State and local · OpenGov
On- Call Utility Civil Construction Services
Description
Alameda Municipal Power (AMP) is soliciting bids from qualified California Class A General Engineering Contractors to provide on-call utility civil construction services throughout AMP's service territory. AMP intends to award contracts to up to two (2) contractors for a two-year te rm; AMP will award greater or fewer contracts at AMP's discretion as described in Section 3.4 through 3.7. Services may include excavation, trenching, underground conduit and substructure installation and replacement, utility box and vault repairs, transformer equipment pads, backfilling, concrete and asphalt restoration, traffic control, and related civil construction activities. Work will be assigned on an as-needed basis through individual Work Authorizations, with no guaranteed minimum volume of work. AMP seeks experienced contractors capable of delivering safe, reliable, responsive, and high-quality construction services to support ongoing maintenance, infrastructure replacement, and electric system improvements. SCOPE OF WORK Scope of Work 1.1 General The Work consists of on-call civil construction for AMP's electric distribution system during the two-year Contract term. The Contractor shall furnish qualified and competent labor and all required PPE, certifications, supervision, tools, equipment, transportation, and incidental services. Individual assignments may include surface restoration; potholing; excavation, trenching, backfill, and compaction; installation, repair, and replacement of underground electric and fiber conduits and conduit risers; concrete equipment pads, foundations, and protective bollards; installation and replacement of underground utility boxes and vaults; replacement of traffic-rated utility lids and covers; electric customer services; small system extensions; and other modifications to existing underground utility facilities. AMP will provide a written description, sketch, drawing, service order, or other task-specific direction identifying the desired Work. Before construction, the Contractor shall submit a written estimate identifying the scope, quantities, applicable Bid Item numbers, and total estimated price. Work shall not begin until AMP provides written authorization. Additions, deletions, or changes to authorized Work shall require written authorization in accordance with the Contract Documents. Contractor shall meet with the AMP Project Manager, Engineer, Inspector, Operations representative, or designee before commencing Work when directed. Contractor shall prepare and submit daily reports and supporting documentation in accordance with Section 3.2, Daily Reports and Supporting Documentation. At completion of each assignment, Contractor shall restore affected areas to the satisfaction of AMP and applicable City requirements. At the end of each assignment, Contractor shall provide a cost worksheet comparing estimated and actual quantities/costs by Bid Item and explain significant overruns or underruns when requested. Contractor shall obtain AMP approval before subcontracting Work not identified in its Bid or otherwise requiring approval under the Contract Documents. Contractor shall identify equipment owned versus rented and shall maintain adequate access to crews, equipment, and staging/laydown resources to support the Work. 1.2 Utility Excavation, Trenching, and Boring Saw cutting, demolition, open-cut excavation, trenching, potholing, boring, directional drilling when authorized, shoring, shielding, benching, dewatering, backfill, and compaction. Protection and support of existing underground and overhead utilities and other improvements. Placement of bedding, aggregate base, slurry/controlled low-strength material (CLSM), and other specified backfill. Hauling and lawful disposal of excavated material and construction debris. 1.3 Electric Utility Substructures Installation of conduit systems, sweeps, stub-ups, sleeves, penetrations, spacers, warning tape, markers, and related appurtenances. Concrete-encased duct banks. Pull boxes, splice boxes, vaults, transformer vaults, and related precast or cast-in-place structures. Removal, installation, and replacement of underground utility boxes, pull boxes, AMP-furnished specialty vaults, and similar substructures, including excavation, temporary support, backfill, compaction, and restoration, as authorized by AMP. Contractor shall furnish only those non-specialty boxes or components expressly assigned to Contractor in the Task Order. Removal, installation, and replacement of AMP-furnished specialty traffic-rated/custom utility lids, covers, frames, and related components, as authorized by AMP. Contractor shall not include their purchase cost. Investigation and assessment of damaged, obstructed, or deteriorated underground electric and fiber conduit systems. Repair, replacement, extension, and rerouting of underground electric and fiber conduits, including associated conduit risers. Conduit rodding, roping, proofing, and verification of conduit condition and accessibility, as authorized by AMP. Civil portions of grounding systems and equipment interfaces. Core drilling, concrete sawing, grouting, and conduit intercept support when specifically authorized. 1.4 Equipment Pads and Foundations Concrete pads and foundations for pad-mounted transformers, switchgear, sectionalizing equipment, capacitor banks, metering/service equipment, communications/control cabinets, EV charging infrastructure, substation auxiliary equipment, and similar AMP facilities. Excavation, aggregate base, formwork, reinforcing steel, concrete, anchor bolts, embeds, sleeves, conduit penetrations, grounding provisions, bollards, and equipment access improvements. 1.5 Surface Restoration Asphalt concrete and concrete pavement restoration. Portland cement concrete sidewalks, curbs, gutters, driveway approaches, and accessible pedestrian improvements where required. Temporary paving, trench plates, and interim restoration. Landscape or miscellaneous surface restoration when included in an assignment. Temporary restoration shall be kept safe, stable, accessible, and serviceable until permanent restoration is accepted. Unless a shorter deadline is required by permit, City standard, or Task Order, permanent restoration shall be completed within ten (10) business days following temporary restoration, subject to AMP-approved written extensions for weather, permit restrictions, material or plant availability, inspections, or other documented conditions beyond Contractor control. Contractor shall promptly notify AMP of any anticipated delay and maintain temporary surfaces throughout the extension. 1.6 Traffic and Pedestrian Control Contractor shall provide traffic and pedestrian control necessary for safe performance of the Work, including plans when required, signs, barricades, cones, delineators, flagging, arrow/message boards, temporary barriers, accessible pedestrian detours, and maintenance of access to residences and businesses. Traffic control plans shall be submitted for City NOTICE INVITING BIDS Bid Submission Alameda Municipal Power (“AMP”), a department of the City of Alameda (“City”), acting by and through the City’s Public Utilities Board (“PUB”), will accept electronically submitted bids for its On-Call Utility Civil Construction Services Project (“Project”), by or before Thursday, December 17, 2026 at 1:00 pm , via OpenGov Procurement, at: https://procurement.opengov.com/portal/alamedaca/projects/324387 (“Bid Portal”). Bids that are not submitted by a registered vendor via the Bid Portal will not be accepted. Project Information Location and Description. The Project is located at Alameda, California . The Scope of Work contains the full description of the Work. Time for Final Completion . Contract duration to be two (2) years but actual projects are as-needed basis based on task orders. AMP anticipates that the Work will begin on or about mid to late March 2027, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Anticipated Contract Velue. AMP anticipates awarding up to two (2) on-call contracts for a two-year term, with a maximum combined not-to-exceed amount of $1,000,000 across both contracts. This amount represents the total funding ceiling for both contractors combined, not $1,000,000 per contractor. No minimum amount of work or expenditure is guaranteed, and AMP is not obligated to distribute work equally between contractors. Actual Task Orders will be issued based on AMP's needs and available funding. License and Registration Requirements License. This Project requires a valid California contractor’s license for the following classification(s): A - General Engineering Contractor DIR Registration. AMP may not accept a bid from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (“DIR”) to perform public work pursuant to Labor Code section 1725.5, subject to limited legal exceptions. Contract Documents The plans, specifications, bid forms and contract documents for the Project, and any addenda thereto (“Contract Documents”) are available for viewing or download free of charge solely via the Bid Portal, as specified above. Bid Security Each bidder must submit bid security equal to ten percent of the maximum bid amount, in the form of cash; a cashier’s or certified check made payable to Alameda Municipal Power; or a bid bond using the Bid Bond form included with the Contract Documents, and executed by a surety licensed to do business in the State of California. The bid security must guarantee that within fourteen days after AMP issues the Notice of Intent to Award, the successful bidder will execute the Contract and submit the insurance certificates and endorsements, valid Certificates of Reported Compliance as required under the California Air Resources Board’s In-Use Off-Road Diesel-Fueled Fleets Regulation (13 CCR § 2449 ed seq.) (“Off-Road Regulation”), if applicable and any other submittals required by the Contract Documents and as specified in the Notice of Intend to Award. Original Payment Bond and Performance Bond can be provided after the City awards and executes the Contract, however, work cannot start until these bonds are approved by the City Attorney’s Office. Prevailing Wage Requirements General. Pursuant to California Labor Code section 1720 et seq., and Alameda Municipal Code section 2-67, this Project is subject to the prevailing wage requirements applicable to the locality in which the Work is to be performed for each craft, classification or type of worker needed to perform the Work, including employer payments for health and welfare, pension, vacation, apprenticeship and similar purposes. Rates. These prevailing rates are on file with AMP and are available online at http://www.dir.ca.gov/DLSR . Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. Compliance. The Contract will be subject to compliance monitoring and enforcement by the DIR, under Labor Code section 1771.4. Performance and Payment Bonds The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. Even though no minimum amount of work or expenditure is guaranteed, and also AMP is not obligated to distribute work equally between contractors, both bonds are required based on final Not-to-exceed amount of the master agreement. Substitution of Securities Substitution of appropriate securities in lieu of retention amounts from progress payments is permitted under Public Contract Code section 22300. Subcontractor List Each Subcontractor must be registered with the DIR to perform work on public projects. Each bidder must submit a completed Subcontractor List form with its bid, including the name, location of the place of business, California contractor license number, DIR registration number, and percentage of the Work to be performed (based on the base bid price) for each Subcontractor that will perform Work or service or fabricate or install Work for the prime contractor in excess of one-half of 1% of the bid price, using the Subcontractor List form included with the Vendor Questionnaire. The Subcontractor List form must be uploaded electronically in PDF format via the Bid Portal. Instructions to Bidders All bidders should carefully review the Instructions to Bidders for more detailed information before submitting a bid. The definitions provided in the "Definitions" section of the General Conditions apply to all of the Contract Documents, as defined therein, including this Notice Inviting Bids. Retention Percentage. The percentage of retention that will be withheld from each awarded final Task Order is five (5) percent. Pre-Bid Conference A pre-bid conference will be held on Thursday, November 19, 2026 at 11:00 am (Pacific Standard Time), at the following virtual location: Microsoft Teams meeting Join: https://teams.microsoft.com/meet/284423753028374?p=xfdB6zkxqjXIpGAFyC Meeting ID: 284 423 753 028 374 Passcode: Wi7nZ6Wp INSTRUCTIONS TO BIDDERS Each bid submitted to Alameda Municipal Power (“AMP”), a department of the City of Alameda (“City”), acting by and through the City’s Public Utilities Board, for AMP’s On-Call Utility Civil Construction Services Project (“Project”) must be submitted in accordance with the following instructions and requirements: Please note that all times are in Pacific Standard Time. Bid Submission Each bid must be fully completed as directed and submitted via OpenGov Procurement, at https://procurement.opengov.com/portal/alamedaca/projects/324387 (“Bid Portal”), by or before the date and time set forth in "Bid Submission" of the Notice Inviting Bids, or as amended by subsequent addendum (“Bid Deadline”). Each bidder must be registered to submit bids to AMP via the Bid Portal. AMP will not consider bids that are not submitted via the Bid Portal. The Bid Portal will be closed to bidding after the Bid Deadline, and late submittals will not be accepted. For additional information on using the Bid Portal, please visit the OpenGov Help Center at https://opengov.my.site.com/support/s/ . General. The bids will not be read aloud in public, but bidders will be able to access and view the bid results via the Bid Portal after the Bid Deadline. AMP reserves the right to postpone the date or time of the Bid Deadline by addenda. Each bidder is solely responsible for all of its costs to prepare and submit its bid and by submitting a bid waives any right to recover those costs from AMP or the City. The bid price(s) must include all costs to perform the Work as specified, including all labor, material, supplies, and equipment and all other direct or indirect costs such as applicable taxes, insurance and overhead. DIR Registration. Subject to limited legal exceptions for joint venture bids and federally-funded projects, AMP may not accept a bid from a bidder without proof that the bidder is registered with the DIR to perform public work under Labor Code section 1725.5. If AMP is unable to confirm that the bidder is currently registered with the DIR, AMP may disqualify the bidder. (Labor Code sections 1725.5 and 1771.1(a).) Bid Submittals All bid submittals listed below must be submitted by or before the Bid Deadline. With the exception of bid security, which must also be physically submitted as specified in Section 2.4 below, the bid submittals must be uploaded electronically in PDF format via the Bid Portal: Sample Agreement CS 11-26-04. Redline is optional. Bidder Qualifications and References. A completed and executed Bidder’s Questionnaire, using the form included with the Contract Documents and including any required attachments; Non-Collusion Declaration. A completed and executed Non-Collusion Declaration using the form included with the Contract Documents; Subcontractor List. A completed and executed Subcontractor List using the form included with the Contract Documents; Bid security. Bid security, submitted electronically or physically as specified in Section 2.4 below; and Additional Submittals. In addition, each bidder must submit the following: IRS Signed W-9 Local Business Declaration (optional) Authorization and Execution All bids are deemed executed and binding against the bidder when submitted pursuant to an electronic login authorization by a vendor registered to submit bids to the AMP via the Bid Portal. Bid Security Each bid must be guaranteed by bid security of ten percent of the maximum bid amount, in the form of cash; cashier’s or certified check made payable to Alameda Municipal Power; or bid bond using the form included in the Contract Documents and executed by a surety licensed to do business in the State of California. Bid Guarantee. The bid security must guarantee for a period of 90 days following the Bid Deadline, that within 14 days after AMP issues the Notice of Intent to Award, the successful bidder will execute and return the Contract using the form provided with the Contract Documents, the insurance certificates and endorsements, and submit valid Certificates of Reported Compliance as required by the Off-Road Regulation, if applicable and any other submittals required by the Contract Documents, as may be further specified in the Notice of Intent to Award. Payment and Performance bonds for 100% of the maximum Contract Price can be provided after the City awards and executes the Contract; however, work cannot start until these bonds are approved by the City Attorney’s Office. Form of Security and Submission. Bid security in the form of cash, cashier’s or certified check, must be physically received by AMP by or before the Bid Deadline at AMP’s business office at 2000 Grand Street, Alameda, CA, 94501. The bid security must be delivered in a sealed envelope, addressed to the attention of the Utility Procurement Administrator, and clearly labeled with the bidder’s legal name and address, the Project title, Invitation Number, and date and time of the Bid Deadline. While cash security is permitted, it is not encouraged, and cash security in lieu of a bid bond, cashier’s check, or certified check is submitted at the bidder’s sole risk. If a digital copy of a Bid Bond is submitted electronically in the Bid Portal, a wet-inked original bid bond will not be required to be physically received by AMP by or before the Bid Deadline. Subcontractor Listing Requirements Pursuant to Public Contract Code section 4104, for each Subcontractor that will perform a portion of the Work in an amount in excess of one-half of 1% of the bidder’s total Contract Price (or for any subcontract of $10,000 or more, if this Project is for street or highway construction), the bidder must provide the information listed below with its bid via the Bid Portal, in addition to its submission of a Subcontractor List form pursuant to Section "Bid Submittals", above. If the Subcontractor exists in the Bid Portal, Contractor must confirm the accuracy of the following information and edit, if necessary, to reflect accurate information. If the Subcontractor does not exist in the Bid Portal, Contractor will need to create a new profile for the Subcontractor. A description of the Work to be performed by the Subcontractor; The Subcontractor’s name; The Subcontractor’s California contractor license number; The location of the Subcontractor’s place of business; and The Subcontractor&
Published attachments
Addenda and notices
Official Notice #1: Optional Pre-Bid Meeting tomorrow · 1
Friendly reminder of upcoming pre-bid meeting: 11:00am PST, November 19, 2026 This is optional and virtual via MS Teams. Link is provided under the Timeline of Overview in this IFB. We look forward to meeting any interested prospective bidders then.
Official Notice #2: Attendance Sheet of Optional PreBid Meeting · 2
OpenGov categories
- 237130 · Power and Communication Line and Related Structures Construction