Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Professional Design Services for 22nd St. Improvement Project- Interstate 10 to Kino Parkway

Description

The City of Tucson Department of Transportation and Mobility is seeking a qualified engineering design consultant to deliver a Design Concept Report and railroad grade separation alternatives analysis for the 22nd St Improvement project between Interstate 10 and Kino Parkway. SCOPE OF WORK Professional Design Services for 22nd St. Improvement Project- Interstate 10 to Kino Parkway The City is seeking a qualified consultant to prepare a Design Concept Report (DCR) for improvements to the 22 nd Street Corridor between Interstate 10 and Kino Parkway. Project Location The project is located in Sections 18 and 19, Township 14 South, Range 14 East, and Sections 13, 14, 23, and 24, Township 14 South, Range 13 East, Gila and Salt River Meridian, within the City of Tucson, Pima County, Arizona. Project Description The City is seeking a qualified consultant to prepare a Design Concept Report (DCR) for improvements to the 22 nd Street Corridor between Interstate 10 and Kino Parkway. The City desires to establish an innovative, safety-focused, sustainable, Complete Streets corridor design resulting in improved safety for all modes, traffic operations, and multi-modal facilities along the subject segment of 22 nd Street. The DCR shall include an evaluation of grade-separation strategies at the Union Pacific Railroad Nogales Subdivision. Improvements to the eastern intersection at 22 nd Street and the South Freeway frontage road and tie-ins with existing improvements east of South Santa Rita Avenue will be included within the scope of planning and design efforts. The initial contract is limited to delivery of a DCR phase only for the corridor. Following completion of the DCR, the City will assess the project status and reserve the right to extend the contract with the selected consultant for subsequent design of the 22nd Street Improvement Project between Kino Parkway and Interstate 10. General Scope of Work The consultant will prepare a DCR for the 22 nd Street Improvement Project in general conformance with the Arizona Department of Transportation (ADOT) Stage Deliverables Checklist and the City of Tucson Engineering Division Active Practice Guideline 03: Design Project Checklist . This phase will include, but not be limited to, development of a traffic report, preliminary survey, drainage analysis, initial geotechnical report and pavement design, itemized cost estimate, typical sections, corridor footprint and alignment, project schedule and proposed phasing – prioritizing expedited delivery, and 15% plans. The project scope includes a new crossing of the Union Pacific Nogales Subdivision track, full pavement reconstruction, drainage facilities improvements, sidewalks, protected bicycle lanes or other enhanced bicycle facilities, median separation, traffic signal and intersection upgrades, continuous street lighting, pavement markings and signing, landscaping/green stormwater infrastructure, and utility coordination/relocation. The DCR shall adhere to the design guidance provided in the Tucson Street Design Guide and prioritize safety, accessibility, and comfort for all modes of travel. Alternatives Analysis The DCR will include an evaluation of at least three alternatives at the Union Pacific Nogales subdivision crossing at 22 nd Street. The alternatives analysis should consider an overpass/bridge crossing, an underpass, and an upgraded at-grade crossing. The project objective is to provide grade separation at the Union Pacific Railroad crossing, but the at-grade crossing should be considered for baseline cost reference, corridor performance, and schedule impacts. The alternatives should be evaluated based on cost, drainage, right-of-way, access impacts at intersecting streets and to significant destinations, visual impact, community preference, railroad permitting requirements, and other criteria as appropriate. To support the visual impact assessment and community feedback, the consultant should prepare up to five photo-simulations showing each crossing alternative from multiple perspectives. Coordination with Union Pacific Railroad and the Arizona Corporation Commission should be included within the DCR phase to inform selection of the preferred alternative. The consultant’s statement of qualifications should be comprehensive and demonstrate the team’s ability to perform all necessary tasks such as survey, right-of-way maps, public involvement, bridge design and selection report development, geotechnical investigation and reporting, drainage analysis, pavement design, traffic engineering and signal design, construction plans, specifications, and cost estimates. The consultant is advised that the following disciplines are important to the determination of each team’s qualifications and should be included in the proposal: Structural Engineering Civil Engineering (including Roadway Geometric Design) Hydrologic and Hydraulic Analysis Environmental Planning Traffic Engineering Traffic Signal Design/Modification Electrical Engineering Geotechnical Engineering Landscape Architecture Utility Coordination Public Involvement/Communications Public Involvement Public engagement will be a critical component of this project. The consultant team should include a public involvement/communications as part of the project team and should demonstrate the ability to engage community members “where they are.” Special consideration must be given to 22 nd Street’s location in an area with high concentrations of mobility-vulnerable populations. Residents will have higher barriers to participation and therefore additional strategies should be developed to engage with affected community members. The public involvement/communications team will provide input and assist the design consultant in communicating with neighborhoods, businesses, the general public and the news media which will include, at a minimum, the following: • Coordination meetings with neighborhood associations and other key stakeholders • Flyers, mailers, and questionnaires to obtain feedback during design • A project website and online opportunities for public input • Public Open Houses and Pop-Up events in public spaces, such as parks, to obtain input during planning and design • Translation services to make materials available in English and Spanish A Citizens Advisory Committee will be established for this project and should be accounted for in project schedule and level of effort. The consultant should plan to schedule, coordinate logistics, and facilitate advisory committee meetings. Environmental Activities The contractor should develop all required environmental documentation to fulfill environmental requirements. Public Art A project artist will be selected for this project. The selected artist will sign a separate contract with the City, and the design consultant shall have no financial or contractual obligations in the services to be provided by the artist. The selected consultant team will be expected to incorporate the project artist’s work and provide general oversight and coordination assistance to the City of Tucson project manager. Public Art coordination will start following the DCR phase. Right-Of-Way Acquisition It is anticipated that significant right-of-way will be needed for this project. The selected consultant team will be expected to provide documents associated with right-of-way acquisitions such as right-of-way plans, parcel maps and legal descriptions. The consultant will also provide general oversight and coordination assistance to the City of Tucson. The Consultant will not be expected to participate in right-of-way acquisition efforts, including discussions with affected property owners relative to redevelopment or mitigation opportunities. Proposals should identify a project approach that advances foundational right-of-way activities during the DCR phase to allow for the potential to start acquisitions at an earlier project phase. Utility Coordination Proposals should incorporate preliminary utility coordination activities into the DCR phase to appropriately identify conflicts and prepare for necessary relocations or mitigation efforts. Project Schedule It is the goal of the City of Tucson and the Regional Transportation Authority to substantially complete construction activities on the 22 nd Street project by the end of the 1 st Period of the RTA Next plan in 2031. To meet the overall design schedule, offerors should develop a DCR approach that results in a final DCR with recommended alternative and associated technical reports, 15% plans, advanced right-of-way activities, and allows for considerable public engagement within 12 months of issuance of the Notice to Proceed. Responsibility All design work shall be performed to the design standards established for the subject project. The consultant shall be responsible for all research, designs, field work, studies, maps, reports, diagrams, details, plans, specifications, and cost estimates necessary to complete this project. The exact scope of work and design requirements shall be negotiated with the successful consultant . NOTICE City of Tucson NOTICE OF REQUEST FOR QUALIFICATIONS NO. 270173 FOR Professional Design Services for 22nd St. Improvement Project- Interstate 10 to Kino Parkway Purusant to ARS Title 34, notice is hereby given that the City of Tucson, hereinafter referred to as "COT" is conducting a competitive Two-Step Process to retain approximately one (1) firm to provide professional design services . The City is seeking firms (hereinafter referred to as “Consultant”) to provide consultant services in the form of a multi-disciplinary team. The City invites interested firms to submit written Statements of Qualifications relating to this solicitation. A Screening Committee will evaluate firms’ qualifications and experience with similar projects (Step 1). Up to three (3) firms firms determined to be best qualified will then be invited to participate in a presentation/interview (Step 2) with the highest rated firm then entering into contract negotiations with the City. Questions must be addressed to the Contract Officer listed in the solicitation. SUBMITTAL DUE DATE: Monday, November 30, 2026 TIME: 2:00 pm LOCAL AZ TIME PRE-SUBMITTAL MEETING DATE: Monday, November 16, 2026 TIME: 10:00 am LOCAL AZ TIME LOCATION : PRE-SUBMITTAL MEETING LINK Meeting ID: 223 381 680 811 620 5 Passcode: VX68K69L Call In#: 1-213-293-2303 Conference ID: 906 289 204# QUESTIONS SHALL BE DIRECTED TO: Maritza Felix (520) 837-4107 maritza.felix@tucsonaz.gov Publication Dates: Monday, November 2, 2026 & Monday, November 9, 2026 published in The Daily Territorial INTRODUCTION Summary Background Contact Information Timeline INSTRUCTIONS TO OFFERORS DEFINITION OF KEY WORDS USED IN THE SOLICITATION For purposes of this solicitation and subsequent contract, the following definitions shall apply: City : The City of Tucson, Arizona Contract : The legal agreement executed between the City and the Contractor/Consultant. Contractor/Consultant : The individual, partnership, or corporation who, as a result of the competitive solicitation process, is awarded a contract by the City. Contract Representative : The City employee or employees who have specifically been designated to act as a contact person or persons to the Contractor, and is responsible for monitoring and overseeing the Contractor's performance under this Contract. Director of Business Services : The contracting authority for the City, authorized to sign contracts and addenda thereto on behalf of the City. May : Indicates something that is not mandatory but permissible. Offeror : The individual, partnership, or corporation who submits a proposal in response to a solicitation. Shall, Will, Must : Indicates a mandatory requirement. Failure to meet these mandatory requirements, if they constitute a substantive requirement, may, at the City’s sole discretion, result in the rejection of a proposal as non-responsive. Should : Indicates something that is recommended but not mandatory. If the Offeror fails to provide recommended information, the City may, at its sole option, ask the Offeror to provide the information or evaluate the proposal without the information. PRE-SUBMITTAL MEETING A Pre-Submittal Meeting will be held at the date and time stated on the cover page of this solicitation, if such a date and time is provided. Attendance at this meeting is not mandatory, but written minutes and/or notes regarding the meeting will NOT be provided, so attendance is encouraged. The purpose of this meeting will be to clarify the contents of this solicitation in order to prevent any misunderstanding of the City's position. INQUIRIES Any question related to the Request for Qualifications shall be directed to the Contract Officer. An offeror shall not contact or ask questions of the department for whom the requirement is being procured. The Contract Officer may require any and all questions be submitted in writing. Offerors are encouraged to submit written questions via the Question and Answers section or electronic mail, at least five days prior to the submittal due date. Any correspondence related to a solicitation should refer to the appropriate Request for Qualifications number, page and paragraph number. Oral interpretations or clarifications will be without legal effect. ADDENDUM OF SOLICITATION Solicitation Addenda will be posted on the City’s link to the online bidding website. Offeror is responsible for checking the webpage regularly for new solicitation addenda and must acknowledge each addendum to this solicitation in its submittal. Please note that vendors who have registered with the Business Services Department at https://procurement.opengov.com/portal/tucson-az and follow the City of Tucson will receive email notifications of solicitation addenda. FAMILIARIZATION OF SCOPE OF WORK Before submitting a statement of qualifications, each Offeror shall familiarize itself with the Scope of Work, laws, regulations and other factors affecting contract performance. The Offeror shall be responsible for fully understanding the requirements of the subsequent Contract and otherwise satisfy itself as to the expense and difficulties accompanying the fulfillment of contract requirements. The submission of a statement of qualifications will constitute a representation of compliance by the Offeror. There will be no subsequent financial adjustment, other than that provided by the subsequent Contract, for lack of such familiarization. PREPARATION OF STATEMENT OF QUALIFICATIONS All submittals shall be on the forms provided in this Request for Qualifications package. It is permissible to copy these forms as required. Facsimiles or electronic mail proposals shall not be considered. At a minimum, your statement of qualification should include the signed Offer form, acknowledgement of any solicitation addenda and your response to all evaluation criteria. The Offer page shall be signed by a person authorized to submit an offer. An authorized signature on the Offer Page, solicitation addendum/addenda or cover letter accompanying the submittal documents shall constitute an irrevocable offer to sell the good and/or service specified herein. Offeror shall submit any additional requested documentation, signifying intent to be bound by the terms of the agreement. The authorized person signing the submittal shall initial erasure, interlineations or other modifications on the submittal. It is the responsibility of all offerors to examine the entire Request for Qualifications package and seek clarification of any requirement that may not be clear and to check all responses for accuracy before submitting a response. Negligence in preparing a submittal confers no right of withdrawal after due date and time. The City shall not reimburse the cost of developing, presenting, submitting or providing any response to this solicitation. Offeror must list any subcontractors to be utilized in the performance of the services specified herein. For each subcontractor, details on respective qualifications must be included. SUBMITTAL FORMAT A statement of qualifications should be submitted on the forms and in the format specified in the solicitation. Any information that the offeror requested to be held as confidential shall be clearly marked as such. The material should be in sequence and related to the solicitation. The sections of the submittal should be organized, clearly identifiable, and should include a minimum of the following sections: the completed Offer Form, all signed addenda, and the offeror’s response to the Evaluation Criteria. Failure to include the requested information may have a negative impact on the evaluation of the offeror's submittal EXCEPTIONS TO CONTRACT PROVISIONS A response to any Request for Qualifications is an offer to contract with the City based upon the contract provisions contained in the City's Request for Qualifications, including but not limited to, the specifications, scope of services and any terms and conditions. Offerors who wish to propose modifications to the contract provisions must clearly identify the proposed deviations and any proposed substitute language in their submittal. However, the provisions of the Request for Qualifications cannot be modified without the express written approval of the Director or his designee. Proposed modifications or exception to the indemnification language herein shall not be considered. If an offer is returned with modifications to the contract provisions that are not expressly approved in writing by the Director or his designee, the contract provisions contained in the City’s Request for Qualifications shall prevail. PUBLIC RECORD All statements of qualifications submitted in response to this Request for Qualifications shall become the property of the City and shall become a matter of public record available for review subsequent to the award notification. CONFIDENTIAL INFORMATION The City of Tucson is obligated to abide by all public information laws. If an Offeror believes that any portion of a submittal, offer, specification, protest or correspondence contains information that should be withheld, a statement advising the Contract Officer of this fact should accompany the submission and the information shall be so identified wherever it appears. The City shall review all requests for confidentiality and may provide a written determination to designate specified documents confidential or the request may be denied. If the confidential request is denied, such information shall be disclosed as public information, unless the offeror submits a formal written objection. CERTIFICATION By signature on the Offer page, solicitation Addendum(s), or cover letter accompanying the submittal documents, Offeror certifies: The submission of the offer did not involve collusion or other anti-competitive practices. The Offeror shall not discriminate against any employee or applicant for employment in violation of Federal or State law. The Offeror has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, meal or service to a public servant in connection with the submitted offer. The Offeror hereby certifies that the individual signing the submittal is an authorized agent for the Offeror and has the authority to bind the Offeror to the Contract. WHERE TO SUBMIT STATEMENT OF QUALIFICATIONS In order to be considered, Offeror must, no later than the Offer Submittal Deadline, submit its Offer electronically through the City’s online bidding system, https://procurement.opengov.com/portal/tucson-az NOTE: THE ENTIRE OFFER MUST BE IN "SUBMITTED" STATUS IN THE CITY’S ONLINE BIDDING SYSTEM IN ORDER TO BE CONSIDERED. RESPONSES THAT HAV

Published attachments
Public questions and answers
  • The RFP doesn't request full team member resumes. Is it acceptable to include resumes for our proposed team members within an Appendix at the end of our proposal?

    Hello, Yes, you can attach resumes within an appendix at the end of your proposal. Thank you.

Plain text

OpenGov categories

  • 90735 · Designing Services
  • 92500 · Engineering Services, Professional
  • 92517 · Civil Engineering
  • 92531 · Electrical Engineering (Incl. Cogeneration Design Services)
  • 92532 · Electronic Engineering
  • 92533 · Engineer Services, Professional
  • 92536 · Engineering Services (Not Otherwise Classified)
  • 92544 · General Construction: Management, Scheduling, Cost Estimation - Engineering
  • 92549 · Highways; Streets; Airport Pay-Parking Lots - Engineering
  • 92593 · Traffic and Transportation Engineering