Penn Manor Large Valve Vault Replacement
Description
The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Penn Manor Large Valve Vault Replacement . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Tuesday, December 8, 2026 . Late responses will not be accepted. This contract consists of replacing a 24-inch large valve vault and approximately 101 feet of 24-inch water main. It also includes relocating approximately 51 feet of 24-inch water main and approximately 54 feet of water house connections to serve Penn Manor Lane in the Bowie area of Prince George’s County, Maryland. SCOPE OF WORK Enter SOW text here. Scope of Work This contract consists of replacing a 24-inch large valve vault and approximately 101 feet of 24-inch water main. It also includes relocating approximately 51 feet of 24-inch water main and approximately 54 feet of water house connections to serve Penn Manor Lane in the Bowie area of Prince George’s County, Maryland. INTRODUCTION Summary The Washington Suburban Sanitary Commission, MD (the "WSSC"), is soliciting sealed responses for Penn Manor Large Valve Vault Replacement . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Tuesday, December 8, 2026 . Late responses will not be accepted. This contract consists of replacing a 24-inch large valve vault and approximately 101 feet of 24-inch water main. It also includes relocating approximately 51 feet of 24-inch water main and approximately 54 feet of water house connections to serve Penn Manor Lane in the Bowie area of Prince George’s County, Maryland. Timeline Release Project Date: October 15, 2026 Question Submission Deadline: October 28, 2026, 2:00pm Response Submission Deadline: December 8, 2026, 2:00pm CONTRACTOR QUALIFICATIONS IFB - LARGE DIAMETER (16" & DIAMETER) The contractor shall be regularly engaged in the construction of water and sewer pipelines and demonstrate successful experience in the installation of large-diameter water mains. The Contractor shall have installed a minimum of 3 miles of transmission main 16 in. diameter or greater. The Contractor shall also demonstrate experience installing at least 10 miles of water main for a water authority, commission, or municipality over the past 5 years. The project manager and/or foreman shall have at least three (3) years’ experience installing utilities, including water main 16 in. diameter or greater. The contractor shall have experience managing multiple subcontractors on at least 10 individual projects and have been responsible for the preparation of contractor submittals, schedules, and quality control of the pipeline work on the project. EXHIBIT A - PROJECT EXPERIENCE SUMMARY With the bid, submit “Exhibit A – Project Experience Summary” and all supportive documents necessary to demonstrate compliance with the minimum qualifications listed herein. Such documentation includes but is not limited to a copy of the plan sheet or other summary from the original contract documents showing the footage (not the entire contract) or a letter from the owner confirming amount of pipe installed for each diameter applicable to this project. Provide an explanation if a project was not or will not be completed within time or budget. Ongoing projects used to demonstrate experience shall be at least 50% complete. MINIMUM PIPELINE CONSTRUCTION The Contractor shall demonstrate successful experience in the installation of large-diameter water mains. See Specification 02510 for qualifications associated with water main construction. The requirements for minimum qualifications and bid submittal are as follows: The Contractor shall have installed, using their own crews, a minimum of three (3) miles of transmission main 16 in. diameter or greater. The Contractor shall demonstrate experience installing at least 10 miles of water main for a water authority, commission, or municipality over the past five (5) years. The Contractor shall have experience in at least 10 individual projects where they were responsible for: managing multiple subcontractors, preparation of contractor submittals, preparation and updates to project schedules, and project quality control. Projects where the contractor certifies that they have performed these functions shall be indicated as “Y” or “Yes” in the summary table under the column “Responsible Supervision”. MINIMUM SAFETY The Contractor shall have a safety plan and provide evidence of an OSHA Total Recordable Incident Rate (TRIR) of less than 2.67 for each of the last three (3) years. Include copies of OSHA Form 300A to support calculation of the TRIR. Calculate the IR using the following formula: TRIR= N*200,000/EH (where N=number of incidents for the year from OSHA form 300 or 300A, EH= number of hours worked by all employees for the year and 200,000 represents the base for 100 equivalent full-time workers for one (1) year working 40hrs/week for 50 weeks). Prime Contractors with a TRIR higher than the 2.67 threshold shall commit to furnishing a dedicated full-time safety professional, consistent with USACE EM 385-1-1 criteria or equal. MINIMUM KEY PERSONNEL The Contractor shall demonstrate that key personnel have successful experience in the installation of large diameter water mains. The project manager and/or foreman shall have at least three (3) years’ experience installing utilities including water main of similar or greater diameter than that included in this project. If applicable to the project, the Contractor shall identify key staff personnel to perform the electrical/mechanical work on this project. The Electrical/Mechanical foremen shall have a minimum of three (3) years supervisory experience. All electrical work shall be performed under the supervision of a Master Electrician with at least ten (10) years of relevant experience. Personnel performing the work shall at least be at the level of a Journeyman with at least five (5) years relevant experience as a full-time Journeyman electrician. If applicable to the project, the Contractor shall demonstrate at least five (5) years of experience in the construction and start-up of remote terminal units. Submit with the Bid the resume of the Key personnel including copy(ies) of all certifications/licenses held by this individual. Resume shall include, at a minimum, past employers for the past five (5) years, five (5) similar projects in the last three (3) years with references, and names and telephone numbers of contact persons. Any change in Field Supervisory staff shall require a resume to be submitted and approved in writing by the WSSC prior to change MINIMUM TRAFFIC CONTROL Also see Specifications Section 01500. Bidder and/or their subcontractor(s) shall be responsible for traffic control work and shall demonstrate in the Bid the minimum qualifications to perform such. Requirements for minimum qualifications and Bid submittal are as follows: Bidder and/or their subcontractor(s) must utilize in the contract at least one field individual as a Flagger and one field individual as a Traffic Manager, both certified by the State of Maryland (the ATSSA – American Traffic Safety Services Association - Certification is recognized by SHA and accepted by WSSC to fulfil the requirement for Flagger). Submit with the Bid the names of these individuals on company letterhead and a copy of each certification. MINIMUM EROSION AND SEDIMENT CONTROL Also see Specifications Section 01570. Bidder and/or their subcontractor(s) shall be responsible for erosion and sediment control work and shall demonstrate in their Bid the minimum qualifications to perform such. Requirements for minimum qualifications and Bid submittal are as follows: Bidder and/or their subcontractor(s) must utilize in the contract at least one supervisory field individual with a State of Maryland Erosion and Sediment Control Training and Certification. Submit with the Bid the name and title of this individual on company letterhead and a copy of this certification. MINIMUM PLUMBING Also see Specifications Section 02510. Bidder and/or their subcontractor(s) shall be responsible for pressure tapping cast iron, ductile iron and polyvinyl chloride water pipes and shall demonstrate in their Bid the minimum qualifications to perform such. Requirements for minimum qualifications and Bid submittal are as follows: Bidder and/or their subcontractor(s) must utilize in the contract at least one field individual with a Tapping Certification and a field supervisor experienced in the performance of this work. Installer must have at least three (3) projects in the last three (3) years of similar size and type that they worked on. Field supervisor must have a minimum of three (3) years in the performance of this work. Submit with the Bid the resumes of the Installer and Field Supervisor and copy(ies) of the certification(s). Resumes shall include, at a minimum, past employers for the past five (5) years, three (3) similar projects in the last three (3) years with references, and names and telephone numbers of contact persons. Any change in Installer and Field Supervisor shall require a resume to be submitted and approved in writing by WSSC prior to change. MINIMUM CHLORINATION AND DE-CHLORINATION Also see Specifications Section 02511. Bidder and/or their subcontractor(s) shall be responsible for chlorination and de-chlorination of water pipes and shall demonstrate in their Bid the minimum qualifications to perform such. Requirements for minimum qualifications for chlorination and de-chlorination are as follows: Bidder and/or their subcontractor(s) must utilize in the contract at least one Field Supervisor with three (3) years of experience in chlorination and de-chlorination of pressurized water pipes using pressurized liquid chlorine as described in AWWA B301 or method described in AWWA C651. Submit with the Bid the resume of the Field Supervisor and copy(ies) of all certifications/licenses held by this individual. Resume shall include, at a minimum, past employers for the past five (5) years, five (5) similar projects in the last three (3) years with references, and names and telephone numbers of contact persons. Any change in Field Supervisor shall require a resume to be submitted and approved in writing by the WSSC prior to change. INSTRUCTIONS TO BIDDERS/OFFERORS COMPLIANCE WITH COMMISSION PROCUREMENT REGULATIONS The Commission's Procurement Regulations, WSSC Code of Regulations, Title 6, Chapter 6.15, are incorporated into this Solicitation and made a part of this Solicitation by reference. The Procurement Regulations can be viewed online at https://wssc.district.codes/Code/6.15 . DEFINITIONS Whenever the following words occur in these Instructions to Bidders/Offerors, they shall have the following meanings. "Bidder" means any person submitting a bid in response to an invitation for bids ("IFB") or a request for quotations ("RFQ"). "Contract Documents" means all documents that are included, attached, or referenced in a Solicitation. "Invitation for bids" ("IFB") means all documents, whether attached or incorporated by reference, utilized for soliciting bids. "Invitation for prequalification" ("IFP") means all documents, whether attached or incorporated by reference, utilized for prequalifying potential bidders. "Offeror" means any person submitting a proposal to a request for proposals ("RFP") or invitation for prequalification ("IFP"). "Request for proposals" ("RFP") means all documents, whether attached or incorporated by reference, utilized for soliciting proposals. "Responsible" means a person who has the capability in all respects to perform fully the requirements stated in the invitation for bids and request for proposals, respectively, and the integrity and reliability that will assure good faith performance. "Responsive" means a person who has submitted a bid or a proposal that fully conforms to the invitation for bids or request for proposals. "Solicitation" means an invitation for bids, a request for proposals, a request for quotations, an invitation for pre-qualification, or any other document issued by WSSC for the purpose of soliciting bids or proposals to perform a WSSC contract. WSSC’S SUPPLIER PORTAL SYSTEM Bidders/Offerors are required to register in WSSC's Supplier Portal System in accordance with WSSC Code of Regulations, Title 6, Chapter 6.25, at the time of bid opening or proposal submission due dates. Failure to have an active supplier profile prior to this time may render the bid or proposal non-responsive. Information regarding the Supplier Portal System can be found online at https://wssc.district.codes/Code/6.25 and www.wsscwater.com . EXPLANATION OF CONTRACT DOCUMENTS TO PROSPECTIVE BIDDERS/OFFERORS Any prospective Bidder/Offeror must carefully examine the Solicitation. If a prospective Bidder/Offeror is unclear as to the meaning or intent of any of the Contract Documents included in the Solicitation, the prospective Bidder/Offeror shall request a clarification from the Procurement Office before its bid/proposal is submitted. All questions pertaining to the Solicitation or Contract Documents shall only be submitted by a Bidder/Offeror to the Procurement Officer identified in the Solicitation via the Online Discussion feature in the Supplier Portal. Questions submitted via email shall not be answered. Replies, where warranted, will be by addenda issued electronically to all parties who have downloaded the Solicitation. Questions received less than ten (10) days prior to the date for opening of bids or due date for receipt of proposals may not be answered. Only questions answered by formal written addenda will be binding. Questions received after this deadline may be addressed at the discretion of the Commission. Oral and other interpretations or clarifications will be without legal effect. Any information given to a prospective Bidder/Offeror by the Commission will be furnished to all prospective Bidders/Offerors via Online Discussion in the Supplier Portal. Any information given to a prospective Bidder/Offeror by the Commission will be furnished to all prospective Bidders/Offerors. SECURITY CLEARANCE REQUIRED FOR ACCESS TO PLANS AND DRAWINGS In order to receive plans and drawings related to the Solicitation, a prospective Bidder's/Offeror's representative must first be approved through a security background investigation. The Bidder's/Offeror's representative can obtain an application for a security clearance by contacting WSSC''s Procurement Office by phone, (301) 206-8288. Requests for plans and drawings can only be fulfilled for representatives having successfully completed the security investigation. Multiple representatives may gain security clearance to request plans and drawings. Additionally, plans and drawings may be accessed through E-Builder® ASP software. A user name and password is issued by the Procurement Officer upon request. To obtain a user name and password for access, a Bidder's/Offeror's representative must first obtain a security clearance. SUBMISSION OF BIDS (COMPETITIVE SEALED BIDDING) Bid Forms Bids shall be submitted in accordance with the instructions in the Solicitation and shall be filled out in typewritten or written ink. If changes and erasures are made, such changes and erasures shall be clear and legible, and shall be initialed by the person signing the forms. The bid forms may provide for submission of a price or prices for one or more items, which may be lump sum bids, alternate prices, and scheduled items resulting in a bid on a unit of construction or a combination thereof, or other bidding arrangements. Unless specifically called for, alternate bids will not be considered. Failure to submit a bid form or submitting an incomplete bid form with the bid may lead to the bid being deemed non-responsive or non-responsible. Bid Submittals Bidders shall complete and submit any submittals required by the Solicitation with the bid. Failure to submit a submittal or submitting an incomplete submittal with the bid may lead to the bid being deemed non-responsive or non-responsible. Bid Bond If the Solicitation requires a bid bond and a Bidder fails to submit a bid bond with the bid, the bid shall be deemed non-responsive. Multiple Unit Prices No Bidder will be permitted to offer more than one price for each item identified in a bid form even though it believes it has two or more products that will meet the specifications in the Solicitation. If a Bidder submits more than one price for any item, all prices for that item may be rejected at the discretion of the Chief Procurement Officer. Further, the bid may be deemed non-responsive. Bid Submittal Limit A Bidder may submit only one bid in response to a Solicitation. If a Bidder submit more than one bid, the bids will be rejected and deemed non-responsive. Alternate Bid Unless alternate bids are specifically requested in the Solicitation, they will not be accepted. Alternate bids will be rejected and deemed non-responsive. Conditional Bids If a Bidder submits a bid that requires the Commission to accept changes or additions to the Contract Documents, the bid will be rejected and deemed non-responsive. Bid Signing Signing of a bid shall comply with instructions in bid forms. Bid Delivery Bids shall be submitted on-line through the Commission's Solicitation Portal. A Bidder shall assume full responsibility for timely submission and only one bid may be submitted. Bid submittals shall contain an Electronic Copy of Original Bid documents. Electronic Copy Bid Submittal shall be submitted via the Portal at https://procurement.opengov.com/portal/wsscwater . Bids shall be submitted on the forms provided and must be signed by an authorized representative of the bidder. Bids submitted in any form other than as specified herein will be deemed non-responsive and will not be considered for award. Bids shall be concise, yet sufficiently comprehensive to set forth the bidders understanding of the required services. Bids must be organized to the structure described in these Additional Instructions. Any bid received after the exact time for receipt will be deemed non-responsive. The bid will not be considered for award. However, an exception may be made when a late bid would have been timely but for the action or inaction of the Commission. ACKNOWLEDGMENT OF AMENDMENTS TO THE SOLICITATION Each Bidder/Offeror shall acknowledge receipt of any amendment to the Solicitation in accordance with the instructions stated in the amendment or otherwise stated in the Solicitation. If a Bidder/Offeror fails to acknowledge the amendment prior to the deadline for submitting a bid or proposal, the bid or proposal may be deemed nonresponsive. WITHDRAWAL OF A BID (COMPETITIVE SEALED BIDDING) Prior to the time and date set for bid opening, a Bidder may withdraw a bid or proposal by "Unsubmitting" their response in the eProcurement Portal. Bids or proposals may only be withdrawn prior to the time and date set for bid opening. No Bidder may withdraw a bid within 120 days after the actual date of the opening of the bids. Negligence on the part of the Bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened. Should there be reasons why a contract cannot be awarded within the specific period, the time may be extended by mutual agreement between the Commission and the Bidder. BID MODIFICATION, MISTAKES, AND MINOR INFORMALITIES (COMPETITIVE SEALED BIDDING) Mistakes in Bids Discovered Before Bid Opening A Bidder may correct mistakes discovered before the time and date set for bid opening by withdrawing or correcting the bid. Mistakes Discovered After Bid Opening but Before Award Mistakes in bids that are discovered after the time and date
Published attachments
Addenda and notices
Addendum #1 · 1
Addendum No. 1 - issued to extend the bid due date until November 19, 2026, at 2:00 PM. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Addendum No. 2 - issued to extend the bid due date until December 8, 2026, at 2:00 PM. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #3 · 3
Addendum No. 3 is issued to revise the bid schedule to include line 23. Provide and install a temporary bypass and revise the plans (Attachment H). Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Please confirm the sequence of operation phasing- in phase 1, under an 8 hour period, the contractor is to remove 24" PCCP main and install DIP in 2 sections- 46' and 41', and then turn the 24" pipe back on, this would require the installation of PCCP adaptors and then require an additional shut down for phase 2. would the installation of line stops assist with shut downs and the limitation of reconnections to the existing pccp pipe? if the main has to stay live during the other work, then perhaps line stops, tapping valves and a temporary bypass around the new vault would be required. please confirm the sequence of operation
It has been determined that a temporary bypass will be required to maintain water service to affected customers during construction. Please refer to the attached Bypass Schedule and revised bid schedule, which includes the temporary bypass line item. The Sequence of Construction has also been revised to incorporate the temporary bypass requirements, as shown on Sheet 5 of 7 of the revised plans.
Please confirm if the water services are to include replacement of the meter pit, or if the services are reconnects
Contractor shall defer to bid item 15 – installation of new meters & meter pits is to be included.
The borings show asphalt over concrete. The specifications say to follow PG county 300.18 which is not showing any Concrete placement. Please confirm if the contractor will only place asphalt
The contractor shall restore all streets in accordance with the City of Bowie’s restoration standards, as specified in Sections 22-36 and 22-37 of the City Code. Any roadway disturbed during construction shall be restored to its original condition or better. Please refer to the City of Bowie’s Street Design Standards 14i_Chapter-VIII---Bowie-Std-Details
if work is to be done when the school is out of session and the road is closed, will the work hours be increased from 9-3 to say 8 to 4:30 ?
The contractor shall strictly adhere to the working hours specified on the contract drawings. Any deviation from these hours shall require prior review and written approval from the City of Bowie. No work outside the specified hours shall be permitted without such approval.
The valve that are listed for shutdowns, which valves are the inline on the 24"?
Valves V072, V049, V050, and V096 are 24-inch inline valves located along the existing 24-inch water main and are identified in the plans as valves to be closed to facilitate the required shutdown during construction.
Is there a staging area for this project?
Per plan sheet 1: Note # 20: CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING STAGING AREA(S) AND FOR MOBILIZATION TO AND FROM SUCH AREA(S) AT NO ADDITIONAL COST TO THE WSSC.
Is there a LUP Permit issued?
No permits from the County or the City of Bowie are required for the proposed construction activities.
Who will be responsible for road repairs due to pre-existing conditions?
Refer to General Note Notes 36 and 40 on the plan’s cover sheet.
In the event that the 8 hours shut down in two different phases for specific activities is not sufficient, how will it be handled?
See Question 1 response.
Is there a expectation of any temporary by pass of the existing system in order to construct this section.
See Question 1 response.
If contaminated soils/hazardous are encountered during excavation, how will be the contractor compensated?
Please refer to WSSC Water Specification 02530.
OpenGov categories
- 237110 · Water and Sewer Line and Related Structures Construction
- 237310 · Highway, Street, and Bridge Construction
- 237990 · Other Heavy and Civil Engineering Construction
- 238110 · Poured Concrete Foundation and Structure Contractors
- 238120 · Structural Steel and Precast Concrete Contractors
- 238910 · Site Preparation Contractors
- 238990 · All Other Specialty Trade Contractors
- 325998 · All Other Miscellaneous Chemical Product and Preparation Manufacturing
- 332996 · Fabricated Pipe and Pipe Fitting Manufacturing
- 423830 · Industrial Machinery and Equipment Merchant Wholesalers
- 484220 · Specialized Freight (except Used Goods) Trucking, Local
- 488490 · Other Support Activities for Road Transportation
- 541380 · Testing Laboratories
- 561730 · Landscaping Services
- 561990 · All Other Support Services
- 562111 · Solid Waste Collection