Skip to content
← Back to search
JustificationActive

Remediation Services at Tobyhanna

DEPT OF DEFENSE · W2SD ENDIST PHILADELPHIA

Contract Details

Notice ID
W912BU26RADERP
Opportunity Type
Justification
Sub-Agency
DEPT OF THE ARMY
Office
W2SD ENDIST PHILADELPHIA
Posted Date
Thursday, October 8, 2026
Response Deadline
Not specified
PSC Code
Y1PZ
Set-Aside
Full & Open Competition
Place of Performance
Tobyhanna, PA, 18466, USA
Status
Active

Description

In general, the Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the contract requirements specified in Table 1 of this Performance Work Statement (PWS) except for those items specified as Government furnished property and services (see Part 3). The Contractor shall perform to the standards in this PWS and the Basic Contract. 1.1.1 The Contractor shall be responsible for fully executing this firm fixed price contract under a Performance-Based Acquisition (PBA). Work to be accomplished includes, but is not limited to, conducting required environmental remediation services for which the United States Department of the Army (the Army) is statutorily responsible; addressing any and all environmental, explosive safety, scheduling, and regulatory issues; and assuming contractual liability and responsibility for the achievement of the contract requirements identified in the PWS. All the contamination associated with these sites shall be addressed including any that has migrated off the installation. 1.1.2 The Contractor shall comply with all applicable Federal, state and local laws and regulations and achieve the contract requirements of this PWS in a manner that is consistent with any applicable orders or permits, all existing cleanup agreements or guidance for the Installation, and relevant DOD and Army regulations, policies, and procedures, for the duration of the contract. 1.1.3 The Contractor shall perform all the necessary environmental remediation work required to meet the contract requirements of this PWS in a manner that is consistent with Comprehensive Environmental Response Compensation and Liability Act (CERCLA), as amended by the S

Read full description (2,595 characters)

uperfund Amendments and Reauthorization Act (SARA), the National Oil and Hazardous Substances Contingency Plan (NCP) and the CERCLA Section 120 Federal Facility Agreement (FFA).non-severable environmental remediation services required to resolve mandatory Pennsylvania Department of Environmental Protection (PADEP) regulatory comments, install additional sentinel and boundary groundwater monitoring wells, complete downhole borehole geophysics/packer testing, execute quarterly sampling of new wells, prepare addenda to the Quality Assurance Project Plan (QAPP) and Conceptual Site Model (CSM), and conduct one year of sitewide annual groundwater monitoring and fence inspections/repairs. Please see the Scope of Work attached to the notice for each of the required tasks for this requirement.

Documents and contact

No public document links were provided with this record.

Check the official notice for attachments and access requirements ↗

Contact
Brian Cox
Email
brian.w.cox@usace.army.mil
Phone
2156566897
Loadingchange history…
Loadingrelated notices…