Description
The City of Plant City is seeking a qualified contractor to replace the existing standby generator serving the municipal communication tower. This project is critical to maintaining uninterrupted communication capabilities during emergency events. The communication tower supports monitoring and control of essential utility infrastructure, including the Water Reclamation Facility (WRF), the Water Treatment Plant South (WTPS), and all lift stations located throughout the City. Reliable backup power is essential to ensure continuous operation of these systems during power outages. The selected contractor will provide and install a new generator system in accordance with project specifications and all applicable codes and standards. City-Determined Quantities Mobilization and Demobilization Bonds and Insurance Standalone Diesel Generator Automatic Transfer Switch Start Up (Generator and ATS) Load Bank Testing Vendor-Determined Quantities Concrete Pad Installation Disconnect and Remove Existing Generator New Generator Installation Scope of Work To provide the full scope of work as per the attached plans and specifications for the Plant City Utilities Communication Tower Generator Replacement (FEMA) . Generator Installation The Contractor shall furnish all labor, materials, equipment, tools, transportation, and services necessary to provide and install a complete standby power system for the communication tower, including a standalone diesel generator, automatic transfer switch (ATS), generator pad, testing, and all associated electrical work. Work shall include, but not be limited to, the following: Furnish and install one (1) EPA‑certified diesel standby generator, rated 14 kW, 1.0 PF, 60 Hz, single‑phase, 120/240V. Generator shall be a factory‑assembled, weather‑proof, sound‑attenuated unit suitable for outdoor installation. Provide sub‑base fuel tank sized for a minimum of 48 hours of runtime at the specified load. Provide all manufacturer‑required accessories including battery, battery charger, block heater, vibration isolators, and control panel. Provide sound‑attenuated enclosure meeting applicable noise‑reduction requirements. Furnish and install an Automatic Transfer Switch (ATS) sized for the generator and tower electrical load. ATS shall be provided by the generator manufacturer. Provide and install all conduit, conductors, grounding, and terminations between the generator, ATS, and the existing main distribution panel. Provide all equipment grounding and bonding in accordance with NEC Article 250. Construct a reinforced concrete generator pad in accordance with project structural details. Coordinate pad dimensions, anchor locations, and conduit stub‑ups with the generator manufacturer’s requirements. Provide factory‑authorized startup of the generator and ATS. Perform on‑site load bank testing to demonstrate generator capacity and performance. Submit complete test results and commissioning documentation. Provide a minimum one‑year manufacturer’s warranty. Provide all O&M manuals, wiring diagrams, startup reports, and warranty documentation. Contractor shall restore all disturbed surfaces and leave the site in clean condition upon completion. The Contractor shall minimize downtime during the transition from the existing generator to the new generator to ensure back up power for the communication tower systems is maintained, with any downtime kept to a minimum, not more than 12 hours. Disconnect and Remove Existing Generator The Contractor shall disconnect and remove the existing generator, including all associated electrical connections, conduit, wiring, and components necessary to facilitate installation of the new standby generator. The existing generator shall be carefully disconnected and removed from its existing location without damage to the equipment. The existing generator shall be retained by the City. The Contractor shall not dispose of, transport, or relocate the existing generator to an alternate location. The Contractor shall coordinate with the City regarding the timing and removal of the existing generator to minimize disruption to backup power for the communication tower. Costs associated with disconnecting and removing the existing generator shall be included in the Contractor’s bid price. Disposal or off-site transportation of the existing generator is not included in the Contractor’s scope or bid price. The Contractor shall leave the existing generator area clean and free of debris following removal and shall properly terminate or make safe any electrical, fuel, or other connections no longer required for the new system. Bidder Instructions Bid Submissions Bids shall be received for 26-056UM-IFB Plant City Utilities Communication Tower Generator Replacement (FEMA) through the City's e-Procurement located at https://procurement.opengov.com/portal/plantcitygov. Valid Term Bids shall be valid for no less than 90 days from the submittal deadline. Rejection The City reserves the right to reject any or all bids at any time and for any reason or no reason. Bids submitted after the deadline shall be rejected. Bids shall be received for 26-056UM-IFB Plant City Utilities Communication Tower Generator Replacement (FEMA) through the City's e-Procurement located at https://procurement.opengov.com/portal/plantcitygov . Bids submitted in an envelope or box shall be rejected. Fax, e-mail, or telephone bids shall be rejected. Bids that are incomplete, unbalanced, conditional, obscure, or which contain terms or additions not called for, alterations or irregularities of any kind, or which do not comply with the contract documents, if applicable, may be rejected at the sole discretion of the City. Response Form Bids shall be made only on the forms included in title Bid Submittals. Bid forms shall be signed by the owner or other authorized individual. Insurance Requirements At a minimum, the contractor shall acquire and maintain until completion of the work the insurance coverage listed below, which constitutes primary coverage. The contractor shall not commence the work until the City of Plant City (City) receives and approves Certificates of Insurance documenting required coverage. Contractor’s General Liability and Automobile Liability policies shall include Endorsement CG 20101185, or equivalent, naming the City as Additional Insured. All required policies shall also include (1) endorsement that waives any right of subrogation against the City for any policy of insurance provided under this requirement or any state or federal Workers’ Compensation or employer’s liability act; (2) endorsement to give the City no less than thirty days’ notice in the event of cancellation or material change. Certificates of Insurance must be accompanied by copies of the requested endorsements. The contractor understands and agrees that the stipulated limits of coverage listed herein in this insurance section shall not be construed as a limitation of any potential liability to the City, or others, and the City’s failure to request, receive or retain, evidence of this insurance coverage shall not be construed as a waiver of the contractor’s obligation to provide and maintain the insurance coverage specified. Workers’ Compensation Insurance : Awardee shall procure and maintain during the life of this contract Workers’ Compensation Insurance for all of its employees to be engaged in work on the Project under this Contract, and in case any such work is sublet, Contractor shall require the Subcontractor similarly to provide Workers’ Compensation Insurance for all the Subcontractor’s employees to be engaged in such work unless such employees are covered by the protection afforded by Contractor’s Workers’ Compensation Insurance. In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers’ Compensation statute, Contractor shall provide and shall cause each Subcontractor to provide adequate insurance for the protection of such of its employees not otherwise protected. Contractor shall indemnify and hold the City of Plant City harmless for any claim made by the Subcontractor for Workers” compensation. Note: If Contractor claims to be exempt from Workers’ Compensation Insurance, then a Certificate of Exemption from the State shall be produced upon request. Commercial General Liability Insurance : Awardee shall procure and shall maintain during the life of this contract, but not limited to, Independent Contractor, Contractual Premises/Operations, and Personal Injury covering the liability assumed under indemnification provisions of this Contract, with limits of liability for personal injury and/or bodily injury, including death. Amounts of coverage shall be satisfactory to the Owner, but not less than $500,000.00 for each occurrence, $1,000,000.00 general aggregate, personal/advertising injury of $500,000.00; Products-Completed Operations aggregate of $1,000,000.00. Also, include in General Liability coverage for the following areas based on the limits of policy, with a minimum of: Fire Damage (any one (1) fire) $50,000.00; Medical Expense (any one (1) person) $5,000.00. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The City of Plant City shall be named as additional insured on the policy. The City shall receive a copy of the Additional Insured Endorsement confirming that the Contractor's coverage is Primary and not Contributory. Commercial Automobile Liability Insurance : Awardee shall procure and shall maintain during the life of this contract Comprehensive Automobile Liability Insurance covering any auto, all owned autos, scheduled autos, hired autos, and non-owned autos. Coverage shall be on an “occurrence” basis. Such insurance to include coverage for loading and unloading hazards. This coverage shall include Combined Single Limit (CSL) for $500,000.00 or Bodily Injury (Per Person), Bodily Injury (Per Accident) and Property Damage for $500,000.00 each. This insurance shall be maintained with an insurance company or companies licensed to do business in the State of Florida. The City of Plant City shall be named as additional insured on the policy. The City shall receive a copy of the Additional Insured Endorsement confirming that the Contractor's coverage is Primary and not Contributory. Subcontractor’s Comprehensive Liability and Property Damage Insurance: The Awardee shall require each of its subcontractors to procure and maintain during the life of their contract Comprehensive Liability and Property Damage insurance coverage in amounts satisfactory to the contractor for its protection, with an insurance company or companies licensed to do business in the State of Florida. The certificate of insurance shall include as a certificate holder: City of Plant City Attn: City Manager 302 West Reynolds Street The City shall be named as additional insured on the policy. Completeness The City may reject bids that are incomplete, conditional, deficient in any way, or which contain unsolicited additions/alterations. Review Documents Bidders must review all specifications and contract documents related to this bid and project. Failure to review all specifications, forms, contracts, addenda, or other documents shall not relieve a bidder from any obligations contained in this bid or their Contract with the City. Familiarity with Project Area Before submitting a bid, bidders shall become fully acquainted with the project areas. Please see Scope of Work for more detail about the project. Submittal of a bid shall serve as bidder’s acknowledgment that they are fully familiar with the service area. Fill-In Required Forms Bidders must accurately fill in any bid forms/documents included in this packet and submit through the City's e-Procurement portal at: https://procurement.opengov.com/portal/plantcitygov. Authorized signatures must be included on forms/documents. Incomplete or missing forms/documents may result in the rejection of the bid. Certification Submittal of a bid shall be deemed as certification that a bidder has fully considered all factors associated with this Invitation for Bids, including any addenda. Project Owner The City of Plant City, Florida owns this project. The City Manager or designee is the City’s authorized representative on this project. Verification of Bidder's Capability The City may, at its sole discretion, determine the bidder’s ability and capacity to perform the work specified in this bid based on, but not limited to, evaluation of the following: Comparable prior project experience (particularly ones similar to this project size/scope). Financial resources. Prior bond history. Licensure and certifications. Equipment, machinery, and/or facilities. Background & references. Bidders deemed to be unqualified to perform the work may have their bid rejected. Waiver of Irregularities The City may waive informalities or irregularities that, in the City’s opinion, do not materially affect a bid. Notice of Award Upon review of the bids and when a determination has been made as to the lowest responsive and responsible bidder, the Procurement Director will issue a Notice of Intent to Award to the selected bidder via the City's e-Procurement Portal. Once the bidder has completed registration, they will receive "Notice" notifications to their email by clicking “Follow” on this project. Ultimately, it is the sole responsibility of each bidder to periodically check the site for any Notices at https://procurement.opengov.com/portal/plantcitygov . This notice shall be sent to the recommended bidder with copies to all bidders. Award City personnel will evaluate the bids. Determination of the lowest responsive and responsible bid will be made after a review of all bids submitted. Bid award shall be made to the vendor submitting the lowest responsive and responsible bid meeting specifications for the base bid. The City may award a Contract based on bid responses received from bidders without further discussion of such bids with the selected bidder. Therefore, bids should be submitted based on the most favorable terms available. Bids that are not greater than $50,000.00 may be awarded by the City Manager. The City Commission makes the final decision regarding the award or rejection of bids that are greater than $50,000.00. Term The contract resulting from this Invitation for Bids shall commence effective upon issuance of a term contract by the City and extend for a period of 390 calendars days after notice to proceed (NTP). Protest Procedures Any bidder or proposer who is allegedly aggrieved in connection with the issuance of the Procurement Director’s recommendation and intent to make a competitive award of a contract may protest to the City Manager per Sec. 2-152. Protest Procedure, of the City’s Code. Revocation of Award If the City discovers that the bidder has misrepresented anything in their bid or that the bidder – in the City’s opinion – is no longer reasonably capable of performing the work as bid, then the City may revoke the award at any time before issuing the formal Notice to Proceed. The Procurement Director will issue the revocation in writing. Bid Interpretations The City has the right to define and interpret bid terms, specifications, and conditions. Contract Execution & Bid Bond The selected bidder must sign and return the contract, any required bonds or letter of credit, insurance certificates, and all other required documents within 14 calendar days after the City sends the documents to the selected bidder. Once the City receives the signed contract and all other required documents back from the selected bidder, then the City’s authorized representative will sign the contract. Failure to sign and return the contract and all other required documents within 14 calendar days may result in the City calling the bid bond or cashing the cashier’s check submitted by the selected bidder with its proposal; barring the selected bidder from consideration on future projects; or both. The City may then select another bidder to perform the work or provide the goods/services specified in this bid. Sworn Statement on Public Entity Crimes A person or affiliate as defined in Section 287.133, Florida Statutes, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity above $25,000 for 36 months following the date of being placed on the convicted vendor list. Bidders must fill out and sign the form titled “SWORN STATEMENT UNDER SECTION 287.133(3)(A), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES.” Failure to do so may disqualify the bid. Other Forms & Documents Bidders are responsible for reviewing and understanding all specifications, forms or other documents associated with the products described in this bid. Submittal of a bid shall serve as the bidder’s acknowledgment that it has reviewed and understood all such documents. Notice to Proceed Following contract signing by the City, a formal “Notice to Proceed” will be issued in writing to the contractor. The start date will be issued by the City’s Project Manager. If the contractor begins work before receiving the Notice to Proceed or start date, then the City may stop work on the project, may require the work to be redone at the contractor’s expense and without additional compensation from the City, or both. The City also may revoke the project award and select another bidder to perform the work. Changes or Modifications The City may at any time make changes within the general scope of the contract in any of the following areas: Time of Performance (i.e., hours of the day, days of the week, etc.). Location of performance of the services. Quantities to be ordered. The contractor shall not commence the performance of additional work or other changes not covered by this contract without an executed notice to proceed or purchase order issued by the City. If the contractor performs additional work beyond the specific requirements of this contract without an executed change order, it shall be at the contractor’s own risk. The City assumes no responsibility for any additional costs for work not specifically authorized by an executed change order. Conditions of Performance Bidders are required to inform themselves fully of the conditions relating to the performance of the work required, including but not restricted to labor and operating conditions under which the work will be or is now being performed; and the successful bidder must apply, so far as possible, such methods and means in carrying out the work that will not cause any interruption or interference with any other work, construction or operation the Owner has underway. Payment and Performance Bond If Payment and Performance Bond is required, it shall be for the amount of the contract. The contractor shall be responsible for recording the payment and performance bond before commencing the work, the contractor shall provide to the City Clerk a certified copy of the recorded bond. As required by 255.05, Florida Statutes, the City may not make any payments to the contractor until the City Clerk re
Published attachments
- Federally_Funded_Subaward_and_Grant_Agreement_-_Utilities_Dept._Communication_Tower_-_Signed
- Scope and Diagrams
- SECTION03300_CONCRETE
- SECTION16230_GENERATOR
- 2026-10-22_Utilities_Communication_Tower_Generator_Replacement
- 26-056UM-IFM_SiteCondition
- Communication Tower Layout
- Approved Products List-July2024
- LoadCenterA_Reference
- Plant_City_Utilities_Communication_Tower_Generator_Replacement_(FEMA)_(Addendum_#2_Revision).pdf
Addenda and notices
Addendum #1 · 1
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
There has been a Non-Mandatory meeting scheduled for December 2, 2026, at 10:00am at 902 N Mobley St, Plant City, FL 33563 for vendors that wish to view the site. The Question Deadline has been moved to December 7, 2026, by 2:00pm and the Receiving Date has been moved to December 17, 2026, by 2:00pm. Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Is there a pre bid meeting & any drawings?
There is not a pre bid meeting scheduled for this bid. There are project specification in the attachment tab.
Will there be a pre-bid meeting/site visit for this project?
Please see the response to question 1 above.
1) Is the Load center A, ECB, Meter existing or are we providing? 2) Can you advise approximate distance from the panel to the generator or LF you would like us to carry? 3) Are we demolishing the existing generator? 4) Can you provide a panel schedule for Load center A?
1) Existing and New Radio Cabinet will be installed before the generator project. 2) Refer to the attached reference drawing and side photos. The contractor working on the radio cabinet installed the conduit for the ATS. 3) No, However, it will be the contractor's responsibility to disconnect before to connect to a new generator. 4) Attached the load center A.
Will sealed drawings be issued by addendum?
No
Will there be better drawings provided for the pad as well as the site in general? The Grant states that it is for a 60KW Generator, your paperwork shows only a 14kw generator which one is correct? Will there be a mandatory meeting or a pre site walk down for this job?
14 KW is the correct one. There will be no mandatory meeting or a pre site walk down.
None of the questions or answers appear in addendum 1
All questions and answers will be record in this question and answer section of the solicitation.
Who can we submit the specs of an alternative brand generator to? We are proposing a WINCO DR2014.
Please email any proposing alternants to Ken Brush at kbrush@plantcitygov.com by the end of business on November 23, 2026. The City will evaluate and determine if the alternant will be acceptable prior to bid opening.
Can we schedule a site visit?
The site is currently under construction and is not accessible. Vendors are allowed to view the sight from a distances but may not enter the site. Pictures of the site have been provided in the Attachment Section of this solicitation.