Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Physical Security Event Monitoring System

Description

The City of Phoenix invites sealed offers for a Contractor to perform integrator services for the replacement Physical Event Monitoring System (PSEM) application. The selected contractor will provide labor to install and upgrade software, install and replace system components, provide Preventative Maintenance Inspections (PMI) and repair faulty equipment. . The Effective Date of this Agreement will be upon final signature and recording by the City Clerk’s department. The Commencement Date of this Agreement will be upon March 31, 2027 , which is on or after the ordinance approved start date or the contract term start date that the Phoenix City Council approves or the Effective Date, whichever is later. The term of this Agreement will be for 5 years, beginning on the Commencement Date, with no options to extend . This solicitation is available through the City’s Procurement Portal. For technical support issues related to the City's Procurement Portal, Offeror may use the support bubble on the bottom right, or email procurement-support@opengov.com for any assistance. For other issues related to this solicitation please contact the procurement officer listed under Contact Information. Notwithstanding the foregoing, this Agreement will terminate upon the earliest occurrence: by reaching the end of the term including any extensions exercised, or termination pursuant to the provisions of this Agreement. Scope of Work Purpose The City of Phoenix (City) Water Services Department (WSD) is seeking a contractor to perform integrator services for the replacement of the legacy Physical Security Event Monitoring System (PSEMS), which has reached-end-of life and is no longer supported. The new PSEM will deliver enhanced functionality, improved management of access rights, and greater visibility of site access and event monitoring. The selected contractor will: Provide the labor to install and upgrade software Install and replace system components Provide preventative maintenance inspections and repair faulty equipment Complete component replacement and system deployment in a live operational environment. To ensure minimal disruptions to ongoing operations, the selected Contractor must work collaboratively with the Water Services Process Control Technology Services (PCTS) division and site owners. This coordination is essential for managing any impacts to existing access configurations and ensuring continuity of operations throughout the duration of the services. Background WSD utilizes and maintains a Physical Security Event Monitoring System (PSEMS) application to physically control and provide secure access to water, wastewater, and remote facilities to all City WSD facilities within Maricopa County. WSD’s standard PSEMS platform is Software House C•CURE 9000. While the majority of sites are already migrated, several sites still require migration to achieve full standardization. The PSEMS includes software and equipment, such as badging workstations, application servers, card readers, and access controllers utilized to ensure the security of key sensitive areas and their assets. Securing the sites ensures WSD meets regulatory performance requirements, in compliance with federal, state and local regulations. Improper maintenance and system support can result in unauthorized site access with the potential of system process interruptions to prevent WSD from providing safe and reliable services to its customers. Definitions/Acronyms DSM – Door Switch Monitor Normal Business Hours - Monday through Friday from 6 AM – 6PM PCTS - Process Control Technology Services PMI – Preventative Maintenance Inspections Premium Hours – All other times outside of normal business hours. Premium hourly rate includes evenings, weekends and all City of Phoenix observed holidays. Premium hours must be approved by PCTS staff prior to work being performed. Failure to obtain PCTS staff approval may result in a delay of payment. PSEMS – Physical Security Event Monitoring System Reimbursable labor hour(s) – begin when the technician arrives at the designated sign in location and terminate when the technician signs out at the designated location. REX – Request to exit Site Method of Procedure (MOP) – Document submitted by Contractor prior to execution to include: pre checks, a cutover plan, and a rollback procedure; City approval required prior to execution. WSD – Water Services Department Contractor General Requirements The Contractor shall perform the following services and responsibilities: On-Site Installation Services Provide on-site services to install controllers, PSEMS security components, and any other material necessary to support and ensure the security of WSD site. PSEM Component Expertise Have the knowledge and ability to install, replace, and convert PSEMS components. System and Software Support Provide labor to install and upgrade software, install and replace system components, perform preventative maintenance, and repair faulty equipment as needed. Permitting Obtain all required permits necessary to perform the work Engineering Documentation Provide engineering documentation for point-to-point wiring diagrams, submittal materials, and Input/Output (I/O) summary for all installed equipment and services. Documentation must be delivered in both hard copy and digital formats. Emergency Service Response Requirements Upon initial notification by PCTS staff, Contractor's initial response must be (via telephone or email) within 30 minutes. Provide onsite physical presence within two (2) hours of initial notification. Quotes and Project Estimates Furnish an itemized quote or project estimate within three (3) business days of each site assessment or initial request from PCTS staff. At a minimum, quotes shall include: Estimated project completion date Estimated labor hours Material costs, including licensing requirements Removal of existing equipment Site clean up Initial visit, commissioning and final site visits to complete the installation and integration of PSEMS hardware and software Permit fees, if applicable Rental equipment estimated cost in accordance with subsection 3.10, if applicable. Note: Travel time to and from job site will not be reimbursable. All mileage, travel costs, and per diem, must be included in the hourly labor rate. Obtain approval from PCTS staff prior to commencement of any work or project Proceed upon receipt of a Purchase Order (PO) for standard scheduled work. For emergency repairs, obtain verbal approval to expedite service; PCTS staff will issue a PO as soon as it is practical. Equipment Installation and Coordination Provide installation services for City owned equipment or install new equipment as requested by PCTS staff. Relocate or remove equipment as directed. All removed equipment will remain the City's property and must be returned to the City within five (5) business days after completion of the service Coordinate with PCTS staff to obtain device configuration information prior to installation. Upon completing device installations, contact PCTS staff for final walk through inspection and obtain project approval prior to submitting an invoice for payment processing. Correct any work performance and deliverables the City deems unsatisfactory upon receiving the City's notification. All deficient work must be fully corrected within twenty-four (24) hours of the City's notice and completed at no additional cost to the City. Complete the work within the agreed upon timeframe. Perform component replacement and system deployment with a live operational environment. Contractor Business Requirements The Contractor shall meet the following business requirements: Organizational Stability Demonstrate stable ownership and core staffing for at least five (5) years and disclose any mergers, acquisitions, or organizational changes that may affect key personnel or business processes represented in the proposal. Business Activity Demonstrate normal business activity during the past five (5) years which includes continuous experience providing electronic security system services. Certified Integrator Status Be a certified integrator of the proposed Software House software and hardware Security System product(s) and be eligible for the City to request Contractor inclusion as the Software House approved dealer of record. Contractor Key Personnel Requirements The Contractor shall comply with the following personnel requirements: Primary Service Representative Assign a service representative who will be the primary contact under this Contract and who has complete authority to act on behalf of the Contractor. The assigned service representative or designee must be available 24 hours a day, seven (7) days a week including holidays, to support emergency needs. Experience Requirements for Key Personnel Ensure Key Personnel have at least five (5) years of continuous, documented experience providing electronic security system services including design, installation, integration, and maintenance. Technical Certification Designate Key Personnel who have completed C•CURE Installer/Maintainer training and certification for validation and commissioning of each deployment. Technician Experience Oversight Assign Key Personnel who will ensure that assigned technicians possess a minimum of one (1) year experience installing, maintaining, and supporting electronic security systems such as access control and intrusion detection. Experience must include projects of comparable size, complexity, and environment (e.g., multi-site, high security, mission-critical systems). Supervision of Non-Certified Technicians Ensure that installer technicians who do not hold manufacturer certification or licenses follow industry best practices under the guidance of Key Personnel. Safety and Licensing Compliance Ensure technicians maintain a current OSHA-10 minimum or equivalent safety training certificate and any required local and state licenses. Background Check Compliance Verify and document technician background check compliance prior to assigning any technicians to City sites and Contractor shall provide confirmation of clearance to the City upon request. Authorization for Subcontracted Services Obtain written authorization from PCTS staff before subcontracting or engaging any third parties to perform services under the resultant Contract. Contractor Responsibility for Subcontractors Contractor’s use of any subcontractors or third parties to perform services and provide technical knowledge does not relieve, release, or affect contractors’ duties, liabilities or obligations, and Contractor shall remain fully liable. Coordination of Site Access Coordinate with PCTS staff to provide subcontractor information to Security Management Unit (SMU) for access to City Sites without badging. NOTE: Subcontractor(s) shall be escorted by City staff, not the contractor. Personnel Sign-In Requirements Ensure all contractor personnel sign in and out at each visit, including when leaving the premises for supplies, meals, breaks, etc. Contractor may use the City’s approved time management system to document when they arrive on the job site to begin service work and when they leave the job site. The Contractor can use their own inhouse “time clock” system and provide weekly attendance reports to the City, if applicable. Time Documentation for Invoicing Ensure that upon arrival, and before beginning any work on the premises, personnel record their start and finish times and submit documentation with the invoice for each project. Emergency Service Arrival Notification Ensure personnel signs in and out for all services. Failure to comply may result in delays or non-payment of services. For emergency services, the contractor shall contact PCTS staff when they arrive onsite and when work is complete. Application Technical Requirements The Following technical requirements outline the necessary system architecture, security protocols, and operational standards for the implementation and management of the new PSEMS application. These specifications are designed to ensure the solution operates securely within the City’s PCTS Security Network, aligns with industry best practices, and supports the City’s long-term operational and security objectives. Architecture There shall be no remote connection or internet access from the secured PCTS Security Network. All PSEMS databases and application management shall be housed on-site on the PCTS isolated Security Network as an on-premise deployment. All system upgrades, updates, and licensing shall be done through offline activation with the collaboration of PCTS Physical Security team. Software version updates within the same model or series (e.g., minor and incremental model/version releases that do not constitute a major product migration) shall be included in the software cost at no additional charge to the City. The Contractor shall integrate the remaining sites into the City’s existing on prem C•CURE 9000 “R” environment, matching the City approved build/hotfix and controller/reader standards. Future migration options may be exercised only upon written City authorization/amendment. Security Comply with laptop check out and check in process with PCTS staff member at the beginning and end of the workday. Ensure checked-out laptops remain on-site during off hours including weekends and holidays. Adhere to relevant industry standards and best practices applicable to the project domain, including but not limited to: OSHA (Occupational Safety and Health Administration) Regulations NIST (National Institute of Standards and Technology) Cybersecurity Framework ISA (International Society of Automation) Standards for Industrial Automation American Society of Civil Engineers (ASCE)/American Water Works Association (AWWA) Adhere to guidelines for the Physical Security of Water Utilities security requirements to protect sensitive information, data, and systems from unauthorized access, disclosure, or manipulation. Ensure security measures align with industry best practices and standards, including encryption, access controls, intrusion detection, and incident response protocols. Adhere to PCTS documentation securing protocols utilizing the Cybersecurity Traffic Light Protocol, for securing critical information within the PCTS network. Training Requirements The Contractor shall coordinate both initial and ongoing training to support PSEMS provisioning and deployment. At a minimum, the training will include: Coordinate In-Person Training Subcontract with Software House to deliver the City approved C•CURE courses listed Attachment B - Pricing Proposal at two (2) WSD sites designated by City Staff. Be responsible for scheduling, coordinating rosters and facilities, and billing. Bill course fees at actual cost with no markup. Coordinate manufacturer-provided C•CURE initial and ongoing training to support PSEMS provisioning and deployment. Coordinate Training Documentation Coordinate written content from Software House for use as reference guides to assist City of Phoenix PCTS staff to manage day-to-day operations. The required content shall be provided in draft form for review and approval by PCTS Infrastructure and Physical Security Supervisor. Any revisions requested by PCTS shall be incorporated by the Contractor at no additional cost. Preventative Maintenance Inspection Requirements The Contractor shall c onduct Preventative Maintenance Inspections (PMI) as identified and requested by the PCTS Infrastructure and Physical Security Supervisor. PMI includes physically visiting each site access control enclosure and performing the following: Preventative Maintenance Inspection Activities Replace batteries Test battery charger output power Remove dust/debris from internal enclosure Check for loose termination/connections and tighten, as needed Operate site and test alarm output signals Check environmental wear and tear Provide a finding report with recommended action items. Specialized Equipment The Contractor shall comply with the following requirements related to tools, equipment, and specialized rental items: Standard Equipment Provision Provide the tools, equipment, and vehicles standard to the trade at no additional cost to the City. Rental of Specialized Equipment Rent any special equipment, including lifts or scaffolding, as necessary to perform the work specified in the Scope of Work or any services requested by the City. Prior Approval for Rentals Obtain prior written approval from PCTS staff before renting any specialized equipment required to complete the job. Rental Quote Submittals Submit a minimum of three (3) rental quotes for any specialized equipment to PCTS staff for review and approval. Rental Cost Reimbursement Reimbursement for equipment rental will be for the actual cost to the contractor. Documentation of the cost must be included with the final invoice, and no mark-up will be permitted. The City will not accept any invoice that has been altered in any manner. Temporary On-Site Storage Specialized equipment may be stored temporarily on-site if PCTS staff is able to coordinate a storage location/space. During the temporary storage on-site, the City is not responsible for lost, stolen or damaged equipment. It is the responsibility of the Contractor to secure this equipment. Equipment Purchased on behalf of the City Purchase equipment inventory such as spare parts and equipment on behalf of the City for various project needs, as requested by the City. Milestones, Deliverables, and Acceptance The Contractor shall meet the following requirements related to quality, safety, deliverables and acceptance: Quality of Work Provide work of the highest quality, meeting or exceeding the standards and specifications outlined in the project requirements and agreements. Defect-Free Deliverables Ensure work is free from defects, errors, and deficiencies that may impact on the functionality, reliability, or safety of the deliverables. Safety Compliance Implement and maintain safety measures throughout the project to protect the health and well-being of workers and stakeholders. Required Milestones and Acceptance Activities Site Method of Procedure (MOP) For each site, Contractor shall submit a MOP (see Exhibit 1 for sample) with pre‑checks, a cutover plan, and a rollback procedure; City approval required prior to execution. Site Acceptance Test (SAT) Conduct door‑level SAT in coordination with City‑designated site owners and PCTS staff Request-to-exit REX functionality Door Status Monitoring (DSM) Lock control operation Alarm routing Threat-level transitions Fire panel drop/restore functions Go/No‑Go Checklist Complete and document a Go/No-Go checklist prior to enabling production access. Documentation Deliverables Acceptance is contingent upon delivery of all as-built engineering documentation in section requires delivery of as‑built engineering documentation per 3.4.E including: Point‑to‑point wiring diagrams I/O summaries Labeled panel photographs Firmware/software baseline register Configuration exports Asset registers Resolution of any Severity ‑1 defects. City of Phoenix Roles and Responsibilities The City shall: Be responsible for the management and deployment of PCTS network infrastructure, including switches and routers, fiber/copper ethernet media, media converters, workstation and server hardware Operating System support. Should the need arise for the contractor to deploy these network parts, the City will provide the parts. Ensure the PCTS Infrastructure and Physical Security Supervisor assigns a PCTS PSEMS project manager. The PCTS PSEMS project manager will be responsible for coordinating with the contractor’s project manager for all site visits, walkthroughs, scheduling, and final integrati

Plain text

OpenGov categories

  • 20628 · Computer Systems, Process Control
  • 68002 · Access Control Systems and Security Systems
  • 93673 · Security and Access Systems Maintenance and Repair
  • 99022 · Card Access Security Services