Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Oliver Hill New Courtroom Furniture

Description

This project includes disassembling and removing the existing courtroom furniture and building and installing the new courtroom furniture based on the plans provided. There are 5 courtrooms that will receive new furniture. All perspective bidders are strongly encouraged to visit the site. Site visits can be scheduled by contacting Ross Crawford, Ross.Crawford@rva.gov. Project Costs Applicable to Entire Project Project Management Design Delivery Installation Demolition & Disposal of Existing Furniture Courtroom Furniture Litigant Table Probation Officer's Desk Witness Stand Judge's Bench Clerk's Desk Spectator Rails/Knee-walls Bailiff's Desk Front Desk Wall/Bookcase Behind Judge's Bench Statement of Work Custom Furniture The Contractor shall build custom furniture pieces according to the provided design specifications, including but not limited to: Litigants’ tables (10) Probation officers’ desk (5) Witness stand (5) Judges’ bench (5) Clerks' desk (5) Probation officers' table spectator rails/knee-walls (10) Bailiff desk (5) Front desk (5) Wall/bookcase behind judges’ bench (5) The Contractor shall provide material samples and stain finish for review and approval prior to production of the new furniture. The Contractor shall ensure all furniture items meet relevant standards including: ANSI/BIFMA standards for commercial furniture quality and safety. American Disabilities Act (ADA) accessibility requirements. The Contractor shall match new material finish for all new furniture with the Headboard Signage. The Contractor shall not stain or finish furniture within the Courthouse. Surfaces shall be solid surface. Solid surface is a manufactured material composed mainly of aluminum trihydrate (ATH) mineral fibers, acrylic or polyester resins, and pigments for color. The color runs through the entire slab, unlike laminate, which has a surface layer over a different backing. This creates a uniform, seamless finish that can be fabricated into countertops, sinks, backsplashes, and custom shapes. Place and Time of Performance Oliver Hill Juvenile and Domestic Relations Court House is located at 1600 Oliver Hill Way. All furniture should be built and manufactured and ready for installation prior to demolishing the existing furniture. The Contractor shall provide a schedule and timing for manufacturing the furniture and for installation. Work shall be performed in only one (1) courtroom at a time. The construction of all furniture must be completed before starting the installation so that there isn't a delay in moving forward to install the new furniture in the next courtroom. Quiet work that does not interfere with courthouse operations can be performed during regular business hours. Any work that requires hammering, noise, fumes from paints or stains must be performed after 4:00 p.m. until 11:00 p.m. during the normal business work week and all-day Saturday and Sunday from 7:00 a.m. until 11:00 p.m. The completion of demolition and installation of new furniture shall not exceed 14 calendar days per room. All perspective bidders are strongly encouraged to visit the site. Site visits can be scheduled by contacting Ross Crawford, Ross.Crawford@rva.gov. Project Planning and Design Development The Contractor shall actively participate in the following planning activities: Attend a pre-launch meeting with the painters, carpet installers, electricians, courtroom clerk administrator and project manager prior to starting this project. Develop a project schedule after the pre-launch meeting to ensure that work is coordinated appropriately for all contractors to perform their work within the 7-to-14-day work schedule for each courtroom. Measure existing furniture throughout each courtroom to ensure that the new furniture is an exact size and match for the existing locations of each judge’s bench, litigants tables, probation officers table, witness stand, clerks’ desk, spectator rails/knee-walls, bailiff desk, front desk, and wall bookcase behind the judge’s bench. Develop detailed shop drawing design plans for the newly fabricated furniture. Provide drawings of new furniture for review and approval prior to production of the new furniture. Present design proposals to City of Richmond representatives for approval before production begins. Provide regular updates on the progress of furniture fabrication and installation. Removal and Disposal of Existing Furniture The Contractor shall remove the following existing pieces of furniture in each of the 5 courtrooms: Litigants’ tables (2) Probation officers’ desk (1) Witness stand (1) Judges’ bench (1) Clerks' desk (1) Probation officers' table spectator rails/knee-walls (2) Bailiff desk (1) Front desk (1) Wall/bookcase behind judges’ bench (1) in each of the 5 courtrooms. The Contractor shall dispose of all debris responsibly, adhering to local codes and regulations for waste management. The Contractor shall conduct an inventory of salvaged items and provide a report of reusable materials to the City of Richmond. Specific Items to Remain The following items in each courtroom will not be replaced and shall remain or be reinstalled. Headboard Signage at Bookcase Wall behind Judges Bench shall be reinstalled. Benches in the rear of each courtroom shall remain. The Contractor shall ensure that these items are not damaged during the course of the project. Delivery and Installation of New Furniture The Contractor shall deliver and install all furniture items by the agreed-upon project completion date, to be determined with approval of furniture drawings and design. City personnel must be notified at least 48 hours in advance of the delivery date. All deliveries must include appropriate safety measures to protect the items and the courthouse environment during transport and installation. The Contractor shall schedule delivery times in advance with designated City contacts to minimize disruption to courthouse operations. Furniture must be delivered in a finished condition, ready for immediate use. All furniture must be completely assembled with minimum construction on site. Prefabricated pieces that are too large to fit through a 3' doorway may be assembled onsite. The Contractor shall demolish and then install new furniture in one courtroom at a time such that there will always be four courtrooms open at a time. Deviation may be permitted with written approval by the City's project manager. Installation of new furniture shall allow for wiring. All materials and work equipment must be kept within the courtroom that is being worked on at the time or removed from the site daily. Cleaning and Inspection The Contractor shall ensure that courtrooms are completely cleaned and cleared of debris and any evidence of installation or demolition. The Contractor shall coordinate with City personnel to ensure seamless integration with existing structures and services. The Contractor shall schedule a final inspection with relevant City representatives to verify that all items have been installed to the City's standards. Performance Evaluation. Performance evaluation of the Contractor shall take place at the completion of each Work Assignment. No Guaranteed Work. The City does not represent, warrant, covenant or guarantee that the Contractor will receive any Work Assignments in a specific contract or renewal term. The City reserves the right, at its sole discretion, to issue separate solicitations for similar work and other projects as the need may occur. Assignment of Work when Multiple Awards. In the event the City awards multiple contracts under this Invitation for Bids as allowed under City Code section 21-55(a), the City will assign work based on the provisions of this section. The City will strive to distribute work assignments (each a “Work Assignment”) to all contractors awarded contracts under this Invitation for Bids. However, the City, in its sole discretion, may assign a Work Assignment to the contractor that it believes is best suited to that specific Work Assignment based on the following factors: Cost effectiveness and reasonableness based on bid price. Performance on past or current Work Assignments as documented pursuant to Section 2.1.3 (“Performance Evaluation”) of Part I (“Statement of Needs”). Resources available compared to existing assigned workload. Responsiveness in responding to Work Assignment requests. Work Assignment Procedure. In the event the selected contractor (i) fails to respond to the City’s request for a Work Assignment within 2 business days, or (ii) declines to perform a Work Assignment, the City may proceed to another contractor. Nothing herein shall be construed to limit the City’s discretion to determine when and under what circumstances to utilize any awarded contractor for Work Assignments. SPECIFICATIONS Background This project includes disassembling and removing the existing courtroom furniture and building and installing the new courtroom furniture based on the plans provided. There are 5 courtrooms that will receive new furniture. All perspective bidders are strongly encouraged to visit the site. Site visits can be scheduled by contacting Ross Crawford, Ross.Crawford@rva.gov. The existing courtroom furniture is the original furniture that was installed after construction of the building. The existing furniture is in bad condition and the laminate is peeling away. The challenges will be to complete 1 courtroom at a time. All furniture will need to be built and ready for installation. We would like to move from one courtroom directly to the next courtroom. We can only have 1 courtroom down at a time. Bid Form Delivery F.O.B: TBD Required Time for Delivery: TBD City Requirements All work shall be done after normal business hours. One courtroom will be available for demolition and reinstallation at a time. Contractors will have 14 days per courtroom to complete all work. Furniture Completion The Contractor shall produce furniture within 90 calendar days of issuance of a purchase order. The Contractor must provide a timeline for furniture production along with their bid. The Contractor shall ensure that furniture installation begins within 14 calendar days of furniture completion. All furniture must include a minimum of one (1) year standard warranty. Compliance with Regulations. The Contractor shall ensure all work complies with local building codes and OSHA regulations for safety. The Contractor shall maintain appropriate permits and documentation for all phases of the work. Bidders shall provide a minimum of one (1) reference adhering to the following: Reference(s) shall refer to projects with similar scope and complexity to this IFB. Project(s) shall have been performed within the last ten years or currently in progress and focus on what the Contractor considers most relevant in demonstrating the qualifications for this Project. Briefly identify the project, location, original and final period of performance, reason for any changes, and services performed. The reference(s) shall include the owner project manager’s contact name, title, address, telephone number, and email address. The reference(s) listed may be contacted and questioned about the firm’s overall capabilities; any problems that developed during performance of work; and quality and performance of applicant's personnel. Contract Award Award shall be made to the lowest responsive and responsible bidder; with lowest total bid amount. Pricing While the quantities shown are the intended quantity, the City reserves the right to purchase only its requirements whatever the quantity may be, plus or minus, during the period specified. Items with a cost of 0.00 dollars will be assumed to be included in the contract at no cost. Minority Business Enterprise / Emerging Small Business Participation Percentage In accordance with section “Minority Business Enterprise / Emerging Small Business Participation” of Part 2 (“Instructions to Bidders”) of this Invitation for Bids, it has been determined for this solicitation the minority business enterprise and emerging small business participation of 0% is reasonably possible given the availability of minority business enterprises and emerging small businesses for the scope of work covered by this solicitation. INSTRUCTIONS TO BIDDERS Authorized Signature All bid submissions must be signed in order to be considered. If the bidder is a firm or corporation, the bidder must show the title of the individual executing the bid and a resolution authorizing the individual to sign the bid and subsequent contract. Award Pursuant to City Code § 21-55(a), the City will make the award to the lowest responsive and responsible bidder. Whenever the City, in its sole discretion, deems it to be in the City’s best interest to do so, the City reserves the right: To conduct any test it deems advisable. To make all evaluations necessary. To cancel this solicitation or to reject any or all bids, in whole or in part, as authorized by City Code § 21-72(a). To waive informalities as authorized by City Code § 21-72(b). To delete items prior to making the award. To negotiate an adjustment of the bid price with the lowest responsive and responsible bidder if and to the extent permitted by City Code § 21-55(b). To award to more than one bidder as authorized by City Code § 21-55(a). Each bidder to whom a contract is to be awarded must register with the City prior to award through the City’s Supplier Registration Portal ( https://rva.gov/procurement-services/supplier-portal ) and provide the banking information necessary to facilitate Automated Clearing House electronic payments. This registration is a condition of award. Bidders Not Debarred By signing its bid in response to this Invitation for Bids, the bidder warrants and represents that neither its organization nor any of its officers, directors, partners or owners is currently barred from bidding on contract by any agency of the federal government, any agency of the Commonwealth of Virginia, any agency of any other state, or any other public body or agency thereof. Contractor Misrepresentation If any bidder knowingly makes a material misrepresentation in submitting information to the City, such misrepresentation will be sufficient grounds for rescinding any contract awarded under this solicitation to that bidder. Any bidder falsely representing past or proposed Minority Business Enterprise / Emerging Small Business participation may be in breach of contract. Upon determination of a breach, the City shall have all available remedies for breach of contract. Delivery and Time for Holding of Bid General terms such as “stock,” “immediately,” and “as soon as possible,” if included as part of a bid, will not be deemed more favorable to the City than any required delivery terms and, in the absence of any required delivery terms, may result in the bidder being deemed nonresponsive. By signing its bid, the bidder offers and agrees, if the City accepts its bid within 90 calendar days from the date of the opening of bids, to furnish any and all items upon which prices are quoted at the same prices set opposite each item, delivered to the point specified in this Invitation for Bids, and at the time specified in the bid. Descriptive Literature The bidder shall submit with its bid descriptive literature of equipment or supplies, which it proposes to furnish, if such articles are of a different manufacture than those specified herein. Should the description furnished in such literature differ from the specifications submitted by the City, and no mention is made to the contrary, it shall be construed to mean that the bidder proposes to furnish equipment or supplies in accordance with such description and not in accordance with the City's specifications, and its bid will be evaluated accordingly. Disqualification Due to Participation in Preparation of Solicitation City Code § 21-281(a) prohibits any person who, for compensation, prepares a solicitation for or on behalf of the City from submitting a response to that solicitation or any portion thereof. For purposes of this section 2.7 (“Disqualification Due to Participation in Preparation of Solicitation”), the word “prepares” has the meaning set forth in City Code § 21-281(b) and thus includes but is not limited to the following: Serving as a director or deputy director of the agency which has initiated the procurement; Serving as the director of procurement services after the department of procurement services has received information on an agency's intent to procure; Serving as the procurement manager for the agency which has initiated the procurement; Serving as the procurement officer in charge of the procurement; Assisting in the development of specifications for invitations for bids or requests for proposals; Attending an evaluation committee meeting that is closed to the public; Voting on or scoring a bid or proposal; or Any other participation in the procurement process which could lead to unfair advantage. Pursuant to City Code § 21-281(c), the Chief Administrative Officer shall make the determination that a person is disqualified from submitting a response to a particular solicitation because of that person’s participation in preparing that solicitation. If a person planning to submit a response to a solicitation contacts the Chief Administrative Officer concerning such a disqualification, such person and the person’s firm shall be disqualified from responding to the solicitation for violating the City’s no contact policy because the person discussed the solicitation with a City representative other than the contract specialist responsible for the procurement. In accordance with City Code § 21-281(d), any person who has been disqualified pursuant to this section 2.7 (“Disqualification Due to Participation in Preparation of Solicitation”) and City Code § 21-281 may appeal the Chief Administrative Officer’s determination of disqualification by following the administrative appeals procedure set forth in City Code § 21-168 or by instituting legal action as provided in City Code § 21-169. Ethics in Public Contracting; No Kickbacks or Conflicts of Interest By signing and submitting its bid in response to this Invitation for Bids, the bidder certifies that he has not violated any provisions of Federal law, the Code of Virginia, the Richmond City Code or Charter. The bidder certifies that its bid is made without collusion or fraud and that the bidder has not offered or received any kickbacks or inducements from any other bidder, supplier, manufacturer or subcontractor in connection with its bid and that the bidder has not conferred on any public employee having official responsibility for this procurement transaction any payment, loan, subscription, advance, deposit of money, services or anything of more than nominal value, present or promised, unless consideration of substantially equal or greater value was exchanged. The bidder agrees that if such warranty is in any respect breached, the bidder will pay to the City the full price agreed by the City to be paid for the supplies, materials, equipment or services to be furnished under the bidder’s bid. By signing and submitting its bid in response to this Invitation for Bids, the bidder represents and warrants that it is in compliance with the provisions of section 3.2.3 (“Anti-Kickback Provision”) of Part 3 General Terms and Conditions included with this Invitation for Bids and, further, that the bidder’s firm has no business or personal relationships with any other companies or persons that could be considered as a conflict of interest o

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum. MBE goal has been changed to 0%. There will be a site Visit on Tuesday, 27 October, 2026 from 1:00pm to 2:00pm.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum. Bid due date has been extended to 23 November, 2026 as the City evaluates the back wall paneling and table surface material specifications.

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum. Attachment K has been updated to the most recent furniture plans. Changes include specification and addition of brackets, access panels behind the judge desk, and removal of paneling along the back wall. Note that the rendered image has not been updated to include this change in scope. Bid due date has been extended to 30 November, 2026.

Plain text

OpenGov categories

  • 26007 · Cabinets, Furniture, Sinks, etc., Dental
  • 41033 · Furniture, Health Care (Custom Made)
  • 42015 · Courtroom Furniture: Chairs, Tables, etc.
  • 42030 · Furniture, General (Custom Made)
  • 42548 · Furniture, Office (Custom Made)
  • 47045 · Furniture, Special: Chairs, Stands, Stools, etc. (For Beds See Class 410)