Prequalified List of Engineering and Associated Specialty Firms (Quarterly Submissions for Addition to 2025-2028 Prequalification Period

Description

Cobb County (“County” or “Owner”) is issuing this solicitation for Prequalified List of Engineering and Associated Specialty Firms (Quarterly Submissions for Addition to 2025-2028 Prequalification Period . Submissions will be reviewed on a quarterly basis but may be submitted at any time. Project Details Important Instructions for Electronic Submittals The Cobb County, GA is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup . Once you have completed account registration, browse back to this page, click on "Draft Response", and follow the instructions to submit the electronic bid. Scope of Work or Project Details Please see the Attachments section for specifications and attachments. Introduction Summary Cobb County (“County” or “Owner”) is issuing this solicitation for Prequalified List of Engineering and Associated Specialty Firms (Quarterly Submissions for Addition to 2025-2028 Prequalification Period . Submissions will be reviewed on a quarterly basis but may be submitted at any time. Timeline Release Project Date: May 16, 2025 Question Submission Deadline: May 24, 2028, 5:00pm Bid Submission Deadline: May 31, 2028, 12:00pm Procurement Contact Stephanie Brice Deputy Director of Procurement Services 122 Waddell St NE Marietta , GA 30060 Email: stephanie.brice@cobbcounty.org Phone: (770) 528-8439 Evaluation Phases Vendor Questionnaire Attachments

Published attachments
Addenda and notices
Public questions and answers
  • Good afternoon, I am not sure I am understanding the prequalification deadline. Is it true that we have until May 31, 2028, to complete the prequalification submission? I copied and pasted this from your site. Is this correct? Release Date: Friday, May 16, 2025 Due Date: Wednesday, May 31, 2028 12:00pm

    Yes, this is correct. As you will read in the documents, this is for quarterly submissions to be added to the list, for those that did not respond to the initial call for firms in December 2024. This will stay open until that time but will only be reviewed quarterly for any additions to the prequalified list.

  • Thank you for the answer below. Yes, I saw the mention of quarters. Do your quarters start in January? And if so, the next review quarter would end on June 30th, correct? Would you recommend submitting on the date of June 30 or before? *********** Previous Answer Below

    The quarters run on the calendar year. Proposers must make their own decision as to when to submit.

  • Our company has recently merged with a company who has received prequalification status good until 2028. Who can I connect with at Cobb County DOT to get answers on how prequalifications should be handled between the two companies where I can share specifics? I don't want to assume the merger means both companies are automatically prequalified.

    If one company is pre-qualified and they are keeping all the same staff that was used for the pre-qualification, they will still be pre-qualified. However, if the new merger changes the staff (adds or loses) that was used for the pre-qualification, the company needs to submit new resumes to ensure that staff still meets the requirements of the pre-qualification.

  • The request for qualifications references three documents as attachments. Where are those attachments located? 1 - Instructions, 2 - SOQ Summary Sheet, 3 - Attachment A – Area Classes to be Considered for Prequalification Form

    The instructions are what is currently published. Additional attachments will be added.

  • Good afternoon, Veritas View is reviewing the requirements for the 2025–2028 Prequalified List of Engineering and Associated Specialty Firms and is evaluating the applicable Area Classifications for which the firm may seek prequalification. To ensure that our submission accurately reflects Cobb County's requirements and that all qualifications and capabilities are properly substantiated, we respectfully request clarification on the following: 1. Area Class 5.04b — Aerial Photography / Unmanned Aircraft System (Concept Grade) For Area Class 5.04b, what specific qualifications, project experience, personnel credentials, equipment capabilities, and/or other documentation must a firm demonstrate to be considered for prequalification? 2. Area Class 5.04c — Aerial Photography / Unmanned Aircraft System (Design Grade) For Area Class 5.04c, what specific qualifications, project experience, personnel credentials, equipment capabilities, and/or other documentation must a firm demonstrate to be considered for prequalification? 3. Area Class 5.05 — Aerial Photogrammetry For Area Class 5.05, does Cobb County require documented completed photogrammetry project experience for prequalification, or may demonstrated personnel training, technical capability, equipment, and related experience satisfy the qualification requirements? 4. UAS Equipment and Security Requirements For Area Classes 5.04b, 5.04c, and 5.05, are there any Cobb County, State of Georgia, federal, NDAA, Blue UAS, cybersecurit

    1. Cobb DOT uses the same criteria that GDOT uses, please see enclosed minimum qualification requirements. 2. Cobb DOT uses the same criteria that GDOT uses, please see enclosed minimum qualification requirements. 3. Cobb DOT uses the same criteria that GDOT uses, please see enclosed minimum qualification requirements. 4. The only requirement the County is aware of is the requirement included in the enclosed memo from GDOT. 5.Yes, list all classes you are seeking Cobb pre-qualification that you DO NOT have GDOT pre-qualification. If you already have GDOT pre-qualification in an area class, do not list it here (enclose the GDOT pre-qualification form for those classes).

  • Good afternoon, Thank you for your response to our UAS clarification questions and for providing the GDOT minimum qualification information. We are reviewing the requirement for Area Class 5.04(b), which states that the firm must be able to meet the requirements of Section 107.26, “Unmanned Aircraft Systems,” in the GDOT Standard Specifications, Construction of Transportation Systems, as amended. We have been unable to locate the referenced Section 107.26 in the currently available GDOT Standard Specifications. Could Cobb County please provide the applicable Section 107.26 or identify the current GDOT specification document/version in which it appears? We want to ensure that our prequalification submission addresses the requirement exactly as intended. Thank you, Derek Crandall Fred H Brooks Enterprises, LLC Veritas View

    Upon further consideration, Cobb DOT will not be able to approve area classes 5.04b and 5.04 c. Per the enclosed GDOT Memo, drones (unmanned aircrafts systems) are prohibited on federal funded projects. Cobb DOT utilizes aerial photography for smaller, locally funded projects; and partial federal and/or state funds for larger projects.

  • Will any landscape architecture design services be part of this project?

    This is a pre-qual list for the services listed in the document and not for a specific project.

  • In your response to question 6 "Clarification- GDOT Standard Specifications Section 107.26" you stated that Cobb DOT will not be able to approve area classes 5.04b and 5.04c due to unmanned aircraft systems being prohibited on federal funded projects. However, the enclosed GDOT Memo does not state all drones are prohibited. Only drones manufactured by certain covered foreign entities are prohibited. There are multiple domestic and foreign made UAS that are not included in the Covered list, and may be used on federal funded projects. Is Cobb DOT simply disqualifying all drones for ease of decision making, or was this an error? Thank you, Jay Green SkyVector Media LLC

    The County will not pre-qualify for these classes as we do not believe we need these services.

Plain text

OpenGov categories

  • 92500 · Engineering Services, Professional
  • 92513 · Bridge Engineering
  • 92517 · Civil Engineering
  • 92535 · Environmental Engineering
  • 92536 · Engineering Services (Not Otherwise Classified)
  • 92538 · Field Engineering
  • 92548 · Harbors; Jetties; Piers; Ship Terminal Facilities - Engineering
  • 92549 · Highways; Streets; Airport Pay-Parking Lots - Engineering
  • 92570 · Municipal Engineering
  • 92588 · Structural Engineering
  • 92593 · Traffic and Transportation Engineering
  • 92594 · Tunnels and Subways/Engineering