State and local · OpenGov
Office Furniture
Description
The Department of Information Technology is undertaking a facilities improvement project to enhance the functionality, comfort, and efficiency of its working environment. This project includes upgrading interior finishes—such as replacing worn carpeting—to create a modern, professional workspace that aligns with current departmental standards. In addition, existing work areas will be reconfigured and enhanced to better support current staffing levels and operational needs. A key component of this project is the modernization of employee workstations. Existing furniture systems will be replaced or modified to meet contemporary ergonomic standards, including the incorporation of sit‑stand functionality to promote employee wellness and productivity. These upgrades will ensure that the workspace supports both current and future operational requirements, improves overall user experience, and aligns with best practices for modern office environments. Please provide a cost proposal to furnish and install the following HON furniture items: (see attachment for detailed specification) Four (4) workstations, 5′-6″ × 6′-0″, with 49″-high panels and 15″-high frameless frosted glass at the locations shown on the plan. Three (3) workstations, 6′-6″ × 6′-0″, with 49″-high panels and 15″-high frameless frosted glass at the locations shown on the plan. One (1) L-shaped sit-stand desk, 72″ W × 78″ D, with all components shown in the furniture schedule. One (1) conference table, 72″ W × 36″ D. Fifteen (15) Herman Miller Aeron task chairs, Size B, black, or City-approved equal in accordance with Section 2.19. Include all applicable furniture, delivery, installation, and tax in the proposal. Carpet replacement will be performed separately and coordinated with furniture removal and installation. Complete 5′-6″ × 6′-0″ workstation Complete 6′-6″ × 6′-0″ workstation Complete L-shaped sit-stand desk 72″ × 36″ conference table Aeron task chair, Size B, black, or City-approved equal Specification Scope of Work The City of Pasadena, California seeks to procure high-quality workstations, conference room furnishings, and ergonomic task seating to enhance the comfort, productivity, functionality, and aesthetic appeal of its office environments. The selected vendor shall provide workstation systems that incorporate sit-stand functionality and all required storage components to support employee wellness, efficiency, and productivity. In addition, the vendor shall furnish ergonomic task chairs designed to meet the functional, comfort, and health-related needs of employees while promoting proper posture and long-term workplace well-being. This procurement supports the City's commitment to providing a modern, efficient, and employee-focused work environment. The proposed furniture solutions shall accommodate current operational needs while offering flexibility to support future workplace requirements. These upgrades are intended to improve the overall user experience, maximize workspace effectiveness, and align with industry best practices for contemporary office design and ergonomic standards. Detailed Specifications Workstations (See attachment) Task Chairs (See Section 3.3) Service Requirements Consultation and Planning: The vendor must provide consultation services to assist in selecting the appropriate seating solutions based on the City of Pasadena's specific needs and office layout. Customization: The vendor should offer customization options for upholstery colors and materials to match the existing office decor. Assembly and Installation: The vendor must provide on-site assembly and installation services for all seating products. This includes the removal and disposal of all packaging materials. Maintenance and Support: The vendor must provide ongoing maintenance and support services, including repair and replacement of defective parts within the warranty period. By adhering to the above scope of work, the City of Pasadena aims to ensure the procurement of high-quality workspace and conference room seating that meets the ergonomic, aesthetic, and functional needs of our office environments. Overall Product Requirements For all line items (1 to 5) listed below, Refer to attached document for the detailed Specifications Four (4) workstations, 5′-6″ × 6′-0″, with 49″-high panels and 15″-high frameless frosted glass at the locations shown on the plan. Three (3) workstations, 6′-6″ × 6′-0″, with 49″-high panels and 15″-high frameless frosted glass at the locations shown on the plan. One (1) L-shaped sit-stand desk, 72″ W × 78″ D, with all components shown in the furniture schedule. One (1) conference table, 72″ W × 36″ D. Fifteen (15) Herman Miller Aeron task chairs, Size B, black, or City-approved equal in accordance with Section 2.19. Include all applicable furniture, delivery, installation, and tax in the proposal. Carpet replacement will be performed separately and coordinated with furniture removal and installation. TASK CHAIR QUANTITY: 15 COLOR: Black Workspace Seating (Task Chairs) Ergonomic Design: Key features include: Chair shall be designed for intensive daily use in a professional office environment. Chair shall incorporate advanced ergonomic features that support healthy seated posture and user comfort. Chair shall be suitable for users of varying body types and sizes. Chair shall be manufactured by an established office furniture manufacturer with demonstrated experience in ergonomic seating. Ergonomic Adjustability: The chair shall include, at a minimum: Pneumatic seat-height adjustment. Adjustable recline/tilt tension control. Multi-position tilt limiter with upright and reclined support settings. Forward tilt capability. Adjustable lumbar and lower back support system. Dynamic spinal support designed to promote natural spinal alignment. Height-adjustable armrests. Adjustable arm pad pivot and width positioning. Adjustable arm pad depth positioning. User-adjustable controls accessible while seated. Materials: Matte, polished, or powder-coated die-cast aluminum or polymer chassis and base 8Z Pellicle elastomeric suspension seat and backrest Harmonic™ 2 Tilt mechanism PostureFit SL hardware or lumbar support Standard or leather-upholstered polyurethane foam arm pads 2.5-inch carpet casters or hard floor casters with quiet roll technology Notification of Filling Contents Seat and Back Construction Seat and back shall provide pressure-distribution support to minimize concentrated pressure points. Suspension-style seat and back construction shall be preferred over traditional foam construction. Materials shall promote airflow and thermal comfort during extended periods of use. Seating surface shall be durable, flexible, and resistant to sagging or deformation under normal use conditions. Base and Mobility Five-star base construction. Dual-wheel casters suitable for carpet and hard-surface flooring. Smooth rolling performance with stability during movement. Swivel capability with a full 360-degree rotation Dimensions Height (in): 41 Width (in): 27 Seat Height Min (in): 16 Seat Height (in): 20½ Base Diameter (in): 26½ Weight (lbs): 41 Durability and Weight capacity: Chair components shall be designed for continuous-use environments. All materials shall be commercial-grade and suitable for high-use government office applications. Chair shall support a minimum user weight capacity of 300 pounds. Environmental and Sustainability Requirements Manufacturer shall provide documentation regarding sustainability initiatives and recycled-content materials, where applicable. Products should be low-emitting and suitable for indoor office environments Warranty: Minimum warranty period shall be twelve (12) years. Warranty shall cover materials, workmanship, and moving components under normal office use. Compliance: Chairs must meet or exceed ANSI/BIFMA X5.1-2017 standards for office seating. Basis of Design: Herman Miller Aeron, Size B, black, or City-approved equal in accordance with Section 2.19 Key features include: PostureFit SL® spinal support system. Pellicle® suspension seat and back. Adjustable recline tension. Tilt limiter and forward tilt functionality. Fully adjustable arms. Twelve-year manufacturer warranty. ORDERING, DELIVERY AND INSTALLATION ORDERING: Vendor must provide a contact person that can be reached by phone and email during Normal Business Hours that can accept any orders placed by the Contract Administrator. All items listed shall be delivered to the City. Delivery shall be no later than Eight Calendar Weeks after orders are placed, and during Normal Business Hours . DELIVERY AND INSTALLATION REQUIREMENTS: Delivery Schedule: The contractor shall complete delivery and installation within eight calendar weeks after issuance of the purchase order. Coordinate the delivery and installation dates with the City’s project manager. Deliveries shall occur between 8:00 a.m. and 4:30 p.m. Monday through Thursday and on scheduled City working Fridays, excluding City holidays, unless the City authorizes a different window in writing . Delivery Location: All products must be delivered to the specified City of Pasadena office locations as detailed in the purchase order. Packaging: All products must be securely packaged to prevent damage during transit. Packaging materials should be environmentally friendly and recyclable where possible. Inspection and Acceptance: Upon delivery, the City of Pasadena will inspect all products to ensure they meet the specified requirements. Any damaged or non-compliant products must be replaced or repaired by the vendor at no additional cost. DELIVERY LOCATION(S) INCLUDE: 100 N. Garfield, Pasadena CA 91101 INSTALLATION SCOPE: Assembly and installation of all furniture and accessories. Removal and disposal of all existing furniture. Attachment of the furniture power whip. (Hardwire connections to the building's electrical grid not in cotract). Data cabling will be handled by the City's technology vendor. Furniture delivery and installation shall be coordinated with the construction schedule and occupancy requirements. Normal Business Hours are Monday through Thursday every other Friday 8:00 a.m. until 4:30 p.m. unless specifically requested by the contract admininstrator, no deliveries shall take place on Saturday, Sunday, or holidays recognized by the City of Pasadena. See the schedule for closed Fridays: https://www.cityofpasadena.net/planning/scheduled-city-closure-9-80-plan/. SHIPPING, STORAGE, AND HANDLING The Vendor shall assume all responsibility for the safe delivery of THE MATERIALS shipped to its destination. The materials shall be protectively packaged for shipment to mitigate the risks to handling such as impacts, atmospheric conditions such as excessive heat and moisture control, and any other shipping risks. Introduction The administrative office at this location faces several workspace and operational deficiencies. Interior finishes such as carpet are significantly worn, existing work areas are insufficient to support current staffing levels, and the existing workstations no longer meet modern ergonomic standards, including the need for sit‑stand functionality. Summary The City is seeking quotes or proposals for Office Furniture as outlined in this SOLICITATION. The Contractor may need to meet other certain minimum qualifications to propose on this specification.. 2026-Informal-0565 Background Contact Information Deadline for Questions The deadline to submit questions related to this solicitation is Monday, November 16, 2026 , prior to 2:00 pm . Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. Vendor Registration Instructions & Customer Service information: Click here to register on the City's eProcurement Portal . If you are already registered and need help logging in or retrieving your user information use the blue chat bubble on the lower right hand corner of the screen. Additional instructions are included in this solicitation (See section named "Instructions for Registering onto the City's eProcurement Portal. Customer Service For assistance with e-bidding or uploading documents: Contact Open Gov via the blue chat bubble Monday through Friday 5am - 5pm PST, except statutory holidays Timeline Instructions NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses to this solicitation accepted by the City of Pasadena (City) shall become the exclusive property of the City. At such time as the City recommends a contractor, and such recommendation, with any recommended contract, all proposals accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof. TERMS AND CONDITIONS OF PURCHASE ORDER CONTRACT TERMS AND CONDITIONS OF PURCHASE ORDER CONTRACT https://www.cityofpasadena.net/wp-content/uploads/sites/27/Terms-Conditions-of-Purchase-Order.pdf Contract Duration The Contract resulting from this proposal is scheduled to start 12/03/2026 . The Contract resulting from this proposal is scheduled to end 02/28/2027 . PRICE ADJUSTMENTS Unit prices shall remain firm for the contract term. Evaluation of Bid Bids will be evaluated based on the lowest Grand Total Price submitted in the Bidders' Proposal. The contract award will be made from among responsive and responsible bidders. In case of a discrepancy between the unit prices and item total, the unit price shall govern. In the event of a discrepancy between the item totals and the grand total price the item totals shall prevail. The prices will be subject to adjustment by the City on that basis in the event of discrepancy and bid awarded. PUBLIC CONTRACT CODE SEC. 9204 NEW PUBLIC WORKS CLAIMS PROCEDURE Observe attached details regarding Public Contract Code Section 9204. AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities. Quantities The quantities contained in the documents are approximate only and are for the sole purpose of comparing proposals. The City may, in accordance with the specifications, request additional goods or services as necessary at the City's sole discretion, as increased by the unit price noted and payment will be made for the amount of goods or services actually provided as determined by the City and accepted at the unit prices noted in the proposal. Standard terms and conditions Prior to the award of any work hereunder, City and contractor shall enter into a written contract in substantially the form attached hereto with such revisions thereto as the City may determine necessary and appropriate. PROPOSERS responding to this SOLICITATION are strongly advised to review all the terms and conditions of the contract and shall be deemed to have accepted them. Funding Source This procurement is funded by: City of Pasadena . Vendors must submit all required documents with their proposal. COST PROPOSAL: Cost Proposal Submittal Submit pricing for all items through the City’s OpenGov pricing table in accordance with Section 4. Definitions The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this SOLICITATION, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract. Addenda If any person contemplating submitting a proposal of the items or services listed herein is in doubt as to the true meaning of any part of this SOLICITATION, he/she may submit to the City representative(s) identified in the subsection named "Deadline for RFP Questions," above, a written request for an interpretation or correction thereof. Any interpretation or correction of City specifications will be made only by addendum, duly issued by the City representative(s) identified in Section 3, above. Addenda (if any) shall be made available to each Proposer. A proposer’s failure to address the requirements of any and all addenda may result in the proposal not being considered. If the City determines that a time extension is required for the proposal, the City will issue an addendum that will give the new submission date. The Proposer is responsible to register with “OpenGov” at www.cityofpasadena.net to insure they receive all SOLICITATION documents including addendums which are available as a download. The City reserves the right to change any part of these Instructions to PROPOSERS and Specifications any time prior to Deadline for Submissions. Any changes shall be in the form of addenda and will become a part of the Proposal documents and of the contract. Ordering Authority Orders for products or services under this contract require prior written authorization from the City’s designated representative, Siranoush Rousian, Senior Project Manager. RELEVANT EXPERIENCE Provide experience with governmental agencies for two projects/contracts of similar scope and size. Complete and submit the attached Relevant Experience Form with your proposal to demonstrate experience with projects/contracts of similar scope and size to that which is to be performed. Delivery Instructions Delivery and installation shall comply with Section 3.4. https://www.cityofpasadena.net/planning/scheduled-city-closure-9-80-plan/. Deliveries Must be Made to: 100 N. Garfield Ave. S-116 WARRANTY Contractor shall provide factory warranties on all materials furnished against defects in materials and/or workmanship. The factory warranty shall become effective on the date of delivery and acceptance by the City. Should any defect in materials or workmanship appear during the warranty period, the Contractor shall repair or replace the same at no cost to the City. DEFECTIVE MATERIALS: Any materials not conforming to requirements of this Specification shall be considered defective. All such materials, whether in place or not, shall be immediately removed from the site of the work. Any defective materials installed shall be removed and replaced by the City and all costs of removal and replacement shall be deducted from any amounts due or to become due to the Contractor. No rejected materials, the defects of which have been subsequently corrected, shall be used. RECEIVING AND INSPECTION Deficient parts will be rejected and the Cont
Published attachments
Public questions and answers
May we submit comparable product in place of HON in our submittal?
Detail specification must be submitted for review and approval. The city's proposed standard is HON.
May a prime bidder satisfy the two similar governmental project requirement using its proposed supplier/installer’s experience? The Relevant Experience Form has five pages: are two projects sufficient, or are five required?
yes
Specifically, will Cosmo and Halifax product from Tayco be acceptable as an alternative to the HON product?
Detail specification must be submitted for review and approval. The city's proposed standard is HON.
OpenGov categories
- 3372 · Office Furniture (including Fixtures) Manufacturing
- 33721 · Office Furniture (including Fixtures) Manufacturing
- 337211 · Wood Office Furniture Manufacturing
- 337214 · Office Furniture (except Wood) Manufacturing
- 33994 · Office Supplies (except Paper) Manufacturing
- 339940 · Office Supplies (except Paper) Manufacturing
- 42412 · Stationery and Office Supplies Merchant Wholesalers
- 424120 · Stationery and Office Supplies Merchant Wholesalers
- 4532 · Office Supplies, Stationery, and Gift Stores
- 45321 · Office Supplies and Stationery Stores
- 453210 · Office Supplies and Stationery Stores