Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

On-Call Structural and Seismic/Disaster Engineering Services

Description

The City of Seattle is seeking qualifications for On-Call Structural and Seismic/Disaster Engineering Services . Qualifications are due no later than 2:00 pm on Wednesday, December 2, 2026 . All questions are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than 5:00 pm on Wednesday, November 18, 2026 . The City of Seattle Finance and Administrative, Capital Development (FAS/CD) division owns and maintains a large portfolio of building across the City. There is a continuous need for facility assessments to ensure safety and functionality. FAS/CD is seeking two qualified professional firms for on-call structural engineering assessments, analysis, design, feasibility cost estimates and construction administration. Scope of Work Scope of Services Provide Structural Engineering consulting services in support of small to medium projects for Public Works, Job Order Contracting or Blanket Vendor projects will provide the following services including, but not limited to: Structural engineering studies that include monitoring, confidence testing, structural calculations, seismic evaluations, fall protection design and review. Reporting to provide options analysis, recommendations and rough order of magnitude estimates. Ability to act as a prime consultant on a project involving preparation of construction documents stamped by a licensed engineer, plan review, permitting, construction administration and inspections related to structural elements of new and existing City facilities requiring expert witness. The Services shall, at all times, be subject to the City's general review and approval. The Consultant shall confer with the City periodically during the progress of the Services and shall prepare and present such information and materials (e.g. detailed outline of completed Services) as requested by the City to determine the adequacy of the Services or the Consultant's progress. Assignment of Projects for Services At the sole discretion of the City, and subject to City approval, the Consultant may be asked to provide services and may be contacted to request a proposal for services. These services, if any, shall be negotiated between the Consultant and the City's assigned Project Manager on a case-by-case basis with the accepted negotiations for scope, fee and schedule itemized in and authorized only by Letter of Authorization (LOA) to this Agreement signed by the Director of the Capital Development (CD) Division. Any such Letter of Authorization shall clearly outline the negotiated scope of work, the timeline for completion, the cost of services based on the hourly rates and terms set forth in this Agreement, any access protocols for the City facility (if applicable), and the City's Project Manager assigned to that work. The City is under no obligation whatsoever to assign services to the Consultant. If the scope of work, schedule, and/or not-to-exceed amount authorized by the City are not acceptable to the Consultant, no Letter of Authorization will be executed, and the City may negotiate the scope of services with another Consultant. Additional Provisions CSI MasterFormat from 2010 to most recent Edition Any Construction Documents produced for FAS - Capital Development (CD) shall conform to Construction Specifications Institute (CSI) MasterFormat 2010 to most recent edition specifications. Additional information can be found at http://www.csinet.org . Computer Aided Design and Drafting (CAD) Standards The Consultant shall produce all electronic record documents according to the standards contained in EXHIBIT A: Computer-Aided Design and Drafting (CAD) Standards for Department of Finance and Administrative Services, revised 08/09/2025. City's Project Manager The City will assign specific project managers to individual scopes of work negotiated with the Consultant under this Agreement. Any such assignments and contact information will be identified in every Letter of Authorization written to assign services under this Agreement. The City reserves the right to change the Project Manager on any assignment and will notify the Consultant of any such change. The City's Project Manager is authorized to act on the City's behalf in connection with the administration of this Agreement. Unless otherwise noted or until directed by the City to the contrary, the Consultant shall be entitled to rely upon the authority of the Project Manager as the City's Representative. The Consultant shall cooperate and coordinate its work with the City's Project Manager(s) as necessary to assure timely preparation and or accomplishment of the Services, including but not limited to, progress payment reviews, cost estimates, schedule, cost, weekly meetings, change order analysis, permitting, and such other functions as the City may reasonably designate. Procurement Contact Information Procurement Contact: Rosanne (Roe) Pulalasi-Gonzales , Sr. Contracts Administrator , roe.pulalasi-gonzales@seattle.gov , (206) 386-4665 Qualifications are to be submitted through the e-Procurement portal at https://procurement.opengov.com/portal/seattle , no later than 2:00 pm on Wednesday, December 2, 2026 . Unless authorized by the Procurement Contact, no other City official or employee may speak for the City regarding this solicitation until award is complete. Any Respondent contacting other City officials or employees does so at Respondent’s own risk. The City is not bound by such information. Purpose and Background The purpose of this Solicitation is to establish one or more On-Call contracts to provide professional Structural and Seismic/Disaster Engineering On-Call Services in support of the FAS Capital Development (FAS CD) projects. The selected Consultant(s) shall furnish technical expertise on an as-needed basis to support projects during planning, design, procurement, and construction phases. FAS/CD is seeking two qualified professional firms for on-call structural engineering assessments. The City of Seattle Finance and Administrative, Capital Development (FAS/CD) division owns and maintains a large portfolio of building across the City. There is a continuous need for facility assessments to ensure safety and functionality. Delivery method may include Design-Bid-Build, Job Order Contracting (JOC), Small Works Roster (SWR) and other alternative project delivery approaches. The preferred Consultant Teams would have experience with structural engineering studies, option analysis, monitoring, recommendations, confidence testing, reporting, seismic evaluations, fall protection, plan review, preparation of construction documents stamped by a licensed engineer, permitting, ability to act as prime consultant on a project and manage construction administration and inspection as related to all structural elements of new and existing City facilities which require specialized structural expertise. Performance Schedule Capital Development would like to have a fully executed contract for on-call structural engineering services no later than December 15, 2026. The initial term of each contract shall be one year. The contract may be renewed annually for up to (4) four additional on-year term, for a total contract duration not to exceed (5) five years Each Letter of Authorization will define clear scope and associated schedule. The consultant(s) will coordinate with FAS Capital Development (FAS CD) Project Manager, as needed, during proposal development to confirm and align schedule expectations. Solicitation Objectives The objective of this solicitation is to establish (2) two structural engineering firms that are able to perform the duties defined in this solicitation immediately upon contract execution. This consultant pool will support FAS Capital Development Division projects by delivering timely, accurate, and coordinated services throughout the project lifecycle, ensuring alignment with project schedule, budgets, and constructability requirements. Minimum Qualifications Minimum qualifications are required for a Consultant to be eligible to submit a proposal response. Your submittal response must show compliance to these minimum qualifications. Those that are not responsive to these qualifications shall be rejected by the City without further consideration: Must be licensed and registered to practice engineering in Washington State and City of Seattle. Must have experience with current code compliance. Provide three (3) relevant projects within the last seven (7) years including experience with assessment of new and existing facilities. And one (1) reference from owners or contractors that worked with the consultant on the submitted relevant projects, for a total of three (3) references. Contract Modifications The City consultant contract is attached (See Attachments Section) Consultants submit proposals understanding all Contract terms and conditions are mandatory. Response submittal is agreement to the Contract without exception. The City reserves the right to negotiate changes to submitted proposals and to change the City's otherwise mandatory Contract form during negotiations. If the Consultant is awarded a contract and refuses to sign the attached Contract form, the City may reject the Consultant from this and future solicitations for the same work. Under no circumstances shall Consultant submit its own boilerplate of terms and conditions. Procedures and Requirements This section details City instructions and requirements for your submittal. The City reserves the right in its sole discretion to reject any Consultant response that fails to comply with the instructions. Registration into the City's Procurement Portal If you have not previously done so, register at: https://procurement.opengov.com/portal/seattle , then subscribe to the City’s Procurement Portal. The Procurement Portal is used by City staff to identify companies for future solicitation lists and check certifications. Women- and minority-owned firms are asked to self-identify their business as such in OpenGov. Registration in the City's Procurement Portal is required to submit a response to this solicitation. Pre-Submittal Conference The City offers an optional pre-submittal conference at the time, date and location on the Timeline, if applicable. Respondents are highly encouraged to attend but not required to attend to be eligible to submit their qualifications. The meeting answers questions about the solicitation and clarifies issues. This also allows Respondents to raise concerns. Failure to raise concerns over any issues at this opportunity will be a consideration in any protest filed regarding such items known as of this pre-submittal conference. Questions Respondents may submit their questions through the Procurement Portal. Respondents may also email questions to the Procurement Contact until the deadline stated in the Timeline. Failure to request clarification of any inadequacy, omission, or conflict will not relieve the Consultant of responsibilities under any subsequent contract. It is the responsibility of the interested Consultant to assure they receive responses to questions if any are issued. Changes to the RFQ The City may make changes to this RFQ if, in the sole judgment of the City, the change will not compromise the City’s objectives in this solicitation. Any change to this RFQ will be made by formal addendum issued by the City, through the Procurement Portal at https://procurement.opengov.com/portal/seattle and shall become part of this RFQ. Receiving Addenda and/or Question and Answers It is the obligation and responsibility of the Consultant to learn of addenda, responses, or notices issued by the City, through the Procurement Portal. Some third-party services independently post City of Seattle solicitations on their websites. The City does not guarantee that such services have accurately provided all the information published by the City. All submittals sent to the City may be considered compliant with or without specific confirmation from the Consultant that any and all addenda was received and incorporated into your response. However, the Project Manager reserves the right to reject any submittal that does not fully incorporate Addenda that is critical to the project. Qualifications Submittal Responses must be received by the City no later than the date and time in the Timeline, except as revised by Addenda. The submitter has full responsibility to ensure the response is submitted to the City's Procurement Portal within the deadline. The Procurement Portal will not allow vendors to upload submissions past the deadline. Respondent Responsibility to Provide Full Response It is the Respondent's responsibility to respond in a manner that does not require interpretation or clarification by the City. The Respondent is to provide all requested materials, forms and information. The Respondent is to ensure the materials are submitted properly and accurately reflect the Respondent’s qualifications. During scoring and evaluation (prior to interviews if any), the City will rely upon the submitted materials and shall not accept materials from the Respondent after the RFQ deadline; this does not limit the City’s right to consider additional information (such as references that are not provided by the Respondent but are known to the City, or past City experience with the consultant), or to seek clarifications as needed. Prohibited Contacts Respondents shall not interfere in any way to discourage other potential and/or prospective consultants from submitting or considering participation in the submittal process. Prohibited contacts includes but is not limited to any contact, whether direct or indirect (i.e. in writing, by phone, email or other, and by the Respondent or another person acting on behalf of the Respondent) to a likely firm or individual that may discourage or limit competition. If such activity is evidenced to the satisfaction and in sole discretion of the City department, the Respondent that initiates such contacts may be rejected from the process. License and Business Tax Requirements The Consultant must meet all applicable licensing requirements immediately after contract award or the City may reject the Consultant. Companies must license, report and pay revenue taxes for the Washington State business License (UBI#) and Seattle Business License, if required by law. Carefully consider those costs before submitting an offer, as the City will not separately pay or reimburse such costs. Seattle Business Licensing and associated taxes If you have a “physical nexus” in the city, you must obtain a Seattle Business license and pay all taxes due before the Contract can be signed. A “physical nexus” means you have physical presence, such as: a building/facility/employee(s) in Seattle, you make sales trips into Seattle, your own company drives into Seattle for product deliveries, and/or you conduct service work in Seattle (repair, installation, service, maintenance work, on-site consulting, etc). We provide a Consultant Questionnaire Form in our submittal package items later in this RFP/RFQ, and it will ask you to specify if you have “physical nexus”. All costs for any licenses, permits and Seattle Business License taxes owed shall be borne by the Consultant and not charged separately to the City. The apparent successful Consultant(s) must immediately obtain the license and ensure all City taxes are current, unless exempted by City Code due to reasons such as no physical nexus. Failure to do so will cause rejection of the submittal. The City of Seattle Application for a Business License and additional licensing information can be found this page here: https://www.seattle.gov/city-finance/business-taxes-and-licenses/business-licenses For Questions and Assistance, call the Revenue and Consumer Protection (RCP) office which issues business licenses and enforces licensing requirements. The general e-mail is tax@seattle.gov . The main phone is 206-684-8484. Self-Filing You can pay your license and taxes on-line https://www.filelocal-wa.gov/Default_FileLocal.aspx If a business has extraordinary balances due on their account that would cause undue hardship to the business, the business can contact the License and Tax Administration office at tax@seattle.gov or 206-684-8484 to request additional assistance. Those holding a City of Seattle Business license may be required to report and pay revenue taxes to the City. Such costs should be carefully considered by the Consultant prior to submitting your offer. When allowed by City ordinance, the City will have the right to retain amounts due at the conclusion of a contract by withholding from final invoice payments. State Business Licensing Before the contract is signed, you must have a State of Washington business license (a “Unified Business Identifier” known as a UBI#). If the State of Washington has exempted your business from State licensing (some foreign companies are exempt and sometimes, the State waives licensing because the company has no physical presence in the State), then submit proof of that exemption to the City. All costs for any licenses, permits and associated tax payments due to the State because of licensing shall be borne by the Consultant and not charged separately to the City. Instructions to apply for a business license can be found at https://dor.wa.gov/open-business/apply-business-license and the State of Washington Department of Revenue contact help page at https://dor.wa.gov/contact . Federal Excise Tax The City is exempt from Federal Excise Tax. No Guaranteed Utilization The City does not guarantee utilization of any contract(s) awarded through this RFQ process. The solicitation may provide estimates of utilization; such information is for Consultant convenience and not a usage guarantee. The City reserves the right to issue multiple or partial awards, and/or to order work based on City needs. The City may turn to other appropriate contract sources or supplemental contracts to obtain these same or similar services. The City may re-solicit for new additions to the Consultant pool. Use of such supplemental contracts does not limit the right of the City to terminate existing contracts for convenience or cause. Expansion Clause The contract limits expansion of scope and new work not expressly provided for within the RFQ. Expansion for New Work (work not specified within the original Scope of Work Section of this Agreement, and/or not specified in the original RFQ as intended work for the Agreement) must comply with the following: (a) New Work is not reasonable to solicit separately; (b) is for reasonable purpose; (c) was not reasonably known by the City or Consultant at time of solicitation or was mentioned as a possibility in the solicitation (i.e. future phases of work, or a change in law); (d) is not significant enough to be regarded as an independent body of work; (e) would not attract a different field of competition; and (f) does not change the identity or purpose of the Agreement. The City may make exceptions for immaterial changes, emergency or sole source conditions, or other situations required in City opinion. Certain changes are not subject to these limitations, such as additional phases of Work anticipated during solicitation, time extensions, and Work Orders issued on an On-Call contract. Expansion must be mutually agreed and issued by the City through written Addenda. New Work performed before an authorizing Amendment may not be eligible for payment. The City reserves the right to independently solicit and award any New Work to another firm when deemed appropriate or required by City policy. Effective Dates of Offer Solicitation responses are valid until the City completes award. Should any Respondent object to this condition, they must object prior to the Q&A deadline in the T

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum. Consultant Inclusion Plan in word doc available. Please refer to attachment and link above.

Public questions and answers
  • There are 3 items under the Minimum Qualifcations section, but they are number 1, 2 and 4. Is 3 missing or is four just mis-numbered?

    Updated. Please refer to Addendum #1

  • The hyperlink for this pdf on page 19 Consultant_Inclusion_Plan.pdf goes to a page with this error message: AccessDenied Request has expired 72000 2026-10-20T15:30:01Z 2026-10-20T21:41:07Z PVM5Z4AXNB4ZC0F9 g7v7JItN+ChVzKBrXAPWeduFTlyC0ZDCpyOApzWaRZRoKk5cN4QBGhKP37nLx0lkyv+g/mLHrzk= Please provide an active link.

    Updated. Please refer to Addendum #1

  • Under Section 3 on page 19, it states "...seven (10) pages" - please confirm if this should be "ten (10) pages" or "seven (7) pages".

    Updated. Please refer to Addendum #1

  • On page 3, section 2, Paragraph 3, the last sentence reads, "...ability to act as prime consultant on a project and manage construction administration and inspection as related to all structural elements of new and existing City facilities which require expert witness." Please explain the consultant's role pertaining the expert witness clause. Also, is there a current lawsuit that should be disclosed so we know if we have a conflict of interest?

    Refer to addendum 2 for appropriate changes to language. RE: lawsuits - To obtain information regarding any lawsuits that may create a conflict of interest, you may submit a public records request to the City.

  • Under Section 5, the list of qualifications requires the professional engineer to be licensed and registered in Washington. Under Section 6, the SOW directly references Structural Engineering. Is the engineer to be a Washington Licensed / Registered Structural Engineer, or is a Civil Engineer familiar with structural and seismic design acceptable?

    The engineer shall be a structural engineer licensed and registered in Washington State.

  • Scope of Work Section 6.1 indicates that firms must have the ability to provide rough order of magnitude cost estimates. Can the selected engage a third-party cost estimator to assist in this work or does the firm need the ability does provide this service in house?

    The purpose is to provide a high-level understanding of costs associated with structural scopes to facilitate informed decisions. Rough order of magnitude (ROM) cost estimates are intended for planning purposes only and should not be considered detailed cost estimates of the proposed work. Firms may still elect to engage third parties for specialized assistance as needed.

  • Section 5 (Minimum Qualifications) requires that interested firms provide (3) relevant projects involving the assessment of new and existing facilities within the previous 7 year period. Can the period be extended to include experience older then 7 years?

    Minimum Qualifications conditions will remain as is. Firms are to provide (3) relevant projects involving the assessment of new and existing facilities within the previous 7-year period.

  • Page 19 of the RFQ states, "3. Statement of Qualifications - The Statement Of Qualifications (SOQ) shall not exceed ten (10) pages, excluding the cover page, resumes, and required forms. Will you be adding a section in the Draft Response area for the resumes?

    Resume's should be included in the main SOQ attachment and will not count against the 10-page limit.

  • Evaluation criterion #4 (Past Performance) and Minimum Qualification #3 both request three past projects. Should the full Past Performance information (scope, client, team, timeline and budget, challenges, outcomes, and references) be included within the 10-page Statement of Qualifications, or will evaluators score Past Performance from the Minimum Qualifications (#3) section?

    The minimum qualifications and evaluation criteria are effectively the same in this context. The Statement of Qualifications (SOQ) must clearly demonstrate compliance with the minimum qualification requirements. SOQ's that do not adequately address or meet these minimum qualifications will be deemed non-responsive and will not advance further to Evaluation Review.

  • "Firms should organize their SOQ using section headings in this RFQ." When referring to the section headings, should firms use the headings on pages 18 - 19 (Letter of Interest, Proof of Legal Name, Statement of qualifications, etc.), or use the section headers under the evaluation criteria (Relevant & Technical Experience, Approach & Methodology, Inclusion Plan)?

    Please refer to the section headers under the evaluation criteria (Relevant & Technical Experience, Approach & Methodology, Inclusion Plan)

Plain text

OpenGov categories

  • 54131 · Architectural Services
  • 541310 · Architectural Services
  • 54133 · Engineering Services
  • 541330 · Engineering Services
  • 54135 · Building Inspection Services
  • 541350 · Building Inspection Services