Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Outreach Event: Cascades Dam Tour

Description

Project Description: Seattle Public Utilities (SPU) will host a tour of the Cascade Dam Facility at Lake Youngs in unincorporated King County, Washington on October 22, 2026 from 10 AM to 1 PM. This three-hour tour will include a walk around the parts of the Cascade Dam facility and Lake Youngs Reservoir Perimeter Dike, a brief explanation of the history and functions of the site, and a discussion of two upcoming consultant contracting opportunities: Cascades Dam and Perimeter Dike Design Lake Youngs Perimeter Drain Lining Project Details This is an outreach tour. We are not requesting submittals at this time. This outreach event will be at the Cascade Dam facility on Thursday, October 22nd from 10 AM to 1 PM. The event will provide a tour of the facility and information about two upcoming consultant contracting opportunities. Facility address and further details will be provided to those who RSVP. Tour Details We will do a walking tour of the Cascade Dam facility. This will be an outdoor event. Please dress comfortably with walking shoes and gear for the rain and/or cold as needed. We anticipate walking on gravel. Please contact Christina.Guros@seattle.gov with any accessibility requests. Introduction Summary Project Description: Seattle Public Utilities (SPU) will host a tour of the Cascade Dam Facility at Lake Youngs in unincorporated King County, Washington on October 22, 2026 from 10 AM to 1 PM. This three-hour tour will include a walk around the parts of the Cascade Dam facility and Lake Youngs Reservoir Perimeter Dike, a brief explanation of the history and functions of the site, and a discussion of two upcoming consultant contracting opportunities: Cascades Dam and Perimeter Dike Design Lake Youngs Perimeter Drain Lining Timeline Release Project Date: September 30, 2026 Dam Tour Date (Non-Mandatory): October 22, 2026, 10:00am Cascades Dam Facility - address to be provided to those who RSVP prior to the event Tour Arrival Time: October 22, 2026, 10:00am Deadline to submit questions: February 26, 2027, 10:00am Project Contact Ulysses Hillard Water Resources Projects Supervisor PO Box 34018 Seattle , WA 98124-4018 Email: ulysses.hillard@seattle.gov Phone: (206) 386-1518 Procurement Contact Christina Guros Contracting Equity Advisor 700 5th Ave Seattle , WA 98104 Email: christina.guros@seattle.gov Phone: (206) 514-1608 Attachments

Plain text