Skip to content
← Back to search

State and local · OpenGov

Opportunityopen

Purchase of Materials and Services for Control Panels and Cabinets

Description

The County of Ontario (the “County”), will receive sealed bids for IFB# B26096 Purchase of Materials and Services for Control Panels and Cabinets . Such sealed bids must be filed with the Ontario County Purchasing Director, 20 Ontario Street, Canandaigua, New York 14424, PRIOR TO 3:00 pm on Tuesday, December 15, 2026 at which time said bids will be publicly opened and read. Electronic bid submittals will not be accepted for this project. Only hard copy submittals delivered to the address above in a sealed envelope will be accepted. Electronic bid submittals will be deemed non-responsive and disqualified. Project work includes Purchase of Materials and Services for Control Panels and Cabinets . Bid Specifications Section 01 12 13 Summary of Work PART 1 – GENERAL 1.1 LOCATION AND DESCRIPTION OF WORK A. The Work is located throughout Ontario County’s Canandaigua Lake County Sewer District. B. The Work to be performed under this Contract includes, but is not limited to, furnishing the equipment and special services described below and all related appurtenances. The equipment includes, but is not limited to, the following: 1. Type A: Radio Panel 2. Type B: Indoor Pump Station Control Panel 3. Type C: Outdoor Pump Station Control Panel 4. Type E: Flow Meter Control Panel 1.2 SEQUENCE AND PROGRESS OF WORK A. Sequencing: 1. Incorporate sequencing of the Work into the Progress Schedule. 2. Sequencing Requirements: a. Approved Shop Drawings. b. Delivery of Goods. c. Completion of on-site services. d. Punch list completion. 1.3 VENDOR'S USE OF SITE A. VENDOR shall have use of OWNER designated areas for delivery and storage related to the Project. PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED) Section 01 13 13 Milestones PART 1 – GENERAL 1.1 DESCRIPTION A. Scope: 1. This Section describes Work to be substantially completed to comply with Milestones indicated in the Agreement. This Section is not intended to describe all the Work or its constraints, interrelationships, or sequential requirements required. 2. To achieve each Milestone indicated in this Section, substantially complete those elements of the Work indicated starting with Article 1.2 of this Section, together with related equipment, systems, and appurtenant Work and activities. 1.2 MILESTONE REQUIREMENTS A. Milestone No. 1 – Shop Drawings Submitted: Requires submittal of Action Submittals identified in Section 40 60 05 - Instrumentation and Control for Process Systems. B. Milestone No. 2 – Furnish Materials & Equipment: All necessary Materials & Equipment shall be furnished and ready for shipment notification submitted to the OWNER. C. Milestone No. 3 – Project Completion: The Contract shall be considered “Complete” when the OWNER determines that all work is complete (including all punch list items), and closeout documents have been submitted. Closeout documents include but are not limited to record drawings, O&M manuals, release of liens, and any other documents/materials required to be submitted in other provisions of the Bid Documents in accordance with the Terms and Conditions. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) Section 01 22 13 Measurement and Payment PART 1 – GENERAL 1.1 DESCRIPTION A. Scope: 1. Items listed starting in Article 1.4 of this Section refer to and are the same pay items listed in the Bid Form and constitute all pay items for completing the Work. 2. No direct or separate payment will be made for providing miscellaneous temporary or accessory works, plant or facility services, VENDOR’s or OWNER’s field offices, layout surveys, Project signs, sanitary requirements, testing, safety provisions and safety devices, submittals and record drawings, water supplies, power and fuel, maintenance of traffic, removal of waste, security, coordination with OWNER’s operations, information technology (including hardware, software, and services) required during construction, commissioning where specified, bonds, insurance, or other requirements of the General Conditions, Supplementary Conditions, Division 01 Specifications, and other requirements of the Contract Documents. 3. Compensation for all services, items, materials, and equipment shall be included in prices stipulated for lump sum and unit price pay items listed in this Section and included in the Contract. B. Each lump sum and unit price, as bid, shall include an amount considered by VENDOR to be adequate to cover VENDOR’s overhead and profit for each separately identified item. 1.3 RELATED PROVISIONS A. Payments to VENDOR: Refer to General Conditions and the Agreement. B. Changes in Contract Price: Refer to General Conditions. C. Schedule of Values: Refer to General Conditions and Section 01 29 73, Schedule of Values. 1.4 CONTRACT NO. 1 – GENERAL Item 1 – Receipt of Approved Shop Drawings: Measurement and Payment: Lump sum payment for Item 1 will be 10 percent of the lump sum cost of the Contract. Item 2 – Delivery of Good: Measurement and Payment: Lump sum payment for Item 2 will be 80 percent of the lump sum cost of the Contract. Item 3 – Completion of Final Punch List: Measurement and Payment: Lump sum payment for Item 3 will be 10 percent of the lump sum of the Contract. PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED) Section 01 66 00 Product Storage and Handling Requirements PART 1 – GENERAL 1.1 DESCRIPTION A. Scope: 1. This Section includes general requirements for storing and protecting materials and equipment. 2. VENDOR shall provide all labor, materials, tools, equipment, and incidentals to store and handle materials and equipment. 1.2 STORAGE A. Store control panels and all appurtenances in a clean, dry location with controls for uniform temperature and humidity. Protect equipment with coverings and maintain environmental controls. B. Store control panels and all appurtenances for easy access for inspection and identification. Keep all materials off the ground, using pallets, platforms or other supports. Protect equipment from corrosion and deterioration. C. VENDOR shall provide access to the OWNER and their representative for inspection of the materials and equipment prior to and during storage. D. VENDOR shall be responsible to store equipment for up to 30-days from ready for shipping notification until OWNER’s representative accepts equipment for shipping. OWNER’s representative shall provide loading and shipping from the VENDOR’s storage location. 1.3 HANDLING A. Handle equipment in accordance with manufacturer's instructions. Furnish one copy of such instructions with equipment at time of shipment. PART 2 – PRODUCTS (NOT USED) PART 3 – EXECUTION (NOT USED) Section 01 78 23 Operations and Maintenance Data PART 1 – GENERAL 1.1 DESCRIPTION A. Scope: 1. This Section includes requirements for manufacturers’ operations and maintenance manuals and related data to be furnished by VENDOR. 2. VENDOR shall submit operation and maintenance data, in accordance with this Section and in accordance with requirements elsewhere in the Contract Documents, as instructional and reference manuals by operations and maintenance personnel at the Site. 3. Required operation and maintenance data groupings are listed in table(s) in Article 1.2 of this Section. At minimum, submit operation and maintenance data for: a. All equipment and systems. b. Instrumentation and control devices. 4. For each operation and maintenance manual, submit the following: a. Preliminary Submittal: Printed and bound copy of entire operation and maintenance manual, except for test data, service reports by Supplier, and submit electronic copies. b. Final Submittal: Printed and bound copy of complete operations and maintenance manual, including test data and service reports by Supplier, and submit electronic copies. 1.2 SUBMITTALS A. Closeout Submittals: Submit the following: 1. Operation and Maintenance Data: a. Submit the operations and maintenance data indicated in the Contract Documents, grouped into submittals as indicated in Table 01 78 23-A: TABLE 01 78 23-A, REQUIRED OPERATIONS AND MAINTENANCE DATA Name of O&M Manual/Data For Materials or Equipment Specified in Section(s) Instrumentation and Control for Process Systems 40 60 05 B. Quantity Required and Timing of Submittals: 1. Preliminary Submittal: a. Electronic Copies: 1 copy. b. Submit to OWNER by the earlier of: 90 days following approval of Shop Drawings and product data submittals, or 10 days prior to starting training of operations and maintenance personnel, or 10 days prior to field quality control testing at the Site. c. Furnish preliminary operation and maintenance data submittal in acceptable form and content, as determined by OWNER, before associated materials and equipment will be eligible for payment. 2. Final Submittal: Furnish final submittal prior to final inspection, unless submittal is specified as required prior to an interim Milestone. a. Printed Copies: 6 copies. b. Electronic Copies: 2 copies. 1.3 FORMAT OF PRINTED COPIES A. Binding and Cover: 1. Bind each operation and maintenance manual in durable, permanent, stiff-cover binder(s), comprising one or more volumes per copy as required. Binders shall be not less than one inch wide and maximum of three inches wide. Binders for each copy of each volume shall be identical. 2. Binders shall be locking three-ring/”D”-ring type, or three-post type. Three-ring binders shall be riveted to back cover and include plastic sheet lifter (page guard) at front of each volume. 3. Do not overfill binders. 4. Covers shall be oil-, moisture-, and wear-resistant, including identifying information on cover and spine of each volume. 5 Provide the following information on cover of each volume: a. Title: “OPERATING AND MAINTENANCE INSTRUCTIONS”. b. Name or type of material or equipment covered in the manual. c. Volume number, if more than one volume is required, listed as “Volume __ of __”, with appropriate volume-designating numbers filled in. d. Name of Project and, if applicable, Contract name and number. e. Name of building or structure, as applicable. 6 Provide the following information on spine of each volume: a. Title: “OPERATING AND MAINTENANCE INSTRUCTIONS”. b. Name or type of material or equipment covered in the manual. c. Volume number, if more than one volume is required, listed as “Volume __ of __”, with appropriate volume-designating numbers filled in. d. Project name and building or structure name. B. Pages: 1. Print pages in operations and maintenance manual on 30-pound (minimum) paper, 8.5 inches by 11 inches in size. 2. Reinforce binding holes in each individual sheet with plastic, cloth, or metal. When published, separately-bound booklets or pamphlets are part of the manual, reinforcing of pages within booklet or pamphlet is not required. 3. Furnish each page with binding margin not less than one inch wide. Punch each page with holes suitable for the associated binding. C. Drawings: 1. Bind into the operation and maintenance manual drawings, diagrams, and illustrations up to and including 11 inches by 17 inches in size, with reinforcing specified for pages. 2. Documents larger than 11 inches by 17 inches shall be folded and inserted into clear plastic pockets bound into the manual. Mark pockets with printed text indicating content and drawing numbers. Include not more than three drawing sheets per pocket. D. Copy Quality and Document Clarity: 1. Contents shall be original-quality copies. Documents in the operations and maintenance manual shall be either original manufacturer-printed documents or first-generation photocopies indistinguishable from originals. If original is in color, copies shall be in color. Manuals that contain copies that are unclear, not completely legible, off-center, skewed, or where text or drawings are cut by binding holes, are unacceptable. Pages that contain approval or date stamps, comments, or other markings that cover text or drawing are unacceptable. Faxed copies are unacceptable. 2. Clearly mark in ink to indicate all components of materials and equipment on catalog pages for ease of identification. In standard or pre-printed documents, indicate options furnished or cross out inapplicable content. Using highlighters to so indicate options furnished is unacceptable. E. Organization: 1. Table of Contents: a. Provide table of contents in each volume of each operations and maintenance manual. b. In table of contents and not less than once in each chapter or section, identify materials and equipment by their functional names. Thereafter, abbreviations and acronyms may be used if their meaning is clearly indicated in a tab Section 01 79 23 Instruction of Operations and Maintenance Personnel PART 1 – GENERAL 1.1 DESCRIPTION A. Scope: 1. VENDOR shall furnish services of Supplier’s operation and maintenance training specialists to instruct OWNER’s and facility manager’s personnel in recommended operating and maintenance procedures for materials and equipment furnished, in accordance with the Contract Documents. 2. Supplier shall provide a combination of classroom and field training at the Site, unless otherwise required elsewhere in the Contract Documents. 3. OWNER or facility manager reserves the right to record training sessions on video for OWNER’s later use in instructing OWNER’s or facility manager’s personnel. B. Scheduling of Training Sessions: 1. General: a. VENDOR shall coordinate training services with start-up and initial operation of materials and equipment on days and times, and in manner, acceptable to OWNER, in accordance with the Contract Documents. b. Training may be required outside of normal business hours to accommodate schedules of operations and maintenance personnel. Furnish training services at the required days and times at no additional cost to OWNER. 2. Prerequisites to Training: a. Training of facility operations and maintenance personnel shall commence no more than two (2) weeks after preliminary operation and maintenance data has been submitted and accepted by OWNER. b. At option of OWNER or ENGINEER, training may be allowed to take place before, during, or after equipment startup. 3. Training Schedule Submittal: a. Training Schedule Required: VENDOR shall prepare and submit proposed training schedule for review and acceptance by OWNER. Proposed training schedule shall show and indicate all training required in the Contract Documents, and shall demonstrate compliance with specified training requirements relative to number of hours of training for various elements of the Work, number of training sessions, and scheduling. b. Timing of Training Schedule Submittal: Submit initial training schedule not less than 60 days before scheduled start of first training session. Submit final training schedule, incorporating revisions in accordance with OWNER’s comments, no later than 30 days prior to starting the first training session. c. OWNER reserves the right to modify personnel availability for training in accordance with process or emergency needs at the facility. 1.2 QUALITY ASSURANCE A. Qualifications: 1. Manufacturer’s Instructors: a. Shall be factory-trained by manufacturer of material or equipment. b. Manufacturer’s instructors shall be proficient and experienced in performing training of the type required. c. Instructors shall be proficient in spoken and written English language. d. Qualifications of instructors are subject to acceptance by OWNER. If OWNER does not accept qualifications of proposed instructor, furnish services of replacement instructor with acceptable qualifications. B. Training Scheduling Conference: 1. Prior to preparing initial training schedule submittal, schedule and hold training scheduling conference at the location where progress meetings are held, to review: a. Training requirements indicated in the Contract Documents. b. Work to be completed prior to starting training. c. Work progress and Progress Schedule relative to startup and training. d. Scheduling constraints for OWNER’s personnel, relative to days and times of training sessions. e. Preferred days for training. f. Location where training will be performed and facilities available. g. Required submittals relative to training. h. Other issues relative to training of operations and maintenance personnel. 2. Attendance is mandatory for the following: a. VENDOR’s project manager. b. VENDOR’s Site superintendent. c. Project manager of Subcontractors responsible for furnishing materials and equipment for which training of operations and maintenance personnel is required. d. Manufacturers and other Suppliers invited by VENDOR. f. OWNER. g. Facility manager’s staff responsible for training coordination, and staff responsible for scheduling operations and maintenance personnel. 3. If additional information must be developed to adequately cover agenda items, reconvene conference as soon as possible. 4. VENDOR shall prepare minutes summarizing the discussions of conference, decisions made, and agreements and disagreements, and submit the minutes to each conference attendee. 1.3 SUBMITTALS A. Action Submittals: Submit the following: 1. Training Schedule: Detailed schedule of training sessions, demonstrating compliance with number of training sessions, hours required in the Contract Documents, and complying with the Contract Times. Submit training schedule submittals in accordance with time frames specified in this Section. B. Informational Submittals: Submit the following: 1. Lesson Plan: Acceptable lesson plan for training on each material or equipment item, in accordance with Table 01 79 23-A and the Contract Documents. Lesson plan shall comply with requirements of this Section as may be supplemented by Specifications Sections where materials and equipment are specified. Include with lesson plan copy of handouts that will be used during training sessions. Furnish lesson plan submittals in accordance with time frames specified in this Section. 2. Qualifications: a. Credentials of manufacturer’s proposed operations and maintenance instructor(s). Credentials shall demonstrate compliance with requirements of this Section and shall include brief resume’ and specific details of instructor’s operating, maintenance, and training experience relative to the specific material and equipment for which instructor will provide training. C. Closeout Submittals: Submit the following: 1. Trainee sign-in sheets for each training session. Submit to OWNER’s training coordinator. 1.4 LESSON PLAN A. Supplier’s lesson plan shall describe specific instruction topics, system components for Section 40 60 05 Instrumentation and Control for Process Systems PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. VENDOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to furnish a complete and operating instrumentation and control system. 2. OTHERS shall be responsible for installing, calibrating, testing, starting up, and placing in satisfactory operation a complete and operating instrumentation and control system. 3. The Work includes, but is not limited to, the following: a. Panels and panel mounted instruments. b. Programmable logic controllers (PLC) and software. c. Operator interface terminal (OIT) units. d. Local area network hardware and software. e. Radio equipment. f. Uninterruptible power supply (UPS). 4. The Work includes, but is not limited to, instrumentation and control systems for various sites located throughout Ontario County’s Canandaigua Lake County Sewer District. These sites are defined as Type A, B, C, and E as follows, refer to Contract Drawings for details and wir

Plain text

OpenGov categories

  • 03126 · Control Systems: Complete (For Automatic Temperature Control)
  • 22014 · Energy Computerized Control Systems for HVAC, Lighting, Utilities, etc. Combination
  • 22015 · Flow Controllers, Indicators, Calibrators, and Recorders (For Air and Gases)