State and local · OpenGov
Police Building Impact Windows Installation
Description
Pursuant to the Port St. Lucie City Code of Ordinance 35.07, this electronic Invitation for Bids (IFB) is being issued to establish a contract with a qualified proposer who will provide Police Building Impact Windows Installation to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB. Scope of Work Scope of Work Scope of Work The Contractor shall comply with all requirements contained in the following contract documents, which are hereby incorporated by reference and form part of this Scope of Work. These documents are mandatory and shall govern all related work, details, and deliverables: • Attachment B – Reference Pages - City of Port St. Lucie Building Replacement of Windows with Impact Glass - Police Department Facility - CPZ Architects, Inc.- 10 pages • Attachment C – Structural Documents - City of Port St. Lucie Building Replacement of Windows with Impact Glass Facility Windows Replacement - Elevations, Detail and Specification - CPZ Architects, Inc - 3 pages • Attachment D – Architectural Documents - City of Port St. Lucie Building Replacement of Windows with Impact Glass / Permit Set 4/10/2026 - CPZ Architects, Inc - 31 Pages The Contractor shall furnish all labor, materials, equipment, and services necessary to complete the following work. The Scope of Work includes, but is not limited to: 1. Window Replacement 1.1 Remove and properly dispose of all existing windows throughout the building. 1.2 Provide and install new hurricane-rated Level E windows meeting all current Florida Building Code requirements, including impact resistance and water infiltration standards. 1.3 Ensure all replacement windows match existing dimensions, profiles, sightlines, and finishes unless otherwise directed by the City. 1.4 Provide all necessary flashing, sealants, anchors, and accessories for a watertight and code-compliant installation. 1.5 Test and verify proper operation of all windows. 2. South Stairwell Curtain Wall System 2.1 Remove and dispose of the existing curtain wall system in the south stairwell. 2.2 Provide and install a new hurricane-rated Level E curtain wall system. 2.3 Ensure full integration with existing structural framing and building envelope. 2.4 Provide required waterproofing, thermal breaks, insulation, and perimeter sealants for a complete assembly. 3. Sally Port Storefront and Openings 3.1 Remove existing doors, windows, shutters, frames, and related materials within the sally port. 3.2 Provide and install new hurricane-rated Level E storefront systems compliant with Florida Building Code and impact requirements. 3.3 Connect the new storefront system and building alarm on the north elevation. 3.4 Coordinate with the City’s security contractor to ensure all systems remain active and functional during installation. 3.5 Provide temporary protection or barriers as required to maintain secure operations of the sally port during construction. 4. Entry Hardware 4.1 Provide all required hardware—including hinges, panic devices, closers, locksets, seals, thresholds, electronic access components, and accessories—to ensure each entry is fully operational, secure, and compatible with existing systems. 4.2 All hardware shall meet ADA and Florida Accessibility Code requirements. 4.3 Provide finish hardware schedules for City review and approval. 5. Security System Coordination 5.1 Coordinate with the City’s designated security contractor to connect all new doors to the existing security and card access systems. 5.2 Ensure all electronic components are fully functional before final acceptance. 5.3 Provide temporary measures to maintain security continuity during construction activities. 6. Shutter Removal and Finish Restoration 6.1 Remove all shutters in phases approved by the City to minimize disruption. 6.2 Perform all required patching, stucco repair, and painting after shutter removal. 6.3 Match all finishes, textures, and paint colors to existing conditions unless otherwise directed by the City. 6.4 Provide protection to adjacent areas to prevent damage during shutter removal. Notes and Additional Requirements 7. Glazing Engineering Documentation 7.1 Provide shop drawings and details for all glazing components and curtain wall assemblies. 7.2 All glazing documentation shall be signed and sealed by a Professional Glazing Engineer registered in the State of Florida. 7.3 Submit wind-load calculations and impact-resistance certifications. 8. Door and Window Assembly Documentation 8.1 Provide signed and sealed shop drawings and engineered details for all door and window assemblies included in the Scope of Work. 8.2 Submit product approvals and NOAs (Notice of Acceptance) for all assemblies and components. Additional Recommended Requirements 9. Building Code Compliance 9.1 All work shall comply with the current Florida Building Code, including High Velocity Hurricane Zone (HVHZ) requirements where applicable. 9.2 Contractor is responsible for obtaining all required permits and inspections. 10. Site Protection and Safety 10.1 Provide site safety measures, barricades, signage, and protection as required. 10.2 Protect existing landscaping, pavement, utilities, and adjacent structures during construction. 11. Quality Assurance and Warranty 11.1 Contractor shall warranty workmanship for a minimum of one year from final acceptance. 11.2 Manufacturer warranties for windows, curtain walls, storefront systems, and hardware shall be submitted to the City. 11.3 Perform final cleaning in all work areas and leave spaces in “turnover-ready” condition. 12. Coordination and Schedule 12.1 Provide a detailed construction schedule including phasing and milestones. 12.2 Coordinate daily activities with City staff to minimize interference with operations. 12.3 Provide advance notification of all closures, access restrictions, or utility interruptions. Introduction Purpose of Procurement Pursuant to the City of Port St. Lucie Code of Ordinances, Section 35.07 , this electronic Invitation for Bid (“IFB”) is being issued to establish a Contract with one or more qualified Contractors who will provide Police Building Impact Windows Installation to the City of Port St. Lucie (hereinafter, “City”) as further described in this IFB. A descriptive overview of the City can be found at https://www.cityofpsl.com/discover-us/about-psl . Please visit the City’s website to familiarize yourself with how our city is structured and operates. Please contact the Issuing Officer with any questions. Overview of the IFB Process The objective of the IFB is to select one (1) or more qualified Contractor (as defined by Section 1 – “Purpose of Procurement”) to provide the goods and/or services outlined in this IFB to the City. This IFB process will be conducted to gather and evaluate responses from Contractors for potential award. All qualified Contractors are invited to participate by submitting responses, as further defined below. After evaluating all Contractor’s responses received prior to the closing date of this IFB and resolution of any Contract exceptions, the preliminary results of the IFB process will be publicly announced, including the names of all participating Contractors and the evaluation results. Subject to the protest process, final Contract award(s) will be publicly announced thereafter. NOTE TO CONTRACTORS: The general instructions and provisions of this document have been drafted with the expectation that the City may desire to make one award or multiple awards. For example, this document contains phrases such as “contract(s)” and “award(s)”. Please refer to Section 1 – “Purpose of Procurement” and Section 9 – “Evaluation and Award,” for information concerning the number of Contract awards expected. Schedule of Events The Schedule of Events set out herein represents the City’s best estimate of the schedule that will be followed. However, delays to the procurement process may occur, which may necessitate adjustments to the proposed schedule. If a component of this schedule, such as the close date, is delayed, the rest of the schedule may be shifted as appropriate. Any changes to the dates up to the closing date of the IFB will be publicly posted prior to the closing date of this IFB. After the close of the IFB, the City reserves the right to adjust the remainder of the proposed dates, including the dates for evaluation, negotiations, award, and the Contract term, on an as-needed basis, with or without notice. Release of IFB: November 16, 2026 Pre-Proposal Meeting (Non-Mandatory): November 23, 2026, 9:00am Pre-Bid Meeting and Site-Visit Walk Through Port St. Lucie Police Department – Building C 121 SW Port St. Lucie Blvd Port St. Lucie, Florida 34984 Please meet in the front lobby of Building C. Question Submission Deadline: December 7, 2026, 5:00pm Question Response Deadline: December 14, 2026, 5:00pm Response Submission Deadline: December 30, 2026, 3:00pm Microsoft Teams meeting Join: https://teams.microsoft.com/meet/2825973343596472?p=woFbcIxTv6QHWM169o Meeting ID: 282 597 334 359 647 2 Passcode: NT2eN3q5 ________________________________________ Need help? | System reference Dial in by phone +1 561-437-3554,,861575986# United States, West Palm Beach Find a local number Phone conference ID: 861 575 986# For organizers: Meeting options | Reset dial-in PIN The City reserves the right to proceed to award without further discussions after receipt of the initial proposals, in which case, evaluation committee reviews, negotiations, and proposal revisions may not be required. Official Issuing Officer (Procuring Agent) India Barr , Procurement Contracting Officer II O. 772-344-4055 ibarr@cityofpsl.com Definition of Terms Please review the following terms: - Contractor(s) – companies desiring to do business with the City (Also called “Bidder,” “Proposer,” or “Offeror.”) - City of Port St. Lucie (“City”) – the governmental entity identified in “Purpose of Procurement,” of this IFB. - Immaterial Deviation – does not give the Contractor a substantial advantage over other Contractors. - Material Deviation – gives the Contractor a substantial advantage over other Contractors and thereby restricts or prevents competition. - Procurement Management Division (“PMD”) – the City department that is responsible for the review and possible sourcing of all publicly sourced solicitations. - Responsible – means the Contractor, whether a company or an individual, has the financial and technical capacity to perform the requirements of the solicitation and subsequent Contract which will assure good faith performance of the Contract. - Responsive – means the Contractor, whether a company or an individual, has submitted a bid which conforms in all material respects to the requirements set forth in the solicitation. - Sourcing Platform/Electronic Bidding System - OpenGov. - Electronic Bid Bond ("eBond") – a digitally executed surety bond submitted through an approved electronic surety platform (Surety2000), carrying the same legal standing as a traditional bond and subject to all requirements in Section 5.1. Any special terms or words which are not identified in this IFB may be identified separately in one or more attachments to the IFB. Contract Term The Initial term of the contract(s) is for one (1) calendar year from the execution date . In the event that the Contract(s), if any, resulting from the award of this IFB shall terminate or be likely to terminate prior to the making of an award for a new Contract for the identified products and/or services, the City may, with the written consent of the awarded Contractor(s), extend the Contract(s) for such period of time as may be necessary to permit the City’s continued supply of the identified products and/or services. The Contract(s) may be amended in writing from time to time by mutual consent of the parties. Unless this IFB states otherwise, the resulting award of the Contract(s) does not guarantee volume or a commitment of funds. 1.6.1 Hours of Service The standard hours of work allowed in the City’s rights-of-way are from 7:00 a.m. to sundown Monday through Friday. Any work performed by the Contractor outside of the aforementioned time limit requires special authorization by the City and requires that the Contractor obtain a noise permit from the Port St. Lucie Police Department (PSLPD). All equipment operated at night shall comply with the noise levels established by the City of Port St. Lucie noise ordinance. Any additional costs associated with work outside of the hours of work allowed shall be borne by the Contractor. This shall include, but is not limited to, costs of inspection, testing, police assistance, and construction administration. All night, Saturday, Sunday, and/or Holiday work must be authorized by the City and requires that the Contractor obtain a noise permit from the PSLPD. All night work within the City’s rights-of-way requires a minimum forty-eight (48) hour prior notice to the City. This clause shall not pertain to crews organized to perform maintenance work on equipment or to operate and maintain special equipment such as dewatering pumps, which may be required to work twenty-four (24) hours per day. Instructions to Contractors This section contains general business requirements. By submitting a response, the Contractor is certifying its agreement to comply with all the identified requirements of this section and that all costs for complying with these general business requirements are included in the Contractor’s submitted pricing. By submitting a response to the IFB, the Contractor is acknowledging that the Contractor: Has read the information and instructions, and Agrees to comply with the information and instructions contained herein. General Information and Instructions 3.1.1 Familiarity with Laws and Regulations It is the responsibility of responding Contractors to be familiar with all Federal, State, and local laws, ordinances, rules, and regulations, that may affect the work. Ignorance on the part of the Awarded Contractor will in no way relieve it from Contract responsibility. 3.1.2 Restrictions on Communicating with Staff/ Cone of Silence From the issue date of this IFB until the time of City Council's approval of the award or the City Manager's approval when proposal amount is below the required formal solicitation threshold (or the IFB is officially canceled), Contractors are not allowed to communicate for any reason with any City staff or elected officials except through the Issuing Officer named herein, during the Bidders'/Offerors’ conference (if any), as defined in this IFB, or as provided by existing work agreement(s). This is commonly known as a Cone of Silence during the procurement process as identified in the City Code of Ordinances, Section 35.13 . Prohibited communication includes all contact or interaction, including but not limited to, telephonic communications, emails, faxes, letters, or personal meetings, such as lunch, entertainment, or otherwise. The City reserves the right to reject the response of any Contractor violating this provision. Further information on this topic can be found on the Cone of Silence and IFB Communication Document. 3.1.3 Submitting Questions All questions concerning this IFB must be submitted in writing on the OpenGov Platform during the Question and Answer open period. Please select the Question and Answer tab in the IFB project and click the "Ask Question" option. Once the question has been entered, select the "Submit Question" button. Enter a subject in the Subject field and then type the question in the Question field below. Once finished, select "Submit." No questions other than written will be accepted. No response other than written will be binding upon the City. All Contractors must submit questions by the deadline identified in the Schedule of Events for submitting questions. Contractors are cautioned that the City may or may not elect to entertain late questions or questions submitted by any other method than as directed by this section. 3.1.4 Attending Bidders'/Offerors' Conference The Bidders'/Offerors’ Conference or any other information session (if indicated in the Schedule of Events) will be held at the locations referred to in “Schedule of Events,” of this IFB. Unless indicated otherwise, attendance is not mandatory, although Contractors are strongly encouraged to attend. However, in the event the conference has been identified as mandatory, then a representative of the Contractor must attend the conference in its entirety to be considered eligible for Contract award. The Contractor is strongly encouraged to allow ample travel time to ensure arrival in the conference meeting room prior to the beginning of any mandatory conference. The City reserves the right to consider any representative arriving late to be “not in attendance.” Therefore, all Contractors are strongly encouraged to arrive early to allow for unexpected travel contingencies. 3.1.5 The City's Right to Request Additional Information- Contractor's Responsibility Prior to Contract award, the City must be assured that the selected Contractor has all the resources to successfully perform under the Contract. This includes, but is not limited to, adequate number of personnel with required skills, availability of appropriate equipment in sufficient quantity to meet the on-going needs of the City, financial resources sufficient to complete performance under the Contract, and experience in similar endeavors. If, during the evaluation process, the City is unable to assure itself of the Contractor’s ability to perform, if awarded, the City has the option of requesting from the Contractor any information deemed necessary to determine the Contractor’s responsibility. If such information is required, the Contractor will be notified and will be permitted approximately ten (10) business days to submit the information requested. 3.1.6 Failing to Comply with Submission Instructions Responses received after the identified due date and time or submitted by any other means than those expressly permitted by the IFB will not be considered. Contractor's response must be complete in all respects, as required in each section of this IFB. 3.1.7 Rejection of Proposals; The City's Right to Waive Immaterial Deviation The City reserves the right to reject any or all responses, to waive any irregularity or informality in a Contractor’s response, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City. The City reserves the right to waive mandatory requirements, provided that, all the otherwise Responsive proposals failed to meet the mandatory requirements and/or doing so does not otherwise materially affect the procurement of requested commodities and/or services. It is also within the right of the City to reject responses that do not contain all elements and information requested in this IFB. A Contractor’s response will be rejected if the response contains any defect or irregularity and such defect or irregularity constitutes a Material Deviation from the IFB requirements, which determination will be made by the City in its sole discretion and on a case-by-case basis. NOTE: The City reserves the right to reject the Bid of any Contractor who has previously failed in the performance of an award, to deliver contracts of a similar nature on time, or who is not in a position to perform properly under this award. This includes the firm, employees, and financial or legal interests. The City will not enter into a contract
Published attachments
Addenda and notices
Official Notice #1: Pre Bid Meeting · 1
Pre Bid Meeting -November 23, 2026 @ 9:00 am - recording.
Public questions and answers
The non-mandatory pre-bid meeting and site-visit walk-through is scheduled for Monday, November 23, 2026 at 9:00 am, during Thanksgiving week. Will the City schedule an additional site visit for bidders who are unable to attend that day? If not, can a Microsoft Teams link be provided for the pre-bid meeting so bidders may participate remotely?
The pre-bid meeting was not originally scheduled to be held virtually, and due to the timing, it would have been extremely difficult to arrange and communicate a virtual attendance option only 15 minutes prior to the meeting's start time. Additionally, with three holidays occurring during this timeframe, November 23 was the only available date that allowed us to conduct both the pre-bid meeting and the required site walkthrough while maintaining the project schedule. The date was selected to ensure adequate time for interested vendors to attend and to avoid further delays to the procurement process.
OpenGov categories
- 15000 · Builder's Supplies
- 15037 · Jalousie Doors and Windows
- 15079 · Storm Doors and Windows
- 15092 · Windows, Frames, and Sashes, Aluminum
- 15093 · Windows, Frames and Sashes, Fiberglass
- 15094 · Windows, Frames, and Sashes, Steel
- 15095 · Windows, Frames, and Sashes, Vinyl or Plastic
- 15096 · Windows, Frames, and Sashes, Wooden
- 44000 · Glass And Glazing Supplies
- 55792 · Windows and Doors Including Parts and Accessories
- 55931 · Doors and Windows
- 90937 · Doors and Windows