State and local · OpenGov
On- Call Labor Compliance Services
Description
The City is seeking the services of qualified firms to provide on-call labor compliance consultant services. The selected consultants will perform agency functions regarding labor compliance for Capital Improvement Program (CIP) projects of varying contract size and levels of complexity in construction. These services will be supporting the Department of Public Works – Engineering Division. The selected consultants shall be responsible for educating, assisting, monitoring, and enforcing prevailing wage requirements of all applicable labor laws to ensure that all contractors working on City projects are in compliance with local, state, and federal prevailing wage statues and regulations. Regulations include, but are not limited to, conformance with the Davis-Bacon Act, California Prevailing Wage laws, City of Pasadena Living Wage Ordinance, and tracking good faith efforts. These tasks include, but are not limited to verification of proper workforce classifications, verification of payment of prevailing wages by Contractor and subcontractors, verification of proper submittal of certified payroll reporting, on-site interviews, apprentice ratio utilization reporting, and monitoring apprenticeships. All applicants must provide thorough and comprehensive responses that clearly demonstrate their team's approach and consistency with the standards outlined in Evaluation Criteria of the RFP document. Scope of Work Scope of Work The City is seeking the services of qualified firms to provide on-call labor compliance consultant services. The selected consultants will perform agency functions regarding labor compliance for Capital Improvement Program (CIP) projects of varying contract size and levels of complexity in construction. These services will be supporting the Department of Public Works – Engineering Division. The selected consultants shall be responsible for educating, assisting, monitoring, and enforcing prevailing wage requirements of all applicable labor laws to ensure that all contractors working on City projects are in compliance with local, state, and federal prevailing wage statues and regulations. Regulations include, but are not limited to, conformance with the Davis-Bacon Act, California Prevailing Wage laws, City of Pasadena Living Wage Ordinance, and tracking good faith efforts. The consultants shall provide a labor compliance officer for all phases of a construction project: project set-up, labor compliance monitoring during construction, and project close-out. The scope of work may include, but is not limited to the following: Project Set-Up Request project information as well as contractor and subcontractor information from the City Project Manager. Gather information such as contact information from the contractor and subcontractors, contract not-to-exceed amount, construction duration, and funding sources (federal, state, and local). Attend preconstruction meeting to present labor compliance requirements and expectations and ensure all attendees are well informed about California Labor Codes and California Code of Regulations relevant to the project. Preconstruction meetings may be held virtually or in person, dependent on the project. Set up labor compliance files and documents regarding the project, Contractor, and subcontractors in audit-ready format. Set up external labor compliance program tracking software or electronic platform for the contractor and subcontractor to submit labor compliance documents. Labor Compliance Monitoring Verify proper workforce classifications for the contractor and subcontractor crews on-site. Verify payment submitted by the Contractor and subcontractors meet the City of Pasadena Living Wage Ordinance, California Prevailing Wages, and the Davis-Bacon Act. Ensure that Contractor and subcontractors maintain proper records as per California Labor Code Sections 1776 and 1812. Review and audit project. Timesheets for the Contractor and subcontractors and monitor daily and weekly records of actual hours worked per worker. Establish and maintain certified payroll reports (CPRs) and fringe benefit statements from the Contractor and subcontractors. Conduct on-site interviews with the Contractor and subcontractors during active construction, ensuring that at least one employee from each trade is interviewed. Cross reference and verify the on-site interviews with the submitted. Monitor compliance with apprenticeship requirements and ratio utilization reporting. Collect apprenticeship documents (DAS-140 and DAS-142 forms), if applicable to project. Prepare monthly project reports for labor compliance and provide progress payment recommendations to the City. Address any and all labor compliance inquiries from the Contractor and subcontractors and provide guidance for inquiries. Identify labor compliance issues and violations with the California Labor Code, California Code of Regulations, and California Public Contract Code and provide appropriate recommendations to the City. Assist the City in the reportings of suspected violations of the Prevailing Wage Law to the Labor Commissioner. Project Close-Out Continue monitoring labor compliance through the punchlist/project close-out phase of the project. Prepare close-out documents to be submitted to the DIR. Perform project close-out duties and transfer all files to the City. Provide a final recommendation regarding the Contractor's compliance with applicable labor laws and regulations and advise the City whether labor compliance matters have been satisfactorily resolved to support release of contract retention. The City will enter into a separate five-year contract with each selected consultant . Each agreement will have a contract amount of $150,000 . This amount applies separately to each agreement and not collectively to the entire consultant pool. A contract does not guarantee the consultant any minimum amount of work or compensation. Introduction Summary Background The City of Pasadena is an ethnically diverse community that is home to approximately 142,017 people. Pasadena is the ninth-largest city in Los Angeles County. It is one of the primary cultural centers of the San Gabriel Valley. The City covers approximately 22.5 square miles, with an average of ten residents per acre. The median age of its residents is approximately 36.9 years. There are over 100,000 jobs in a wide variety of industries in the City of Pasadena. Contact Information Deadline for Questions The deadline to submit questions related to this solicitation is Tuesday, November 10, 2026 , prior to 5:00 pm . Questions regarding this solicitation should be submitted directly through the City's eProcurement Portal Q&A function. Do not contact any City employee or official regarding this solicitation. Any questions submitted after the date and time specified may not be considered. Timeline General Instructions NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses to this Request for Proposal (RFP) accepted by the City of Pasadena (City) shall become the exclusive property of the City. At such time as the City Manager recommends a contractor to the City Council, and such recommendation, with any recommended contract appears on the Council agenda, all proposals accepted by the City shall become a matter of public record and shall be regarded as public, with the exception of those elements of each proposal which are defined by the contractor as business or trade secrets and plainly marked as "Trade Secret", "Confidential" or "Proprietary". Each element of a proposal which a contractor desires not to be considered a public record must be clearly marked as set forth above, and any blanket statement (i.e. regarding entire pages, documents or other non-specific designations) shall not be sufficient and shall not bind the City in any way whatsoever. If disclosure is required or permitted under the California Public Records Act or otherwise by law, the City shall not in any way be liable or responsible for the disclosure of any such records or part thereof. Electronic Submission and Delivery Instructions It is understood and agreed upon by the Proposer in submitting a Proposal that the City has the right to withhold all information regarding this RFP until after City completed its evaluation and makes a recommendation to the City Council to award the contract. Information releasable after such time is subject to the disclosure requirements of the Public Records Act, California Government Code Section 7920.005, et seq. Proposers shall provide all materials required in this RFP. The Proposal shall provide clear and sufficient detail to enable the City's Selection Committee to evaluate the responsiveness and quality of the Proposal to each of the RFP requirements listed in the Submittal/Checklist section of the RFP. Although some factors may be weighted more heavily than others, all factors are considered necessary for a responsive submittal. Proposers shall adhere to submission deadlines. Parties interested in responding are required to submit proposals electronically through the City of Pasadena's eProcurement Portal no later than 2:00 pm on Wednesday, November 18, 2026 . Please upload sufficiently early electronically through the city's eProcurement Portal before the time and day listed in the Notice Inviting Proposals. Proposals must be received in the system prior to the deadline. Proposer shall submit three (3) bound copies signed original hard/paper copies of the Proposal to the following address, no later than three (3) business days after the Proposal Submission Deadline. Danica Lauren Alfajora, P.E. City of Pasadena, Department of Public Works 100 N Garfield Avenue, Rm N306, Pasadena, CA 91101 The hard/paper copies of the proposal must be formatted on standard-size 8½”x11” pages; 12 point font only. The entire Technical Proposal can be no more than 50 grand total pages. The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ #Proposer's Submittals/Checklist .” The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and #Proposer's Submittals/Checklist . No Pricing shall be included in this part. If there are any discrepancies between the hard/paper copies and the electronic submission, the electronic submission shall prevail. Proposals received after the Proposal Deadline may not be accepted by the City. Technical Proposal The proposal must be prepared in two parts: a "Technical Proposal" and a "Price Proposal." Each of the parts shall be separate and complete in itself so evaluation of one may be accomplished separate from the evaluation of the other. The Technical Proposal should disclose your technical approach in as much detail as possible, including, but not limited to, the requirements of the technical proposal instructions. Along with all required forms and submittals (See #Attachments , and Submittals/Checklist . No Pricing shall be included in this part. Separate Price Proposal The Price Proposal must include all costs associated with the Technical Proposal as described in the Price Proposal instructions in the “ Submittals/Checklist . ”Parties interested in responding are required to submit their Price Proposal with their Technical proposal through the City's eProcurement Portal. The pricing must include the total price proposed to accomplish all the performance and deliverables requested in this RFP, and offered by your firm. Each Proposer must submit a Price Proposal containing all costs associated with the technical proposal. The price proposal shall describe both the total and the detailed price for which the consultant will commit to complete the total scope of work and end products. The price proposal detail shall describe costs for each professional’s time, for the completion of each proposed task, and for all materials and supplies. The fee information is relevant to a determination of whether the fee is fair and reasonable in light of the services to be provided. Costs shall include the proposed costs and, if necessary, the approximate number of hours to provide the services as described in your proposal. Any additional fees outside the scope of the agreement must be approved in writing before commencing services for said fees. Vendor’s RFP response must be inclusive of all costs and expenses associated with travel, lodging, and any other incidental costs. The City will not separately reimburse costs not included in the proposal. Reference SAMPLE PRICE PROPOSAL - LAPM 10-H2 On-Call Cost Proposal Reimbursable cost schedules shall depict only those expenditures that are exclusive to and in support of the scope of services. The proposed reimbursable cost schedule shall include a detailed list of reimbursables. Each Proposer must submit a PRICE Proposal containing all costs associated with the technical proposal. Using the attached Price Proposal in this RFP, provide Proposer’s lump-sum price for performing all services and work called for in the SCOPE OF WORK. The Proposer’s lump-sum price shall include, without limitation: all designs, equipment, materials, labor, insurance and bond premiums, home office, jobsite, and other overhead, profit and services relating to the Proposer’s performance of its obligations under the Contract (including all work, equipment, materials, labor, and services provided by subcontractors and intellectual property rights necessary to perform the work); performance of each and every portion of the work all costs of obtaining Government approvals other than Government approvals that are the responsibility of the City of Pasadena; all costs of compliance with Government rules, except to the extent such compliance is the responsibility of the City of Pasadena; all taxes, duties, permits, and other fees or royalties incident to the performance of the SCOPE OF WORK; payment of all salaries, wages, benefits, and expenses of the Proposer’s employees; compensation for all risks, liabilities, and contingencies assigned to the Proposer; and all other costs needed or incurred to complete the Project. all ProForma Submission Requirements (if required) Pre-Proposal Meeting See the "Timeline" in the Introduction section ( #Introduction) . If there is a Mandatory pre-proposal meeting, bidders/proposers are required to attend at the time, date, and location included in the Timeline. If there is a Non-Mandatory pre-proposal meeting, bidders/proposers are not required to attend. Each bidder/proposer will have the opportunity to clarify and ask questions regarding the Specifications. The Pre-Proposal Meeting will be held at the time, date, and location in the Timeline of this solicitation. Definitions Definitions The words (A) "City", (B) "Department", (C) "Director", or (D) "Contractor", as used in this RFP, shall be understood to refer respectively to (A) the City of Pasadena, California; (B) the several departments therein; (C) the directors of the several City departments; or any of their properly authorized assistants; and ( D) the person, firm or corporation with whom the contract is made by said City or the agent or legal representative who may be appointed to represent such person, firm or corporation in the signing and performance of said contract. General Requirements Standard terms and conditions Prior to the award of any work hereunder, City and contractor shall enter into a written contract in substantially the form attached hereto with such revisions thereto as the City may determine necessary and appropriate. PROPOSERS responding to this RFP are strongly advised to review all the terms and conditions of the contract, and shall be deemed to have accepted them. Firm commitment of availability of service Once a proposal is opened, a PROPOSER is expected to maintain an availability of service as set forth in its proposal for at least four months after date for opening proposals. Reservations The City reserves the right to reject any or all bids or proposals and any item or items therein, and to waive any non conformity of proposals with this RFP, whether of a technical or substantive nature, as the interest of the City may require. Documents to be construed together The Request for Proposal (RFP), the Proposal, the Non Collusion Affidavit, and all documents referred to in the complete specifications and the Contract to be entered into between the Contractor and the City, and all modifications of said documents, shall be construed together . PUBLIC CONTRACT CODE SEC. 9204 NEW PUBLIC WORKS CLAIMS PROCEDURE Observe attached details regarding Public Contract Code Section 9204. AB 626, approved by the Governor on September 29, 2016, created a new Public Contract Code Section 9204, which specifies new procedural requirements for claims submitted by a contractor on any public works project. These new requirements contain burdens for both private contractors and public entities and are specifically made applicable to charter cities. Request for Proposal (RFP) quantities: The quantities contained in the RFP documents are approximate only and are for the sole purpose of comparing proposals. The City may, in accordance with the specifications, request additional services as necessary at the City's sole discretion, as increased by the unit price noted and payment will be made for the amount of services actually provided as determined by the City and accepted at the unit prices noted in the proposal. Price Adjustment Clause At the conclusion of the first contract year and prior to the commencement of the second contract year or any subsequent contract extension period, the contractor may request unit price increases. Under no circumstances shall the City accept price increases, which exceed the rate of the then current Consumer Price Index (C.P.I.) "All items in Los Angeles-Long Beach-Anaheim, CA, all urban consumers, not seasonally adjusted" for the latest available preceding 12 month period. The percentage increase shall be a 12 month percentage increase for the first month of the subsequent contract year(s). CHANGE ORDER MANAGEMENT CHANGE ORDER MANAGEMENT Any additional work identified during the course of the project that is deemed necessary, but outside the original Scope of Services, must be recorded as a Change Order and approved by the City Project Manager in writing before work is started. Taxpayer Protection Act Under the provisions of the City of Pasadena Taxpayer Protection Act ("TPA"), the Contractor/Organization will be considered a "recipient of a public benefit." The full provisions of the TPA are set forth in Pasadena City Charter, Article XVII. Under the TPA, City public officials who approve this Contract are prohibited from receiving specified gifts, campaign contributions or employment from Contractor for a specified time. As well, if this Contract is to be approved by the City Council, Councilmembers or candidates for Council are prohibited from receiving campaign contributions during the time this Contract is being negotiated (from the due date for an RFP response until award of a contract; this restriction does not apply to competitive and noticed low bid contracts). This prohibition extends to individuals and entities that are specified in the TPA and includes Contractor/Organization and its trustees, directors, partners, corporate officers and those with more than a 10% equity, participation, or revenue interest in Contractor/Organization. Contractor/Organization understands and agrees that: (A) Contractor/Organization is aware of the TPA; (B) Contractor/Organization will complete the forms provided by the City to identify all of the recipients of a
Published attachments
- MASTER SERVICES CONTRACT (ENG)
- REQUIRED FORMS - AAs - SIG-LEGAL-STATUS - DECLARATION OF NONCOLUSION 08022024 v2
- Unique Entity ID (SAM)
- DISQUALIFICATION_DISCLOSURE (4)
- CONFLICT_OF_INTEREST (5)
- Pasadena_Taxpayer_Protection_Amendment_Disclosure (2)
- DESIGNATED REPRESENTATIVESdocx
- Insurance - Professional-Services
- LAPM_10-H2_-_OnCall_Sample_Cost
- On-Call_Labor_Compliance_Services.pdf
Public questions and answers
1. Will public-agency references and experience earned by proposed personnel through a previous employer satisfy the three-reference requirement for a newer firm?
Firms will be evaluated on the firm's references with public agencies for similar labor compliance services. Public agency experience earned solely by proposed personnel through previous employers does not satisfy the requirement.
What SAM registration status, UEI evidence, and representations/certifications must be complete at submission?
Please see Section 15 for Submittals/Checklist, 5.3 for Unique Entity Identifier for the form to be filled out at submission.
Does the 50-page limit include the cover letter, contents, resumes, and required forms?
Yes.
What pricing scenario and total should accompany the on-call rate schedule?
Refer to Section 15 for Submittals/Checklist, Part 2.4 for Separate Price Proposal Submittal. Consultants shall submit hourly rates for key personnel and all costs associated with performing all services and work listed in the scope of work.
Must consultants supply a cognizant-agency/Caltrans-accepted indirect-cost rate, and what alternative is available to a new firm?
Refer to Section 15 for Submittals/Checklist, Part 2.4 for Separate Price Proposal Submittal. Consultants shall submit hourly rates for key personnel and all costs associated with performing all services and work listed in the scope of work using the Exhibit 10-H2 form.
Does the generic 5% bid-bond language on p. 65 apply to this professional-services RFP? Does the related 15-day post-award contract/bond language apply?
Bid bond is not required.
Are the three paper copies due November 23, what is the receipt cutoff, and how should the separate price proposal be packaged?
Hard copies are due November 23rd, end of business day at 5pm. Price proposal shall be in a separate sealed envelope.
Please provide the missing Federal Required Certification, lobbying disclosure, and conditional DHS disclosure forms.
Please see Section 15 for Submittals/Checklist, 5.1 for Federal Required Certification, 5.2 for Disclosure of Lobbying Activities, and 4.1 for DHS Disclosure forms.
Does this award require City Council approval and separate submission of the taxpayer-protection form to the Clerk?
The Pasadena Taxpayer Protection Amendment Disclosure form is a requirement for this RFP; separate submission to the City Clerk's office is not required.
Does the City require DIR registration for the consultant’s own labor compliance services?
Yes.
Who pays for and licenses the electronic compliance platform?
Consultant pays for licenses and electronic compliance platform.
Which federal clauses and accessibility-testing requirements apply to this specific agreement and its routine reports?
Please see Section 15 for Submittals/Checklist, Part 5 for the required federal forms. Please refer to Section 4 for City Requirements, Part 4.21 for Accessibility Compliance Requirements.
If allowed, shall covers and any organization materials be included in both the electronic and hard copies, or hard copies only?
Covers and organization materials are allowed in both electronic and hard copy submissions. The use of these materials is at the consultant's discretion.
Are tabs/dividers advised to be part of the proposal organization and if so, are they included in the page count?
Consultants are to decide if tabs and dividers are needed for their proposal. Tabs and dividers are not counted towards the total page count.
The Technical Proposal outline in the Proposal Checklist identifies the first chapter as the" Statement of Qualifications and Experience." Section 3/3.1 in the Proposal Checklist is also identified as "Statement of Qualifications and/or Experience," but there is no asterisk/response required. Please clarify if any information is to be provided in this section.
Information is not needed for Section 3.1 for Statement of Qualifications and/or Experience as this will be reviewed as part of the Technical Proposal.
The RFP requirement to provide three (3) bound copies of the Proposal intonates front and back covers are to be included with the package. If so, are covers included in the page count?
Front and back covers do not contribute towards the total page count.
In the Price Sheet signature block on the last page of the form, the entry field for "Title" is a dollar amount field and cannot be filled in with text. Please advise.
"Title" still allows for letters/text. If needed, please put in a text box to fill out the required information.
In the RFP, page 4, under 2.Electronic Submission and Delivery Instructions, last bullet: "Proposer shall submit three (3) bound copies signed original hard/paper copies of the Proposal… ." Are all signatures in the proposal package to be wet signatures, or the cover letter only? Several forms have a pre-formed field to apply electronic signatures. Your guidance is appreciated.
Only cover letter requires a wet signature.
Regarding format font requirements: Does the 12-point font apply to all proposal content including headers, footers, tables, and graphics? Would a 10-pt font be acceptable for these proposal components?
The 12-point font shall also apply to headers, footers, tables, and graphics.
Is there a requirement for staff to be onsite or within a certain mileage range of the City?
There is no requirement to be within a certain range of the City. However, please note that one of the tasks listed in the Scope of Work includes on-site interviews with the Contractor and subcontractors during active construction.
Insurance: please confirm that the primary/non-contributory and additional-insured requirements in Exhibit N apply to the general liability and automobile policies, and that the professional liability policy need only meet the $2,000,000 limit, retroactive-date and five-year maintenance requirements.
Confirming that primary requirements shall include general liability, automobile policies, and professional liability (limit no less than $2,000,000) per occurrence/claim.
What should be uploaded in the submittal portal for section 3.1. Statement of Qualifications and/or Experience? Is this the same information requested in the Technical Proposal under section B) Mandatory Content?
Submission for Section 3.1 Statement of Qualifications and/or Experience is not required as this information will be reviewed as part of the Technical Proposal.
Since the required forms count toward the 50-page maximum and total more than 30 pages, does this mean that fewer than 20 pages remain for the Technical Proposal narrative? Additionally, please clarify how the electronic submission should be assembled: should the required forms be included within the 50-page Technical Proposal PDF upload, or uploaded separately in the designated portal fields while still counting toward the 50-page maximum?
The required forms total less than 20 pages; consultants will have more than 30 pages to address information in the Evaluation Criteria. Please upload documents per the designated field in Section 15 for Submittals/Checklist.
The RFP identifies “Additional Data” as Mandatory Content but does not specify the information required. Please clarify what proposers should include in this section?
This is meant to be open ended for consultants to add any additional data, if needed, to the proposal.
Was there a mandatory pre-proposal meeting as referenced on Page 6? If so, please provide the meeting date, time, location or access information, and confirm whether failure to attend would result in disqualification?
There was no pre-proposal meeting for this RFP.
Must the required public-agency references be distinct clients, or may two separate projects performed for the same client be listed as two references?
Section 12 for Evaluation Criteria, Sub-Section 5 for References intends to list three different references, but does not limit consultants from using the same public agency for multiple references.
Is a local office or locally based staff required, or is remote administration from outside California, with scheduled site visits for interviews and pre-construction meetings, acceptable under this on-call contract?
Remote administration does not automatically disqualify a consultant. During evaluations, staff will check that consultants are in good standing on the California Business Search and the consultants will need to be able to apply for a Pasadena Business License before contract award.
The scope requires on-site worker interviews (at least one per trade). Must interviews be conducted in person on City job sites, and at what frequency? May any portion be completed by phone or video?
Section 6.1 specifies that interviews are conducted on-site during active construction. The frequency is at the Project Manager's discretion and will be stated when reaching out to the selected on-call consultants before a project begins.
Can you please clarify how many projects you would like included as part of our "Relevant Experience" section?
This is to be decided at the consultant's discretion to make sure the proposal addresses information listed in the scope of work, evaluation criteria, and submittals/checklist.
Could you please clarify whether the separate Price Proposal submittal should include the completed “EXHIBIT 10-H2 COST PROPOSAL,” in addition to the proposed level of effort, hourly rates, and reimbursable costs?
Exhibit 10-H2 Cost Proposal was uploaded as an attachment as a sample or template for consultants to use for the Price Proposal. Consultants may use their own formatting to address all the required information in Section 2.4
How many projects on average does the City award per year? What is the average cost and duration of a typical City project?
The average number of projects, construction costs, and construction duration varies per year and per project. This year, Public Works has awarded 10+ construction contracts.
Does the department have an Incumbent Consultant?
Yes. Public Works is advertising for a new list of On-Call Labor Compliance Services as the current contracts are expiring soon.
OpenGov categories
- 237 · Heavy and Civil Engineering Construction
- 2379 · Other Heavy and Civil Engineering Construction
- 23799 · Other Heavy and Civil Engineering Construction
- 237990 · Other Heavy and Civil Engineering Construction
- 5413 · Architectural, Engineering, and Related Services
- 54133 · Engineering Services
- 541330 · Engineering Services