Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Parkland Trail Extension Routing Study

Description

Lead County staff, internal and external stakeholders, and the public through a planning process to identify and select a preferred route to extend a safe, user-friendly and accessible multi-modal trail in Parkland. Northern extensions are expected to start at the northern terminus of the existing Parkland Community Trail near Keithley Middle School and continue north to Tacoma city limits. Southern extensions are expected to start at Sprinker Recreation Center, cross Military Road, continue through Spanaway Park, into the Spanaway community. Long-term extensions will connect south to the City of Roy. Scope of Work Scope of Work Develop an engagement plan to engage with County staff, the public, adjacent property owners, and other internal and external key stakeholders. Produce a publicly vetted conceptual design which includes a final trail alignment and feasibility analysis, ROM costing, phasing plan, and estimated design and construction timelines. The alignment will likely remain in the road right-of-way, like Phase 1 of the Parkland Community Trail, except where the trail passes through property owned by Pierce County Parks and Recreation. The trail must accommodate a variety of active mode users, including bikes, pedestrians, non-motorized recreational equipment, assistive mobility devices, electric bikes as allowed by local and state law, and other comparable devices. The conceptual design will include innovative solutions for trailheads, crosswalks, signage, and other intersection crossing and safety treatments. The routing study shall investigate possible trail connections in the Parkland–Spanaway area for the following areas: Area 1: Improvements to the Military Road crossing to connect Sprinker Recreation & Community Center with Spanaway Park, including improvements within Spanaway Park to accommodate regional trail traffic. Area 2: Route selection and conceptual design to extend the Parkland Community Trail north toward Tacoma and beneath SR 512 (e.g., via Ainsworth Avenue or C Street). Area 3: Route selection and conceptual design to extend the trail south of Spanaway Park to key community destinations, including Spanaway Elementary School and Spanaway Lake High School. Area 4: Southern trail connections to Roy Y and the City of Roy. The work will include, but not be limited to the following tasks: Review of existing planning documents, public outreach materials, studies, reports, drawings, and property encumbrances. Design materials to communicate project needs to a broad audience. Facilitate public meetings and workshops to solicit project input from the public, advocates, and other interested parties. Generate digital communication tools to solicit public input on project direction and inform selection of preferred alternatives. Professional survey, physical inspection/inventory of existing features and facilities. Planning and feasibility analysis required to establish preliminary, alternate and final trail alignments, as well as service and residential driveway improvements, parking, and intersection treatments. Coordination with Pierce County Traffic to confirm intersection crossing options. Coordination with Pierce County Surface Water Management to confirm regulated flood data and associated FEMA requirements. Coordination with Pierce County Planning & Public Works to ensure recommendations align with ongoing community planning efforts. Coordination with City of Tacoma active transportation planners. Consult with adjacent property owners and other key stakeholders to produce publicly vetted designs for the trail. Develop funding and phasing strategy. Develop costing and full project timelines considering preliminary investigation, design, permitting, grants, bidding, and construction. Provide support services in other disciplines as required including, but not limited to: Construction cost estimating Surveying Geotechnical Environmental Cultural Resources Civil Engineering Electrical Engineering Transportation Engineering Structural Engineering Depending on consultant team performance and available funding, Parks may amend the PSA of the selected team to include additional phases of design, bidding support, and construction administration. Deliverables/Tasks Project Management Develop and maintain a project schedule. Conduct Regular team check-ins. Prepare agendas, meeting summary minutes, and action/decision log for Porject Management meetings. Participate by Consultant Project Manager in weekly status updates with Pierce County Park's project manager by phone, as needed. Prepare monthly progress reports. Existing Condition Assessment Review existing crossing to identify options to improve safety and user experience for Area 1 (i.e. Military Road crossing and Spanaway Park). Review all relevant planning documents, studies, outreach materials, drawings, and available information (Areas 1-3). Identify potential destinations and trail connections to support development of alternative routes (Area 2, Area 3). Identify natural or undeveloped parcels suitable for potential park amenities (Area 2, Area 3). Conduct limited field verification to supplement and confirm existing data (Areas 1-3). Identify project constraints, including ROW availability, crossings, driveways, active transportation infrastructure, sight distances, trees, critical areas, historic resources, utilities, and coordination needs with landowners and agencies (Areas 1-3). Prepare a technical memorandum summarizing findings and existing conditions Conceputal Design of Alternative Alignments Develop conceptual designs and planning-level cost estimates for up to three trail alignments with community connections (Areas 1-3). Develop conceptual designs and planning-level cost estimates for up to three trail alignments with community connections (Areas 1-3). Identify major structural elements, possible conflict points with vehicles, and propose conceptual strategies (Areas 1-3). Estimate ROW acquisition needs and associated costs (Areas 1-3). Identify preliminary environmental impacts and permitting considerations in consultation with Pierce County Development Services (Areas 1-3). Develop strategies to avoid or replace high value trees (Areas 1-3). Prepare a roll plot (or comparable technical drawing) and a technical memorandum summarizing conceptual designs and costs (Areas 1-3). Public Engagement Develop an engagement plan for school districts, local jurisdictions, community groups, stakeholders, and the public (Areas 1-3). Support notifications and outreach activities (Areas 1-3). Prepare graphics and presentation materials for public meetings (Areas 1-3). Lead in person and virtual public engagement to collect input and inform preferred route development (Areas 1-3). Coordinate with Pierce County Planning & Public Works and City of Tacoma to align any concurrent active transportation planning (Area 2, Area 3). Begin initial coordination with WSDOT and JBLM regarding potential southern trail connections to Roy Y and the City of Roy (Area 4). Document engagement outcomes in a technical memorandum. Evaluations of Alternatives Develop and refine evaluation criteria based on stakeholder and public input. Apply the criteria to compare alternative alignments and assess project tradeoffs. Prepare graphics and exhibits communicating evaluation results. Support Pierce County Parks in identifying preferred trail alignments. Publish the evaluation results in a summary report. Cost Estimates, Timeline, Funding, and Phasing Development concept-level cost estimates of preferred alternatives. Identify potential funding sources, including grants and internal resources, and associated timelines. Determine phasing needs and propose logical sequencing if required. Develop a project timeline encompassing all phases and reflecting priorities and long-term planning considerations. Introduction Summary Background Contact Information Timeline Submittal Criteria 2026-RFQ-229 , Parkland Trail Extension Routing Study Submittal Checklist For proposals to be considered the following must be included in your submittal: Letter of Interest: Maximum one page, identify lead firm, project manager, and key staff proposed to work on the project, signed by the principal professional intended to lead the project effort. The letter needs to include contact information, number of years the consultant/contractor has been in business under current or previous names or additional assumed business names. Provide similar information concerning each subcontracted contractor. Provide a comprehensive organizational chart with key personnel for your firm and potential subconsultants, clearly identifying the estimated participation of Minority, Women, and Veteran owned (MWV) businesses and estimated percentage of total work anticipated to be performed by each sub-tier partner. Teams submitting qualifications must include a Washington State licensed architect and civil engineer. The selected team must comply with all applicable Federal, State and County laws and codes as well as Pierce County Park’s policies. Your approach to this type of work and explain how you have the experience, qualifications, size, and resources to provide the services listed in the scope of work. The name and brief resume of the key individual(s) who would be assigned to this project and an individual assigned to back up the key person in their absences, together with similar information for each individual to be provided under any subcontract. A proposal that outlines your firm approach to the work, capacity and availability, as well as any additional services or procedures of benefit to the County not specifically required by this Request for Qualifications, which the Consultant offers to provide. The name and title of the person authorized to execute a contract on behalf of the firm. The caption, cause number, Court, Counsel, and general summary of any litigation pending, or judgment rendered within the past three (3) years involving the firm. (if applicable) A statement outlining any proposed exceptions to the County’s requirements or requested clarifications to the requirements, including any exceptions to the terms of the County’s standard Services Agreement, a sample of which is attached hereto as “Attachment A.” Firms should understand, however, that the County is typically unwilling to change the terms of its standard Services Agreement and a firm’s inability to agree to those standard terms may be a basis for the County to instead negotiate with one or more other firms. References listing customers with descriptions of three similar projects completed recently. Include the year completed, how well the project met the scope, timeline, budget, final construction costs, and contact information for the Owner’s Representative. Acknowledgement (via the County's eProcurement Portal) of each addendum issued. (if applicable) Before you submit, please ensure your company profile in OpenGov and MRSC are up-to-date with your current business designations. Use the provided links below for instructions on updating your profiles. OpenGov: Updating User Profile, Company Profile, Email Address, Adding an Additional User MRSC Log In: Public Agency Membership - MRSC Rosters By submitting a proposal, proposer agrees that all documents, reports, proposals, submittals, working papers, or other materials prepared by the Contractor pursuant to this proposal shall become the sole and exclusive property of the County, and the public domain, and not property of the Contractor. The Contractor shall not copyright, or cause to be copyrighted, any portion of said items submitted to the County because of this solicitation. Only electronic submittal via the County's eProcurement Portal shall be accepted. No hard copies, emails or fax submittals are acceptable. Submittal Format Please use the following as a guideline to format your qualifications: Font Size: Please fonts no smaller than 11 points Format : In order for Pierce County to adequately compare and evaluate qualification objectively, each response to specific requests and criteria should be clearly labeled. Page Count : Maximum qualifications length should not excess 20 pages - NOT including title page, letter of interest (cover letter), table of contents, resumes and required forms.) These requirements are in addition to any other requirements identified herein. Procurement Documents & RFQ's Holder List BIDDERS WHO REGISTER AND DOWNLOAD BID DOCUMENTS will be automatically added to the FOLLOWER'S list in the County's eProcurement Portal . Notifications for bid updates, addendum and other bid information will be sent to all bidders who register on the Pierce County eProcurement Portal. Procurement Questions All questions must be submitted within the County's eProcurement Portal, under the Questions and Answer Section not later than 4:30 pm on Friday, December 4, 2026 . Bidders must be registered in the eProcurement Portal software in order to submit questions, receive addenda, notifications and ultimately submit a proposal. Proposals must be received by the Procurement & Contract Services and the Finance Department before 1:00 pm on Friday, December 11, 2026 . The proposer is responsible for submission of proposal before the deadline. The County shall not be responsible for late submittals. Expected Term of Resulting Agreement The initial contract period is anticipated to be for 18 months The County has the option of renewing for an additional two years after initial contract is executed. The actual schedule will be negotiated with the selected firm based on consultant and agency staff availability and finalized scope of work. Evaluation and Award Process An evaluation team will review the SOQ and evaluate all responses received based upon the criteria listed herein. The County may request clarifications or additional information, if needed. A selection may be made based on the Firms and initial evaluation criteria alone or the firms determined to be most qualified through the initial evaluation phase may be interviewed and the final determination will also consider reference checks and interviews. References may be requested to be submitted or may be gathered by the County. The County intends to select the Consultant who represents the most qualified team (or teams, as determined by the evaluation team) to Pierce County and begin the negotiation and award process based on the evaluated scores. Selected Consultant will be invited to enter contract negotiations with the County. Should the County and the selected consultant not reach a mutual agreement, the County will terminate negotiations and move to the next highest ranked consultant and proceed with negotiations. A Consultant’s inability to agree to the terms of the County’s Professional Service Agreement "Attachment A" may be a basis for the County to terminate negotiations and begin negotiating with one or more other Consultant. Selected Consultant(s) may be asked to provide the following for negotiation Per Employee Direct Labor Rates Provide the most recent audit of the firm received from WSDOT or a State or Federal agency that can establish the overhead rate. Subcontractors (if used) fully burdened, per-employee labor rates direct labor rates (if available). If subcontractors are on an ad hoc basis no rates needed. The County reserves the right to accept or reject any or all submitted SOQs, and to waive as informalities any irregularities, and to contract as the best interest of the County may require. The County also may reject SOQs that are non-responsive or that are submitted by non-responsible firms Evaluation RFQ General Terms and Condition Pierce County expressly reserves the following rights To waive any and/or all irregularities in the proposals submitted. To reject any or all proposals or portions thereof. To base awards with due regard to quality of services, experience, compliance with specifications, and other such factors as may be necessary in the circumstances. To make the award to any vendor or combination of vendors whose proposal(s), in the opinion of the County, is in the best interest of the County. Pierce County will not accept late proposals. Pierce County may return unopened any proposal or modification received after the hour and date specified. Reimbursement The County will not reimburse proposers for any costs involved in the preparation and submission of responses to this RFQ or in the preparation for and attendance at subsequent interviews. Title VI Compliance Pierce County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Cooperative Purchasing The Washington State Interlocal Cooperation Act, Ch. 39.34 RCW, authorizes public agencies to cooperatively purchase goods and services if all parties agree. By responding to this RFQ, Consultants agree that other public agencies may purchase goods and services under this solicitation or contract at their own cost and without Pierce County incurring any financial or legal liability for such purchases. Pierce County agrees to allow other public agencies to purchase goods and services under this solicitation or contract, provided that Pierce County is not held financially or legally liable for purchases and that any public agency purchasing under such solicitation or contract file a copy of this invitation and such contract in accordance with RCW 39.34.040. Public Records and Proprietary Material Proposals submitted under this Solicitation will be considered public documents and, with limited exceptions, will become public information and may be reviewed by appointment by anyone requesting to do so following the conclusion of the evaluation, negotiation, and award process. This process is concluded when a signed contract is completed between the Pierce County and the Proposer. If a firm considers any portion of its response to be protected under the law, the vendor shall clearly identify each such portion with words such as “CONFIDENTIAL,” “PROPRIETARY” or “TRADE SECRET” on each page for which the protection is sought. If a request is made for disclosure of such portion, Pierce County will notify the vendor of the request. Contract Compliance For Professional, Technical, Supply or Services It is the policy of Pierce County to foster an environment that encourages economic growth and diversification, business development and retention, increases competition and reduces unemployment. In support of that policy, Pierce County reaffirms its commitment to maximize opportunities in public contracting for all contractors including minority and women owned business enterprises. Proposers are encouraged to utilize qualified, local businesses in Pierce County and Washington State where cost effectiveness is deemed competitive. In addition, Proposers are encouraged to subcontract with firms certified by the Washington State Office of Minority and Women’s Business Enterprises (MWBE). MWBE DIRECTORY ASSISTANCE A directory of MWBE firms is published quarterly by the Washington State Office of Minority and Women’s Business Enterprises (OMWBE). Copies of the directory are available from the Stat

Plain text