State and local · OpenGov
Project No. 130075- 64, Solid Waste Old Admin Building Renovation
Description
Montgomery County (Ohio) is requesting bids for PP-2026-0072 - Project No. 130075-64, Solid Waste Old Admin Building Renovation . All submissions are due before 1:30 pm on Wednesday, November 18, 2026 . Total Bid Cost Fully completed pricing table (Bid Form 00400) in Excel format must be submitted with bid. Total Project Cost Cover Page Cover Page - Mandatory Pre Bid Meeting ITEM: Formal Invitation to Bid TITLE: PP-2026-0072 : Project No. 130075-64, Solid Waste Old Admin Building Renovation DEPARTMENT: Environmental Services DELIVERY: Montgomery County Environmental Services SUBMISSION: OpenGov ENGINEERS ESTIMATE: $ 2,074,930.00. A/E: SPGB Architects DUE DATE: Wednesday, November 18, 2026 DUE TIME: 1:30 pm CONTACT: Barb Asberry , asberryb@mcohio.org . PRE BID MEETING: There is a mandatory pre bid meeting that will be hosted at 2550 Sandridge Drive, Moraine OH 45439 on Tuesday, November 3, 2026 at 1:00 pm . SUBMISSION REQUIREMENTS: 1. All items noted as required must be submitted with Bid. Failure to submit the required Forms or specification may be cause for rejection of your Bid. 2. All Bids must be submitted by the time and date above. No proposals will be accepted after the listed time. 3. It is the Bidder's Responsibility to check for Addenda prior to submitting Bids. This can be done by going to https://procurement.opengov.com/portal/montgomerycountyoh and reviewing the list. 4. It is the Bidder's Responsibility to read all General Terms & Conditions and be able to submit using the OpenGov system. Sincerely, MONTGOMERY COUNTY COMMISSIONERS Kyle Kolopanis Purchasing Director Pricing Proposal Bid Submission Attachments
Published attachments
- MCES-130075-64_100_ Combined CD Specs
- 130075-64 Drawings - MCES Solid Waste Old Admin Building Renovation BID SET 2026-08-19
- 00400 Bid Form
- MCES-130075-64 appendix A_Part1
- MCES-130075-64 appendix A_Part2
- MCES-130075-64 appendix A_Part3
- MCES-130075-64 appendix A_Part4
- MCES-130075-64 appendix A_Part5
- MCES-130075-64 appendix A_Part6
- MCES-130075-64 appendix A_Part7
- MCES-130075-64 appendix A_Part8
- MCES-130075-64 appendix A_Part9
- MCES-130075-64 appendix A_Part10
- MCES-130075-64 appendix A_Part11
- MCES-130075-64 appendix A_Part12
- MCES-130075-64 appendix A_Part13
- MCES-130075-64 appendix A_Part14
- MCES-130075-64 appendix A_Part15
- MCES-130075-64 appendix A_Part16
- MCES-130075-64 appendix A_Part17
- MCES-130075-64 appendix A_Part18
- MCES-130075-64 appendix A_Part19
- MCES-130075-64 appendix A_Part20
- MCES-130075-64 appendix A_Part21
- MCES-130075-64 appendix A_Part22
- MCES-130075-64 appendix A_Part23
- MCES-130075-64 appendix A_Part24
- MCES-130075-64 appendix A_Part25
- MCES-130075-64 appendix A_Part26
- MCES-130075-64 appendix A_Part27
- MCES-130075-64 appendix B
- MCES-130075-64 appendix C
- MCES-130075_64 appendix D
- Project_No._130075-64,_Solid_Waste_Old_Admin_Building_Renovation_(Addendum_#1_Revision).pdf
Addenda and notices
Official Notice #1: Mandatory Pre-Bid Meeting Presentation and Attendance Sheet · 1
Please see attached mandatory pre-bid presentation and attendance sheet.
Addendum #1 · 1
Please see attached Addendum #1 which provides answers to submitted questions and updates Drawings for Sheet E-100 and EP-201.
Official Notice #2: Bid Tabulation · 2
Please see attached Bid Tabulation.
Public questions and answers
1- Drawings A-610, details 2, 3, 4 this details a storefront frame for the stationary openings, while there is no storefront specification provided. Are aluminum storefront frames the intent or are stationary aluminum windows the intent. Aluminum storefront frames would be more cost efficient while aluminum windows have greater thermal efficiency. 2- Drawing A-610, detail 5, 6, 7 the detail is for a casement window, while the description for these details is “Double Hung”, as well the W7 window is drawn as a double hung window. Please specify whether a casement, double hung or single window is the intent. 3- Could a frame depth for the aluminum windows be provided in the specification or the details, windows can vary significantly in depth which is reflected the window cost. 4- We request an extension to the bid dead line, it often takes as much as 2 weeks to get quotes back from aluminum window manufacturers and dependent upon the timing of the response to this RFI, it will be difficult to put together an accurate bid. 5- Is the color for the aluminum windows to match the "Red" of the rest of the building.
1- Provide fixed aluminum windows per specification 085113. 2- Provide operable single hung windows. 3- 4 ½” 4- No extension. 5- Color to be clear anodized as specified.
Sheet E-100 shows 4 panels (LA, LB, LPG, & LE) being replaced. No panel schedule is listed for panel LPG.
Please see Addendum #1.
Panel HA is a new panel. The feeder and conduit size are not listed. Please advise.
Please see Addendum #1.
In the bid submission 2.4 Bid Submittal Document it includes the following : Drug Free (2.3) Disclosure Policy(2.1) & Bid Form (2.5) There is seperate spots for us to attach these, noted in () should we also attach them in 2.4?
Yes. OpenGov will not allow you to submit the bid without the uploads.
OpenGov categories
- 90900 · Building Construction Services, New (Incl. Maintenance And Repair Services)
- 90963 · Maintenance and Repair, Commercial and Institutional Building
- 91052 · Maintenance and Repair Services, Building (Not Otherwise Classified)
- 91065 · Remodeling and Alterations
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)