Police Department Rehabilitation Project

Description

The Kenton County Airport Board (“KCAB”) will receive proposals for Police Department Rehabilitation Project . A pre-proposal meeting and site visit will be held on Thursday, November 19, 2026 at 10:00 am at 3222 Terminal Dr, Hebron, KY 41048 . Questions are due at 11:59 am on Tuesday, December 1, 2026 and answers will be posted no later than Monday, December 7, 2026 at 11:59 pm . Proposals must be received by Thursday, December 17, 2026 at 2:00 pm . No proposals will be accepted after that time unless such date or time is extended pursuant to an addendum issued by KCAB. SCOPE OF WORK Technical Specification See attached Technical Specification. Scope of Work The Scope of Work is defined by the Contract Documents and consists of the following: A. 1. The demolition and renovation of interior spaces and miscellaneous exterior work. HVAC Fire Protection System Electrical Plumbing Architectural finishes Perimeter site fence and gate 2. Coordination and execution of all demolition/renovation activities including: a. Removal and legal disposal of demolished material. b. Salvaging items for reuse or storage by Owner. c. Conformance and implementation of all requirements dictated by federal, state and local authorities having jurisdiction. B. Temporary restroom trailers: 1. Contractor shall provide one (3) stall restroom trailer and one (2) stall restroom trailer with shower in each stall throughout the Phase 2 renovation of Women #112 and Men #113. The trailers shall be located in the parking lot per sheet AS100. a. Trailers shall be self-containing with fresh water tank and waste tank. There will NOT be water or sanitary connection to the building. Electric connection to the existing building is to be provided. Refer to the Electrical drawings b. Both trailers are to be serviced daily (including weekends/holidays) including fresh water tank fill, waste holding tank pump out, stocking of toiletry supplies, and cleaning. a. HVAC Demolish existing HVAC, including control wiring, condensate piping, VFD’s, and any accessories associated with demo items Modify existing ductwork and fittings as needed to accommodate new work Provide new air handling units, split barrel chiller, VAVs, fire suppression range hood Provide new louvers, duct work, piping, supports, accessories as required for a complete and proper installation b. Fire Protection Remove and replace sprinkler heads and branch piping as noted on the plans as required to coordinate with new work c. Electrical Replace existing water damaged lights Relocate existing door power in the IT server room to new door location Provide and install charging cabinets for bodycam chargers and IT rack Provide power to new range hood with integral lights and fan Provide power to new gate operators (fence) d. Perimeter Site Fence/ Gate Add new perimeter fence and two vehicle gate operators around the property e. Architectural Finishes Renovations to patrol room: flooring, ceiling, and paint Renovations to patrol room: flooring and paint Renovations to first floor restrooms: epoxy flooring, epoxy showers, replace gypsum board and repaint Renovations to IT server room: remove, infill, and reinstall door f. Above Ceiling Wiring Allowance In addition to all work shown on the drawings and defined within specifications, the Electrical Contractor shall include $25,000 to clean up and to clean up and secure with J-hooks and hangers all wiring and conduit above the ceiling as necessary and directed by the Owner. Contractor to coordinate this work with the Owner. Labor rates included in Bid Form to be used for billing against the allowance. g. Temporary Restroom Allowance In addition to all work shown on the drawings and defined within specifications, the Contractor shall include $15,000 for additional maintenance or services for the temporary restrooms. Contractor to coordinate this work with the Owner and use unit prices included in the Bid Form. h. Owner’s Allowance In addition to all work shown on the drawings and defined within specifications, the Contractor shall include $125,000 for additional work scope due to unforeseen conditions. Contractor to coordinate this work with the Owner. The Police Department is a 24 hour facility for employees. Contractor shall be mindful of this area and take measures to keep this clean and limit disruptions. Any work outside the working hours of 7a to 5p shall be coordinated with CVG. Contractors shall provide their own restroom facility for use for the duration of the project. Contractor area shown on the civil site plans. Minimum Qualifications 1.2. Minimum Qualifications The contractor must meet the following service requirements throughout the duration of the project: Project Management: The contractor shall provide a dedicated project manager who will oversee daily operations and act as a liaison with the airport authority. Work Schedule: Work must be planned and executed in coordination with airport operations to minimize disruptions. Communication: Frequent communication with CVG personnel regarding project status, safety concerns, and any issues that may arise during construction. Weekly progress meetings will be held. Submittals: All proposed materials and construction methods must be submitted and approved before commencing work. Inspections: The contractor will allow for inspections by airport authority representatives at all stages of construction to ensure compliance with all standards and specifications. All materials and equipment related to the project must adhere to the following delivery requirements: Delivery Schedule: Materials must be delivered to the job site in a timely manner, adhering to a mutually agreed-upon schedule to avoid delays in construction. Quality of Materials: All materials delivered must meet the specifications outlined in the bid documents and be subject to approval by airport authorities upon receipt. Packaging: All construction materials must be adequately packaged to prevent damage during transportation and delivery to the airport site. Site Access: Delivery vehicles must comply with airport regulations regarding access, including security and identification requirements for personnel entering the airport. Timely Reporting: The contractor must provide the airport authority with a daily report of materials delivered, along with any discrepancies encountered. The contractor shall complete the work in accordance with the following standards and regulations: Federal Aviation Administration (FAA) Advisory Circular (AC) 150/5370-10H: Standards for Safety and Design for Construction of Airports American Concrete Institute (ACI): Standards for concrete materials and testing. Occupational Safety and Health Administration (OSHA): Compliance with all safety regulations. Cincinnati/Northern Kentucky International Airport Authority (CVGAA) guidelines: Specific requirements set forth in airport construction and operational standards. All bids must comply with the specifications and requirements set forth in attached document. Contractors are expected to provide their qualifications, experience, and understanding of the project, demonstrating their capability to perform the work to the highest standards. NOTICE TO BIDDERS NOTICE TO BIDDERS Pursuant to KRS 424.260 and KRS 183.142, the Kenton County Airport Board (Owner) will receive competitive sealed bids for the Police Department Rehabilitation Project at the Cincinnati/Northern Kentucky International Airport (Airport) located in Boone County, Kentucky (the “Project”). Bids will be received no later than 2:00 pm on Thursday, December 17, 2026 . No bids will be accepted after that time unless extended pursuant to an addendum issued by the Owner. The Project includes renovating the Airport Police Department building by replacing HVAC equipment, modifying fire protection systems, upgrading electrical systems, installing perimeter fencing and two vehicle gate operators, and improving finishes in the patrol room, first-floor restrooms, and IT server room. It also includes allowances for above-ceiling wiring cleanup, temporary restroom maintenance or services, and unforeseen work. Construction must be coordinated to minimize disruption to the department’s 24-hour operations. Further detail and copies of the bidding documents may be downloaded from https://procurement.opengov.com/portal/cvgairport . A Pre-Bid meeting and site visit will be held Thursday, November 19, 2026 at 10:00 am ET, at 3222 Terminal Dr, Hebron, KY 41048 . Please RSVP by Tuesday, November 17, 2026 through KCAB’s online bidding system https://procurement.opengov.com/portal/cvgairport . Select Police Department Rehabilitation Project then click on Events RSVP and provide the name of the person attending. NOTE: Although attendance at the pre-proposal meeting is not limited, the subsequent walkthrough is limited to a maximum of two (2) persons per company. Access inside the Airport Police Department requires additional security clearances, above normal CVG requirements. All persons wishing to attend the pre-bid meeting shall submit via email their name (as shown on license), Driver’s License number, and state of issue to the CVG procurement department at procurement@cvgairport.com no later than 5pm Tuesday, November 17, 2026. This information will be used to complete a criminal history check. Any criminal history will eliminate the individual from entering the building. There must not be any felony charges/conviction in the background of any contract agent to allow access into the building. Bidders must provide a Proposal Bond in an amount not less than 5% of the total main bid amount as specified. Preference for Kentucky resident bidders will be applied in accordance with Kentucky law. The Owner reserves the right to waive any informality or irregularity in any bid or bid guaranty, to reject any or all bids, to award or refrain from awarding a contract for the work, and to negotiate with the apparent qualified responsible bidder to such extent as may be beneficial to the Owner. KENTON COUNTY AIRPORT BOARD BY: Lawrence J. Krauter, Chief Executive Officer Cincinnati/Northern Kentucky International Airport Hebron, Kentucky 41048 TIMELINE Release Project Date: November 12, 2026 Pre-Bid Meeting (Non-Mandatory): November 19, 2026, 10:00am Agenda 3222 Terminal Dr, Hebron, KY 41048 Question Submission Deadline: December 1, 2026, 11:59am Question Response Deadline: December 7, 2026, 11:59pm Response Submission Deadline: December 17, 2026, 2:00pm INSTRUCTIONS TO BIDDERS GENERAL The project is to be financed by Local (O&M, CVG capital) . Non-discrimination: Each bidder shall complete, sign and include in its bid the Equal Opportunity Report Statement. When a determination has been made to award a contract to a specific contractor, such contractor shall, prior to award, after award or both, furnish such other pertinent information regarding its own employment policies and practices as well as those of its proposed subcontractors as the FAA, the Sponsor (Owner), or the Secretary of Labor may require. All such information required of a subcontractor shall be furnished by the contractor. Compliance with Law: The Owner has included provisions in this Bid Document/Contract pursuant to the requirements of the Airport Improvement Act of 1982, as amended by the Airport and Airway Safety and Capacity Expansion Act of 1987, and the Rules and Regulations of the FAA that pertain to the work. Bidders must comply with all Federal Requirements including those Federal Requirements included in the Special Provisions Section of this Bid Document/Contract. Bidders must comply with all state laws and local ordinances. The successful bidder must provide evidence of qualifications to conduct business as the contractor for the project under the laws of the Commonwealth of Kentucky within five days following the Owner's issuance of a Notice of Award. General Bond Requirements: Bidders shall provide a Proposal Bond in an amount not less than 5% of the total main bid amount as specified. Only the Proposal Bond form, included with these documents. The successful bidder shall provide Payment and Performance Bonds by a surety company duly authorized to do business in the Commonwealth of Kentucky in the amount of one hundred percent (100%) of the contract amount. The Payment and Performance bonds furnished by the successful bidder must be executed by the owner, a general partner or, if a corporation, the secretary's signature and the seal of the corporation must be affixed. These bonds must remain in effect for the length of the agreement. The agent of the surety must exhibit certificate or license showing legal rights of the surety to do business in the Commonwealth of Kentucky. Only the Payment and Performance Bond forms provided with these documents is acceptable. Insurance requirements are specified in the Contract bound within these documents. EXAMINATION OF CONDITIONS AFFECTING WORK Prior to submitting a bid, each bidder shall examine and thoroughly familiarize itself with all existing conditions including all applicable laws, codes, ordinances, rules and regulations that will affect the work. Bidders shall visit the site, examine the grounds and all existing buildings, utilities, and roads and shall ascertain by reasonable means all conditions that will in any manner affect the work. Site visits will be at the pre-bid meeting only on Thursday, November 19, 2026 at 10:00 am . Bidders shall submit questions per Section 1.3.5 below for any additional information deemed necessary to be fully informed as to exactly what is to be expected prior to submitting a bid. The drawings have been prepared on the basis of surveys and inspections of the site, and represent an essentially accurate indication of the physical conditions at the site. However, the physical conditions as shown on the drawings are not guaranteed as to accuracy. The bidder shall fully inform itself as to existing physical conditions by inspection and other reasonable means as the bidder determines. SUBMISSION OF BIDS Pricing must be submitted electronically using the Line Item table on Owner’s bidding system included in this Invitation To Bid (ITB). No other form is acceptable. Submittals must be signed or confirmed by a duly authorized official of the bidding company. Additional items to be submitted are listed below. CONTENTS • Proposal Form • Equal Employment Opportunity Certification • Bidder’s Qualifications • Bid Tab (if using) • Proposal Bond • Subcontractor List • Affidavit of Workers Compensation • Safety Evaluation and Plans • Safety Evaluation Form Responses to this ITB must be submitted electronically through the Owner’s online biding system which can be accessed at https://procurement.opengov.com/portal/cvgairport . Select the Project and follow the instructions for submittal. The completed and signed bid (together with all required attachments) must be transmitted and received in the system no later than Thursday, December 17, 2026 at 2:00 pm Eastern Time (ET) . Bidders should allow sufficient time to upload and transmit all required information. Bidder is solely responsible to ensure its submission is transmitted prior to the due date and time. Owner will not accept submissions after the due date and time and is not responsible for any error in transmission including but not limited to power outage, internet connectivity, unauthorized access, etc. The successful bidder is required to provide verified breakdown of costs of work in a manner acceptable to the Owner. PREPARATION AND SUBMISSION OF BIDS Each bidder shall acknowledge receipt of all addenda through the online bidding system. Bids containing reservations, conditions, omissions, items not required in the bid, or irregularities of any kind, may be rejected by the Owner as being incomplete and not qualified for consideration. Each bid must indicate the full business name and address of the bidder and signed by a duly authorized official of the bidding company. A bid submitted by a partnership must list the names of all partners and signed in the partnership name by one of the members of the partnership who is authorized to sign for the partnership. A bid submitted by a Corporation must be executed in the legal name of the Corporation, followed by the state of incorporation and signed by the President or Vice President or other authorized person. The name of each person signing the bid must be typed below the signature. When the person signing for a corporation is other than the President or Vice President and when requested by the Owner, Bidder shall provide a Power of Attorney or other satisfactory evidence of the authority of the officer signing on behalf of the Corporation for the Owner's records. The name of each person signing the bid must be typed below the signature. The bid must be accompanied by a guaranty in the form of a Proposal Bond executed on the form provided in an amount equal to but not less than 5% of the aggregate amount of the main bid including the main bid options. If a bidder is awarded the contract, but fails, refuses, or neglects to execute the contract or to furnish either the required Payment or Performance Bonds 10 days after receipt of written Notice of Award, then the amount of the Proposal Bond shall be paid to, or retained by, the Owner as liquidated damages, and not as a penalty. Each bidder is required to state that the bidder is the only person interested in the Bid; that the Bid is made without any connection with any person making another Bid for the same contract, and that the Bidder did not, in any way, collude, conspire, or agree, directly or indirectly with any person, firm, corporation or other person in regard to the amount, terms, or conditions of this Bid, also that no member of the Kenton County Airport Board (Owner) or any person in the employ of the Owner, is directly or indirectly interested in the Bid, or in the supplies or the work to which it relates, or in any portion of the profits thereof. QUESTIONS / INTERPRETATIONS Each bidder must carefully examine the Project plans and documents and all addenda or other revisions and thoroughly familiarize itself with the detailed requirements prior to submitting a bid. Should a bidder find discrepancies or ambiguities in, or omission from the Project documents, or be in doubt as to their meaning, the bidder shall at once and, in any event at least seven days prior to the bid closing date, notify the engineer who will send written addenda to all bidders. All addenda sent to bidders will become a part of the Contract. No allowance will be made after bids are received for oversight or error by bidder. Owner/Engineer is not bound by and bidders may not request or rely on any oral interpretation or clarification of this ITB . Therefore any questions regarding this ITB are encouraged and must be submitted electronically using the Q&A tab of this ITB on Owner’s online bidding system, which can be accessed at https://procurement.opengov.com/portal/cvgairport . Questions received on or before Tuesday, December 1, 2026 at 11:59 am will be posted on the Q&A tab of this ITB on the bidding system no later than Monday, December 7, 2026 at 11:59 pm . Answers to questions from any Bidder will be available to all Bidders. All communications regarding this invitation to bid must only be through the Contract and Procurement Administration Department. No communication is to be directed to any other Owner personnel unless otherwise instructed by the Contract and Procurement Administration Department. Failure to comply may result in the disqualification of respondent’s bid. MODIFICATIONS AND/OR WITHDRAWAL OF PROPOSALS A bidder may withdraw or revise (by withdrawal of one proposal and submission of another) a bid through the

Published attachments
Addenda and notices
Public questions and answers
  • There is no elevations of scope of work for Masonry and/or joint sealant.

    The only masonry work is the cutting or infilling of openings in the exterior masonry for new HVAC louvers or where louvers are being removed. Contractor to verify.

  • Can you tell us the existing Fire Alarm in the building, is there a vendor that we need to use.

    No specific fire alarm vendor, but the brand needs to be Honeywell Silent Knight as called out on Sheet E000.

  • I read the Security Addendum twice and from what I can tell this has to do with a contractor that is working on or maintaining a system that contains sensitive background information. We as construction contractors will not be doing anything like that so does this Security Addendum really pertain to us. I understand that we may need to go through a more intense background check and that is fine. Can you please explain what exactly is required from the General Contractor, its employees and its subs employees with regards to this Security Addendum.

    Any person working in the police department is required to get CJIS access for entry into the building, regardless of the work being done. The security addendum provides information on the CJIS process and an example of the document the contractor needs to sign.

  • Most of the areas with HVAC work show to demo and replace the ceilings. In Hallway 101 and Hallway 208 and Rooms 111, 116, 203, 214 and 215 there are VVT, EF's, and some large duct to be removed and replaced. This work cannot be replaced through the ceiling grid per HVAC contractors comments. Can the ceiling work scope be revised to include these areas.

    Refer to General Note on sheets A400 & A401 to remove & reinstall ceiling as needed to complete MEP work except where noted to demo and install new.

  • Who is responsible for moving furniture out of offices where all ceilings are to be removed and replaced and in the limited offices to get new flooring. In the fitness room who is responsible to move the fitness equipment.

    Per phasing notes M002, furniture/equipment in Phase 3 areas is to remain in place. Contractor shall take measure to protect the furniture/equipment during construction in Phase 3 areas. Contractor shall remove furniture in Training 111 and Patrol Room 118 and dispose of. Owner will install new furniture in these rooms. In all other rooms in other Phases, the Contractor is responsible for moving & reinstalling furniture if/as needed or protecting furniture if leaving in place. If moving furniture, the furniture must moved to a room within the same project Phase area and coordinate with Owner.

  • I read response to first Security Addendum question and looked up CJIS certification in Kentucky and all information points towards this having to be initiated by a qualifying agency which I assume is CVG or the Police Dept. Then fingerprinting, training, and online course modules. Are these administered by CVG or a third party and what costs are associated with these items.

    IdentoGO is the fingerprint collection point that must be used per KSP. Prints must be processed specifically at IdentoGO under the Service Code 27GKGT and reference the CVG Agency ORI, which is KY0080500 under Type, Contractor. The fingerprint processing fee is the responsibility of the Contract company or Contract employee. Verify fee with IdentoGO. There is no cost for CJIS Security Awareness training. Upon Background clearance the online training modules are assigned by the CVG Terminal Agency Coordinator via CJIS Online. Certification is for 1 yr; recertification must occur annually prior to expiration to maintain the qualification. There is no fee associated other than the initial print fee, so long as certifications remain current for the duration of work at CVG.