Skip to content
← Back to search

State and local · OpenGov

Opportunityevaluation

On-Call Planning Consulting Services for Airport Development

Description

The City of Lawrence is seeking one or more highly qualified consultants or consultant teams to provide on-call planning and consultation services for the Lawrence Regional Airport. The objective of the contract is to provide comprehensive planning services for the Lawrence Regional Airport on behalf of the City of Lawrence. Tasks include but are not limited to environmental assessments, CATEX, UASCE determinations, airport economic impact studies, governing document policy revisions including minimum standards, rules and regulations, and ground development policies, DBE/ACDBE plan development and implementation, Title VI plan development and implementation, economic impact studies, business plan development, and land acquisition strategic development. The City receives entitlements from the FAA in the amount of $150,000 annually and receives additional support from KDOT Aviation through KAIP Grants and various State and Federal earmarks. Projects may utilize this contract at the discretion of the City based on future analysis and available funding. This Master Agreement establishes the relationship between the City and the selected vendor, however does not guarantee a specific amount of work; Each assignment will receive a defined scope, schedule, funding source, and authorization through the city's Task Order framework. SCOPE OF WORK The entire scope of work should be entered here. On-Call Planning Services for Airport Development Summary The City of Lawrence is seeking one or more highly qualified consultants or consultant teams to provide On-Call Planning Consultant services for the Lawrence Regional Airport. The objective of the contract is to provide planning consultant services for the Lawrence Regional Airport on behalf of the City of Lawrence. Tasks include but are not limited to planning services related to environmental assessments, CATEX, UASCE determinations, airport economic impact studies, governing document policy revisions including minimum standards, rules and regulations, and ground development policies, DBE/ACDBE plan development and implementation, Title VI plan development and implementation, economic impact studies, business plan development, and land acquisition strategic development. The City receives entitlements from the FAA in the amount of $150,000 annually and receives additional support from KDOT Aviation through KAIP Grants and various State and Federal earmarks. Projects may utilize this contract at the discretion of the City based on future analysis and available funding. The firm selected will enter in an on-call engineering services agreement (ESA). The ESA will have a 3-year term, pertaining to the listed items below, all of which contingent upon funding are reasonably expected to be initiated within this term as FAA AC 150/5100-14E, and FAA Order 5100.38. The City of Lawrence and the selected firm will execute Task Orders to the On-Call ESA with specific scopes for individual projects. The task order scopes will vary, adjusting to the needs of the City and the Airport. Engineering Services in this request include but are not limited to: DBE/ACDBE Plan Development and Implementation (Preliminary estimated cost over 5 years - $75,000) Title VI Plan Development and Implementation (Preliminary estimated cost over 5 years - $50,000) Environment Assessments to include CATEX submissions and Determinations from USACE. (Preliminary estimated cost over 5 years - $200,000) Airport Economic Impact Studies (Preliminary estimated cost over 5 years - $100,000) Minimum Standards for Commercial Aeronautical User Revisions (Preliminary estimated cost over 5 years - $75,000) Rules and Regulations Revisions (Preliminary estimated cost over 5 years - $50,000) Ground Development Policy Revisions (Preliminary estimated cost over 5 years - $75,000) Airport Business Plan Development (Preliminary estimated cost over 5 years - $125,000) Land Acquisition Strategic Planning (Preliminary estimated cost over 5 years - $125,000) Project Effectiveness Reporting (Preliminary estimated cost over 5 years - $50,000) Grant Administration, Independent Fee Estimates, and Closeout (Preliminary estimated cost over 5 years - $500,000) Public Outreach (Preliminary estimated cost over 5 years - $50,000) Background The Lawrence Regional Airport is one of the oldest recognized public use airports in Kansas, having been in service since October 1929. The City of Lawrence has continued the operation of the airport since its acquisition in 1977. The City has previously established engineering, architectural, and planning services for the airport through the City’s Construction Management, Engineering, and Development (CMED) division of its Municipal Services and Operations (MSO) Department. The Airport is a separate division under MSO. The Airport recently underwent master planning services, resulting in the completion of the 2026 Airport Master Plan and Airport Layout Plan. Generally speaking, the master plan identified needs to improve airfield pavement infrastructure, landside infrastructure, hangar development, utility infrastructure, an airport fire station, and conceptual development and construction of a vertiport and adjacent solar farm. Additionally, more projects have been identified since the Master Plan was submitted, to include airfield lighting system rehabilitation, construction of a heavy aircraft parking apron, rental car infrastructure development, and land acquisition. Additionally, planning services identified include development of a DBE/ACDBE plan, Title VI program development, Environmental Assessments for private development, and revisions to Airport Rules and Regulations, Rates and Charges, and Minimum Standards for Commercial Aeronautical Users. All projects with additional details are listed further below in the scope of services. All projects undertaken through KDOT KAIP or FAA AIP Grants will also require the selected vendor to perform Grant Administration services exactly as described in each awarded grant, and in accordance with City of Lawrence policies and regulations. All airport projects remain under the purview of the City of Lawrence, and in consideration of the City of Lawrence’s Strategic Plan, are subject to City Commission approval and adoption. The on-call agreement is intended for use for the projects as stated in this RFQ, however, the City preserves the ability to conduct a separate procurement when appropriate. Firms that submit for, and may be awarded, the Engineering, Architecture, and Construction Services on-call contract may also submit for the Planning and Consulting Services on-call contract, and vice versa. Each procurement will be evaluated independently based upon the qualifications and evaluation criteria established for that procurement. The City may select the same consultant under both procurements when that consultant is independently determined to be the most qualified firm for each respective scope of services. Selection under one procurement shall not create a preference or advantage in the evaluation of the other procurement. The evaluations conducted by the city will be initially evaluated without disclosure of the firm's identity, also known as being "blinded", to promote impartiality and objective evaluation, followed by evaluation of the firm's qualifications and experience. Scope of Work 1. As part of the scope of services, the selected vendor is BIDDER INSTRUCTIONS In order to establish a basis of quality and performance, certain requirements and qualifications may be specified in the bid. It is not the intent of the City to exclude other requirements or qualifications of equal value, utility or merit. Proposers may review all proposal requirements and seek exceptions or clarifications to requirements established in this document as outlined below. Whenever a trade name, brand name or model and catalog numbers followed by the words “or equivalent” or “approved equal” are used in the bid invitation. It is for the purpose of item identification and to establish standards of quality, style, and features. Bids on equivalent items of substantially the same quality, style, and features are invited. However, to receive consideration, such equivalent bids must be accompanied by sufficient descriptive literature and/or specifications to clearly identify the item and provide for competitive evaluation. The City will be the sole judge of quality and suitability. It is the proposer’s responsibility to ask questions, request changes or clarifications, or otherwise advise the City if any language, specifications, or requirements in the bid appear ambiguous, contradictory, or arbitrary, or appear to inadvertently restrict or limit open competition. The City reserves the right to make a determination, correction, or clarification whenever an inconsistency or discrepancy is found. There shall be no communication with any other City employee regarding this solicitation except with designated City participants if prior written approval is obtained from City Purchasing. Violations of this provision by vendor or City personnel may result in the rejection of the proposal. Submitted questions will receive an official written response from the City and will become addenda to the RFP. The only official position of the City is that which is stated in writing and issued in the RFP as addenda thereto, no other means of communication, whether oral or written, shall be construed as a formal or official response/statement, and such communications may not be relied upon. Failure to notify the City of any conflicts or ambiguities in this bid event may result in items being resolved in the best interest of the City. The City will use its best efforts to disseminate addenda; however, this shall not relieve proposers of the responsibility for determining if addenda have been issued. All addenda to this bid are available on the City's eProcurement Portal located at https://procurement.opengov.com/portal/lawrenceks . PREPARATION OF BIDS Bidders are expected to examine the entire bid request and all attachments including drawings, specifications, and instructions. Failure to do so is at Bidder’s risk. Bidders shall furnish information required by the solicitation in the form requested. The City reserves the right to reject bids with incomplete information or which are presented in a different format. Each bid must be legible. All bids shall be signed, in the appropriate location, by a legally authorized company representative. Erasures or other changes must be initialed by the person signing the bid. Bid prices shall be entered in spaces provided on the bid form. All unit prices and mathematical extensions and totals shall be indicated where required. In cases of errors in extensions or totals, the unit price will govern. PRE-BID MEETING A Pre-Bid Meeting will be held on Wednesday, November 11, 2026 at 2:00 pm at https://teams.microsoft.com/meet/26510134977297?p=Rym0aFK9Z2KPBNxfOl . All bidders are highly encouraged to attend the pre-bid meeting. COST OF PREPARING PROPOSAL The cost of developing and submitting the proposal is entirely the responsibility of the bidder. This includes costs to determine the nature of the engagement, preparation of the proposal, submitting the proposal, negotiating for the contract and other costs associated with this bid. ACKNOWLEDGEMENT OF ADDENDA Bidders are required to register for an account via the City’s e-Procurement Portal hosted by OpenGov. Once the bidder has completed registration, they will receive addenda notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any addenda at https://procurement.opengov.com/portal/lawrenceks . SUBMITTALS Bids, and modifications, therefore, must be submitted electronically via the City’s e-Procurement Portal https://procurement.opengov.com/portal/lawrenceks . Bidder's proposal must be received on Tuesday, November 24, 2026 by 3:30 pm . Late entries will not be accepted. Bidders must use the provided forms. Instructions for completing proposal forms are provided in the Bid Submission Requirements section. Any proposal that does not adhere to the requirements of each Proposal Form may receive a “0” score for the particular Proposal Form or the entire response may be deemed non-responsive and rejected. Blind proposal forms must not contain names nor other information that can be used to determine the Contractor’s identity (such as company names, personnel names, project names, client names, sub-contractor names, manufacturer or supplier names, product names, company logos, etc.) Bidders must not exceed the maximum page limits specified. The page limit applies to a single side of a page only (for example, ‘1 page’ implies a single side of a piece of paper on standard 8½”x11” page size and with a minimum font size of 11 or greater). GOOD STANDING REQUIREMENT No bid will be accepted from, nor a purchase order or contract awarded to, any person, firm or corporation that is in arrears or is in default to the City of Lawrence, Douglas County or the State of Kansas upon any debt of obligation or is a defaulter as surety or otherwise afore mentioned government entities. Debt or obligation may include, but is not limited to taxes, fees, fines and utility payments. Parties listed on the government-wide exclusions in the System for Award Management (SAM) are not allowed to bid or receive purchase orders. SAM Exclusions contains the names of parties debarred, suspended, or otherwise excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. The City will not award a solicitation to a vendor that has been federally debarred and is required to confirm they are not debarred on the solicitation signature sheet. Vendors must also enclose printed documentation from System for Award Management (SAM). COOPERATIVE CONTRACT PRICING The City of Lawrence is a member of Sourcewell, Omnia Partners, Choice Partners, Equalis, Greenbush, BuyBoard, TIPS-USA, PACE, KPN, MACPP, HGAC BUY, NCPA, 1GPA, NPPgov and GSA Advantage . The city is also eligible to receive pricing on State of Kansas contracts that are available to all political subdivisions. Vendors/Manufacturers who participate in more than one of these shall quote the lowest available contract cost. ALTERNATE BIDS (If Applicable) Each Bidder shall bid all alternates included in the form(s) provided except, should they desire not to bid an alternate, they may insert the words "no bid" in the space provided for prices for such alternate. However, when a Bidder writes "no bid" for one or more alternates, they thereby waive any claim to the contract award if that alternate (or those alternates) becomes the basis for determining the low bid and/or change contract award. If an alternate price called for involves no change in price, Bidder shall so indicate by writing the words "no change" in the space provided. If the space provided for an alternate price is left blank, the blank space shall mean no bid. All amounts shall be clearly marked to indicate whether Alternate Price is an "ADD" or a "DEDUCT" price from the BASE BID Price. If neither is indicated, then "ADD" shall be implied. PROPOSAL FORMAT Submission will consist of the following documents unless otherwise noted. Each document shall be uploaded into the specific area listed in the BID SUBMISSION REQUIREMENTS section of OpenGov. Failing to separate cost from the proposal could result in submittal not being considered. EVALUATION PROCESS After determining a technical proposal satisfies the mandatory requirements in the Request for Proposal, a comparative assessment of the proposal in relationship to the published evaluation criteria shall be made. The City reserves the right to consider historic information and fact, whether gained from the proposal, references, or any other source, in the evaluation of the proposals. Any, all or no bidders may be required to appear before the evaluation committee to explain the bidder's understanding and approach to the project and/or respond to questions concerning the proposal; or, the City may award without conducting negotiations, based on the initial proposal. The City reserves the right to request information from bidders as needed. If information is requested, the City is not required to request the information of all bidders. PRESENTATIONS The City may request bidders to provide a presentation of their Response, including their skills, experience, key attributes of personnel and/or demonstrate an understanding of the Service requirements. Notice of the presentation and an outline of expectations for the contents of the presentation will be provided to the relevant Respondents if required. CONTRACT TERM Three (3) years + Two (2) One-year options for renewal UNDERSTANDING THE TASK ORDER PROCESS AS AN ON-CALL VENDOR Successful bidders will be awarded an Indefinite Days Indefinite (IDIQ) Service Agreement that acts as a Master Contract. The Task Order process below is used when services are needed. City departments provide scope, location, timeline and other details when requesting a quote. Vendor provides itemized quote using service agreement rates. Department reviews quote, or quotes in cases where multiple bidders were awarded, and selects a vendor. Purchase Order (PO) or project-specific Contract is issued for work exceeding $10,000. Vendor sends itemized invoice upon work completion. City pays invoice by funds transfer (ACH/EFT) or Procurement Card (VISA) BID SUBMISSION REQUIREMENTS The Blind, Non-Blind and Fee Proposals are available as fillable documents. Failure to separate forms as required will result in a proposal being deemed non-responsive. EVALUATION OF SUBMITTALS The evaluation criteria below are not in any particular order, and are not exhaustive. Consultants are NOT allowed to re-create, re-format, or modify the templates (cannot alter font size, font type, font color; add colors, pictures, diagrams, etc.). Proposals that fail to meet the above formatting requirements may be removed from the evaluation process and given a score of zero. TERMS AND CONDITIONS AWARD Bids will be analyzed, and awards made to bidder(s) whose bid(s) are deemed Overall Best Value. Bids must be responsive, complying with in all material aspects of this solicitation. Bidders must also be responsible, having the experience, personnel, equipment, and finances to perform the requirements contained herein. The award shall be contract(s) whose documents will consist of the bid solicitation and any addenda, contractors’ proposal(s), and executed City of Lawrence agreement. No modifications to the City’s standard contract language shall be accepted. Federal policy and procedures shall prevail for purchases made with grant funding per City of Lawrence Purchasing Policy. Federally funded City projects will comply with Build America, Buy America requirements as described in 2 CFR Part 184. NOTICE OF AWARD The City of Lawrence shall issue a contract as its notification of award to successful bidders. LEGAL ACTION The parties agree that the appropriate venues for any legal actions arising out of this Agreement are the District Court of Douglas County, Kansas, or, if federal jurisdiction exists, the United States District Court for the District of Kansas. FORCE MAJEURE Neither party shall be deemed to be at default under this Agreement to the extent that any delay in performance results from any cause beyond its reasonable control and without its intentional act or negligence. INSPECTION AND ACCEPTANCE Inspection and acceptance will be at destination unless otherwise provided. Until delivery and acceptance and after rej

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Addendum 1 consists of the following: Preproposal Agenda Q&A received by deadline date Attendance List Revised Non Blind Proposal Forms (Bidders should submit the revised non-blind proposal forms with their bid response.) Updated Project Team Form - may be accompanied with up to 3 additional pages of information about the project team members listed. Addition of Grant Administration Experience Form Clarification and updates on the short listing of candidates and the interview process, format, and scoring under Evaluation Criteria section. Please use the See What Changed link to view all the changes made by this addendum Interviews may be conducted only if the evaluation committee determines additional information is necessary to distinguish among the highest-ranked firms. Interviews, if conducted, will be limited to the (3) three highest-ranked firms. The project manager shall attend the interview, and attendance by other key personnel identified in the proposal is strongly encouraged. The evaluation committee will evaluate both the written proposal and interview performance when making a final recommendation.

Public questions and answers
  • Will the City accept proposals addressing selected services within the Scope of Work?

    Proposals that don't address all the services listed within the scope will be deemed non-responsive for completeness, and disqualified.

  • 1) On page 18 of the RFQ in the scoring and evaluation section, item 1 Project Team indicates that “…highly responsive submissions will demonstrate the current workload and availability of the proposed team members, including sufficient capacity to support LWC’s anticipated projects throughout the contract term; distinguish the proposed individual’s qualifications, expertise, and experience from the overall firm’s experience; and demonstrate that proposed key personnel possess substantial and relevant airport experience applicable to the projects identified within the scope of this RFQ.” Where should proposers demonstrate the qualifications, experience, current workload, availability and capacity of the proposed team members, since there does not appear to be a dedicated section for this information in the PROPOSAL FORM – PROJECT TEAM? Should this information be included within the Project Team table?

    Proposers should provide the qualifications, relevant experience, current workload, availability, and capacity of proposed key personnel within the Project Team section of the response. Information may be included in the Project Team table and/or accompanying narrative, subject to the applicable submission requirements and page limits. Responses should distinguish individual qualifications and experience from the firm's overall experience.

  • 2) On page 22 of the RFQ in the scoring and evaluation section, item 6 is Grant Administration Experience. This is not referenced elsewhere in the document and a form is not provided for this. Is this required and will a form be provided?

    Proposers should address their grant administration experience within the applicable Non-Blind Proposal response. Responses should demonstrate relevant experience directly related to these services who will be working directly with the city regarding grant administration, including applicable federal and state funding programs, procurement and contracting compliance, reimbursement, reporting, amendments, closeout, and audit documentation, consistent with the evaluation criteria stated in the solicitation.

  • 3) Are the dates stated in the RFP for short list notification (November 27) and interviews (December 4) still correct?

    City staff are off November 27th as part of the Thanksgiving holiday observance. As such, notifications will go out on November 30th. All other dates are correct.

  • On page 8 of the RFP it is stated the firm selected will enter into an on-call engineering services agreement. Is this terminology correct or will it be an on-call planning services agreement?

    This contract will be for on-call planning services. The selected firm may be the same as the City's On-Call Engineering Consultant for the airport, however, this is a separate agreement specifically intended for on-call planning services at the airport.

  • Similar to the on-call engineering RFQ, are we able to add three pages for resumes?

    See Addendum 1

  • A fee proposal form is provided; however, the RFQ states on page 13, DO NOT SUBMIT A FEE PROPOSAL OR PRICING as part of your initial submission. Do we need to provide and upload a completed Fee Proposal Form for this submission?

    Submit Attachment A – Fee Schedule separately, uploaded to Section 3 of the Bid Submission requirements. The Fee Schedule should not be included with either the blind or non-blind forms

Plain text

OpenGov categories

  • 90606 · Airports (Lighting, Fueling, Navaids) - Architectural Services
  • 90657 · Land Development and Planning - Architectural
  • 90664 · Planning, Urban (Community, Regional, Area wide, and State)
  • 90666 · Planning, Site (Installation and Project)
  • 92508 · Airports (Lighting, Fueling, Navaids) - Engineering
  • 92517 · Civil Engineering
  • 92537 · Facilities Design Services, Engineering
  • 92549 · Highways; Streets; Airport Pay-Parking Lots - Engineering
  • 92561 · Land Development and Planning/Engineering
  • 92592 · Value Engineering and Value Analysis Services, Professional
  • 92593 · Traffic and Transportation Engineering
  • 96800 · Public Works And Related Services