Pensacola Bay Center - Owner's Representative (OR) / Construction, Engineering, and Inspection (CEI) Consultant

Description

The Pensacola Bay Center Reimagined (PBC-R) Project is intended to revitalize and expand the existing entertainment campus to better serve residents, visitors, event partners, and the broader Northwest Florida region. The initiative seeks to modernize the existing facility, introduce new event and hospitality spaces, and evaluate additional multipurpose venues that support evolving market demands, regional economic development, tourism competitiveness, and long-term community objectives. Escambia County intends to solicit qualifications from professional consulting firms with demonstrated experience in providing Owner’s Representative (OR) services and, when separately authorized by the County, Construction Engineering and Inspection (CEI) services for the Pensacola Bay Center Reimagined (PBC-R) Project. Professional consulting services may be required throughout multiple phases of the project, including planning, design, procurement, construction, commissioning, and project closeout. The specific scope, extent, and duration of services will be determined by the County based on project priorities, funding availability, implementation schedules, and the unique requirements of each authorized phase. The selected Consultant may be required to provide a comprehensive range of professional services, including project management and oversight; planning and programming support; design coordination and review; procurement assistance; construction administration and oversight; CEI services, when specifically authorized; project controls; cost estimating, budgeting, and cost management; schedule development and monitoring; quality assurance; risk assessment and management; commissioning coordination; project closeout; and warranty administration. The specific services to be performed shall be established through the Consultant’s approved scope of services and shall be subject to the County’s authorization for each applicable project phase. The OR Consultant shall serve as Escambia County’s designated representative, acting solely within the authority expressly delegated by the County. The Consultant shall provide project management, coordination, and oversight services and facilitate effective communication among the County, Architect/Engineer of Record, construction contractor, subcontractors, testing agencies, utility providers, regulatory authorities, and other project stakeholders. The Consultant shall represent and protect the County’s interests by promoting adherence to the approved project scope, budget, schedule, quality standards, Contract Documents, and applicable regulatory requirements, while maintaining transparency, accountability, and effective project controls. The County shall retain sole authority over all contractual commitments, procurement actions, funding allocations, policy determinations, and other decisions not expressly delegated to the Consultant in writing. The Consultant shall not independently authorize changes to the project scope, contract price, schedule, or other contractual obligations without prior written approval from the County. Project Description Escambia County is undertaking a multiphase revitalization and potential expansion initiative known as the Pensacola Bay Center Reimagined (PBC-R) Project. The program is intended to modernize and enhance the existing Pensacola Bay Center and its surrounding campus, expand its operational capabilities, and strengthen its role as a regional destination for entertainment, tourism, hospitality, recreation, and community events. The proposed program is anticipated to include renovations and modernization of the existing facility, with potential future development of a new multipurpose event center, additional recreational facilities, structured parking, and associated campus infrastructure improvements. The overall project is currently envisioned as three potential phases, as generally described below. The final scope, sequencing, schedule, and implementation of each phase will be determined by the County based on further planning and design development, feasibility evaluations, funding availability, operational priorities, and applicable regulatory approvals. Selection of a Consultant for one phase shall not constitute a commitment or guarantee of selection or engagement for any subsequent phase. Each phase shall be subject to separate written authorization by the County, with its respective scope of services, professional fees, staffing requirements, deliverables, and schedule established and approved prior to commencement of work. Phase 1 – Renovation of Existing Facility This phase is anticipated to encompass renovations, modernization, and improvements to the existing facility and associated campus areas. The proposed scope of work may include, but is not limited to, the following: Interior and exterior architectural, aesthetic, and functional improvements. Development of premium event and hospitality spaces, including club seating, lounges, and restaurant areas. Expansion and modernization of food and beverage concession facilities. Construction of a stage pocket and associated back-of-house infrastructure. Expansion or reconfiguration of lobby and concourse areas. Development of an outdoor event plaza. Associated building systems, accessibility, life-safety, operational, and site improvements identified during project development. The final scope of Phase 1 will be determined by the County as project design, budget considerations, operational needs, and implementation priorities are further evaluated and refined. Phase 2 – New Multipurpose Event Center (Subject to Financing and Authorization) This potential phase contemplates the planning, design, and construction of a new multipurpose event center, preliminarily estimated at approximately 150,000 square feet. The proposed facility may accommodate a variety of functions, including conventions, exhibitions, sporting tournaments, graduations, banquets, ballroom events, conferences, meetings, and other large-scale indoor gatherings. The scope, size, configuration, and implementation of this phase remain preliminary and are subject to further evaluation, funding availability, and formal authorization by Escambia County. The goals of this Event Center expansion project will be to deliver: Large dividable Event Floor Space (185’x300’) Pre-function and Spectator Facilities Multi-purpose/Multi-sport Spaces Conference / Exposition / Trade Show Space Meeting Rooms Ballrooms Under-Building Structured Parking The additional Service Area / Connector / Loading Dock expansion would include: Event Operations Support Facilities for the entire PBC Campus Commercial Kitchen (Preparation and Warming) Dry and Cold Food Storage Loading / Marshalling Area VIP / Delivery Drop-off (secure and under-roof) Small Meeting Rooms Large Restroom Facilities Create a physical, under-roof connection between PBC and Event Center. The final size, configuration, functional program, and supporting infrastructure requirements of the proposed facility will be established through further programming, feasibility assessments, constructability evaluations, design development, and funding considerations. Implementation of this phase shall be contingent upon the County’s determination of project feasibility, availability of sufficient funding, and formal authorization to proceed. Phase 3 – Optional Facilities (Subject to Financing and Authorization) At the County’s discretion, future phases of the project may include the development of additional facilities and supporting infrastructure within the Pensacola Bay Center campus. Potential improvements may include, but are not limited to, the following: New Ice-Skating Facility : A standalone ice-skating facility, separate from the existing tenant-scheduled rink, potentially incorporating concession areas, spectator seating, public restrooms, private event and party rooms, rooftop outdoor event spaces, administrative offices, and associated support facilities. Structured Parking Facility : A multilevel parking garage designed to accommodate increased parking demand, improve campus accessibility, and support event operations. Preliminary concepts contemplate a five-level parking structure capable of accommodating approximately 1,300 vehicles, subject to further evaluation and design. The necessity, feasibility, scope, configuration, and implementation of these potential improvements will be evaluated independently. Neither facility is guaranteed to proceed, and any future development shall be contingent upon the County’s determination of project feasibility, funding availability, applicable regulatory approvals, procurement requirements, and formal authorization to proceed. Overall Project Vision Collectively, the proposed improvements are intended to transform the Pensacola Bay Center into a modern, versatile, and integrated entertainment and event campus within walking distance of Pensacola’s Downtown Historic District. The overall redevelopment program is envisioned to enhance the facility’s ability to accommodate diverse entertainment, recreational, convenand community activities while promoting regional tourism, stimulating economic development, improving the visitor experience, and supporting the long-term operational and financial sustainability of the Pensacola Bay Center. Scope of Work Scope of Solicitation This solicitation encompasses all three anticipated phases of the Pensacola Bay Center Reimagined (PBC-R) Project. The specific scope of services, professional fees, deliverables, staffing requirements, and project milestones for each phase will be further defined and negotiated as the County determines the need and authorization to proceed. The County reserves the right, at its sole discretion, to authorize, defer, modify, or discontinue consultant services associated with any future phase. The County further reserves the right to retain the selected consultant for subsequent phases or to pursue separate solicitations and engage other qualified firms, as deemed to be in the County’s best interest and in accordance with applicable procurement requirements. Prior to proceeding with Phases 2 and/or 3, Escambia County may negotiate the applicable scope of services, professional fees, staffing, deliverables, and project schedules with the selected consultant. Any such negotiations shall be completed, and the resulting agreements formally approved and authorized by the County, prior to the commencement of services for the respective phase. Selection under this solicitation does not guarantee an award or authorization of services for any subsequent phase. Summary of Work The Owner’s Representative (OR) Consultant shall serve as the County’s designated representative in providing project management, coordination, oversight, and administrative support throughout the authorized phases of the project. The OR Consultant shall assist the County in managing project delivery to achieve the approved scope, budget, schedule, quality standards, Contract Documents, applicable laws and regulations, and County requirements. The OR Consultant shall not replace, assume, or relieve the Architect/Engineer of Record, Contractor, or other licensed professionals of their respective contractual, statutory, or professional responsibilities. Any additional professional services requiring specific licensure shall be performed only when expressly authorized by the County, included within the Consultant’s approved scope of services, and provided by appropriately licensed professionals in accordance with applicable laws and regulations. General Responsibilities The OR Consultant will: Serve as the County’s primary project-management representative and central point of coordination among the County, Architect/Engineer, Contractor, consultants, vendors, utilities, regulatory agencies, and other project participants. Plan, coordinate, manage, and monitor the various aspects of the project. Advise the County on matters involving scope, cost, schedule, constructability, quality, procurement, risk, and project delivery. Act in the County’s interest, within the authority delegated to the consultant under the agreement and applicable task order, in maintaining the required quality while managing project costs and schedule. Establish clear responsibilities and communication procedures among the project participants. Identify decisions that require County action or approval and help ensure those decisions are addressed in a timely manner. Identify potential problems, conflicts, delays, cost impacts, and other project risks and promptly advise the County of recommended actions. Maintain complete and accurate project records in a format acceptable to the County. Follow applicable Escambia County policies and procedures, contract requirements, and federal, state, and local laws, rules, codes, and regulations. Attend County meetings, public meetings, Board of County Commissioners meetings, and other meetings when requested. Provide enough qualified personnel to properly perform the services required for each project. Assist the County with the evaluation and selection of Architectural/Engineering consultants and other professional service providers. Coordinate value-engineering activities when requested. Monitor the design team’s progress and apparent compliance with established project requirements, without assuming the Architect/Engineer’s professional responsibility for the design throughout the project as applicable. Project Management and Administration The OR Consultant will: Develop and maintain a Project Management Plan appropriate to the size and complexity of the project. Assist the County in establishing and documenting project goals, objectives, scope, budget, schedule, and performance requirements. Establish and maintain project communication and document-control procedures. Coordinate project meetings and prepare agendas, meeting minutes, action-item logs, and decision logs. Maintain current logs for RFIs, submittals, change orders, potential change orders, design revisions, pay applications, testing, inspections, deficiencies, and other significant project matters. Track project decisions, approvals, financial commitments, and changes in scope. Maintain an electronic project file containing correspondence, meeting records, reports, schedules, cost information, approvals, testing documentation, inspection records, and other project records. Provide project documentation requested by the County within the timeframe established by the County. Assist the County and its auditors with audits and reviews involving project records, payments, reports, and contract compliance. Promptly notify the County of matters requiring County action or approval. Maintain the Project Action Register identifying responsible party, required action, date assigned, required completion date, current status, and resolution. Design and Preconstruction Services When included in the project, the OR Consultant will: Design Compliance Monitoring Participate in and advise the County throughout the design process, including programming, design charrettes, constructability reviews, and other design activities. The OR Consultant will manage and monitor the design schedule, design reviews, coordination, and approved design modifications. The OR Consultant will review drawings and specifications and serve as an agent of Escambia County during the design, construction, commissioning, and occupancy phases of the project, as applicable. The OR Consultant will: Assist the County with developing and refining the project scope, concepts, design narratives, and schematic designs. Review design development for scope, budget, schedule, constructability, maintainability, and operational considerations. Develop and maintain a Master Schedule and Master Project Budget, along with individual project schedules and budgets as needed. Coordinate the activities of the Architect/Engineer and other design professionals. Facilitate and coordinate Owner-led design and project management meetings and participate in construction meetings as appropriate. Review plans and specifications for constructability, coordination, completeness, and consistency with the approved project requirements. Assist with value engineering and identify opportunities to reduce project costs without compromising the project requirements. Review estimates of probable construction cost at appropriate stages of design. Monitor design progress against the approved schedule. Identify long-lead materials and equipment, permitting County Authority, Approvals and Consultant Limitations The OR Consultant will provide professional oversight, management, and recommendations but will not bind Escambia County to contractual obligations, approve expenditures, authorize changes in project scope, or commit County funds unless specifically authorized in writing by the County. The County will retain authority over all matters requiring County approval, including contracts, change orders, change directives, payments, budget transfers, scope changes, and any other action that commits County funds or otherwise binds the County. The OR Consultant is responsible for ensuring that recommendations and supporting documentation submitted to the County are accurate, complete, properly documented, and consistent with the project requirements. The OR Consultant shall act solely within the authority delegated by Escambia County under the Agreement and applicable Task Order. Nothing in the Consultant’s services shall relieve the Architect/Engineer, Contractor, subcontractors, testing agencies, commissioning providers, or other project participants of their respective contractual statutory, or professional responsibilities. The OR Consultant shall not be responsible for construction means, methods, techniques, sequences, procedures, or safety precautions and programs, which remain the responsibility of the Contractor. The Consultant’s observations, inspections, reviews, recommendations, or failure to identify defective or nonconforming work shall not relieve the Contractor of its obligation to perform the work in accordance with the Contract Documents. The OR Consultant shall not modify the Contract Documents, authorize changes in t he Work, approve additional compensation or time, accept or reject Work, direct the Contractor’s workforce, or commit County funds except to the extent expressly authorized in writing by the County. Professional design interpretations, modifications, and certifications shall remain the responsibility of the Architect/Engineer of Record unless separately authorized professional services are included in the Consultant’s agreement and performed appropriately licensed professionals. Conflict of Interest The OR Consultant shall disclose any actual, potential, or apparent conflict of interest involving the Consultant, its principals, employees, subconsultants, affiliates, the Architect/Engineer, Contractor, subcontractors, suppliers, testing agencies, commissioning providers, or other project participants. The OR Consultant, including its principals, employees, subcontractors, and affiliated entities, must not have a financial interest in a construction contractor that creates an actual or apparent conflict of interest with the project. The OR Consultant, or any construction firm in which the Owner’s Representative has a prohibited financial interest, may not bid on or perform construction work that the Owner’s Representative is responsible for overseeing under this contract. Standard of Performance and Personnel The OR Consultant will perform all services in accordance with generally accepted professional practices applicable to pu

Published attachments
Addenda and notices
  • Addendum #1 · 1

    Changed the verbiage in the Scope of Work 10.3. Removed "performance bond" and changed to Professional Liability insurance coverage. Please use the See What Changed link to view all the changes made by this addendum.

  • Official Notice #1: Question Submission Deadline 12/1/2026 at 1pm CT · 1

    Question Submission Deadline: December 1, 2026, 1:00pm

  • Addendum #2 · 2

    Re-formatted table in Scope 8.2.

  • Addendum #3 · 3

    Changed verbiage in 2.8 "Procedure" to: Proposers who are deemed, based on the Evaluation criteria, fully qualified and best suited among those submitting proposals, will be Short Listed and requested to participate in discussions/interviews regarding a new set of questions determined the committee. Discussion/Interviews may cover methods of operation, and all other relevant factors. The County will hold a Final Ranking meeting upon completion of Interviews for selected firms. The committee will vote to move into negotiations with the top ranked firm. At the conclusion of negotiations, the proposed contract results will be submitted to the County Commissioners for consideration. The Commissioners may request the contract awardee to participate in additional discussions / presentations regarding their proposals to decide on which proposer is offered a contract. All pricing provisions contained in this contract, including any option to increase quantity or to extend performance period if such an option is exercised, will remain fixed throughout the contract period. If the County and the Proposer cannot negotiate a successful agreement, the County may terminate said negotiations and begin negotiations with another Proposer. This process will continue until an agreement acceptable to the County has been executed or all proposals are rejected. No Proposer shall have any rights against the County arising from such negotiations or termination thereof.

  • Addendum #4 · 4

    Added Draft contract to attachments.

  • Addendum #5 · 5

    Moved Proposal Due Date to 12/22/26 at 1:30pm CT

  • Addendum #6 · 6

    Professional Liability amount changed to $20,000,000.00.

  • Addendum #7 · 7

    Changed the verbiage for Tab 13 to reflect: 13 - TAB J - County Forms and Addenda ADMINISTRATIVE REQUIREMENTS has vital information for this solicitation process and has forms that must be completed for proposals to be deemed responsive. Please make sure you review Escambia County Required Forms listed in Vendor Submissions and return all required information and forms in a separate tabbed section titled Tab 13 - TAB J - County Forms and Addenda. You will electronically acknowledge addenda through OpenGov. Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #8 · 8

    Pushed Question & Answer deadline to next Tuesday 12/1/26 at 1pm CT. Please use the See What Changed link to view all the changes made by this addendum.

  • Addendum #9 · 9

    Added DEI Certification Form to Vendor Submissions.

Public questions and answers
  • Tab A and Tab E require the Proposer to have at least ten (10) years of experience providing the requested services. Will the County accept the documented experience of the firm’s principal(s) and key personnel, including experience from before the firm was founded, toward this requirement? If not, is the ten-year firm requirement pass/fail for responsiveness, or will it be considered in scoring under Criterion 1?

    The County will evaluate the Proposer’s relevant experience based on demonstrated project experience performed by the firm and its proposed team, with particular emphasis on projects where the principal(s) and key personnel have successfully worked together in their respective roles. Submitted projects should be comparable in scope, size, complexity, and services to those anticipated for the Pensacola Bay Center Reimagined Project. Individual experience obtained by principals or key personnel prior to the formation of the proposing firm or established project team may be identified to demonstrate individual qualifications; however, such experience will not be credited toward the firm's demonstrated history of working together as a team. The ten (10)-year experience requirement will not be treated as a pass/fail criterion for determining responsiveness. Rather, the firm's relevant experience, qualifications, and demonstrated history of successfully performing comparable services as a team will be considered in scoring under Criterion 1.

  • Section 8.2 defines project experience as “work completed for a single Proposer.” May a Proposer list projects that its principal(s) or key personnel managed as owner’s representative or project manager while employed by another firm, as long as the individual’s role is clearly identified? If so, should these projects go in Tab E or only in the Key Personnel experience pages

    Projects performed by a principal or key personnel while employed by another firm may be included under the Key Personnel experience pages, provided the individual's specific role and responsibilities are clearly identified. Such projects should not be represented as experience of the proposing firm unless the firm itself performed the services. The County places significant emphasis on demonstrated collaboration among the proposed team members on projects relevant to the Pensacola Bay Center Reimagined scope of work. Accordingly, projects completed by the same proposed team members while employed by another firm may be considered relevant team experience, provided the individuals worked together on those projects and their respective roles are clearly documented. The County's evaluation will consider both the qualifications of individual team members and, more importantly, their demonstrated experience successfully collaborating as a team on projects of comparable scope, size, and complexity.

  • Section 10.4 asks for financial statements for the three (3) most recent complete fiscal years. What will the County accept from a firm that has been in business for fewer than three complete fiscal years? Also, Section 10.3 asks for evidence of capacity to provide a performance bond of up to $20,000,000. Will a performance bond be required for the Owner’s Representative/CEI professional services agreement, or is this requirement intended for construction contractors?

    For firms that have been in business for fewer than three (3) complete fiscal years, the County will accept financial statements covering the firm's period of operation since its inception. The inability to provide three (3) complete fiscal years of financial statements will not automatically disqualify a Proposer or be treated as a pass/fail criterion. Rather, the submitted financial information will be reviewed and considered as part of the County's evaluation and scoring process. Regarding Section 10.3, a Performance Bond will not be required for the Owner's Representative (OR) and/or Construction, Engineering, and Inspection (CEI) professional services agreement. The performance bond requirement is intended for the General Contractor during the construction phase. The RFQ will be revised to clarify and remove this requirement as it pertains to OR/CEI professional services. The selected Owner’s Representative (OR) and/or Construction Engineering and Inspection (CEI) consultant(s) will be required to maintain Professional Liability (Errors and Omissions) insurance coverage with limits of not less than $20,000,000, in accordance with the terms and requirements of the applicable professional services agreement.

  • Does the County have any small, minority, women-owned, or disadvantaged business participation goals or preferences for this solicitation or any phase of the PBC-R Project? If Phase 2 or Phase 3 is funded wholly or partly with state or federal grants, does the County expect participation requirements to apply to consultant services for those phases?

    Escambia County encourages participation by small, minority-owned, women-owned, and disadvantaged business enterprises; however, the County has not established any mandatory participation goals, set-asides, or specific inclusion requirements. At this time, the County does not anticipate imposing additional business participation requirements for subsequent phases of the Pensacola Bay Center Reimagined Project, including Phases 2 and 3.

  • Under Tab E, "Experience and Past Performance", the table on p.37 (section 8.2) is cut off from the RFQ document. Could the complete table format be uploaded to the "downloads" or issued with an addenda?

    I reformatted 8.2 so it should fit on a page now. You may need to redownload the solicitation to see the fix.

  • Is any federal funding available or anticipated for this project?

    No, no federal funds are used for this solicitation.

  • Section 2.6 states that compensation will be provided on a lump-sum basis, while Section 2.1 indicates that the scope of services and professional fees for each phase will be further defined and negotiated. Could the County please clarify whether respondents are expected to include a proposed fee as part of the initial RFQ submission? If so, please specify the preferred fee structure and level of detail, including whether fees should be presented separately by project phase or service category.

    No, since this is a Request for Qualifications we do not want to see a fee structure with the submission. Any discussion of Fees will be during negotiations with the top ranked firm after the Final Ranking.

  • The RFQ outlines three anticipated phases of the Pensacola Bay Center Reimagined Project, with final scopes and schedules subject to further development and authorization. Could the County provide the current anticipated construction budget and estimated schedule duration for each phase, including any preliminary milestones or target completion dates? This information would assist respondents in developing an appropriate staffing and resource allocation approach.

    An anticipated Scope for Phase 1 (renovations) is included in the solicitation. Schedules will be developed in coordination with Bay Center events. Budgets and durations will be coordinated from the master list of projects. Project budgets are not firmly established at this time and are predicated on the availability and sources funding.

  • The RFQ states that the Owner's Representative Consultant will develop outline specifications as design narratives are developed or refined. Could the County clarify whether the intent is for the OR Consultant to coordinate and review specifications prepared by the Architect/Engineer of Record, rather than independently develop technical design specifications? We understand that preparation of these specifications would typically fall within the design professional's responsibilities.

    Standard industry practice is for the design team to develop final detailed specifications for construction. The Or is expected to develop a basic outline of specifications are design narratives are develop in order to create basic expectations for the design team to follow. The Or consultant will coordinate and review the design team's specifications for accuracy and compliance with project guidelines established during the narrative development process.

  • The RFQ identifies Owner-side evaluations of electrical, mechanical, structural, security/life-safety, and plumbing systems. Could the County clarify whether these evaluations are intended to be general Owner's Representative reviews focused on operational requirements and project objectives, or whether formal independent technical peer reviews are anticipated? If formal peer reviews are required, would the County consider procuring these specialty services separately once the applicable scope and project phase have been established?

    Evaluations will be based on standard industry operational requirements and project objectives for the project facilities usage. The County will not prescribe means and methods.

  • The RFQ requires the OR Consultant to observe and document construction progress and apparent quality, including identifying deviations from the Contract Documents. Could the County clarify the anticipated level of construction quality oversight expected of the OR Consultant and whether independent third-party quality control inspections are required beyond those performed by the Contractor, Architect/Engineer of Record, and other designated inspection professionals? If additional independent inspections are required, would these services be separately authorized based on the specific project scope?

    The County expects the highest quality of performance and delivery of construction services whether it is in regards to management, oversight, design, construction, or inspection. The County will not prescribe means and methods.

  • The RFQ indicates that CEI services will be provided when included in the authorized scope of work. Could the County confirm whether respondents are expected to include dedicated CEI personnel and inspection services within their initial proposed team and staffing plan, or whether these services may be separately procured or provided through qualified subconsultants once the scope, inspection requirements, and construction schedule are established?

    Respondents should consider the requirements of CEI services needed from their experience. CIEI services should be included in any Phase considerations. The County understands that the service levels may vary between project phases. Each phase will be defined and negotiated separately.

  • The RFQ describes detailed Critical Path Method (CPM) schedule management responsibilities, including critical-path analysis, float reviews, recovery schedules, time-extension analyses, and contemporaneous delay documentation. Could the County clarify whether the anticipated scope requires this level of specialized scheduling analysis throughout construction or whether the OR Consultant's primary responsibility will be to review, monitor, and report on the Contractor's schedule? If specialized forensic scheduling or delay analysis becomes necessary, would those services be authorized separately?

    A high level of scheduling management will be required during Phase 1 when construction needs will be coordinated with Bay Center Event Schedules. Subsequent phases may or may not require this level of scheduling specialization although industry standards are expected at a minimum.

  • The RFQ requires the OR Consultant to independently validate estimates of probable construction cost at designated design milestones. Could the County clarify whether this responsibility is intended to involve general cost review and validation by the OR Consultant or the preparation of independent estimates by a specialized third-party estimating professional? If independent third-party estimates are required, would the County consider authorizing these services separately at the appropriate project milestones?

    The County expects the OR Consultant to have the ability to develop, manage, update and deliver valid ICE at identified milestones. This is considered to be a basic financial management service of the OR. The OR should have the inherent ability to perform accurate cost estimating as a key performance indicator of the quality of their services. The County will not prescribe the means and methods.

  • The RFQ requires the OR Consultant to establish and monitor a project quality-control program and provide independent quality assurance observation, inspection, documentation, and reporting. Could the County clarify the intended distinction between the OR Consultant's quality assurance responsibilities and the Contractor's quality control obligations?

    These obligations are established by industry standard.

  • The RFQ identifies photographic documentation as a component of monthly project reporting. Could the County clarify the anticipated scope and frequency of photographic documentation? Specifically, is standard progress photography performed by the project team sufficient, or is a specialized third-party construction documentation service anticipated? If specialized documentation is required, would the County consider procuring or authorizing these services separately?

    Standard project progress photography is anticipated at this time.

  • The RFQ includes responsibilities related to assisting the County with the preparation and defense of claims or disputes, including technical evaluations, contractual analyses, and schedule impact assessments. Given that the extent and complexity of potential claims cannot be reasonably determined at this stage, could the County clarify whether these services would be separately authorized and compensated if required? Additionally, please confirm whether any specialized legal, forensic, or expert consulting services and associated expenses would be addressed separately from the OR Consultant's base scope.

    This solicitation is for qualifications. Compensation will be addressed under Stage 2 of the selection process.

  • The RFQ requires the OR Consultant to assist the County throughout the applicable warranty period, including tracking warranty items, coordinating corrective work, and performing an 11th-month warranty inspection. Could the County clarify the anticipated level of involvement and staffing commitment during the post-construction warranty period? Specifically, is the expectation for the OR Consultant to provide ongoing dedicated personnel throughout the warranty period, or would periodic coordination and support, in collaboration with the County's facilities management personnel, satisfy this requirement?

    Periodic coordination as required is the expectation.

  • The RFQ requests relevant project experience in multiple sections, including firm-wide qualifications, individual key personnel experience, and past project performance. Additionally, Sections 5.4, 8.8, and 9.9 contain overlapping requirements for documenting up to three relevant projects per key person, with references to both Appendices B and F. To ensure a comprehensive yet concise response, can the County confirm whether proposers may reference the same projects across multiple sections and provide detailed project information once, with appropriate cross-references where applicable? Additionally, can the County clarify whether individual key personnel project experience should be included in Appendix B, Appendix F, or both?

    1) Confirmed. 2) Appendix F is for the proposer's Subcontractor Plan. See instruction on paragraph 9.8 for information that should be included in Appendix F. All information regarding key personnel that are employees of the proposer is to be included under Appendix B.

  • Tab A requests a personnel allocation graphic demonstrating the availability and anticipated commitment of proposed personnel, including competing assignments and resource capacity. Tab B similarly requests information regarding assigned personnel, their responsibilities, and a draft work schedule or project management plan demonstrating availability throughout each stage of the project. To avoid duplicative information while ensuring all requirements are addressed, can the County confirm whether proposers may provide one comprehensive personnel staffing and allocation plan that addresses both sections, with appropriate cross-references?

    A single comprehensive of project assigned personnel with cross-references may be submitted.

  • Do you anticipate a full closure of the facility in the off season?

    Yes. Anticipated to be mid-June through September 30.

  • Is there an estimated budget?

    This is a formal solicitation so the budget is expected to exceed $50,000.00.

  • Do you have a design and construction timeline with a final completion date?

    No.

  • Can you confirm what the next steps are once qualifications are submitted?

    Once qualifications are submitted, the committee will meet to short list no less than 3 firms during a Short List meeting - currently scheduled in early January. Next, the committee will perform Interviews with the short listed firms and a Final Ranking after the interviews. From there, the committee will move into negotiations with the top Ranked firm. All dates will be communicated to the short listed both via email and notices to the solicitation in OpenGov.

  • Should we include scheduling personnel - five (5) years of experience in section 5.2 since they are in 9.7?

    9.7 is under Tab F - Subcontractor Plan. This would mean please include intended Subcontractor's PM, CM, Construction/Project Controls, and Scheduling experience. If your firm is not intending to subcontract the work, then leave Tab F blank.

  • With the Thanksgiving holiday quickly approaching, would it be possible to get a deadline extension?

    Yes, please see Addendum pushing date out.

  • Pg. 44 of the RFQ asks for “best terms from a monetary standpoint”, but there are no pricing instructions or fee forms included and there are no scoring criteria associated with commercial terms. Please confirm that this is a qualifications-based selection only and that commercial terms will be negotiated after selection.

    Correct. This is a request for qualifications. Fees will be negotiated during negotiations after a top ranked firm is chosen.

  • 1. Please provide the current estimated construction budget and if possible, the total project budget including soft costs for Phase 1, and any preliminary cost estimates for Phases 2 and 3.

    The projects are not designed yet so we do not have a construction budget.

  • Can you provide the anticipated Phase 1 schedule, including the anticipated Owner’s Representative Notice to Proceed and the anticipated construction start and duration?

    Phase 1 OR NTP in Spring of 2027. Project identification and design through the end of 2027. Construction on Phase 1 projects may begin in Spring of 2028.

  • Can you confirm the County’s intended delivery method for this project (e.g., Design-Bid-Build, Design-Build, CMAR, etc.)?

    No. Due to the number of possible projects in Phase 1, any delivery method may be considered. Phase 2 and 3 will be defined when funding is available for the projects.

  • Can the County provide a copy of the professional services agreement that is intended to be used for the Owner’s Representative / CEI on this project? If the County intends to use an industry standard form of agreement such as an AIA, CMAA, or similar contract, please provide a reference to that contract.

    Yes, please see Addendum 4 for the draft agreement.

  • Page 13 of the RFQ states that the OR Consultant will develop outline specifications as design narratives are developed. Development of outline specifications is typically done by the designer of record (DOR) as part of their basic services during design development. Will the OR Consultant be expected to develop outline specs separately from the DOR? Or manage the design process to ensure that proper outline specs are developed by the DOR? Please confirm.

    Outline specification development during the design narrative stage is meant to define some standards that will be expected in the final design by the DOR. The DOR will be expected to expand on the OR's specifications in order to create a complete design package for construction.

  • References are made to an electronic document management platform. Is there a specific platform that the County requires?

    No, a specific platform is not required. Any non-proprietary platform is acceptable.

  • Under section C “Existing Contracts” the RFQ asks that this information be provided in spreadsheet format. Would the County confirm this just means in a table format or does the City wish for us to provide an excel sheet alongside our submittal?

    The "City" is not involved in this solicitation. This solicitation is focused on the "County" level of government. Either a spread sheet ot other table format is acceptable as long as the submission meets the stated requirements of the solicitation.

  • Would the County clarify if under Section 4 Tab A. the County wants a written narrative outlining our firm’s project experience addressing all of the bullets and that actual project sheets and specific project information should be included in Section 8 Tab E. If this is incorrect, would the County please specify what they want in each Section.

    Correct. Please refer to the solicitation for instructions.

  • The RFQ mentions identifying three projects per key personnel in several sections. Would the County please confirm we only need to include three total projects for each key team member. Additionally, would the County confirm if the information should be included in Appendix B or Appendix F.

    Appendix F is for the proposer's Subcontractor Plan. See instruction on paragraph 9.8 for information that should be included in Appendix F. All information regarding key personnel that are employees of the proposer is to be included under Appendix B.

  • The County’s response to Question #3 states that the selected consultant will be required to maintain Professional Liability insurance of not less than $20,000,000, while Section 6 (p. 68) of the RFQ states limits of $1,000,000 per wrongful act / $2,000,000 aggregate. Please confirm the required Professional Liability limits (per claim and aggregate).

    Yes, please see addendum 6 updating coverage amount to $20,000,000.00.

  • Please confirm the required tab order and labels for the response. The table on page 26 of the RFQ identifies Tab H as Insurance Requirements and Tab I as Additional Items/Services Offered, and the section headings on pages 41–42 reverse these labels.

    Please follow the tab order listed on page 26 describing the Table of Contents for the proposer's response.

  • Please confirm whether cover pages, tab dividers, tables, and appendices count toward the stated page limits, and identify any font size, margin, or maximum file-size requirements for the single electronic submission.

    No, presentation pages are not counted towards document limit. Tables with pertinent proposal information will count towards document page total. Appendices pages do not count towards page limits as proposal reviewers may or may not review appendix information unless it appears to be pertinent. Pertinent information would be that information specifically requested by the solicitation to be included in the appendix.

  • The RFQ mentions providing an organization chart and summary table in both Section 9 and Section 5. Would the County please confirm where this should be included.

    The organizational chart requested in Section 5 - Tab B - Key Personnel is to contain the proposer's employees. The organizational chart requested in Section 9 - Tab F - Subcontractor Plan, paragraph 9.6 is to contain the proposer's subcontractor personnel.

  • Under section 1 Cover Letter the RFQ states "If a Corporation, Respondent must state the full name and title of each of the corporate officers.". Does the list of officers count towards the 3-page limit?

    Yes

  • Does the documentation verifying the authorization of the signing representative count towards the three-page cover letter page limit?

    No.

  • Are we permitted to use an 11 X 17 size page to provide the Existing Contracts information?

    No. Please use standard 8.5 inch X 11 inch letter size paper for all proposal pages

  • Are we permitted to submit the org chart on an 11 x 17 size page?

    No. Please use standard 8.5 inch X 11 inch letter size paper for all proposal pages.

  • The solicitation asks proposers to demonstrate 10 years of relevant experience. Is that experience requirement evaluated at the firm level only, or may a proposer satisfy it through the combined relevant experience of its proposed key personnel and named team members, including personnel whose experience was gained at prior firms?

    The solicitation is seeking the experience of the Firm in Section 4 Tab A. The experience of the personnel is addressed in Section 5 Tab B.

  • Would the County accept independent licensed CPA reviewed financial statements for fiscal years 2024 and 2025, supplemented by internally prepared 2026 year-to-date financial statements and a notarized CFO certification, in lieu of audited financial statements to satisfy the requirements of TAB G, including Section 10.5?

    For firms that have been in business for fewer than three (3) complete fiscal years, the County will accept financial statements covering the firm's period of operation since its inception. The inability to provide three (3) complete fiscal years of financial statements will not automatically disqualify a Proposer or be treated as a pass/fail criterion. Rather, the submitted financial information will be reviewed and considered as part of the County's evaluation and scoring process.

  • The County’s draft agreement includes a professional liability insurance requirement that could affect which subconsultants we are able to include on the team. Section 8.6 of the draft standard agreement states that each subconsultant must carry insurance in an amount equal to or greater than the coverage carried by the consultant. Does this mean all subconsultants must carry the same professional liability limits as the prime consultant regardless of their scope, or whether the County would accept professional liability limits that are aligned with each subconsultant’s scope of services in lieu of matching the prime’s limits?

    The County would accept professional liability limits that are aligned with each subconsultant’s scope of services in lieu of matching the prime’s limits.

  • Please confirm the required tab designations for Sections 11 and 12. Section 2.7 identifies Tab H as Insurance Requirements and Tab I as Additional Items/Services Offered; however, the detailed requirements identify Tab I as Insurance and Tab H as Additional Items/Services. Which tab order should Proposers follow?

    Follow the Tab assignments as listed in Section 2.7- Table of Contents of the solicitation document.

  • Please confirm whether County Forms, Addenda, and Administrative Requirements should be submitted under Section 13 / Tab J, as shown in the Required Format table, or in a separate section titled “Tab 10 - Administrative Requirements.” If both are required, please clarify what content belongs in each.

    Please see Addendum 7. Please put the Escambia County required documents into 13 Tab J.

  • Please clarify the required appendix placement for key-person resumes and project examples. Sections 5.3–5.4 direct these materials to Appendix B, while Section 8.8 directs directly relevant projects for Tab B key personnel to Appendix F. Should Appendix B contain prime Proposer key-person resumes/project examples and Appendix F be limited to subcontractor personnel?

    Yes - Appendix B contain prime Proposer key-person resumes/project examples and Appendix F be limited to subcontractor personnel

Plain text

OpenGov categories

  • 91842 · Engineering Consulting
  • 92500 · Engineering Services, Professional
  • 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering
  • 92555 · Inspecting, General/Engineering
  • 92556 · Inspecting, Structural/Engineering
  • 92588 · Structural Engineering