State and local · OpenGov
Paukie Island Causeway Bank Stabilization
Description
Beaufort County plans to stabilize the eroding embankment slopes along both sides of the Paukie Island Road causeway, west of the existing tidal creek culvert, by installing about 560 linear feet of Envirolok vegetated shoreline protection (about 287 LF on the north side and 273 LF on the south side). The work consists of a geotextile bag wall built on a 1:1 batter, with a maximum exposed height of about 4 feet. It is reinforced with geogrid and has a wrapped aggregate drain behind it. The bags will be filled with a sand and topsoil blend, then hydroseeded with a salttolerant native seed mix and planted with sea oxeye. The disturbed marsh in front of the wall will be restored with smooth cordgrass plugs, giving a living shoreline that blends into the surrounding salt marsh. Because the work lies within the SCDES Bureau of Coastal Management critical area, construction will be scheduled around low tides and done under SCDES and U.S. Army Corps of Engineers permits. SCOPE OF WORK Project Information Item Description Project Shoreline Protection – Paukie Island Road Causeway, Beaufort County, SC Owner Beaufort County, South Carolina Engineer of Record McSweeney Engineers, LLC, 300 W Coleman Blvd, Ste 203B, Mt Pleasant, SC 29464 Work Approx. 560 LF of Envirolok vegetated bag wall (approx. 287 LF north side, 273 LF south side per Sheet C2), max. exposed height approx. 4 ft, geogrid, drainage, backfill, marsh planting and hydroseeding Vertical datum NAVD 88. Approximate tidal datums (Sheet C3): MHHW +3.55 ft, MLLW −4.43 ft Governing agencies SCDES Bureau of Coastal Management (OCRM critical area), U.S. Army Corps of Engineers, Beaufort County Earthwork, Part 1 1.1 SUBMITTALS Work plan and sequence, submitted at least 14 days before mobilization. Include tide-window scheduling, staging and access, equipment list, and methods to keep equipment off the marsh surface. Utility locate ticket numbers (SC811), plus potholing results for utilities within 10 ft of the wall, geogrid paths or excavation limits. Survey control layout and pre-construction cross sections at each wall segment. As-built survey, sealed by a South Carolina Registered Land Surveyor, in AutoCAD and PDF formats. 1.2 QUALITY ASSURANCE Keep a copy of the Contract Documents and all permits (SCDES-BCM and USACE) on site at all times. Comply with all applicable federal, state and local regulations, including OSHA, USACE, SCDES Bureau of Coastal Management, and permit conditions. The Contractor bears full responsibility for installing the work in accordance with the permits. 1.3 SITE CONDITIONS Field-verify all existing dimensions, elevations and conditions before ordering materials or starting work. Bring discrepancies to the Engineer's attention in writing. Existing utilities: Utility locations shown are approximate, and not all utilities may be shown. Known utilities include an underground communication line roughly 3–4 ft landward of the wall face, and an 8-in. PVC DR18 water main that crosses the south wall alignment. The Contractor shall: Request SC811 locates and pothole utilities before excavating or installing geogrid. Maintain at least 1 ft clearance between geogrid and any utility. Where this clearance cannot be met, notify the Engineer. Relocate utilities only with written approval of both the Owner and the utility owner, at no additional cost to the Owner. Tidal work: Perform excavation, leveling-pad placement and the buried courses during low-tide windows. Work outside standard hours requires the Owner's approval (see 1.7). 1.4 WORK HOURS A. Standard work hours are 7:00 AM to 5:00 PM, Monday through Friday. No work on Sunday. Saturday work and work outside these hours (including low-tide windows) must be scheduled with and approved by the Owner. Earthwork, Part 2 2.1 MATERIALS Fill, backfill, aggregate and drainage materials: As specified in Section 31 23 00. Geosynthetics: As specified in Section 31 32 19. Earthwork, Part 3 3.1 SURVEY CONTROL A. Establish and maintain survey control at all times to set and maintain lines and elevations. Elevations are NAVD 88. 3.2 PROTECTION Install erosion, sediment and turbidity controls in accordance with Section 31 35 00 before any land disturbance. Limit disturbance seaward of the wall face to what is needed for installation. For bidding purposes, assume this width is 3 ft. Do not disturb marsh vegetation outside the limits shown. Protect existing pavement, structures, culverts, utilities and vegetation to remain. Repair any damage at no cost to the Owner. Provide controls to keep debris out of the water. Remove any debris that enters the water immediately. 3.3 CLEARING AND GRUBBING Clear and grub within the work limits only. Remove vegetation, roots, debris and existing failed slope materials. Dispose of cleared material off site in accordance with applicable regulations. Burning is not permitted. 3.4 FUEL AND MATERIAL HANDLING Do not store fuel on the project site. Bring fuel to the site as needed. Fuel, lubricate and maintain equipment in a manner that gives maximum protection against spills. Keep a spill kit on site. 3.5 STOCKPILES AND BAG-FILLING AREA A. Locate stockpiles and the bag-filling work area outside the critical area, in locations approved by the Owner. Surround stockpiles with silt fence and cover them before rain events. 3.6 TRAFFIC CONTROL AND ROADWAY REPAIR Provide all traffic control in accordance with the MUTCD and SCDOT standards. Repair or resurface any roadway damaged by the work in accordance with the SCDOT Standard Specifications. 3.7 CLEANUP A. Remove all construction debris and surplus materials before final inspection. 3.8 MEASUREMENT AND PAYMENT A. General earthwork, clearing, survey control, utility locating, traffic control and cleanup are incidental to the work. No separate payment will be made unless a bid item is listed on the Bid Schedule. END OF SECTION 31 00 00 Excavation and Fill, Part 1 General 1.1 SUMMARY This section covers excavation for the wall and its reinforced zone, removal and replacement of unsuitable foundation soil, the #57 granite leveling pad, the wall drainage aggregate and pipe, reinforced and retained backfill, and compaction and testing. Related sections: 31 00 00 Earthwork; 31 32 19 Geosynthetic Soil Stabilization; 31 35 19.13 Envirolok Vegetated Wall/Slope System; 31 35 19.19 Envirolok Bag Fill Material. 1.1 SUBMITTALS A. Product data for the drainage pipe and fittings. Excavation and Fill, Part 2 2.1 REINFORCED BACKFILL Inorganic soil classified SW, SP, SM or SC per ASTM D2487, free of debris, roots, organics and deleterious material. Gradation per ASTM D6913: Sieve size Percent passing 1 in. 100 No. 4 20 – 100 No. 40 0 – 60 No. 200 0 – 35 Cohesionless coarse-grained soils (sand) are preferred. Finer soils with low plasticity (PI of the fine fraction less than 20) may be used only with the Engineer's approval. Maximum particle size is 1 in., unless installation-damage testing of the geogrid with the larger material is submitted and approved. The material must achieve an effective friction angle of at least 30 degrees at 95% standard Proctor density. 2.2 RETAINED FILL AND STRUCTURAL FILL A. Retained fill and structural fill used to replace unsuitable foundation soil: Material meeting 2.1 A, or other material approved by the Engineer that achieves the retained-fill and foundation parameters in 1.3. 2.3 LEVELING PAD AND DRAINAGE AGGREGATE A. No. 57 crushed granite meeting AASHTO M43 / SCDOT Section 701, clean and free of fines. Limestone is not permitted. 2.4 DRAINAGE PIPE A. 4-in. diameter perforated corrugated polyethylene pipe meeting AASHTO M252, with manufacturer's fittings. Outlet pipe at daylight locations shall be solid-wall, with an outlet treatment as detailed or approved by the Engineer to limit tidal backflow and siltation. 2.5 FILTER FABRIC A. Nonwoven geotextile wrap for the drainage aggregate, as specified in Section 31 32 19. Excavation and Fill, Part 3 3.1 EXCAVATION Excavate to the lines and grades shown, including the leveling pad, the buried courses and the reinforced soil zone. Take precautions to minimize over-excavation. Fill over-excavation with compacted reinforced backfill, or as directed by the Engineer, at the Contractor's expense. Excavate only the length of wall that can be set and backfilled within the same low-tide window. Do not leave open excavation exposed to tidal inundation. Dewater excavations as needed to place and compact materials in the dry. Discharge water only through approved sediment controls and in accordance with permit conditions. 3.2 FOUNDATION PREPARATION A. Excavating for the leveling pad. Remove all organic material. Level and compact the foundation. 3.3 LEVELING PAD Install a continuous #57 granite leveling pad 12 in. thick and at least 3 ft wide, as shown on Sheet S1. Compact it with a vibratory plate to a firm, unyielding, level surface. Set the pad elevation so that the bottom two courses of Envirolok bags are buried below finished grade. 3.4 WALL DRAINAGE Place a continuous drain section of approximately 1 SF of #57 granite, fully wrapped in filter fabric, with the 4-in. perforated drainpipe at the location shown on Sheet S1. Daylight the drain through the wall face at 20-ft maximum intervals, at the outlet detail approved by the Engineer. 3.5 BACKFILL PLACEMENT AND COMPACTION Place and compact backfill as each course of Envirolok units is installed. Place backfill in loose lifts not exceeding 8 in. Compact each lift to at least 95% standard Proctor maximum dry density (ASTM D698). At placement, the moisture content shall be between optimum and 3 percentage points below optimum (ASTM D698). Use only hand-operated compaction equipment within 3 ft of the back of the Envirolok units. Place, spread and compact backfill so that slack does not develop in the geogrid. Place fill from the wall face back toward the tail of the reinforcement. Do not operate tracked equipment directly on geogrid. Maintain at least 6 in. of fill over geogrid before tracked equipment passes over it. Rubber-tired equipment may run on the geogrid at low speed, without sudden braking or sharp turns. At the end of each day, grade the backfill away from the wall and direct runoff away from the wall area. Do not let runoff from adjacent areas enter the wall construction area. 3.6 TOLERANCES Finished grades: within 3 in. of the grades shown. Top of wall: not to exceed the existing top of bank or El. 6.5 ft (NAVD 88), as directed by the Engineer. 3.7 FIELD QUALITY CONTROL A. The contractor shall ensure that installation of manufactured materials is in accordance with the manufacturer’s written instructions. 3.8 DISPOSAL A. Remove unsuitable and surplus excavated material from the site and dispose of it legally. Do not place excavated material in the marsh or the critical area. 3.9 MEASUREMENT AND PAYMENT A. Excavation, leveling pad, drainage and backfill are included in the unit price per linear foot of Envirolok wall. Geosynthetic Soil Stabilization, Part 1 1.1 SUMMARY This section covers geogrid soil reinforcement connected to the Envirolok facing, and the nonwoven geotextile filter fabric used to wrap the wall drainage aggregate. Related sections: 31 23 00 Excavation and Fill; 31 35 19.13 Envirolok Vegetated Wall/Slope System. 1.1 SUBMITTALS Manufacturer's product data and certification of Minimum Average Roll Values (MARV) for each geosynthetic, at least 30 days before construction. Geogrid long-term design strength (LTDS) with the reduction factors for installation damage, creep and durability, determined in accordance with AASHTO LRFD and the NCMA Design Manual. Connection strength data between the geogrid and the Envirolok units with connector pins, if available from the manufacturer. Proposed substitutions must be submitted with equal-or-better test data at least 14 days before bid opening. 1.2 DELIVERY, STORAGE AND HANDLING Deliver rolls with labels that identify product, lot and roll number. Store rolls off the ground and covered to protect them from UV exposure, mud, standing water and damage. Do not use damaged material. Do not leave geosynthetics exposed to sunlight for more than 7 days before they are covered. Geosynthetic Soil Stabilization, Part 2 2.1 GEOGRID REINFORCEMENT Acceptable products (Sheet S1): Miragrid 3XT, manufactured by Solmax (formerly TenCate/Mirafi). Stratagrid SGU60, manufactured by Strata Systems. An approved equal with long-term design strength, coverage ratio and pullout and connection properties at least equal to those of the products listed. The geogrid shall be high-tenacity polyester (PET) or HDPE, formed as a regular network of integrally connected tensile elements with apertures sized to interlock with the surrounding soil. It shall be manufactured specifically for soil reinforcement. Geogrid length and layout: Install geogrid as shown on Sheet S1. 2.2 GEOTEXTILE FILTER FABRIC A. Nonwoven, needle-punched polypropylene or polyester geotextile meeting AASHTO M288 Subsurface Drainage, Class 2, see Technical Specifications for MARV properties. Geosynthetic Soil Stabilization, Part 3 3.1 GEOGRID INSTALLATION Cut and lay geogrid at the elevations shown on the Drawings or as directed by the Engineer. Orient the geogrid with its primary strength direction (generally the roll direction) perpendicular to the wall face. The Contractor shall verify the orientation before placement. Place geogrid in continuous lengths perpendicular to the wall. Splices in the strength direction are not permitted. Butt adjacent sheets parallel to the wall with no gaps. Connect geogrid to the facing by laying it over the front portion of the installed course of Envirolok units. Drive the connector pins through the geogrid and into the units below. Place and compact the next course to lock the reinforcement in place. Pull the geogrid taut and remove all slack before and during placement of fill. Stake or pin the tail if needed to hold tension. Place and compact fill over the geogrid in accordance with Section 31 23 00. Maintain at least 6 in. of cover before tracked equipment operates over it. Replace any geogrid damaged during installation. 3.2 GEOTEXTILE INSTALLATION Place the geotextile against prepared subgrade without wrinkles or folds. Wrap the drainage aggregate completely and overlap the edges at least 12 in. on top. Overlap roll ends at least 18 in. Lap upstream fabric over downstream fabric. Replace any torn or punctured fabric, or patch it with a piece that extends at least 3 ft beyond the damage in all directions. 3.3 MEASUREMENT AND PAYMENT A. Geogrid and geotextile are included in the unit price per linear foot of Envirolok wall. No separate payment will be made. Slope Protection and Erosion Control, Part 1 1.1 SUMMARY This section covers temporary and permanent slope protection, erosion and sediment control, and turbidity control. It includes the floating turbidity barrier, silt fence, erosion control blanket, construction entrance (where used), temporary stabilization, inspection and maintenance, and removal. The Envirolok vegetated wall (Section 31 35 19.13) is the permanent slope protection at the shoreline. Permanent vegetation is specified in Sections 32 92 00, 32 92 19 and 32 93 00. 1.2 REFERENCES SCDES (formerly SCDHEC) Standard Drawings SC-03 (Silt Fence) and SC-06 (Construction Entrance), current editions. SCDES Bureau of Coastal Management and USACE permits for this project. SCDOT Qualified Products List, Approval Sheet 34 (Silt Fence Fabric). SCDOT Supplemental Technical Specification SC-M-815-9, Rolled Erosion Control Products (01/25). SCDOT Standard Specifications for Highway Construction, Section 815, current edition. 1.3 SUBMITTALS Erosion, sediment and turbidity control plan that shows device locations, installation sequence and tide-window schedule, at least 14 days before mobilization. Product data for the turbidity barrier, silt fence fabric and posts, and erosion control blanket. Inspection reports, within 24 hours of each inspection. 1.4 REGULATORY REQUIREMENTS Comply with the permit conditions. Where these specifications and the permits differ, the permit governs. Flag or otherwise clearly mark all Waters of the State, including wetlands and marsh, in the field before disturbance. Slope Protection and Erosion Control, Part 2 2.1 FLOATING TURBIDITY BARRIER, IF REQUIRED Floating turbidity curtain with closed-cell foam flotation (at least 8 in. diameter), a woven geotextile or reinforced vinyl skirt, ballast chain along the bottom of the skirt, and a top tension cable or load line. Skirt depth shall reach to within 1 ft of the bottom at mean low water, unless the permit requires otherwise. Anchorage: galvanized anchors with chain and polypropylene line, with marker buoys as shown on Sheet C4. 2.2 SILT FENCE Woven geotextile filter fabric listed on SCDOT QPL Approval Sheet 34, at least 36 in. wide. The fabric shall be at least 85% polyolefin, polyester or polyamide by weight, and free of treatments or defects that affect its filtering properties. Steel T-posts at least 48 in. long, weighing 1.25 lb/ft (±8%), with a minimum yield strength of 50,000 psi and projections for fastening the fabric. Heavy-duty plastic ties. 2.3 EROSION CONTROL BLANKET Biodegradable, double-net straw/coconut or 100% coconut fiber erosion control blanket meeting SCDOT SC-M-815-9 for the slope and flow conditions. Netting shall be natural-fiber (jute or coir) or loose-weave, wildlife-friendly netting with movable joints. Fixed-junction plastic netting is not permitted. Staples: U-shaped, 11-gauge steel or biodegradable stakes, at least 6 in. long (8 in. in sandy soils). 2.4 CONSTRUCTION ENTRANCE (WHERE USED) Stone: 2 to 3 in. D50 crushed stone, at least 6 in. deep. Limestone is not permitted. Underlying nonwoven geotextile per Section 31 32 19. Slope Protection and Erosion Control, Part 3 3.1 SEQUENCE A. Install the turbidity barrier and the landward sediment controls before any land disturbance. The suggested construction sequence is: Install the turbidity barrier and the silt fence or other perimeter controls landward of the work. Locate and pothole utilities and establish survey control. Excavate and set the leveling pad during low-tide windows. Place the bags, geogrid, drainage and backfill, course by course. Fine grade, hydroseed, plant, and install the erosion control blanket on disturbed landward areas. Remove temporary controls after final stabilization and with the Engineer's approval. 3.2 TURBIDITY BARRIER, IF REQUIRED Install the barrier seaward of the work area so that it fully encloses the in-water and intertidal work. Secure each end above MHW (MHHW El. +3.55 ft NAVD 88). Keep the barrier in place and functioning until the disturbed area is stabilized and the water inside the barrier is visually no more turbid than the water outside. Inspect the barrier daily during in-water work. Repair or reposition it immediately if it is damaged, displaced or overtopped. 3.3 SILT FENCE Install silt fence in accordance with SCDES Standard Drawing SC-03: Space posts at 6 ft maximum and drive them at least 24 in. into the ground. Posts shall extend 1 to 2 in. above the fabric, and no more than 3 ft above the ground. Bury at least 12 in. of fabric in a trench, then backfill and compact the trench. Fabric height shall be at least 24 in. above the ground. Attach the fabric with heavy-duty plastic ties spaced evenly within the top 8 in. of the fabric. Use continuous rolls cut to length. Where a joint is unavoidable, make it by one of the methods on SC-03. Do not place silt fence across channels, in concentrated flow (greater than 0.5 cfs), or in areas subject to tidal flow. Use silt fence only landward of the high-tide line, as shown or as directed by the Engineer. Remove sediment when it reaches one-third of the fence height. 3.4 EROSION CONTROL BLANKET, IF USED Prepare a sm