Piezometer Automation at WSSC Water Dams

Description

The Washington Suburban Sanitary Commission, MD ("WSSC Water"), is soliciting sealed responses for Piezometer Automation at WSSC Water Dams . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Tuesday, November 24, 2026 . Late responses will not be accepted. This Scope of Work outlines the necessary work effort pertaining to the construction of Automated Data Acquisition Systems (ADAS) for piezometers at three WSSC Water dams, including T. Howard Duckett Dam, Brighton Dam, and Little Seneca Dam, as indicated on the design plans. To execute the proposed work, the CONTRACTOR shall perform work in conformance with the WSSC Water Standard Specifications. SCOPE OF WORK Enter SOW text here. SCOPE OF WORK The Contractor shall install the Automated Data Acquisition Systems (ADAS) on twenty-nine (29) existing piezometers at three WSSC Water dams, including T. Howard Duckett Dam (4), Brighton Dam (6), and Little Seneca Dam (19). To execute the proposed work, the Contractor shall perform work in conformance with WSSC standard specifications and contract documents. Construction Administration services will be provided by the Owner's Representative. The construction drawings identify conduit routing and wiring diagrams. The Contractor shall furnish and install all materials in accordance with the construction drawings, approved submittals, and manufacturer requirements unless specifically identified as Owner-furnished. Contractor's Responsibilities (ADAS Installation) Purchase all equipment required for the installation of the ADAS, in accordance with construction drawings and cut sheets, except for Owner-furnished equipment as listed within the “EXCLUSIONS” section. Personal Protective Equipment (PPE) must be worn at all times while on the WSSC Water site. Pick up instrumentation cables from WSSC Water’s Owner's Representative. Submit all required documents, calculations, etc. as required by the Contract documents and obtain WSSC Water’s approval prior to the start of work. Provide means for attaching wire conduit to the buttresses in Duckett Dam. Install all equipment and associated components required for the ADAS, including but not limited to conduits, enclosures, junction boxes, Wye assemblies, fittings, wraps, clamps, wiring, heat elements, instrumentation cables, building penetrations, anchors, risers, concrete work, and any additional materials identified in the construction drawings or otherwise noted. Contractor Responsibilities (Other) Site Safety Submit a Safe Work Plan to WSSC Water’s Project Manager for review and approval. Provide equipment and management for confined space and permitted confined space entry at Duckett and Brighton Dam, in accordance with OSHA documentation. Provide two air monitors for work inside Duckett and Brighton Dam, including days that Owner's Representative (up to 5 days) is on-site. Provide stand-by rescue crew for work in Duckett Dam, including days that Owner's Representative (up to 4 days) is on-site. Comply with Little Seneca Dam Safety Permit No. 25-MR-0003, originally issued on August 27, 2024. Walkways at Duckett Dam are susceptible to icing during colder months Contractor is responsible for either scheduling work to avoid these conditions or safely removing the ice to maintain a safe working environment. This hazard, and the Contractor’s proposed mitigation approach, shall be fully addressed in the Site Safety Plan. Site Restoration Restore the site as required by WSSC Water’s Standard Specifications and the Contract documents. Including but not limited to asphalt pavement at Little Seneca Dam, riprap at Little Seneca Dam, and orange safety fencing along the Duckett Dam and Brighton Dam catwalks. Exclusions Purchase and installation of strain gauge piezometers with connection leads at each of the 29 piezometer standpipes. Purchase of instrumentation cables. Final connection of each instrumentation cable at RTU cabinets Final survey and as-built preparation Interface between Maryland Department of Environment (MDE) and WSSC Water. TASK ORDER PROCEDURE/WORK ORDER/RELEASE PROCESS The Contractor may determine the order in which work is conducted at Duckett, Brighton, and Little Seneca Dams, recognizing that weather conditions may affect scheduling. The Contractor shall coordinate with the WSSC Project Manager and Owner’s Representative to schedule deliveries, establish a material staging area, and provide advance notification of all planned activities to avoid conflicts with dam operations. All personnel shall follow required site access procedures (including sign‑in and use of full PPE) and the specific access requirements at each dam. DELIVERY/SERVICE LOCATION Coordinate deliveries with WSSC Water's Project Manager and Owner's Representative. Duckett Dam, 7400 Brooklyn Bridge Road, Laurel, Maryland 20707 Access via badged gate, at the end of W Bond Mill Road Brighton Dam, 2 Brighton Dam Road, Brookeville, Maryland 20833 Access via badged gate at Brighton Dam Visitor Center Little Seneca Dam, 13920 Wisteria Drive, Germantown, Maryland 20874 Access via keyed gate at the intersection of Wisteria Drive & Wanegardner Drive WARRANTY The Contractor shall furnish a Maintenance Bond in accordance with Article 25 to guarantee all materials and equipment furnished and Work performed for a period of 1 year from the date(s) of substantial completion, except that (1) those items listed as exceptions on the certificate(s) of substantial completion shall be so guaranteed for a period of 1 year from the date of Final Completion and (2) those items where longer guarantee provisions are required. The Contractor warrants and guarantees that the completed Work is free from all defects due to faulty materials, equipment, and workmanship. This shall include but not necessarily be limited to the following: Against all faulty or imperfect materials and equipment, subsidence of backfills, fills and embankments, vegetation stabilization, and against all imperfect, careless and/or unskilled workmanship. That the Work performed under this Contract, including all mechanical and electrical equipment, and appurtenances, and each and every part thereof, shall operate, with proper care and maintenance, in a satisfactory and efficient manner in accordance with the requirements of these Contract Documents. Where manufacturer's equipment warranty(s) are required elsewhere herein, said equipment warranty shall name WSSC WATER as a beneficiary, and the Contractor shall furnish the WSSC with a copy of the manufacturer's equipment warranty. That the structures shall be watertight and leak-proof at every point and in every joint. No use or acceptance by WSSC Water of the Work or any part thereof, nor any failure to use same, nor any repairs, adjustments, replacements, or corrections made by the Commission due to the Contractor's failure to comply with any of his obligations under the Contract Documents, or other corrections made by WSSC Water shall impair in any way the guarantee obligations assumed by the Contractor under these Contract Documents. The Contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of any damage to other parts of the Work resulting from such defects and agrees to replace with proper workmanship, materials, equipment, and re-execute, correct or repair without cost to WSSC, any Work which may be found to be improper or imperfect and/or which does not operate in a satisfactory manner and fails to perform as specified, or in any other way does not conform to the Contract Documents, unless such damage is the direct result of negligence on the part of WSSC Water personnel, or fair wear and tear. WSSC Water will give notice of observed defects with reasonable promptness. In the event that the Contractor fails to make such repairs, adjustments or other Work that may be made necessary by such defects, the WSSC Water may do so and charge the Contractor the cost thereby incurred. Latent defects will not be considered to be included in the Work covered by the one-year maintenance bond. The guaranteed provisions specified herein shall not limit the WSSC Water right to recover damages for the Contractor's refusal to repair defective Work after the expiration of the Maintenance Bond and the guarantee provisions specified herein. ROLES AND RESPONSIBILITIES The following roles and responsibilities: WSSC Water Representative Purchase and install strain gauge piezometers with connection leads for each of the 29 piezometer standpipes. Purchase instrumentation cables that shall be installed in the conduits by the Contractor. Lead kick off meetings at all three sites. Provide access to each site. Provide access to the RTU cabinets at each site. Provide an on-site construction inspector during the Contractor’s work hours. Receive, review, and respond to Requests for Information. Receive, review, and respond to Submittals provided by the Contractor. Interface between the Contractor and WSSC Water. Prepare as-built drawings and complete survey. Prepare weekly inspection reports of the work at Little Seneca Dam for regulatory compliance. Connect wires from strain gauge piezometers to RTU already installed by WSSC Water. Verify the functionality of all of the strain gauge piezometers with the WSSC Water Process Control Engineering Division. Monitor project scheduling. Schedule and lead progress meetings. Review contractor invoicing (monitor breakdown for work at each dam). Provide the interface between MDE and WSSC Water. CHANGE OF KEY PERSONNEL The Supplier shall not make any changes to the Key Personnel identified in the Statement of Work without the prior written approval of the WSSC-appointed Project Manager. Any proposed replacement or change to Key Personnel shall be submitted to the WSSC-appointed Project Manager for review and approval prior to implementation. Proposed replacement personnel shall possess qualifications, experience, and expertise that are equal to or greater than those of the individual being replaced. The Supplier shall ensure continuity of services and shall not remove or replace Key Personnel until written approval has been received from the WSSC-appointed Project Manager. DELIVERABLES Prepare weekly inspection reports of the work at Little Seneca Dam for regulatory compliance. Submit a Site-Specific Safe Work Plan for review and approval by WSSC Water prior to mobilization. Submit all required shop drawings, product data, calculations, certifications, and other contract-required documentation for approval prior to beginning work. Completion of all construction efforts as outlined in the Scope of Work. CONTRACT TERM This Contract will have a term of one hundred and twenty-five days (125) days. INTRODUCTION Summary The Washington Suburban Sanitary Commission, MD ("WSSC Water"), is soliciting sealed responses for Piezometer Automation at WSSC Water Dams . Responses are to be submitted via WSSC's eProcurement Portal via https://procurement.opengov.com/portal/wsscwater PRIOR TO 2:00 pm on Tuesday, November 24, 2026 . Late responses will not be accepted. This Scope of Work outlines the necessary work effort pertaining to the construction of Automated Data Acquisition Systems (ADAS) for piezometers at three WSSC Water dams, including T. Howard Duckett Dam, Brighton Dam, and Little Seneca Dam, as indicated on the design plans. To execute the proposed work, the CONTRACTOR shall perform work in conformance with the WSSC Water Standard Specifications. Timeline Release Project Date: October 29, 2026 Pre-Bid Meeting (Non-Mandatory): November 12, 2026, 10:00am Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2378471759953182?p=b6EN17P57CATiuqBwL Meeting ID: 237 847 175 995 318 2 Passcode: YH2hM9j3 Question Submission Deadline: November 16, 2026, 2:00pm Response Submission Deadline: November 24, 2026, 2:00pm MINIMUM QUALIFICATIONS MINIMUM QUALIFICATIONS Each Bidder shall meet the following minimum qualifications to be considered for the Award: The Bidder should be in business for a minimum of five (5) years providing construction services for electrical instrumentation projects. The Bidder's team shall include at least one (1) Master Electrician, registered in the State of Maryland. Prime Contractor must have an Experience Modification Rate (EMR) that is less than 1.0 or a current Total Recordable Incident Rate (TRIR), or other incident rate less than 100% of the industry average based on NAICS code(s). Failure to meet these identified rates will require the contractor to designate a Safety Representative whose primary focus is on accident prevention. SAFETY REQUIREMENTS All contractors must complete and submit the attached Contractor Safety and Health Program Questionnaire. Failure to provide this information may result in disqualification. Contractors whose current Experience Modification Rate (EMR) exceeds 1.0, or whose most recent Total Recordable Incident Rate (TRIR) (or other incident rates) exceed 100% of the industry average for their applicable NAICS code(s), must designate a qualified and experienced safety representative. This representative’s duties shall include accident prevention and supervision of all site-specific safety programs on WSSC Water projects. The designated safety representative must be present, actively engaged, and qualified to manage and implement safety requirements in compliance with regulatory and project-specific standards. Industry average incident rates may be referenced at http://www.bls.gov/news.release/osh.nr0.htm INSTRUCTIONS TO BIDDERS/OFFERORS COMPLIANCE WITH COMMISSION PROCUREMENT REGULATIONS The Commission's Procurement Regulations, WSSC Code of Regulations, Title 6, Chapter 6.15, are incorporated into this Solicitation and made a part of this Solicitation by reference. The Procurement Regulations can be viewed online at https://wssc.district.codes/Code/6.15 . DEFINITIONS Whenever the following words occur in these Instructions to Bidders/Offerors, they shall have the following meanings. "Bidder" means any person submitting a bid in response to an invitation for bids ("IFB") or a request for quotations ("RFQ"). "Contract Documents" means all documents that are included, attached, or referenced in a Solicitation. "Invitation for bids" ("IFB") means all documents, whether attached or incorporated by reference, utilized for soliciting bids. "Invitation for prequalification" ("IFP") means all documents, whether attached or incorporated by reference, utilized for prequalifying potential bidders. "Offeror" means any person submitting a proposal to a request for proposals ("RFP") or invitation for prequalification ("IFP"). "Request for proposals" ("RFP") means all documents, whether attached or incorporated by reference, utilized for soliciting proposals. "Responsible" means a person who has the capability in all respects to perform fully the requirements stated in the invitation for bids and request for proposals, respectively, and the integrity and reliability that will assure good faith performance. "Responsive" means a person who has submitted a bid or a proposal that fully conforms to the invitation for bids or request for proposals. "Solicitation" means an invitation for bids, a request for proposals, a request for quotations, an invitation for pre-qualification, or any other document issued by WSSC for the purpose of soliciting bids or proposals to perform a WSSC contract. WSSC’S SUPPLIER PORTAL SYSTEM Bidders/Offerors are required to register in WSSC's Supplier Portal System in accordance with WSSC Code of Regulations, Title 6, Chapter 6.25, at the time of bid opening or proposal submission due dates. Failure to have an active supplier profile prior to this time may render the bid or proposal non-responsive. Information regarding the Supplier Portal System can be found online at https://wssc.district.codes/Code/6.25 and www.wsscwater.com . EXPLANATION OF CONTRACT DOCUMENTS TO PROSPECTIVE BIDDERS/OFFERORS Any prospective Bidder/Offeror must carefully examine the Solicitation. If a prospective Bidder/Offeror is unclear as to the meaning or intent of any of the Contract Documents included in the Solicitation, the prospective Bidder/Offeror shall request a clarification from the Procurement Office before its bid/proposal is submitted. All questions pertaining to the Solicitation or Contract Documents shall only be submitted by a Bidder/Offeror to the Procurement Officer identified in the Solicitation via the Online Discussion feature in the Supplier Portal. Questions submitted via email shall not be answered. Replies, where warranted, will be by addenda issued electronically to all parties who have downloaded the Solicitation. Questions received less than ten (10) days prior to the date for opening of bids or due date for receipt of proposals may not be answered. Only questions answered by formal written addenda will be binding. Questions received after this deadline may be addressed at the discretion of the Commission. Oral and other interpretations or clarifications will be without legal effect. Any information given to a prospective Bidder/Offeror by the Commission will be furnished to all prospective Bidders/Offerors via Online Discussion in the Supplier Portal. Any information given to a prospective Bidder/Offeror by the Commission will be furnished to all prospective Bidders/Offerors. SECURITY CLEARANCE REQUIRED FOR ACCESS TO PLANS AND DRAWINGS In order to receive plans and drawings related to the Solicitation, a prospective Bidder's/Offeror's representative must first be approved through a security background investigation. The Bidder's/Offeror's representative can obtain an application for a security clearance by contacting WSSC''s Procurement Office by phone, (301) 206-8288. Requests for plans and drawings can only be fulfilled for representatives having successfully completed the security investigation. Multiple representatives may gain security clearance to request plans and drawings. Additionally, plans and drawings may be accessed through E-Builder® ASP software. A user name and password is issued by the Procurement Officer upon request. To obtain a user name and password for access, a Bidder's/Offeror's representative must first obtain a security clearance. SUBMISSION OF BIDS (COMPETITIVE SEALED BIDDING) Bid Forms Bids shall be submitted in accordance with the instructions in the Solicitation and shall be filled out in typewritten or written ink. If changes and erasures are made, such changes and erasures shall be clear and legible, and shall be initialed by the person signing the forms. The bid forms may provide for submission of a price or prices for one or more items, which may be lump sum bids, alternate prices, and scheduled items resulting in a bid on a unit of construction or a combination thereof, or other bidding arrangements. Unless specifically called for, alternate bids will not be considered. Failure to submit a bid form or submitting an incomplete bid form with the bid may lead to the bid being deemed non-responsive or non-responsible. Bid Submittals Bidders shall complete and submit any submittals required by the Solicitation with the bid. Failure to submit a submittal or submitting an incomplete submittal with the bid may lead to the bid being deemed non-responsive or non-responsible. Bid Bond If the Solicitation requires a bid bond and a Bidder fails to submit a bid bond with the bid, the bid shall be deemed non-responsive. Multiple Unit Prices No Bidder will be permitted to offer more than one price for each item identified in a bid form even though it believes it has two or more products that will meet the specifications in the Solicitation. If a Bidder submits more than one price for any item, all prices for that ite

Published attachments
Addenda and notices
  • Official Notice #1: Site Visit: Piezometer Automation at WSSC Water Dams · 1

    There will be a site visit held on Tuesday, November 17, 2026, 10:00am at Duckett Dam: 7400 Brooklyn Bridge Road, Laurel, MD 20707. After Duckett Dam a site visit may be held at Little Seneca Dam: 13920 Wisteria Drive, Germantown, MD 20874.

  • Addendum #1 · 1

    Addendum #1 Piezometer Automation at WSSC Water Dams

  • Official Notice #2: Pre-Bid Meeting: Piezometer Automation at WSSC Water Dams · 2

    You will find attached the pre-bid meeting presentation and attendance for bidder's review.

Plain text

OpenGov categories

  • 237990 · Other Heavy and Civil Engineering Construction
  • 238120 · Structural Steel and Precast Concrete Contractors
  • 238910 · Site Preparation Contractors
  • 532490 · Other Commercial and Industrial Machinery and Equipment Rental and Leasing
  • 541330 · Engineering Services
  • 541690 · Other Scientific and Technical Consulting Services