Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Oracle E-Business Suite (EBS) Current-State (As-Is) Assessment and Oracle Fusion Cloud Future-State (To-Be) Design

Description

The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Oracle E-Business Suite (EBS) Current-State (As-Is) Assessment and Oracle Fusion Cloud Future-State (To-Be) Design . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Friday, December 11, 2026 . Late responses will not be accepted. Project work includes documenting how WSSC Water operates today, defining what WSSC Water needs, determining how those needs fit Oracle Fusion Cloud standard capabilities, and designing optimized future-state processes. Its deliverables will establish the current-state baseline, requirements, and future-state design, which will be used directly during the Program's design, configuration, and implementation phases. The awardee of this Oracle EBS Current-State (As-Is) Assessment and Oracle Fusion Cloud Future-State (To-Be) Design contract, and its teaming partners (subcontractors, joint ventures, or other entities named in the awardee's proposal or performing work under the contract), may participate in a future Program Management and Organizational Change Management solicitation; however, will not be able to participate as a prime or subcontractor in a future System Integrator solicitation. SCOPE OF WORK Introduction WSSC Water is replacing its on-premises Oracle E-Business Suite (EBS) with Oracle Fusion Cloud ERP, Supply Chain and Inventory, Procurement, and Human Capital Management (HCM), Enterprise Performance Management (EPM) delivered as Software as a Service (SaaS). The ERP Modernization Program will redesign business processes, consolidate systems, retire customizations, and modernize how Finance, Procurement, Human Resources, General Services, and Information Technology work. WSSC Water's Finance, Procurement, and Human Resources processes run mostly in EBS and partly outside it, in standalone and third-party applications, spreadsheets, databases, shared files, mobile and handheld tools, and manual or paper-based steps. Both must be understood before the new platform is designed, so that work now performed outside EBS can be consolidated into Oracle Fusion Cloud wherever practical. This Scope of Work defines the services required to document how WSSC Water operates today, define what WSSC Water needs, determine how those needs fit Oracle Fusion Cloud standard capabilities, and design optimized future-state processes. Its deliverables will establish the current-state baseline, requirements, and future-state design that will be used directly in the design, configuration, and implementation phases of the Program. Mobile access for employees, managers, and field and shift workers is a WSSC Water requirement and shall be addressed throughout the current-state assessment, requirements, Fit-Gap analysis, and future-state design. Roles and Responsibilities WSSC Water Responsibilities Assign a Project Sponsor with authority to approve deliverables and a Commission Project Manager as the single point of contact, who coordinates internal activities, routes deliverables, and consolidates comments. Designate process owners, business owners of systems outside EBS, data owners, and SMEs for each module and department, and make them available for scheduled workshops, interviews, and validation sessions. Provide read-only access to EBS test and production environments as needed, a list of known systems and tools used outside EBS, and existing documentation, reports, logs, and data extracts. Provide participation from IT, Cyber Security, Internal Audit, Human Resources, Finance, and Labor Relations as needed. Review deliverables within the agreed review period and make decisions on dispositions, additional capabilities, exceptions, and design choices. Vendor Responsibilities Project Management: Assign a dedicated Project Manager as primary point of contact. Develop and maintain the project plan, schedule, and work breakdown structure; facilitate weekly status meetings and provide written status reports; track risks, issues, and dependencies and escalate as needed; and maintain project documentation with version control. Functional and Technical Expertise: Provide experienced functional leads with deep knowledge of Oracle EBS and Oracle Fusion Cloud Financials, Procurement, Supply Chain, HCM, EPM, and Payroll, and technical staff to analyze integrations, data structures, and customizations. Maintain continuity of assigned personnel. Workshop Facilitation: Plan, schedule, and lead all As-Is, requirements, Fit-Gap, and To-Be workshops; prepare agendas, materials, and pre-work; capture notes, decisions, and action items; and keep workshops focused and productive. Process Documentation: Document As-Is and To-Be processes in BPMN 2.0; identify pain points, risks, and improvement opportunities; and maintain consistency and quality across all documentation. Deliverable Development: Produce all required deliverables , complete and accurate; perform internal quality review before submission; and present findings and recommendations to leadership. Collaboration and Communication: Maintain open communication with the Commission Project Manager and SMEs, respond to inquiries promptly, raise items needing a WSSC Water decision with context and a recommended course of action, and report findings candidly, including adverse findings about current processes or Oracle Fusion Cloud gaps. Experience must be shown in resumes by project, platform, and role. Each Functional Lead and Technical Architect shall hold the active Oracle certification(s) for each module or area they support, and shall provide a copy of each certification or its verification credential with the resume. Any replacement of key personnel shall hold the same required certifications. Deliverables Task ID Deliverable Description Acceptance Criteria 1 D-01 Project Plan and Schedule Milestones, schedule, workshop calendar, communication approach, and risk, issue, and decision log. Approved by the Commission Project Manager. 1 D-02 Deliverable Expectations Documents Outline, format, level of detail, reviewers, and acceptance criteria for each deliverable. Approved by the Commission Project Manager before each deliverable starts. 2 D-03 EBS As-Is Process Documentation BPMN Level 1–3 (Level 4 where needed) maps and narratives for all in-scope EBS processes, with participants, systems, approvals, controls, volumes, cycle times, access methods, and pain points. Written confirmation of accuracy from each process owner. 2 D-04 Pain Point and Opportunity Register Prioritized issues and improvement opportunities linked to processes, quantified where possible, with baseline performance measures. Accepted by the Commission Project Manager and department leads. 3 D-05 Inventory of Processes and Systems Outside EBS Each system, tool, mobile or handheld device, and manual process with purpose, owner, users, data, volumes, EBS touchpoints, controls, and known costs. Written confirmation from each business owner. 3 D-06 Process Documentation Outside EBS and Preliminary Consolidation Assessment BPMN documentation linked to EBS processes, and a preliminary disposition for each system or tool with rationale. Accepted by the Commission Project Manager and department leads. 4 D-07 Application and Technical Architecture Baseline EBS footprint, environments, database, middleware, hosting, disaster recovery, and batch scheduling. Reconciled to system data; accepted by WSSC Water IT. 4 D-08 Customization (RICEFW) Inventory All custom objects with purpose, usage, complexity, criticality, and preliminary disposition. Reconciled to system object lists; accepted by WSSC Water IT. 4 D-09 Integration Inventory All current interfaces with source, target, direction, method, frequency, volume, owner, and criticality. Accepted by WSSC Water IT. 4 D-10 Reporting Inventory Reports by department and module, including spreadsheet and ancillary reporting, with usage. Accepted by department leads and WSSC Water IT. 4 D-11 Data Landscape and Data Quality Assessment Data domains, volumes, quality findings, cleansing needs, and retention and archival requirements. Accepted by WSSC Water IT and data owners. 4 D-12 Controls, Security, and Compliance Baseline Security responsibilities, SoD conflicts, control inventory, audit findings, and regulatory obligations. Accepted by WSSC Water Cyber Security and Internal Audit. 4 D-13 Current-State Cost Baseline Annual cost of the current EBS environment. Accepted by Finance and WSSC Water IT. 5 D-14 Requirements Management Plan and Elicitation Log Approach, templates, prioritization, approval workflow, change control; workshop schedule, participants, decisions, and open items. Approved by the Commission Project Manager. 5 D-15 Requirements Matrix and RTM Prioritized, testable business, functional, reporting, integration, data, mobile, and controls requirements by department, with traceability. Every requirement has an ID, owner, priority, and source; each department approves its requirements in writing. 5 D-16 Technical and Security Requirements Technical, cloud, security, identity and access, integration, environment, performance, and availability requirements developed with WSSC Water IT. Accepted by WSSC Water IT and Cyber Security. 5 D-17 Regulatory and Compliance Requirements Matrix Applicable laws, standards, policies, and collective bargaining provisions mapped to requirements. Accepted by Finance, Human Resources, Procurement, and Internal Audit. 6 D-18 Oracle Fusion Cloud Capabilities Review and Fit-Gap Analysis Report Disposition for every requirement and custom object, impacts, exceptions, items requiring validation during implementation, and the Oracle Fusion Cloud release reviewed. Approved by the Project Sponsor and department leads. 7 D-19 Future-State Vision and Design Principles Vision, principles, and design decisions endorsed by leadership. Approved by the Project Sponsor. 7 D-20 To-Be Process Documentation BPMN Level 1–3 (Level 4 where needed) future-state processes with roles, approval workflows, controls, mobile steps, and target performance measures. Written approval from each process owner; traces to the RTM. 7 D-21 Target Operating Model Service delivery model, roles, governance, staffing implications, support model, CoE, and quarterly release management. Accepted by the Project Sponsor, Human Resources, and WSSC Water IT. 7 D-22 Security, Controls, and Approval Workflow Design Control objectives, role-based security, SoD principles, approval hierarchies, delegation rules, and audit readiness. Accepted by department leads, Cyber Security, and Internal Audit. 8 D-23 Additional Capability Assessment Assessment and recommendation for any additional capability in Task 8. Accepted by the Project Sponsor; WSSC Water decisions recorded. 9 D-24 Consolidation and Migration Readiness Recommendations Final consolidation dispositions; conceptual target architecture; data migration and archival strategy; future-state integration list; reporting disposition; role-mapping guidance; final customization dispositions; sequencing inputs. Accepted by the Project Sponsor and WSSC Water IT. 9 D-25 Benefits and Cost Identification Benefit drivers, baselines, estimates, owners, and measurement approach. Accepted by the Project Sponsor and Finance. 7 D-26 Role Change Impact Assessment Changes to roles, responsibilities, and work practices by department, role, and location with severity; working-condition changes for Labor Relations; communication and training considerations. Accepted by Human Resources and the Project Sponsor. 10 D-27 Final Report, Executive Summary, and Presentation Consolidated findings and recommendations, executive summary, and leadership presentation. P Deliverable Acceptance Criteria Acceptance Criteria All documentation is delivered in agreed formats Stakeholders validate As-Is and To-Be processes and approve them Fit-Gap analysis is approved Future design approved Final presentation is delivered Acceptance does not relieve the Contractor of responsibility to correct material errors discovered within ninety (90) days after final sign-off, at no cost to WSSC Water. Assumptions Oracle Fusion Cloud ERP, EPM, Supply Chain, and HCM is the target platform. WSSC Water SMEs will be available for scheduled workshops and reviews. The Vendor will have read-only access to necessary EBS environments and to systems outside EBS. Existing documentation will be provided at the start of the project; the information in Attachment A is accurate to the best of WSSC Water's knowledge. Work is performed remotely and on-site at 14501 Sweitzer Lane, Laurel, Maryland 20707. On-site presence is required for discovery and design workshops, validation sessions, and the final presentation. Scope changes require a written change order. Out of Scope Oracle Fusion Cloud subscriptions, licensing, configuration, extension development, environment provisioning, custom mobile application development, or mobile device procurement. Demonstrations or validation of Oracle Fusion Cloud in a configured environment. Data migration execution, data cleansing execution, and integration development. Testing or training execution. Redesign or replacement of connected operational systems (EAM, CIS, GIS) beyond their interfaces. Decommissioning of EBS or of any system outside EBS. Communications or negotiations with employee representatives, and legal advice. Implementation of any recommendation. Contract Term and Indicative Schedule The work shall be completed within a tentative one hundred eighty (180) days from project kick-off, subject to modification with WSSC Water's written approval. The timing below is indicative; the Offeror shall propose a detailed schedule. Tasks Milestones Indicative Timing from project kick-off 1 Project initiation Weeks 1–3 2, 3, 4 As-Is assessment, processes and systems outside EBS, technical inventory Weeks 3–12 5 Requirements definition Weeks 9–15 6, 8 Oracle Fusion Cloud Capabilities review, Fit-Gap, and additional capabilities Weeks 13–19 7, 9 Future State Designed: To-Be, role change impact, and consolidation and migration readiness Weeks 17–24 10 Final report, presentation, and knowledge transfer Weeks 24–26 Project Objectives D ocument the Current State: Produce a validated, fact-based record of EBS business processes, workflows, system interactions, approval hierarchies, controls, data dependencies, pain points, and manual workarounds for each in-scope department. Document Processes Outside EBS: Identify and document Finance, Procurement, General Services and HR processes and systems that operate outside EBS, and assess each for consolidation into Oracle Fusion Cloud. Inventory the Technical Environment: Catalog EBS customizations, interfaces, reports, data, security roles, and technical architecture, reconciled to system-generated data. Identify Gaps and Improvement Opportunities: Identify bottlenecks, redundant steps, outdated practices, heavy reliance on customization or manual intervention, and risks to compliance, auditability, data quality, and operational continuity. Define Requirements: Establish a complete, prioritized, and testable set of business, functional, technical, security, mobile, and regulatory requirements, traceable to processes and pain points. Assess Fit to Oracle Fusion Cloud: Determine where WSSC Water processes align with Oracle Fusion Cloud standard capabilities, where processes must change, and where customizations must be retired, replaced, or re-engineered. Assess Additional Capabilities: Determine which Oracle Fusion Cloud capabilities not currently in production WSSC Water should adopt to support future-state processes, regulatory requirements, operational efficiency, and integration with asset management and financial operations. Design the Future State: Design simplified, standardized processes, roles, approval workflows, data governance practices, and controls based on Oracle Fusion Cloud standard capabilities, water-utility practice, and public-sector requirements, including mobile access for employees, managers, and field and shift workers, without replicating current EBS processes or customizations. Prepare for Migration: Recommend how data, integrations, reports, security roles, customizations, and systems outside EBS should be handled in the implementation. Identify Change Impacts: Identify how roles, responsibilities, and work practices will change Enable Informed Decisions: Give leadership the documentation, analysis, and future-state vision needed to decide scope, sequencing, resourcing, and implementation approach. Guiding Principles Future-State Design Principles Adopt standard Oracle Fusion Cloud capability before customizing ("adopt, don't adapt"). Any extension requires a documented business justification. Simplify and standardize processes across WSSC Water wherever practical. Embed controls, security, segregation of duties (SoD), and auditability in the design. Establish a single source of truth for each data domain, with named data owners. Enable self-service, mobile access, automation, and real-time analytics. Design for quarterly SaaS release adoption and sustainable operations. Do not replicate current EBS processes or customizations in the future state (a "lift and shift" approach). Standard Functionality Alignment and Exception Process Standard capability is the default. Where standard capability, configuration, or a process change can meet a requirement, including one now met outside EBS, the Vendor shall recommend that approach. The Vendor shall base each Fit-Gap disposition on current Oracle documentation and release information. Any recommended extension, custom integration, or other departure from standard capability shall be documented with the business need, the standard alternative considered, why that alternative is insufficient, and the long-term support and quarterly release testing impact. No departure from standard capability shall be included in the approved future-state design without written approval from WSSC Water. Stakeholder Departments and In-Scope Domains Primary Stakeholder Departments Each department head (or a written delegate with equivalent authority) will designate process owners and subject matter experts (SMEs) and approve deliverables affecting that department (Deliverable Acceptance Criteria). The Vendor shall give each department's needs equal weight and facilitate cross-departmental agreement where processes and data are shared. Department Principal Processes and Interests Current Oracle EBS Footprint (to be validated) Finance Financial accounting and reporting (including GASB), period close, encumbrance and budgetary control, budgeting, treasury and cash management, accounts payable, fixed assets and capitalization, projects and grants, travel and expense, audit and controls General Ledger, Accounts Payable, Payroll Human Resources Position management, recruiting, onboarding and offboarding, employee records, compensation, benefits, time and labor (field crews and shift work), absence, payroll, collective bargaining rules, retirement and pension interfaces, talent, learning, performance, career pathing, and succession planning HRMS, to include benefits Procurement Requisitioning, sourcing and competitive solicitations, contract and supplier management, purchasing, receiving, supplier onboarding and performance, MBE/SLBE participation tracking, purchasing cards, and spend analytics Purchasing, iSupplier Portal General Services Warehouse and inventory, materials management, supplies, surplus and disposal Inventory Engineering and Construction Capital program planning and budgeting, project setup and costing, design and construction contracts, change orders, progress payments and retainage, funding sources, project closeout, and ca

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: Pre-bid/Pre-Proposal Meeting Info · 1

    See attached list of attendees and the pre-bid slide deck.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #3 · 3

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #4 · 4

    Please use the See What Changed link to view all the changes made by this addendum. Additionally, responses to questions 10, 62, 70, 74, and 139 have been modified to the following: The subcontractor can compete as a Prime for a future Program Management and Organizational Change Management, but cannot compete as a Prime or Subcontractor on a future System Integrator solicitation. Please refer to Section 1. Introduction: "The awardee of this Oracle EBS Current-State (As-Is) Assessment and Oracle Fusion Cloud Future-State (To-Be) Design contract, and its teaming partners (subcontractors, joint ventures, or other entities named in the awardee's proposal or performing work under the contract), may participate in a future Program Management and Organizational Change Management solicitation; however, will not be able to participate as a prime or subcontractor in a future System Integrator solicitation." Eligibility for other solicitations will depend on the scope of work performed and whether that involvement creates an organizational conflict of interest or an unfair competitive advantage. Any potential conflicts will be evaluated in accordance with WSSC Water's procurement requirements.

  • Addendum #5 · 5

    Please use the See What Changed link to view all the changes made by this addendum. Additionally, responses to questions 22, 23, 58, 90, 92, 94, 101, 112, 115, 122, 129, 132, 140, 145, 146, 151, 156, 159, 176 have been modified.

Public questions and answers
  • The revised solicitation permits the Prime Contractor and subcontractor to combine their experience to meet the stated Oracle firm-level minimum qualifications. Beyond the required full-time W-2 Project Manager, must the Prime Contractor independently demonstrate prior experience managing comparable enterprise technology assessment or transformation projects?

    Yes. Section 2(A) may be met by the Prime or by a combination of the Prime and its Subcontractor(s). An addendum will be issued to change the following: Oracle Partner Network membership will satisfy the Firm requirement instead of an Oracle Certified Implementer.

  • Where a subcontractor's experience and qualifications are used to satisfy the Oracle firm-level minimum qualifications, what documentation must the Prime Contractor provide to demonstrate the subcontractor's commitment to the project? Would a signed commitment letter be sufficient, or does WSSC require a teaming agreement, subcontract, or another specific form of documentation?

    A signed commitment letter identifying the subcontractor, its proposed role and responsibilities, and its commitment to perform the applicable services is acceptable. A formal teaming agreement or executed subcontract is not required unless otherwise specified in the solicitation.

  • If the Prime Contractor's Project Manager is responsible for overall project management, coordination, schedule, risk, and deliverable oversight, but does not perform Oracle functional or technical work, is an active Oracle or comparable certification required for that individual?

    The Project Manager must hold an active, industry-recognized project management certification (for example, PMI Project Management Professional (PMP)) to satisfy the requirement. Functional Leads and Technical Architects must hold active Oracle certification(s) for each module or area they support (Section 8.2).

  • Does WSSC anticipate minimum staffing levels or minimum hours/level of effort for the Project Manager, Functional Leads, Technical Lead/Architect, and supporting analysts? If no minimum is prescribed, may the Offeror propose staffing levels and allocations based on its methodology and project schedule?

    WSSC Water does not prescribe minimum staffing levels or hours. Offerors shall propose the staffing, roles, and allocation percentages they consider necessary to complete all tasks and deliverables, showing the allocation in the key personnel matrix (VQ 1.2, Alloc. %) and in the Project Work Plan and Schedule (Factor 2). The proposed staffing will be evaluated for adequacy and risk.

  • Does WSSC expect the full proposed project team to remain assigned throughout the entire engagement, or may staffing levels and individual allocations vary by phase—for example, discovery, current-state assessment, future-state design, and final recommendations—provided all required work and deliverables are completed?

    Allocations may vary by phase, provided all work and deliverables are completed and the work plan shows the allocation of each role by phase. Key personnel shall remain assigned to the engagement for the contract term, as confirmed in the signed letter of commitment (Factor 1), and continuity of assigned personnel is required (Section 8.2). Any replacement of key personnel requires WSSC Water's approval and must hold the same required certifications.

  • Will WSSC provide the selected contractor with available EBS documentation, process maps, system and application inventories, integration inventories, customization records, reporting inventories, and related technical documentation? Will WSSC identify business and technical subject matter experts and make them available for discovery sessions and requirements workshops?

    Yes WSSC Water will provide all available documentation and will identify and make available all subject matter experts.

  • Can WSSC clarify the anticipated review and acceptance process for project deliverables, including the expected timeframe for WSSC review and consolidated feedback? Will the selected contractor have an opportunity to address comments and resubmit deliverables before formal acceptance?

    The final review periods will be set in the approved Project Plan (D-01). The Contractor submits a Deliverable Expectations Document (D-02) for approval before work on each deliverable begins; it sets the outline, level of detail, reviewers, and acceptance criteria. The Commission Project Manager routes each submitted deliverable and returns consolidated comments for modifications if needed for resubmission prior to formal acceptance.

  • The solicitation requires the vendor to respond to clarification questions for up to 90 calendar days after acceptance of the final report. Is this 90-day support period included within the stated project duration, or does it begin after the project period and final-report acceptance? Are there anticipated limits on the volume or nature of clarification requests during this period?

    The 90-day clarification period begins after acceptance of the final report and is excluded from the project duration.

  • WSSC previously issued Solicitation #102583 for the Oracle EBS Process Assessment and Future-State Design, which was subsequently canceled. Given that the scope of work under the current Solicitation #123581 appears substantially similar to the original solicitation, could WSSC clarify the reason for the cancellation and subsequent reissuance, including any changes in procurement strategy that prompted this decision?

    In accordance with WSSC Water Procurement Regulations §6.15.370(a), the Chief Procurement Officer may cancel a solicitation when determined to be in the best interest of WSSC Water. Solicitation #102583 was canceled pursuant to this authority. Solicitation #123581 represents a new procurement opportunity issued in accordance with applicable procurement regulations.

  • The revised solicitation indicates that the awardee and its named teaming partners may compete for a future Program Management/Organizational Change Management solicitation. Can WSSC confirm whether a subcontractor identified in the proposal and performing services under this contract may independently compete as a Prime Contractor for that future opportunity, subject to the stated restrictions?

    The subcontractor can compete as a Prime for a future Program Management and Organizational Change Management, but cannot compete as a Prime or Subcontractor on a future System Integrator solicitation. Please refer to Section 1. Introduction: "The awardee of this Oracle EBS Current-State (As-Is) Assessment and Oracle Fusion Cloud Future-State (To-Be) Design contract, and its teaming partners (subcontractors, joint ventures, or other entities named in the awardee's proposal or performing work under the contract), may participate in a future Program Management and Organizational Change Management solicitation; however, will not be able to participate as a prime or subcontractor in a future System Integrator solicitation." Eligibility for other solicitations will depend on the scope of work performed and whether that involvement creates an organizational conflict of interest or an unfair competitive advantage. Any potential conflicts will be evaluated in accordance with WSSC Water's procurement requirements.

  • The solicitation provides for up to 90 calendar days of clarification support following acceptance of the final report. Can WSSC clarify whether this 90-day period is included in the original 180-day period of performance and contract price, or whether it represents an additional period of support beyond the initial 180 days? Additionally, is this support expected to be provided on an as-needed basis, with no dedicated full-time staffing requirement?

    The 90-day clarification period begins after acceptance of the final report and excluded from the project duration. This will required as-needed support and full time staffing is not required as long as responses are timely.

  • Does WSSC anticipate that key personnel will remain available throughout the additional 90-day clarification period, or may the contractor provide support through designated personnel on an as-needed basis?

    The 90-day clarification period begins after acceptance of the final report and is excluded from the project duration. This will require as-needed support, and full-time staffing is not required as long as responses are timely.

  • Related to the 2A. Firm Experience and Credential requirement for the Offeror to be a "certified implementer” - given the awardee and its teaming partners are precluded from implementation work, would you instead be willing to consider an Oracle PartnerNetwork Member with access to dedicated Oracle Fusion sandbox environments for all applicable modules to satisfy the qualification?

    We will issue an addendum to change the following: Oracle Partner Network membership will satisfy the Firm requirement instead of Oracle Certified Implementer.

  • Will payment for the 90-day clarification support be included in the original contract deliverables and payment schedule, or will WSSC issue separate task authorizations or compensation for support requested during this period?

    The 90-day clarification support is included in the fixed price for Line Item 6. WSSC Water will not issue separate task authorizations or compensation for clarification support. Work beyond clarification of accepted deliverables requires a written change order under Section 5.7.

  • Can WSSC Water clarify whether the two required utility-sector engagements must specifically involve As-Is process assessment and To-Be process design for migration from Oracle EBS to Oracle Fusion Cloud only?

    Prior engagements must include As-Is process assessment and Future Design (To-Be) from Oracle EBS to Oracle Fusion Cloud.

  • Section 2(A) permits the prime contractor and subcontractor to collectively satisfy the firm's experience requirements. Can WSSC confirm whether a prime contractor that does not independently possess seven (7) years of Oracle EBS functional consulting experience and three (3) years of Oracle Fusion Cloud ERP/HCM functional consulting experience may satisfy these requirements entirely through a qualified subcontractor?

    Yes. Section 2(A) may be met by the Prime or by a combination of the Prime and its Subcontractor(s).

  • Section 2(A) requires the offeror to be a certified implementer of Oracle ERP/SCM/HCM SaaS. Can WSSC clarify which Oracle certifications or partner credentials are acceptable to demonstrate compliance? Additionally, can this requirement be satisfied through a certified subcontractor if the prime contractor does not independently hold the required credentials?

    Yes. Section 2(A) may be met by the Prime or by a combination of the Prime and its Subcontractor(s). An addendum will be issued to change the following: Oracle Partner Network membership will satisfy the Firm requirement instead of an Oracle Certified Implementer.

  • Question 3: Two Required Utility-Sector Engagements Section 2(B) requires at least two completed engagements involving Oracle EBS As-Is assessment and Oracle Fusion Cloud To-Be design for utility-sector organizations with approximately 1,500 or more employees. Would WSSC consider comparable Oracle EBS-to-Fusion Cloud assessment and design engagements completed for large government agencies or other public-sector organizations of similar size and complexity, or must both qualifying references be strictly from utility-sector organizations?

    WSSC Water will consider prior engagements for similar sized utility or Government agencies.

  • Can WSSC confirm whether the two qualifying engagements required under Section 2(B) may be demonstrated collectively by the prime contractor and subcontractor, with each organization contributing one qualifying completed engagement?

    Yes. Section 2(A) may be met by the Prime or by a combination of the Prime and its Subcontractor(s).

  • Question 5: Completion and Acceptance Requirements Section 2(B) states that an engagement qualifies when its As-Is and To-Be phases have been completed and accepted by the client. Can WSSC confirm whether such engagements qualify even if the subsequent Oracle Fusion Cloud implementation or migration remains ongoing? What documentation would be acceptable to demonstrate client acceptance of the As-Is and To-Be deliverables?

    Yes. An engagement qualifies if its As-Is and To-Be phases were completed and accepted by the client, even if the subsequent Oracle Fusion Cloud implementation is still under way. Acceptable evidence includes a client acceptance or sign-off document, a client letter confirming completion and acceptance, or confirmation by the client reference listed in the proposal. WSSC Water may verify acceptance with the client reference.

  • General — Estimated budget, RFP p. 74, §11 — Does WSSC Water have an approved budget, independent cost estimate, or anticipated contract-value range for Solicitation 123581 that it can share for fixed-price proposal planning?

    Budget information is not available for this solicitation.

  • General — Future program milestones, RFP pp. 3, 45, 54; Tasks 7–9 — Are there any already-approved Oracle Fusion Cloud implementation milestones or target go-live dates that the assessment, future-state design, and migration-readiness recommendations must take into account?

    Yes, target dates have been established. This information will be provided to the awarded vendor during Task 1 Project Initiation.

  • Proposal — Overall page limit, RFP p. 13, §4.5; FAQ p. 1 — Does the overall 50-page Technical Proposal limit in Section 4.5 still apply in addition to the individual five-tab page limits and exclusions stated in the FAQ?

    Section 9 (Evaluation Factors) governs the structure of the Technical Proposal. Section 4.5 will be amended by an addendum to align with Section 9. The Technical Proposal is limited to 50 single-sided pages, excluding: key personnel resumes (up to three pages each), redacted sample deliverables, the detailed schedule (Tab 5), and required forms and certifications.

  • Proposal — Engagement summaries, RFP pp. 4, 75; FAQ p. 1 — For each qualifying engagement, should offerors follow the one-page summary limit in the FAQ or the up-to-two-page allowance in the RFP and Vendor Questionnaire?

    FAQ is no longer applicable and has been removed. Please refer to section 4.5.

  • Proposal — Customer reference count, RFP pp. 4, 14, 75; FAQ p. 1 — How many customer references must be submitted in total, given the three-customer reference instruction in Section 4.5 and the at-least-two referenced clients requested in Section 2 and Vendor Questionnaire 1.1?

    The proposal structure and submission requirements are clarified as part of Addendum No. 3. Please review the updated Additional Instructions.

  • Eligibility — Implementer-status proof, RFP p. 4, §2(A); p. 75, VQ 1.1–1.2 — What organization-level evidence should a prime contractor or qualifying prime–subcontractor combination submit to demonstrate the required certified Oracle ERP/SCM/HCM SaaS implementer status?

    Yes. Section 2(A) may be met by the Prime or by a combination of the Prime and its Subcontractor(s). An addendum will be issued to change the following: Oracle Partner Network membership will satisfy the Firm requirement in lieu of Oracle Certified Implementer.

  • Personnel — Certification standard, RFP p. 4, §2(C); p. 41, §8.2 — For Functional Leads and Technical Architects, are comparable non-Oracle certifications accepted under Section 2(C), or are active Oracle certifications required for every supported module or technical area under Section 8.2?

    Functional Leads and Technical Architects must hold active Oracle certification(s) for each module or area they support, as stated in Section 8.2. Comparable non-Oracle certifications are not accepted for these roles. The 'comparable certification' provision in Section 2(C) applies to key personnel whose area of support is not an Oracle module, such as the Project Manager.

  • Personnel — Project Manager certification, RFP pp. 4–5, §2(C); p. 41, §8.2 — What certification, if any, must the proposed prime-employed Project Manager hold to satisfy the key-personnel certification requirement?

    The Project Manager must hold an active, industry-recognized project management certification (for example, PMI Project Management Professional (PMP)), which satisfies Section 2(C) for that role. Provide evidence in the key personnel matrix.

  • Personnel — Project Manager allocation, RFP pp. 4–5; pp. 40–41, §8.2 — Does the requirement for a dedicated, prime-employed Project Manager mean full-time allocation to this project, or may the PM have a stated part-time allocation while remaining a full-time W-2 employee of the prime?

    The Project Manager must be dedicated to this engagement and is expected to be allocated full time for the duration of the project, excluding the 90-day clarification period.

  • Compliance — Insurance at proposal stage, RFP p. 36, §7.1; p. 76, VQ 4.1 and 5.2 — Must the current certificate of insurance uploaded with the proposal already reflect all WSSC-specific endorsements and coverage requirements, or may those endorsements be provided within ten days after Notice of Award?

    The Certificate of Insurance will be required within 10 days after receipt of the Notice of Award.

  • Scope — Capital-project applications, RFP pp. 47, 50, Tasks 2–3; revised Attachment A p. 2 — For Primavera P6 and e-Builder, should the fixed-fee scope include full capital-project workflows within those applications, or only the activities, decisions, and handoffs needed to design WSSC Water’s future Oracle processes?

    Primavera P6 and e-Builder are systems outside EBS and are in scope under Task 3. The Contractor shall document the capital project processes performed in these applications that fall within the Capital Projects and Contracts and the Project, Capital, and Grants Accounting domains in Section 8.11. Engineering design and detailed construction-scheduling workflows that do not affect these domains are not in scope.

  • Scope — Operational-system boundary, RFP pp. 44, 47, §§8.6, 8.11; revised Attachment A p. 2 — For connected operational systems such as Oracle WAM, C2M and Trimble Unity Maintain, does the “interface-level only” boundary also apply where their workflows interact with in-scope Finance, Procurement, Inventory, or capital-project processes?

    Yes

  • Scope — Individual interface count, RFP p. 51, Task 4(D); revised Attachment A p. 1 — Can WSSC Water provide an approximate count or planning range of individual inbound and outbound interfaces, rather than only the approximately 30 applications connected to EBS?

    32 total inbound and outbound integrations.

  • Scope — Payroll rule count, RFP pp. 47–48, 50–52; revised Attachment A p. 1 — Can WSSC Water provide approximate counts of pay groups and materially different collective-bargaining or timekeeping rule sets included in the HR and Payroll assessment?

    Bi-Weekly Payroll. 2 bargaining units. Approximately 16 Earning rules are based on shift and overtime schedule. 14 different earnings policy codes- this is due to employees being paid OT by the day and by the week, exempt employees who are paid straight time, and no overtime. Shift diff along with the 8-, 9-, 10-, and 12-hour shifts.

  • Scope — Field and shift-worker population, RFP pp. 40, 47, 50–53; FAQ p. 2 — For sizing mobile, kiosk, self-service and time-entry workshops, can WSSC Water provide an approximate number or proportion of field and shift workers whose access needs must be assessed?

    67 shift workers, 303 field workers, with some overlap in both groups.

  • Scope — Additional Fusion capabilities, RFP p. 53, Task 8; FAQ p. 2 — Is there an indicative shortlist or planning range of additional Oracle Fusion Cloud capabilities WSSC Water expects to evaluate under Task 8?

    For planning, Offerors may assume that Task 8 will assess Oracle Fusion Cloud capabilities in the in-scope domains (Section 8.11) that are not supported by EBS in production today and refer to Attachment A for an nonexclusive list of systems and process outside of EBS. The vendor will make the appropriate recommendations for those additional modules to fulfill business requirements.

  • Scope — Data-quality analysis depth, RFP pp. 51, 54, Tasks 4(F), 9(C); FAQ p. 3 — Should Task 4(F) be priced for independent record-level profiling across all in-scope EBS data domains, or for a targeted assessment using representative WSSC-provided extracts and existing quality evidence?

    Task 4(F) should be priced as a targeted assessment, not record-level profiling of every data domain.

  • Does WSSC Water permit the use of offshore resources for remote activities such as Oracle EBS assessment, business process documentation, fit-gap analysis, and Oracle Fusion Cloud future-state design, provided all security, data protection, and project requirements are met?

    Yes

  • Scope — Segregation-of-duties review, RFP pp. 40–41, 51, Task 4(G); FAQ p. 3 — Does the current-state controls and SoD assessment require the contractor to independently analyze Oracle EBS role and permission combinations, or to review existing security-control and audit evidence with WSSC’s IT and Internal Audit teams?

    The Contractor reviews existing security-control and audit evidence with WSSC Water IT and Internal Audit. The Contractor also analyzes system-generated reports of EBS responsibility and function assignments, provided by WSSC Water, to identify segregation-of-duties conflicts against a documented rule set.

  • Scope — Current-state cost data, RFP pp. 42, 51, 54; D-13 and D-25 — For the current-state EBS annual cost baseline, will WSSC Water provide the relevant licensing, hosting, support, internal-labor and contractor-cost records needed for D-13 and D-25?

    Yes. WSSC Water will provide the information to the awarded vendor as needed.

  • Schedule — Contract term, RFP p. 16, §4.7; p. 44, §8.7; FAQ p. 4 — For labor-rate commitments and contract pricing, is the applicable base term two years as stated in Section 4.7, or the approximately 180-day period from kickoff confirmed in Section 8.7 and the FAQ?

    Section 4.7 will be amended to remove the reference to labor rates.

  • Schedule — On-site planning allowance, RFP p. 44, §8.5; FAQ pp. 3–4 — Can WSSC Water provide an estimated range of on-site workshop and observation days, including visits to locations outside Laurel, to be included in the fixed fee?

    WSSC Water does not prescribe a number of on-site days. Offerors should state the number of on-site days and site visits assumed in their work plan.

  • Price proposal — Labor-rate schedule, RFP pp. 16, 63, 74; §§4.7, 9, 11 — Where should offerors submit the fully loaded hourly rates and proposed labor hours by category when the Section 11 pricing form provides only six fixed-fee milestone amounts?

    Labor rates are not required for this solicitation.

  • Payment — Deliverable acceptance, RFP pp. 41–43, §8.3; p. 74, §11 — Will payment of each fixed-price milestone depend on formal acceptance of all deliverables assigned to its task group, including how cross-cutting weekly status reports (D-29) are handled?

    Yes. Each milestone is paid upon WSSC Water's acceptance of all deliverables assigned to its line item in Section 11. Partial milestone payments will not be made.

  • Payment — Monthly invoicing, RFP pp. 18–19, §5.6; pp. 63, 74 — Under this fixed-price milestone agreement, are periodic invoices limited to accepted milestone values, with labor hours and rates supplied as supporting information rather than as the basis for payment?

    Full payment for each milestone is contingent on WSSC Water's acceptance of all deliverables assigned to that line item in Section 11.

  • Teaming — Qualification-providing partner, RFP p. 4, §2(A–B); p. 14, §4.5; p. 67, §10.7 — When a proposed subcontractor’s completed Oracle EBS-to-Fusion utility engagements are used to satisfy the minimum qualifications, must that subcontractor perform a specified portion of the related assessment and design work, or is its proposed role and percentage of participation evaluated without a minimum workshare?

    WSSC Water does not set a minimum workshare for an individual Subcontractor. A Subcontractor whose completed engagements or credentials are used to meet Section 2 must be named in the proposal and must perform the corresponding assessment and design work. Its role, level of involvement, and percentage of work must be stated (Section 4.5, Tab 1(3), and the OSDI subcontracting certification). Total subcontracting may not exceed 49 percent of the Contract value (Section 5.21(A)).

  • MBE/SLBE — Partial participation credit, RFP p. 66, §10.5 — For the partial-credit categories shown in Section 10.5 (11%, 4%, and 0.50%), can WSSC Water confirm through an example whether each percentage is counted as a share of total contract value or as a share of the overall 35% subcontracting goal?

    The chart in Section 10.5 states out of the 35%, those three MBE designations can only partially fulfil the 35% goal. For example, if using Asian American firms, they can only meet 11% of the goal. Anything more will not be used toward the goal.

  • MBE/SLBE — Reciprocity approval timing, RFP p. 68, §10.9; FAQ p. 1 — For a firm certified by an approved council affiliate outside the local region, must express OSDI certification-reciprocity approval be obtained before proposal submission, or is submitting the current certificate with the proposal for verification sufficient?

    Please see section 10.9 which states, "Expressed approval is required from the OSDI for M/WBE certification reciprocity prior to the submission of bids/proposals." However, if you are certified with the NMSDC or WBENC or any of their affiliates, reciprocity is not required.

  • MBE/SLBE — Good Faith Efforts documentation, RFP pp. 68–70, §§10.9–10.10; p. 72, §10.14 — When an offeror meets the full 35% MBE/SLBE subcontracting goal, is the detailed 13-indicator Good Faith Efforts evidence and 90-point evaluation still required, or does that scoring requirement apply only to an offeror requesting a full or partial waiver?

    Points are awarded for Indicators 1 through 13 when required and completed documentation is submitted at the time the partial or full waiver is being requested.

  • MBE/SLBE — Authorized signatures on forms, RFP p. 70, §10.11; pp. 72–73, §10.14 — Does the two-authorized-signature instruction in Section 10.14 apply to every OSDI form, including the Non-Discrimination Declaration and Good Faith Efforts Affidavit, or specifically to the Subcontracting and Supplier Certification Form identified in Section 10.11?

    The two authorized signatures are required for the Subcontracting and Supplier Certification forms only, which is the Prime and Subcontractor.

Plain text

OpenGov categories

  • 541511 · Custom Computer Programming Services
  • 541611 · Administrative Management and General Management Consulting Services
  • 541614 · Process, Physical Distribution, and Logistics Consulting Services