
This Prequalification was opened yesterday to provide applicants as much time as possible to gather the information required to submit a responsive application. The application is not due until January 12, 2027 which is compliant with the District's January window. Since Pro-Craft was approved during the October 2026 window you are approved until October 2027; you do not need to apply again in January. But we have many contractors that elect to prequalify more than once per year. You are welcome to apply to any, some or all of the application windows.
OpenGov categories
- 07502 · Alarm Systems, Visual and Audio (For Electrically and Mechanically Operated Doors)
- 33500 · Fertilizers And Soil Conditioners
- 51500 · Lawn Maintenance Equipment And Accessories (See Class 020 For Agricultural Types)
- 59500 · Nursery (Plants) Stock, Equipment, And Supplies
- 65000 · Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 67500 · Pesticides And Chemicals: Agricultural And Industrial
- 69000 · Power Generation Equipment, Accessories, And Supplies
- 69100 · Power Transmission Equipment (Electrical, Mechanical, Air And Hydraulic)
- 79000 · Seed, Sod, Soil, And Inoculants
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 91000 · Building Maintenance, Installation And Repair Services
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
- 91300 · Construction Services, Heavy (Incl. Maintenance And Repair Services)
- 91400 · Construction Services, Trade (New Construction)
- 95900 · Marine Construction And Related Services; Marine Equipment Maintenance And Repair
- 96800 · Public Works And Related Services
- 98800 · Roadside, Grounds, Recreational And Park Area Services