Skip to content
← Back to search

State and local · OpenGov

Opportunityevaluation

Parking Deck Repairs – Downer Place & Galena Boulevard

Description

The City of Aurora is initiating the first year of a five‑year comprehensive repair and maintenance program for the 5 E. Downer Place and 43 W. Galena Boulevard parking garages. This initial phase focuses primarily on the second levels of both structures, addressing essential concrete rehabilitation including full‑depth, partial‑depth, vertical, overhead, and scattered concrete repairs. Additional structural work includes joint sealant replacement in select areas and the repair or replacement of damaged connectors. In conjunction with the structural repairs, the project includes important waterproofing improvements. Work will involve recoating existing membrane systems, installing new membrane over repaired or currently unprotected areas, routing and sealing floor cracks, and performing minor plumbing repairs. These upgrades are critical to extending the life of both facilities and preventing further deterioration caused by water intrusion. Following the completion of repairs, all existing striping, ADA markings, directional arrows, and pedestrian walkway indicators will be repainted to restore the current layout. The City is seeking qualified vendors experienced in structural restoration, concrete repair, waterproofing systems, and parking facility rehabilitation to carry out this work with quality and long‑term durability in mind. 5 E. Downer Place Parking Garage (Stolp Island Parking Garage) Project Mobilization and Demobilzation Horizontal Structural Concrete Repair Partial Depth (Scope of Work item 2.a) Full Depth Concrete Double Tee Repairs (Scope of Work item 2.b) Structural Vertical/Overhead Concrete Repair-Form and Pour/Pump Repairs (Scope of Work item 3.a) Double Tee Connection Replacement (Scope of Work item 4.a) Reweld Cracked Tee-to-Tee Shear Connections (Scope of Work item 4.b) Joint Sealant Work-Rout and Seal Cracks (Scope of Work Item 5.a) Double Tee Joint Replacement (Scope of Work Item 5.b) Install New Waterproofing Membrane over New Concrete Repairs (Scope of Work item 6.a) Recoat of Existing Waterproofing Membrane (Scope of Work Item 6.b) Floor Drain Cover Replacement (Scope of Work 7.) Parking Space Striping and Pavement Markings (Scope of Work 8.) Miscellaneous Items and General Conditions (Scope of Work 9.) 43 W. Galena Boulevard Parking Garage (Tivoli Parking Garage) Project Mobilization and Demobilzation Horizontal Structural Concrete Repair Partial Depth (Scope of Work item 2.a) Full Depth Concrete Repairs (Scope of Work item 2.b) Structural Vertical/Overhead Concrete Repair-Form and Pour/Pump Repairs (Scope of Work item 3.a) Structural Vertical/Overhead Concrete Repair-Form and Pour/Pump Corbel Repair (Scope of Work item 3.b) Double Tee Connection Replacement (Scope of Work item 4.a) Double Tee Joint Replacement (Scope of Work item 5.) New Waterproofing Membrane Installation (Scope of Work item 6.a) Recoat of Existing Waterproofing Membrane (Scope of Work Item 6.b) Stair Tower Repairs-Floor/Landing (Scope of Work 7.a) Stair Tread and Riser Repairs (Scope of Work 7.b) Replace Deteriorated Floor Drain Covers (Scope of Work 8.) Parking Space Striping and Pavement Markings (Scope of Work 9.) Miscellaneous Items and General Conditions (Scope of Work 10.) SCOPE OF WORK Detailed Scope Of Work 5 E. Downer Place Parking Garage (Stolp Island Parking Garage) Scope of Work 1. Project Mobilization and Demobilization of the work in accordance with the scheduling requirements. This item also includes any general or special work permits, licenses, etc., if any, required to perform the repairs. 2. Horizontal Structural Concrete Repair Items: a. Partial Depth Concrete Repairs: Work includes sounding and verifying the extent of the concrete deterioration at the top portion of the cast-in-place concrete topping repair areas, providing shoring as necessary, saw-cutting 1/2 inch (max.) along the perimeter of squared off repair area, removal (by approved methods) and disposal of existing construction materials, surface preparation, cleaning/supplementing of all exposed or deteriorated portions of reinforcing steel, and concrete placement, and curing. Assume the average depth of concrete removal is 3”. Provide approved repair concrete material (minimum thickness 3”) according to the specifications and the details shown on plans to match the existing slab elevations and thickness. Partial depth repairs must be attached to existing concrete by existing reinforcement as shown in details. All existing reinforcement shall remain across partial depth concrete bond line, unless directed otherwise. Provide supplemental anchors at 1’-0” on center to anchor new reinforcement without existing anchorages across patch repair bond line. See Detail 2/R500. b. Full Depth Concrete Double Tee Repairs: Work includes sounding and verifying the extent of the concrete deterioration at the slab top and bottom surfaces for repair areas, providing shoring as necessary, saw-cutting 3/4 inch (max.) at the slab, top surface along the perimeter of squared off repair area, slab Full-Depth removal and disposal of existing construction materials, surface preparation, cleaning/supplementing of all exposed, deteriorated portions of reinforcing steel, formwork installation, concrete placement, and curing per repair details and specifications. Provide Repair Concrete or Pre-bag repair concrete according to the specifications and the details shown on plans to match the existing slab elevations and thickness. See Details 1/R500 and utilize Fast Setting Concrete Materials per Specification Section 03 31 24.16. 3. Structural Vertical/Overhead Concrete Repair Items: a. Form and Pour/Pump Repairs: Removal of the spalled/deteriorated concrete member surface (slab/beam soffits, column surface, etc.) by approved methods, sandblast cleaning of the exposed reinforcing steel to remain, applying approved zinc-rich paint onto the exposed steel and installation of supplementary, epoxy-coated reinforcing steel and approved repair material by ‘form and pour/pump’ repair method to restore the original configuration of the concrete members. (Assume average thickness of 3”). See Detail 1&2/R501 and utilize materials per Specification Section 03 37 16.16. 4. Double Tee Connector Repairs: a. Double Tee Connection Replacement: Perform full depth double tee flange connection repair/replacement at locations indicated on drawings or determined in field by then engineer. Work is to be performed according to Detail 3/R500. Work is to include providing shoring as necessary, saw-cutting 3/4 inch (max.) at the slab, top surface along the perimeter of squared off repair area (to the minimum extents illustrated per the referenced detail), slab Full-Depth removal and disposal of existing construction materials, surface preparation, cleaning/supplementing of all exposed, deteriorated portions of reinforcing steel, removal of all existing double tee connector hardware, formwork installation, placement/epoxy doweling of new reinforcement, concrete placement, and curing per repair details and specifications. Assume the average thickness of concrete removal is 4 ½” (varies 4” to 7” in tee flange). Provide Repair Concrete or Pre-bag repair concrete according to the specifications and the details shown on plans to match the existing slab elevations and thickness. Contractor can utilize Repair Concrete per Specification Section 03 30 00 or Fast Setting Concrete Materials per Specification Section 03 31 24.16. b. Reweld Cracked Tee-to-Tee Shear Connections: Re-weld the tee flange connector at locations with broken welds. Provide welding (1/4” full penetration grove weld 2.5” long on both sides of existing or new steel bar /plates) with approved methods and materials to reconnect the double tee-to-tee connection. 5. Joint Sealant Work: a. Rout and Seal Cracks: Provide primer and approved two-component polyurethane joint sealant materials. Replace existing or provide new sealant. Includes rout and clean the existing cracks on the top surface of concrete slabs, remove all existing deteriorated sealant, if any, in cracks at designated locations, clean and prepare the surface by approved methods, and install primer and approved two-component polyurethane joint sealant according to the details by the manufacturer and as shown on plans. See Detail 3/R501 and utilize materials per Specification Section 07 92 00. b. Double Tee Joint Replacement: Replace existing or provide new sealant. Includes rout or clean existing joints, remove existing control joint sealant and backer-rod material for the entire joint length at designated joints of the precast DT decks on the designated locations, clean and prep the concrete surfaces and exposed steel connector components by approved methods. For non-stainless connectors - paint the exposed steel components using approved rust-inhibitive paint. Provide primer, backer rod, and joint sealant. All joint sealant locations are also coated with a traffic membrane strip and the sealant shall be filled flush with the top of tee surface, (not recessed). See Detail 3/R501 and utilize materials per Specification Section 07 92 00. 6. Waterproofing Membrane Work: a. New Water GENERAL INFORMATION CITY OF AURORA, IL (Government) The City of Aurora (“City”) is a municipal corporation and unit of local government existing under the laws of the State of Illinois pursuant to the Illinois Municipal Code, 65 ILCS 5/1-1-1 et seq. (the “Code”). The City was established to provide municipal services and to promote the health, safety, and welfare of its residents and businesses within its jurisdiction. The City owns, operates, and maintains various public facilities and infrastructure, including municipal buildings, parks, and community centers located throughout Aurora, Illinois. INSTRUCTIONS TO BIDDERS SUMMARY The City of Aurora is initiating the first year of a five‑year comprehensive repair and maintenance program for the 5 E. Downer Place and 43 W. Galena Boulevard parking garages. This initial phase focuses primarily on the second levels of both structures, addressing essential concrete rehabilitation including full‑depth, partial‑depth, vertical, overhead, and scattered concrete repairs. Additional structural work includes joint sealant replacement in select areas and the repair or replacement of damaged connectors. In conjunction with the structural repairs, the project includes important waterproofing improvements. Work will involve recoating existing membrane systems, installing new membrane over repaired or currently unprotected areas, routing and sealing floor cracks, and performing minor plumbing repairs. These upgrades are critical to extending the life of both facilities and preventing further deterioration caused by water intrusion. Following the completion of repairs, all existing striping, ADA markings, directional arrows, and pedestrian walkway indicators will be repainted to restore the current layout. The City is seeking qualified vendors experienced in structural restoration, concrete repair, waterproofing systems, and parking facility rehabilitation to carry out this work with quality and long‑term durability in mind. TIMELINE Release Project Date: October 28, 2026 Pre-Proposal Meeting (Mandatory): November 5, 2026, 11:00am Stolp Island Parking Deck 5 E. Downer Place by the elevator Question Submission Deadline: November 12, 2026, 11:00am Question Response Deadline: November 16, 2026, 5:00pm Response Submission Deadline: November 18, 2026, 11:00am Purchasing Division Definitions Award: The formal decision to select a vendor for a contract. Bid: A submitted response by a vendor in response to a bid document. Bidder: An individual, firm, or corporation formally submitting a proposal for the work contemplated, or any portion thereof, acting directly through an authorized representative. Change Order: A change to a contract or purchase order made after it has been approved by the city that alters the term of the contract, the contract price, or the obligations of the parties. Contract: A formal agreement between the City and a successful bidder outlining obligations, deliverables, timelines, and pricing. Cooperative Purchasing: When goods or services are purchased through shared contracts (mostly government entity contracts), to leverage buying power. Direct Purchase Method: The method in which, after bids are rejected or if no bids are received, the City Council by resolution may approve the work to be done by city personnel or authorize the purchase of goods or services involved to be purchased more economically on the open market without complying with the requirements of the Purchasing Division. Emergency Procurement: An expedited purchase that bypasses standard bidding due to immediate threats to public health, safety, or welfare. Encumbrance: Funds that are formally committed and set aside in the budget to pay for a specific future purchase. Evaluation Criteria: The standards and scoring factors used to assess bids or proposals. Formal Bid: For goods/services over $25,000, with well-defined requirements and structured bidder/proposal submissions. Informal Bid: For goods/services valued between $5,000 and $24,999, with well-defined requirements. Businesses are notified via web alerts. Invitation for Bid (IFB): A formal solicitation inviting vendors to submit competitive bids based strictly on price and predefined specifications. Invoice: A bill sent by a vendor/contractor/supplier for goods/services provided. Shows what was purchased, how much it costs, and payment due date. Local Bidder Preference: Policy that allows the City to give priority or scoring advantages to local businesses. Lowest Responsible Bidder: The lowest bidder whose offer best responds in quality, fitness and capacity to the requirements of the proposed work or usage. Payment Bond: The bond executed by the Vendor/Contractor and his surety guaranteeing the payment of all sums of money due for any labor, materials, apparatus, fixtures, or machinery furnished to such principal for the purpose of performing the contract work. Performance Bond: The bond executed by the Vendor/Contractor and his surety, guaranteeing complete execution of the contract. Piggybacking: An authorized purchase made by utilizing another government agency's existing, competitively awarded contract. Plans: All drawings, sketches, and detailed Plans or reproductions thereof pertaining to the construction involved. Procurement: The process by which a municipality acquires goods, services, or construction, including planning, soliciting offers, evaluating responses, awarding contracts, and managing vendor performance. Professional Services: Services that require specialized professional knowledge or expertise, such as accounting, architecture, engineering, law, medicine, surveying, or other fields defined by state law. Proposal: A bidder’s response to a solicitation that often includes technical details, methodology, pricing, and qualifications. Public Notice: Official announcement of a solicitation, typically published through OpenGov. Purchase/Procurement Card (P-card): A City issued charge card for the purchase of city-related goods/services. Purchase Order (PO): The formal authorizing document issued after an award. No work begins, or payment made, without a city-generated PO. Sent to Vendor/Contractor/Supplier. Quote: Request from vendors for pricing on goods or services or a combination thereof that may be verbal or in writing. Request for Proposals (RFP): A solicitation used when seeking a solution, goods, or service and evaluating vendors based on multiple criteria, not only price. Request for Qualifications (RFQ): A solicitation for qualifications, used especially for professional or consultative services. It does not result in a contract. Requisition: A request to create a PO for the purchase of goods/services. Stays internal. Responsible Bidder: Section 2-331(5) of the Aurora City Code requires that bidders for city contracts in excess of $25,000 must participate in active apprenticeship and training programs approved and registered with the United States Department of Labor’s Bureau of Apprenticeship and Training to be considered a responsible bidder. Scope of Work (SOW): A detailed document outlining the specific tasks, deliverables, timelines, and quality standards required from the vendor. Sole Source: A non-competitive procurement used when only one vendor can provide the required goods or services. Specification: Any description of the physical or functional characteristics, or of the nature of a supply, service or construction item. A specification may include a description of any requirement for inspecting, testing, or preparing a supply, service, or construction item for delivery. Vendor/Contractor/Supplier: A company or individual that enters into a contract with the City to provide goods or services. ACCEPTANCE OF BID PROPOSALS a. Bidders intending to respond to this solicitation must create a free account with OpenGov Procurement . Registration is required to establish a communication link with the City. The Bidder, and not the City, is solely responsible for obtaining all addenda issued for this solicitation. Addenda and other relevant information will be posted through the City’s E-Procurement System. Notifications of issued addenda will be emailed to all persons registered as following this bid. Failure of any Bidder to receive any addendum or interpretation shall not relieve the Bidder of any obligation under its submitted Bid Proposal. All addenda issued shall become part of the Contract Documents. Paper submissions will not be accepted . b. Bids will be accepted only through the City’s E-Procurement System, OpenGov, up to the date and time specified in the solicitation. The official system clock within the City’s E-Procurement System shall govern all submission deadlines. Late submissions will not be accepted under any circumstances, including technical difficulties such as internet connectivity issues. The City strongly encourages Bidders to complete submissions well in advance of the deadline. All bids must include all requested information and all required forms, certificates, affidavits, and addendum acknowledgments to be considered responsive. c. A subcontractor may not submit a Proposal or otherwise serve as the PRIME VENDOR on behalf of another entity. Responses submitted solely on behalf of a subcontractor, third-party vendor, broker, or other entity that will not be the prime vendor under the resulting Contract will not be accepted. d. Bids shall be submitted on the forms provided and must include all required information and certifications. Bids submitted in any other manner, or failing to include all required information or certifications, may be rejected as non-responsive. Bids may be modified or withdrawn prior to the bid opening deadline through the City’s E-Procurement System. Each Bid shall include the legal name of the Bidder, complete mailing address, and electronic signature of a person legally authorized to bind the Bidder. The printed or typed name of the authorized signer shall also be provided. e. The City of Aurora reserves the right to accept or reject any or all bids, in whole or in part, to accept alternate bids, and to waive any immaterial defect, technicality, informality, or irregularity in any bid received. Unless otherwise specified, the City reserves the right to hold bids for ninety (90) days following the bid opening date. By submitting a bid, the Bidder agrees to accept a Notice of Award if issued within this ninety (90) day period. The City further reserves the right to cancel this solicitation at any time without liability for any costs incurred by any Bidder in preparing or submitting a Bid Proposal. Each Bidder assumes

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #2 · 2

    Please use the See What Changed link to view all the changes made by this addendum.

Public questions and answers
  • Please confirm whether bidders are required to provide two separate 10% bid bonds, one for each garage's individual bid amount, or whether one bid bond covering 10% of the combined bid total is acceptable for both individual awards under IFB #26-099.

    It will be ten (10%) of the total amount of the bid submitted. Please see section 2.7 of this solicitation.

Plain text

OpenGov categories

  • 15007 · Boxes, Shoring (For Construction Worker Protection)
  • 15553 · Parking Structures
  • 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
  • 90922 · Building Construction, Non-Residential (Office Bldg., etc.)
  • 90930 · Building Construction (Not Otherwise Classified)
  • 91115 · C.I.P., Construction/Rehabilitation, Other than Buildings
  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
  • 91336 · Construction, Parking Lot and Alley
  • 91375 · Maintenance and Repair, Parking Lot and Alley
  • 91394 · Paving/Resurfacing, Alley and Parking Lot
  • 91884 · Parking Consultant