Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Pineview Passive Park Construction

Description

Beaufort County is soliciting competitive bids from qualified contractors for the construction of the Pineview Preserve Passive Park, located at 484 Sams Point Road on Lady’s Island in Beaufort County, South Carolina. The project consists of site improvements and recreational amenities intended to provide public access to the approximately 110-acre preserve while maintaining its natural character. Work includes construction of a park entrance and parking area, restroom building, pedestrian trails, elevated boardwalk, wildlife viewing blind, viewing platform, and associated site improvements. Additional work includes site preparation, clearing within designated limits, grading, stormwater management, utility connections, erosion and sediment control, tree protection, landscaping, and restoration of disturbed areas. All work shall be completed in accordance with the issued construction documents, technical specifications, applicable permits, and project requirements. The Contractor shall coordinate and execute the work to deliver a complete, functional passive park while protecting existing vegetation and environmentally sensitive areas within the preserve. Pineview Preserve Passive Park - Base Bid General Conditions and Mobilization (Supervision, Project Management, Bonds, Insurance, Staking, Layout, and Mobilization) Permits, Fees, and Utility Connection Charges Sitework (Site Preparation, Clearing, Earthwork, Fine Grading, Seeding, Erosion Control, and Related work) Asphalt Paving (Entrance Driveway and Parking Areas) Pavers (Grass Pavers, Gravel Pavers and Related Work) Concrete (Sidewalks, Restroom Building Foundation and Slab, Pervious Concrete and Related Work) Parking Signage, Pavement Markings, Striping, Bike Rack, and Related Installation. Restroom Building CMU Walls and Related Masonry Work Restroom Building Roof Framing and Sheathing Roofing and Exterior Finishes Doors, Frames, and Hardware Interior Finishes and Specialties Mechanical Systems and Equipment Sanitary Sewer System (Grinder Pump, Piping, and Force Main Connection) Plumbing Systems, Fixtures, and Related Work Electrical Service and Site Electrical Building Electrical Systems, Lighting and Fixtures, Including Front Entry Monument Sign Uplighting and Related Work Boardwalks and Wildlife Blind and Viewing Platforms Front Entry Monument Sign Split-Rail Fencing, Entry Gates and Related Work Gate Operator, Controls, Keypad, Hardware, Installation and Related Work Landscape Planting, Shrubs, Mulch, and other Specified Landscape Improvements Site Restoration, Final Cleanup, and Demobilization Testing, Inspections, Record Drawings, and Closeout SCOPE OF WORK Scope of Work The Contractor shall furnish all labor, materials, equipment, supervision, coordination, and services necessary to construct the Pineview Preserve Passive Park in accordance with the issued construction documents, technical specifications, and applicable codes and regulations, except for items specifically identified as Owner-furnished or otherwise noted in the plans. The work includes, but is not limited to, the following: 1. Mobilization and Site Preparation Mobilize personnel and equipment, establish construction access and staging areas, verify site conditions, and perform required layout and preparatory activities. Locate and protect existing utilities and site features designated to remain. 2. Clearing, Tree Protection, and Environmental Controls Perform clearing and vegetation removal only within the designated limits of disturbance. Install and maintain tree protection, erosion and sediment controls, and other required environmental protection measures throughout construction. Protect existing vegetation, wetlands, and other environmentally sensitive areas from construction impacts. 3. Earthwork, Grading, and Drainage Perform excavation, grading, fill placement, and subgrade preparation to establish proposed site elevations for the park improvements. Install stormwater management and drainage features in accordance with the construction documents, including drainage stone at the restroom building perimeter where indicated. 4. Entrance, Access, Parking, and Fencing Construct the proposed park entrance, driveway, and parking area, including asphalt paving, concrete sidewalks, pervious concrete pavement, grass and gravel pavers, crushed-gravel paths, accessible parking, signage, striping, pavement markings, and associated improvements shown in the construction documents. Furnish and install the entrance gate, including the automatic gate operator, controls, digital keypad, timer, associated hardware, and required electrical connections. Provide gate-operation shop drawings and coordinate the installation with the electrical plans. Install the two-rail and diamond three-rail split-rail fencing shown in the construction documents. Signage and pavement markings shall comply with applicable requirements identified in the construction documents. 5. Pedestrian Trails and Elevated Boardwalk Prepare designated pedestrian trail alignments, including hand clearing and grubbing where required, and construct elevated boardwalk sections. Provide required foundations, structural framing, decking, transitions, handrails, guards, and associated components in accordance with the civil, landscape, and structural drawings. Maintain designated trail alignments and protect existing trees and natural features. 6. Wildlife Blind and Viewing Platform Construct the proposed wildlife blind and viewing platform, including foundations, structural framing, decking, access components, railings, and other features indicated in the construction documents. 7. Restroom Building Construct the proposed restroom building in accordance with the architectural, structural, plumbing, mechanical, and electrical drawings. Work includes foundations and concrete slab, reinforced CMU walls, roof framing and roofing, exterior and interior finishes, doors and hardware, plumbing fixtures, mechanical systems, electrical systems, lighting, and associated equipment necessary to provide a complete, functional facility. 8. Water, Sewer, and Electrical Utilities Provide and install the utility infrastructure and connections required to serve the restroom building and park improvements in accordance with the construction documents. Water service work includes the water service connection, tapping of the existing water main, required fittings and appurtenances, and installation of the proposed water service piping, including the horizontal directional drilling shown in the utility plans. Sewer work includes the proposed grinder pump system, associated piping, connections, and equipment shown in the utility and pump detail drawings. Complete the sewer connection to the existing force main in accordance with the approved plans and applicable utility requirements. Electrical work includes the electrical service and distribution infrastructure, underground conduit and wiring, building electrical systems, and other electrical components shown in the electrical site plan and building electrical drawings. Coordinate electrical work with the automatic entrance gate and front entry sign lighting. The Contractor shall coordinate utility installations and connections with the applicable utility providers and authorities, obtain required utility approvals, and complete required applications, service arrangements, inspections, testing, and service activation activities necessary to provide operational water, sewer, and electrical services. 9. Monument Sign, Site Amenities, Landscaping, and Site Restoration Furnish and install the front entry monument sign shown in the construction documents, including the CMU structure, concrete footing and foundation, stucco finish, sign face, and lettering on both sides. Provide required sign shop drawings for approval and coordinate the sign construction with the applicable details. Provide and install the sign up-light, including the specified lighting fixture, hardwired electrical connections, wiring, and automatic timer in accordance with the construction and electrical drawings. Furnish and install the specified five-loop bike rack, including required mounting and installation components. Complete landscaping, planting, stabilization, and restoration of disturbed areas as indicated in the construction documents. Remove construction debris and restore areas affected by construction activities, leaving the site clean and ready for public use. 10. Permits, Inspections, Testing, Project Meetings, and Closeout Beaufort County Planning and Zoning has issued the Final Development Permit for the project. The Contractor IMPORTANT ELECTRONIC SUBMITTAL REQUIREMENTS Response submittals for this Invitation For Bid will ONLY be received electronically and must be submitted ONLINE, through the Procurement Portal, no later than 3:00 pm on Thursday, January 7, 2027 . All responses must adhere to the following guidelines: Suppliers are encouraged to submit responses as soon as possible. Responses are received through our secure Procurement Portal and cannot be opened prior to the due date and time. The time and date of receipt as recorded by the server will serve as the official time of receipt. The County is not responsible for late submissions, regardless of the reason. All requested information and forms MUST be uploaded as indicated in the PROPOSAL SUBMITTAL Section. If you have a problem with your submittal, you may contact Support through the Procurement Portal. TITLE VI STATEMENT COUNTY COUNCIL OF BEAUFORT COUNTY Title VI Statement to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants It is the policy of the County Council of Beaufort County, South Carolina, hereafter referred to as “Beaufort County” or “the County”, to comply with Title VI of the 1964 Civil Rights Act (Title VI) and its related statutes. To this end, Beaufort County assures that no person shall be excluded from participation in, denied the benefit of, or subjected to discrimination under any of its programs or activities on the basis of race, color, national origin, age, sex, disability, religion, or language regardless of whether those programs and activities are Federally funded or not. The County is also committed to assuring every effort will be made to prevent the discrimination of low-income and minority populations as a result of any impact of its programs or activities. Beaufort County also assures that every effort will be made to prevent discrimination through the impacts of its programs, policies, and activities on minority and low-income populations. Additionally, the County will take reasonable steps to provide meaningful access to services for persons with limited English proficiency. In addition, Beaufort County will not retaliate against any person who complains of discrimination or who participates in an investigation of discrimination. Beaufort County will, where necessary and appropriate, revise, update, and incorporate nondiscrimination requirements into appropriate documents, directives, and regulations. Pursuant to Title VI requirements, any entity that enters into a contract with Beaufort County including, but not limited to Prime Contractors, Subcontractors, Architects, Engineers, and Consultants, may not discriminate on the basis of race, color, national origin, age, sex, disability, religion, or language in their selection and retention of first-tier subcontractors, and first-tier subcontractors may not discriminate in their election and retention of second-tier subcontractors, including those who supply materials and/or lease equipment. Further, Contractors may not discriminate in their employment practices in connection with highway construction projects or other projects assisted by the U.S. Department of Transportation (USDOT) and/or the Federal Highway Administration (FHWA). In all solicitations either by competitive bidding or negotiation made by the Contractor for work to Beaufort County to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the Contractor of the Contractor's obligations under the contract and the Title VI regulations relative to nondiscrimination on the basis of race, color, national origin, age, sex, disability, religion, or language by providing such a statement in its bidding and contract documents. Upon request, the Contractor shall provide all information and reports required by Title VI requirements issued pursuant thereto, and shall permit access to its books, records, accounts and other sources of information, and its facilities as may be determined by Beaufort County, USDOT, and/or FHWA to be pertinent to ascertain compliance with such regulations, orders, and instructions. Where any information required of a Contractor is in the exclusive possession of another who fails or refuses to furnish this information, the Contractor shall so certify to USDOT or FHWA, as appropriate and via Beaufort County, and shall set forth what efforts it has made to obtain the information. In the event of the Contractor's non-compliance with nondiscrimination provisions of this contract, USDOT may impose such contract sanctions as it or FHWA may determine to be appropriate, including, but not limited to: Withholding of payments to the Contractor under the contract until the Contractor complies, and/or Cancellation, termination, or suspension of the contract, in whole or in part. In the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of this direction to comply with Title VI, the Contractor may request USDOT to enter into such litigation to protect the interests of USDOT and FHWA. Additionally, the Contractor may request the United States to enter into such litigation to protect the interests of the United States. Any person or Subcontractor who believes that they have been subjected to an unlawful discriminatory practice under Title VI has a right to file a formal complaint within one hundred eighty (180) days following the alleged discriminatory action. Any such complaint must be filed in writing or in person: Beaufort County Government Post Office Drawer 1228 | Beaufort, SC 29901-1228 843-255-2304 Telephone | E-mail: dthomas@bcgov.net INVITATION FOR BID Dates Advertised: 11/23/26 This is a Formal Sealed Bid We require Bids to be Electronically submitted through the Procurement Portal. Please go to https://procurement.opengov.com/portal/bcgov and sign up to submit your bid. BIDS WILL BE RECEIVED UNTIL 3:00 pm LOCAL TIME ON Thursday, January 7, 2027 . Bid Title: Pineview Passive Park Construction Bid No: IFB 010727 PREBID CONFERENCE: A Pre-Bid conference will be held on Thursday, December 10, 2026 at 2:00 pm p.m. virtually through Teams. This is a Non-Mandatory meeting; all interested bidders and subcontractors are encouraged to attend. Teams: This is a virtual meeting. Please contact nicole.sproesser@bcgov.net to be added to the meeting. . All questions must be submitted through the Procurement Portal no later than 5:00 pm on Wednesday, December 30, 2026 . A Bid Tabulation Will Be Posted On The Procurement Portal After Bid Opening. BID ACCEPTANCE AND DELIVERY (Prices bid must be firm for a minimum of 90 ). In compliance with the Invitation, and subject to all conditions thereof, the Offeror agrees, if this bid is accepted within (90) days from date of opening, to furnish any or all items quoted on at prices as set forth after the item and to make delivery within N/A after receipt of order with transportation cost included and prepaid. Unless otherwise stated and accepted herein, the Offeror agrees to complete this proposed contract in less than thirty (30) calendar days after issue date of purchase order. I M P O R T A N T IF YOU CONSIDER THESE SPECIFICATIONS AS RESTRICTIVE, SEE GENERAL PROVISIONS, PARAGRAPH #20, DISCREPANCIES. Bids received after the time specified for opening cannot be considered. BID INVITATION Pineview Passive Park Construction IFB 010727 Sealed bids submitted through the Procurement Portal will be received electronically until 3:00 pm on Thursday, January 7, 2027 at which time responses to this request will be recorded in the presence of one or more witnesses in the Procurement Services Department. A Bid Tab will be posted on the Procurement Portal for: Pineview Passive Park Construction A PRE-BID conference will be held on Thursday, December 10, 2026 at 2:00 pm p.m. virtually through Teams. This is a Non-Mandatory meeting; all interested bidders are encouraged to attend. WebEx: This is a virtual meeting. Please contact nicole.sproesser@bcgov.net to be added to the meeting. . Bid documents are available through the Procurement Portal at https://procurement.opengov.com/portal/bcgov . Beaufort County reserves the right to reject all proposals and to waive minor informalities and irregularities. All Bids shall be accompanied by a Bid Bond drawn in favor of the Beaufort County Treasurer of Beaufort County, Beaufort, South Carolina, in the amount of at least five percent (5%) of the bid for the complete work: such Bid Bond representing that the Bidder, if awarded a contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the attorney for Beaufort County, South Carolina. Each bond shall be equal one hundred percent (100%) of the contract amount. A copy of the Bid Bond or Certified Check must be electronically sent with your bid documents through the Procurement Portal, as indicated in the Vendor Questionnaire Section. The original Bid Bond or Certified Check must be received by the Procurement Services Department within 10 days after the bid due date. Failure on the bidder’s part to provide a copy of the Bid Bond or Certified Check by the Bid closing date and time will be considered as a nonresponsive bid and rejected by the County. The Bid Bond shall be forfeited to the County Council of Beaufort County, South Carolina as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within fourteen (14) days after being notified that he has been awarded the Contract. The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes required for the construction and installation of this project as required by local, state, and federal regulations. County permits shall be required as applicable, but the fee shall be waived. This waiver shall apply to the Beaufort County permit fee only and not to any "City or Town" permit fee and/or licenses, when applicable. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of 1970. Bidders must certify that they do not and will not maintain or provide for their employees any facilities, which are segregated on the basis of race, color, creed, or national origin. The Beaufort County Council reserves the right to reject all Bids and waive any formalities. Any claims for cost incurred by any bidders in preparation of any part of, or total package for this project will not be handled for reimbursement by Beaufort County or their representatives. The Bidding Documents consist of the following, including all addenda issued there with and forms referenced therein, in addition to the drawings: Bid Documents Contract General Conditions Supplemental Conditions General Provisions Special Provisions Specifications Bid opening will be held at the Procurement Services Department. There will be no Public Bid Opening. A Bid Tabulation will be posted on the Procurement Portal. SMALL AND MINORITY BUSINESS PARTICIPATION PLEASE REVIEW THIS SECTION CAREFULLY, PAYING PARTICULAR A

Plain text

OpenGov categories

  • 51500 · Lawn Maintenance Equipment And Accessories (See Class 020 For Agricultural Types)
  • 65000 · Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
  • 79000 · Seed, Sod, Soil, And Inoculants
  • 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
  • 91200 · Construction Services, General (Incl. Maintenance And Repair Services)
  • 96800 · Public Works And Related Services
  • 98800 · Roadside, Grounds, Recreational And Park Area Services
  • 98832 · Grading (Of Parking Lots, etc. - Not Road Building)