Re- Bid of Club 19 - Awning: 4- Inch Insulated Roof System
Description
The City of Pembroke Pines is seeking bids from qualified firms, hereinafter referred to as the Contractor, to furnish and install a new covered awning, including all required demolition, materials, structural components, roofing, finishes, labor, and related work , in accordance with the terms, conditions, and specifications contained in this solicitation. Complete Installation Club 19 Awning: 4-Inch Insulated Roof System – Complete Installation SCOPE OF WORK SCOPE OF WORK The Contractor shall provide all labor, materials, equipment, tools, supervision, transportation, permits, inspections, temporary protection, and incidental work necessary to complete the construction and installation of the new approximately 1,318-square-foot aluminum roof/awning system at Club 19, located at 10500 Taft Street, Pembroke Pines, Florida 33026. The scope of work outlined below is not all-inclusive and shall be performed in conjunction with all attachments provided with the solicitation. All work shall comply with the current architectural plans, structural drawings and calculations, approved products, manufacturer requirements, approved submittals, and all applicable codes and regulations. All dimensions, quantities, measurements, and existing site conditions identified in the solicitation documents shall be field-verified by the Contractor prior to submitting its bid. Any discrepancies, omissions, or conflicts identified between the solicitation documents, plans, specifications, and actual field conditions shall be submitted to the City in writing through the solicitation's question-and-answer (Q&A) process before the bid submission deadline. Demolition / Existing Conditions Remove existing awning materials and structural components within the designated work area. Load, haul and dispose of demolition debris generated by this scope. Protect all existing building components, concrete beams and columns, slabs, sidewalks, utilities, landscaping, equipment, and adjacent improvements designated to remain. Repair or replace any improvements damaged by the Contractor at no additional cost to the City. Prior to bidding and construction, verify all dimensions and existing conditions in the field, including existing concrete beams and columns, slab thickness and condition, connection points, elevations, clearances, and other conditions affecting the Work. Existing conditions identified as VIF (Verify in Field) shall be verified before fabrication or installation. Report discrepancies to the City before proceeding with the affected Work. Insulated Roof System Furnish and install a new 4-inch insulated roof system in accordance with the current project plans, approved details and verified field conditions. The roof system shall consist of 4-inch insulated aluminum panels (0.024 x 2-lb EPS), Florida Product Approval No. FL-7561, installed in the configuration, slopes, dimensions, and locations shown on the approved plans. Provide all required receiving channels, fascia, gutters, flashing, trim, fasteners, sealants, closures, and accessories for a complete, secure, and weather-tight installation. Roof slopes shall be as shown on the structural roof framing plan. Structural Aluminum Framing Furnish and install approximately ten (10) 6 in. x 6 in. x 1/8 in. aluminum columns and associated 4 in. x 10 in. x 1/8 in. aluminum beam framing, as indicated by the current plan. Final column quantities, member locations, connections, and framing configuration shall be governed by the approved structural drawings. Provide all structural angles, channels, plates, fasteners, through-bolts, anchors, and related components required for a complete installation. Structural aluminum materials shall comply with the approved structural documents. Support / Anchorage Provide one (1) isolated concrete footing for the designated column. Remaining columns to be supported with structural angles through-bolted to the existing approximately 6-inch concrete slab, subject to field verification and approved structural details. The existing 6-inch-thick concrete slab-on-grade is to remain and shall be field verified. Columns supported by the existing slab shall use the engineered column-to-slab connection shown on Sheet S2.0, including structural aluminum angles, 1/2-inch Hilti KH-EZ CRC anchors, through-bolts, spacing, embedment, and minimum edge/joint distances shown in the approved structural documents. Verify slab thickness, condition, edge/joint locations, and suitability before drilling or installing anchors. If field conditions differ from the structural documents or are unsuitable for the specified anchorage, stop the affected Work and notify the City and Engineer of Record before proceeding. Isolated Concrete Footing Construct the isolated footing designated F-30 in accordance with the approved structural foundation plan and Detail 7A/S2.0. The footing is shown as 30 inches square (2' - 6" x 2' - 6") and 24 inches deep, with the 6 in. x 6 in. x 1/8 in. aluminum column embedded a minimum of 20 inches. Provide excavation, reinforcing steel, concrete, compacted fill, column coating, placement, curing, and related work required by the structural documents. Concrete shall have a minimum 28-day compressive strength of 3,000 psi unless otherwise indicated by the approved structural documents. Connections to Existing Structure Provide all connections of the new aluminum framing and insulated roof system to existing concrete beams, CBS walls, roof overhangs, fascia, trusses, and other existing components exactly as shown on the approved structural details. No modification to an engineered connection, anchor, member size, footing, fastener, or structural detail shall be made without approval of the Engineer of Record. Coordination / Submittals Coordinate the structural Work with the architectural, mechanical, electrical, plumbing, and other applicable project documents. Provide required product data, fabrication/shop drawings, and other submittals required by the plans. Contractor-designed temporary forming, shoring, or bracing requiring engineered shop drawings shall be signed and sealed by a Florida-licensed Professional Engineer, as required by the structural documents. Permits / Inspections / Safety Obtain all required permits, sub-permits, inspections, and approvals necessary for completion of the Work unless otherwise stated by the City. Maintain a safe and secure work area with required barricades, signage, temp NOTICE Notice is hereby given that the City of Pembroke Pines is seeking quotes for: QQ # PSPW-26-QQ-10 Re-Bid of Club 19 - Awning: 4-Inch Insulated Roof System Solicitations may be found on the City of Pembroke Pines website under the Procurement Department at http://www.ppines.com/index.aspx?NID=667 , and may be downloaded directly from the OpenGov platform at https://procurement.opengov.com/portal/pembrokepines . For Technical Support , proposers can reach the OpenGov Service Desk between 7:00 am to 10:00 pm from Monday through Friday via the following methods: Chat (preferred method): Click the button in the lower right-hand corner of the portal. E-mail: procurement-support@opengov.com Phone: 1 (650) 336-7167 If additional help is needed with downloading the solicitation package please contact the Procurement Department at (954) 518-9020 or by email at purchasing@ppines.com . The Procurement Department hours are between 7:00 am to 6:00 pm on Monday through Thursday and is located at 8300 S. Palm Drive , Pembroke Pines , FL 33025 . Bidders shall submit all questions regarding this bid via the City's e-Procurement Portal, located at https://procurement.opengov.com/portal/pembrokepines . Please note the deadline for submitting questions. All answers will be posted on the City's e-Procurement Portal. Bidders may also click “Follow” on this bid to receive an email notification when answers are posted. It is the bidder's responsibility to check the portal for updates. Only written responses issued through the OpenGov platform will be considered official for interpretations or clarifications. Proposals will be accepted until 10:00 am on Monday, November 23, 2026 , electronically at https://procurement.opengov.com/portal/pembrokepines/projects/325224 . GENERAL PROJECT INFORMATION & TIMELINE Project Timeline The work shall be completed within 10 calendar days from issuance of the City's Notice to Proceed (NTP), with an estimated start date of December, 2026 . Tentative Schedule of Events Issuance of Solicitation (Posting Date): November 10, 2026 Pre-Bid Meeting (Non-Mandatory): November 17, 2026, 10:00am 10500 TAFT STREET, PEMBROKE PINES, FL 33026 Question Due Date: November 19, 2026, 10:00am Issuance of Final Answers to Questions: November 19, 2026 Bid Submission Deadline: November 23, 2026, 10:00am Non-Mandatory Pre-Bid Meeting/Site Visit There will be a non-mandatory scheduled pre-bid meeting on Tuesday, November 17, 2026 at 10:00 am . Meeting location will be at the 10500 TAFT STREET, PEMBROKE PINES, FL 33026 Proof of Attendance: Contractor s may be required to sign in at any of the meetings to show proof of attendance. It is the Contractor ’s responsibility to make sure that they sign in at the meeting. Estimated Project Cost $ 56,000 Grant/Federal Funding Not applicable for this project. Proposal Security/Bid Bond A Proposal Security shall not be required for this project. Payment and Performance Bonds Payment and Performance Bonds shall not be required for this project. Permit, License, Impact or Inspection Fees With the exception of the City related permit, license, impact or inspection fees (including the Building Department and Engineering Department Permit Fees), which will be waived for this project, the City does not anticipate any additional permit, license, impact or inspection fees for this project. Any related State or County fees, for the aforementioned permits, will be paid by the City. In addition, the City shall cover the cost for any other permit fees related to external entities through the City’s Owner’s Contingency for this project , therefore proposers should not include permit costs in their total proposal price. Furthermore, please note the City’s average time for a Contractor to apply for and receive an approved permit is 30 days; delays in this timeline caused by the Contractor ’s failure to actively monitor the permit process and submit all required documentation in a timely manner, will count against the project’s contractual completion period. PURPOSE AND BACKGROUND Purpose The City of Pembroke Pines is seeking bids from qualified firms, hereinafter referred to as the Contractor, to furnish and install a new covered awning, including all required demolition, materials, structural components, roofing, finishes, labor, and related work , in accordance with the terms, conditions, and specifications contained in this solicitation. Background Pembroke Pines, Florida, ranked as the eleventh largest city among the state's four hundred plus municipalities and the second largest in Broward County, maintains a welcoming small-town ambiance that resonates with its residents. Located conveniently in southwest Broward County, the city provides seamless access to major highways, employment centers, entertainment venues, parks, golf courses, and a diverse array of dining and shopping options. With a population of approximately 170,000 residents spread across 32.68 square miles, Pembroke Pines is renowned as one of the best cities to live in America. The city boasts 28 superior parks, lush landscaping, and a distinctive South Florida charm that contributes to its natural beauty. Notably recognized as 2024's Best Place to Raise a Family in Florida, and 2024's Best City of Hispanic Entrepreneurs by WalletHub, Pembroke Pines also earned a place as the on Money Magazine's esteemed Best Places to Live list in 2014, as the sole Florida representative, ranking in at #32 in the nation. Incorporated in 1960, Pembroke Pines is celebrated as a safe and desirable community, having received accolades such as the All-America City designation. The city's commitment to arts and culture, exceptional schools, diverse population, numerous parks, and forward-thinking approach in an ever-evolving world make it a standout destination. Pembroke Pines is also the home to the largest municipal-run charter school system in the nation, serving over 6,000 students across five separate campuses. The City’s award-winning charter school system is located in the Broward County School District, which is the sixth largest school district in the nation. PRICE PROPOSAL / BID TABLE The vendor must provide their pricing electronically through the designated line items listed on the Bid Sheet/Pricing Table via the City's e-Procurement portal on OpenGov. Vendor Notes: The bid tables includes a “Vendor Notes” column for any additional comments regarding the requested line item(s). A comment is preferred in the “Vendor Notes” column. If the vendor does not need to submit any comments, they may leave it blank or enter N/A or similar. Primary Responses: The initial Bid Table is for the primary responses so that the vendors can submit the requested goods and/or services. SUBMITTAL DOCUMENTS Bids must be submitted electronically at https://procurement.opengov.com/portal/pembrokepines on or before 10:00 am on Monday, November 23, 2026 . Please note vendors should be registered on OpenGov under the name of the organization that they are operating as and it should match the organization name on the documents that they are submitting and utilizing when responding to the solicitation. In addition, the vendor must complete the required documents in this section and provide any additional information requested throughout this solicitation. Any additional information requested in the solicitation should be scanned and uploaded. The City recommends for proposers to submit their proposals as soon as they are ready to do so. Please allow ample time to submit your proposals on the https://procurement.opengov.com/portal/pembrokepines website. Proposals may be modified or withdrawn prior to the deadline for submitting Proposals. PLEASE DO NOT SUBMIT ANY PROPOSALS VIA MAIL, E-MAIL OR FAX. Prospective proposers interested in responding to this solicitation are requested to provide all of the applicable information listed in this section. Submittals that do not respond completely to all of the requirements specified herein may be considered non-responsive and eliminated from the process. Brevity and clarity are encouraged. INSURANCE REQUIREMENTS General Indemnification The Contractor shall indemnify and hold harmless the CITY and its officers, employees, agents and instrumentalities from any and all liability, losses or damages, including attorneys' fees and costs of defense, which the CITY or its officers, employees, agents or instrumentalities may incur as a result of claims, demands, suits, causes of actions or proceedings of any kind or nature arising out of, relating to or resulting from the performance of this Agreement by the Contractor or its employees, agents, servants, partners, principals or subcontractors. The Contractor shall pay all claims and losses in connection therewith and shall investigate and defend all claims, suits or actions of any kind or nature in the name of the CITY, where applicable, including appellate proceedings, and shall pay all costs, judgments, and attorneys’ fees which may issue thereon. The Contractor expressly understands and agrees that any insurance protection required by this Agreement or otherwise provided by the Contractor shall in no way limit the responsibility to indemnify, keep and save harmless and defend the CITY or its officers, employees, agents and instrumentalities as herein provided. Insurance Coverage Contractor shall not commence work under this Agreement until it has obtained all insurance required under this paragraph and such insurance has been approved by the Risk Manager of the CITY nor shall the Contractor allow any subcontractor to commence work on any subcontract until all similar such insurance required of the subcontractor has been obtained and similarly approved. Certificates of Insurance, reflecting evidence of the required insurance, shall be filed with the CITY’s Risk Manager prior to the commencement of this Agreement. Policies shall be issued by companies authorized to do business under the laws of the State of Florida. The insurance company shall be rated no less than “A” as to management, and no less than “Class VI” as to financial strength according to the latest edition of Best’s Insurance Guide published by A.M. Best Company. Certificates of Insurance shall provide for thirty (30) days’ prior written notice to the CITY in case of cancellation or material changes in the policy limits or coverage states. If the carrier cannot provide thirty (30) days’ notice of cancellation, either the Contractor or their Insurance Broker must agree to provide notice. Insurance shall be in force until all obligations required to be fulfilled under the terms of the Agreement are satisfactorily completed as evidenced by the formal acceptance by the CITY. In the event the insurance certificate provided indicates that the insurance shall terminate and lapse during the period of this Agreement, the Contractor shall furnish, at least forty-five (45) days prior to the expiration of the date of such insurance, a renewed certificate of insurance as proof that equal and like coverage for the balance of the period of the Agreement and extension thereunder is in effect. The Contractor shall neither commence nor continue to provide any services pursuant to this Agreement unless all required insurance remains in full force and effect. Contractor shall be liable to CITY for any lapses in service resulting from a gap in insurance coverage. Contractor shall be required to obtain all applicable insurance coverage, as indicated in the sections below, prior to commencing any work pursuant to this Agreement. Comprehensive General Liability Insurance Comprehensive General Liability Insurance written on an occurrence basis including, but not limited to: coverage for bodily injury and property damage, personal & advertising injury, products & completed operations, and contractual liability. Coverage must be written on an occurrence basis, with limits of liability no less than: Each Occurrence Limit - $1,000,000 Fire Damage Limit (Damage to rented premises) - $100,000 Personal & Advertising Injury Limit - $1,000,000 General Aggregate Limit - $2,000,000 Products & Completed Operations Aggregate Limit - $2,000,000 Products & Completed Operations Coverage shall be maintained for the later of three (3) years after the delivery of goods/services or final payment under the Agreement. ( For Construction projects: Increase to ten (10) years and include a Designated Construction Project(s) General Aggregate Limit) The City of Pembroke Pines must be shown as an additional insured with respect to this coverage. The CITY’s additional insured status shall extend to any coverage beyond the minimum limits of liability found herein. Workers’ Compensation and Employers’ Liability Insurance Workers’ Compensation and Employers’ Liability Insurance covering all employees, and/or volunteers of the Contractor engaged in the performance of the scope of work associated with this Agreement. In the case any work is sublet, the Contractor shall require the subcontractors similarly to provide Workers’ Compensation Insurance for all the latter’s employees unless such employees are covered by the protection afforded by the Contractor Coverage for the Contractor and all subcontractors shall be in accordance with applicable state and/or federal laws
Published attachments
- Club19-Arch.ProgressSet-9.01.26
- Structural Drawing
- FL7561-FBC 2023
- Structural Design Calculations
- Purchase Order Terms and Conditions (Rev. 2026-06-30)
- Sample Insurance Certificate
- Standard Release of Lien
- Specimen Contract - Construction Agreement
- Question & Answer Report from Previous Bid
- Re-Bid_of_Club_19_-_Awning:_4-Inch_Insulated_Roof_System_(Addendum_#2_Revision).pdf
Addenda and notices
Official Notice #1: Pre-Bid Meeting · 1
Contractors who did not attend the original Pre-Bid Meeting, must attend the meeting on November 17, 2026, 10:00am Location: 10500 TAFT STREET, PEMBROKE PINES, FL 33026
Addendum #1 · 1
The City has extended the solicitation timeline to provide additional time for the questions and answers portion of the solicitation. The updated schedule is provided below. Deadline for Questions: November 19, 2026 10:00 AM City Responses to Questions: November 19, 2026 6:00 PM Bid Submission Deadline: November 23, 2026 10:00 AM
Official Notice #2: Non - Mandatory Pre-Bid Meeting Sign In Sheet 11.17.26 · 2
Addendum #2 · 2
Roof Plan
Public questions and answers
Hello, will the pre-bid sign-in sheet for the Club 19 awning project (PSPW-26-QQ-10) be available to vendors? If so, could you let me know where to find it after the November 17 meeting? Thank you.
Please refer to Official Notice #2.
In the previous bid Q&A (Question 4), the answer said the seating area roof would be higher than the rest of the new roof, with the change in height at or above the existing tie beam and flashing between the two roofs. S2.0 Detail 8 and S1.3 show one continuous roof at a single height, while A-4 South Elevation shows the ramp roof lower than the patio roof. Will the seating area roof be higher than the rest of the new roof, and if so, where does the change in height occur and what is the bearing elevation and flashing condition at the transition?
Roof over the seating area will be higher than the other roof, the change will occur over the existing tie beam and will be flashed by contractor.
A-3 Roof Plan shows a diagonal hip/valley line from the existing column at the bar to the southeast new column, with panels running east-west on the east side of the bar. S1.3 Roof Framing Plan shows all insulated panels running north-south with no hip or valley member. Which panel orientation governs in this area structural or architectural?
Panels will run north to south.
S1.3 shows the new covered walkway roof extending 4'-6" north of the north beam to the existing building, using the insulated panel to fascia detail (S2.0, Detail 4). A-2 and A-3 show the new roof stopping at the north column line within its current boundaries, and A-1 shows the planter between the building and the new roof remaining. The previous bid Q&A (Question 2) said the planter would be removed. There are discrepancies between the structural and architectural drawings, does the new walkway roof extend to the existing building fascia or stop at the north column line, and therefore will we be referring to the structural drawing to this due to removal of planter?
Planter will be removed by the city and roof will extend north to the building.
The structural drawings and the architectural progress set do not coordinate. They conflict with column layout, dimensions, roof geometry, roof extent and foundations. The architectural plans also don’t appear to support the design described at the pre-bid meeting on November 17 at 10:00 AM. Which drawing set should bidders use to prepare their bids. Will revised, coordinated drawings be issued by addendum before the bid due date if not which drawings should bid be estimated by?
No new drawings will be issued before the bid due date; work will be as described at the pre-bid meeting. Drawings from Calc Engineering ( B - Structural Drawing)
We consider that the panels running North to South is not feasible. There would an unnecessary gap between the panel and the edge of the roof and panel. I can openly discuss wit the EOR/PM a solution.
Panels will run north and south.
OpenGov categories
- 14560 · Roofing
- 87010 · Awnings, Cloth
- 87020 · Awnings, Metal and Wood
- 87022 · Awnings, Vinyl
- 91200 · Construction Services, General (Incl. Maintenance And Repair Services)