Repair Port Deposit I&I - Package 3
Description
The purpose of this project is to eliminate stormwater and spring flow from entering the sanitary sewer by installing new storm drain piping and appurtenances in several locations along MD 222 in the Town of Port Deposit. There is also one section of sanitary sewer that will be replaced along Race Street. Bid Sheet for Project Mobilization / Demobilization Maintenance of Traffic Construction Stakeout Erosion and Sediment Control Test Pit Excavation Flowable Backfill for Utility Cuts Brick Masonry for Miscellaneous Structures Clean Existing Pipe any Size Clean Existing Drainage Structures 15 Inch RCCP, Class IV 18 Inch RCCP, Class IV 24 Inch RCCP, Class IV 24 Inch X 38 Inch Elliptical RCCP, Class HE IV Standard NR Inlet - Minimum Depth Standard Type S Inlet, Single Grate - Minimum Depth Standard Type S Inlet, Double Grate Tandem - Minimum Depth Standard Shallow Manhole 4 Ft. Square with Type A Frame & Cover- Minimum Depth 72 Inch Diameter Manhole for 42 and 48 Inch Pipes - Minimum Depth Inlet Protection Landscaping Yard Inlet 8 Inch PVC Drainage Pipe, Schedule 40 Landscaping Junction Box 6 Inch PVC Drainage Pipe, Schedule 40 Superpave Asphalt Mix 9.5mm for Surface, PG 64S-22, Level 2 6 Inch White Thermoplastic Marking 6 Inch Yellow Thermoplastic Marking 6 Inch Portland Cement Concrete Pavement for Driveway, Mix 6 Standard Type A Combination Curb and Gutter 24" Gutter Pan, 8" Minimum Depth 5 Inch Concrete Sidewalk Type A Sanitary Drop Connection Sanitary Sewer Cleanout Shallow Manhole (60 inch) - 8 Inch PVC Sanitary Sewer Line, SDR 26 8" Sanitary Sewer Lamphole Sanitary Sewer As-Built Sanitary Sewer Lateral Piping Undercut Excavation and Backfill Rock Removal Dear Supplier, Thank you for your interest in doing business with Cecil County, Maryland. We look forward to a very successful procurement process. Please take notice of the response submittal requirements outlined in this solicitation. Read and follow the instructions very carefully, as any misinterpretations or failure to comply with instruction could lead to your submittal being rejected as nonresponsive. Any change(s) to this solicitation will be conveyed though the written addenda process. Notifications of addenda are sent electronically to Suppliers registered as receiving this solicitation by purchase or download. In addition, all addenda are posted on the County's OpenGov eProcurement Platform https://procurement.opengov.com/portal/cecil . Please read carefully and follow all instructions provided on the addendum, as well as the instruction provided in the original solicitation. It is the responsibility of all potential Contractors to monitor the Procurement Division’s website for any changing information prior to submitting their reply. It is the intent of the Procurement Division to provide quality services. Should you have any questions, please visit our website or feel free to contact the Procurement Officer identified in this solicitation. Again, thank you for your continued interest in doing business with Cecil County Government. Sincerely, Connie S Kamit Procurement Manager Procurement Division CECIL COUNTY, MARYLAND Feedback Form Solicitation Feedback Form In order to help us improve the quality of the County solicitations, and to make our procurement process more responsive and business friendly, we ask that you take a few minutes and provide comments and suggestions regarding this solicitation. Please return your comments with your response. If you have chosen not to respond to this solicitation, please email this completed form to the attention of the Procurement Officer (see the Key Information Sheet below for contact information) at procurement@cecilcountymd.gov . Title: Repair Port Deposit I&I - Package 3 Solicitation No: IFB B-27-022-55078 If you have chosen not to respond to this solicitation, please indicate the reason(s) below: ( ) Other commitments preclude our participation at this time. ( ) The subject of this solicitation is not something we ordinarily provide. ( ) We are inexperienced in the work/commodities required. ( ) Specifications are unclear, too restrictive, etc. (Explain in REMARKS section.) ( ) The scope of work is beyond our present capacity. ( ) Doing business with Cecil County is simply too complicated. (Explain in REMARKS section.) ( ) We cannot be competitive. (Explain in REMARKS section.) ( ) Time allotted for completion of the Bid/Proposal is insufficient. ( ) Start-up time is insufficient. ( ) Bonding/Insurance requirements are restrictive. (Explain in REMARKS section.) ( ) Bid/Proposal requirements (other than specifications) are unreasonable or too risky. (Explain in REMARKS section.) ( ) MBE or County-Based Small Business requirements. (Explain in REMARKS section.) ( ) Prior Cecil County contract experience was unprofitable or otherwise unsatisfactory. (Explain in REMARKS section.) ( ) Payment schedule too slow. ( ) Other: ______________________________________________________________ REMARKS section below. (Attach additional pages as needed) REMARKS: _____________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Supplier Name: _______________________________ Date: ___________________ Contact Person: _________________________ Phone: (____) __________________ E-mail Address: ________________________________________________________ Abbreviations and Definitions For purposes of this solicitation, the following abbreviations or terms have the meanings indicated below: Bid – A statement of price offered by a Bidder in response to the solicitation. Bidder – An entity that submits a Bid in response to this solicitation. Bid Price - The Bidder’s price for services and/or goods in response to this solicitation, which shall be included on the Price Bid Sheet and will be used in determining the recommended awardee. Business Day(s) – The official working days of the week include Monday through Friday. Official working days exclude County Holidays and days the County is closed due to weather or other emergency event. Normal County business hours are 7:30 a.m. – 4:00 p.m. The Contractor will not be permitted to do any work that requires the presence of the County’s inspection or supervisory forces on days which are County Holidays or on Saturdays or Sundays, unless such work has been previously authorized by the County Representative. Contract Commencement - The date the Contract is signed by the authorized Contractor and the County representative, or such other date as set forth in the Contract. Contractor – The selected Bidder that is awarded a Contract by the County. County – Cecil County, Maryland, a body corporate and politic. eMMA – eMaryland Marketplace Advantage (eMMA) is the electronic commence system managed by the State of Maryland. Local Time – Time in the Eastern Time Zone as observed by the State of Maryland. Unless otherwise specified, all stated times shall be Local Time, even if not expressly designated as such. Notice of Intent to Award– A written notice from the Procurement Officer that the County intends to award a contract to the recipient of the notice, subject to the receipt of requested items stated in this solicitation documents. Pre-Bid Conference (Conference) – A meeting to discuss objectives and answer questions related to this solicitation in order to enhance prospective Bidders’ understanding of the County’s requirements and to facilitate better preparation of their Bids. Procurement Officer – Prior to the award of any Contract, the sole point of contact in the County for purposes of this solicitation. Proposal - Offer made outlining the terms for a potential agreement, not strictly price based. Purchasing Agent – Authorized representative of the Procurement Office. Responsible Bidder - Bidder or offeror who has the capability in all respects to perform fully the contract requirements, and the experience, integrity, perseverance, reliability, capacity, facilities, equipment, and credit which will assure good faith performance. Redacted - to obscure or remove (text) from a document prior to publication or release. To censor or obscure for legal, security, or proprietary purposes. Responsive Bidder - Is a vendor who has submitted a bid, which conforms in all material respects to the requirements stated in the IFB. Term Contract – The executed agreement awarded to the successful Bidder pursuant to this solicitation. The agreement will be in the form of a Term Contract that the Contractor will receive upon approval. General Information Notice of Communication All communications by a vendor to the county, its officials, and department heads regarding this procurement shall be done through the Cecil County Procurement Office. No vendor, its’ representative, agent, or employee shall engage in private communication with a member of the Cecil County Council, Government, or county department heads regarding any procurement of goods or services by the County from the date that this procurement packet is released. No private communication regarding the purchase shall be permitted until the procurement process is complete and a purchase order is granted, or a contract is entered into. “Private Communication” means communication with any vendor outside of a posted meeting of the governing body, a regular meeting of a standing or appointed committee, or negotiation with a vendor which has been specifically authorized by the governing body. THE RESPONDENT IS RESPONSIBLE FOR READING AND UNDERSTANDING ALL DOCUMENTS, FORMS, SPECIFICATIONS, AND INSTRUCTIONS WITHIN THIS ENTIRE DOCUMENT. Follow all instructions; you are responsible for obtaining any information needed in order to respond to this solicitation. Further, the Respondent is responsible for providing any and all relevant information necessary to submit a response. Failure to do so will be at the Respondent’s risk and may result in rejection of the response as non-conforming. General Requirements apply to all advertised solicitations; however, these may be superseded, whole or in part, by OTHER DATA CONTAINED HEREIN. Review the Table of Contents. Be sure your proposal package is complete. Legal Notice These General Provisions are considered standard language for an Offeror (hereinafter referred to as “Offeror”, “Vendor”, “Respondent”, or “Contractor”) submitting a response for a Request for Bids, Proposals, Qualifications or other solicitation (hereinafter referred to as “Procurement Packet”) made by the County of Cecil (hereinafter referred to as “Cecil County” and “County” or any other governing body/agency for which the Cecil County Procurement Office has been authorized to perform procurement services. The Cecil County Procurement (Purchasing) Office webpage may be found at https://www.ccgov.org/government/purchasing . It is the Offeror’s sole responsibility to be in compliance of all federal, state, and local laws, requirements, rules, codes, ordinances, and regulations applicable to their proposed goods and/or services. In the event of any conflict between the terms and provisions of these requirements and the specifications, the specifications shall govern. In the event of any conflict of interpretation of any part of this overall procurement packet, Cecil County's interpretation shall govern. Referenced appendices may be subject to change. General Instructions for Solicitations The Cecil County, Maryland's Finance Department and Procurement Division is issuing this Invitation for Bid (IFB) to establish a term contract with a Contractor(s) to perform Repair Port Deposit I&I - Package 3 . The County reserves the right to award to multiple vendors at its own discretion and what is considered the County's best value by the Procurement Manager which will be considered final. Instructions, Forms, and Specifications: All bids/proposals are to be submitted on and in accordance with the forms provided by the Procurement Division. All bids must be submitted electronically as specified within the County's OpenGov eProcurement platform. All bid/proposal times are either Eastern Standard Time or Eastern Daylight Time, whichever prevails. Late bids/proposals will not be considered. Responses to Invitation for Bid (IFB) and Request for Proposal (RFP) shall be required to acknowledge the Procurement Affidavit, as provided by the Procurement Division. This does not apply to Request for Quotation (RFQ). Amendments to solicitations often occur prior to bid opening and sometimes within hours prior to bid opening. All bidders are responsible for frequently visiting the Procurement web site to obtain amendments once they have downloaded a solicitation. Additional information or clarification of any of the instructions or information contained herein may be obtained from the Procurement Division. The County assumes no responsibility for oral instructions or suggestions. All official correspondence in regard to this solicitation must be directed to, and will be issued by, the Procurement Division. Bidders finding any discrepancy in or omission from the specifications, in doubt as to meaning, or asserting that the specifications are discriminatory, shall notify the Procurement Division in writing at once, but in no case later than five (5) business days prior to the scheduled opening of bids. Exceptions stated do not obligate the County to change the specifications. The Procurement Division will notify all bidders in writing, by amendment duly issued, of any substantive revisions to specifications or instructions. Unless a written exception detailing non-conformance to specifications is noted on the bid, any part number, product number, catalog number, etc., noted on the bid will be considered in full compliance with the specifications. Submission of a bid in response to this solicitation evidences the bidder's acceptance of these General Instructions and the terms and conditions of the solicitation. Submission of a bid evidences bidder's representation and warranty that the person submitting the bid response is authorized to act for and bind the contractor. All original and duplicate bids/proposals and other attachments, related documents and correspondence, including all follow-up documents and correspondence, shall be typed or written in English. All prices/percentages and/or other monetary figures shall be in United States dollars. It shall be the bidder's responsibility to verify that the electronic version is complete. Issuing Officer: The sole point of contact for the County for purposes of this solicitation is the Buyer, listed on the cover page; questions regarding any aspect of the competitive process must be directed to the Issuing Officer in writing. Award of Solicitations Any award pursuant to Requests for Quotations and Invitation for Bid may be made to the lowest responsive and responsible bidder as outlined within the County Procurement Manual, 2019, as amended. Awards on Requests for Quotations will be made within sixty (60) days after receipt of quote, unless otherwise indicated within solicitation. Invitation for Bid shall be made within one hundred eighty (180) days after bid opening unless otherwise indicated within solicitation. No bidder will be allowed to withdraw a bid during that period. The successful bidder may be required to give security or bond, as stated in the bid document, for payment and/or performance of the contract. When there is a conflict between the unit price or percentage and the extension, the unit price or percentage will prevail as the amount of the bid. The County will not pay interest charges or other penalties for invoice payments. Prices quoted shall be exclusive of all non-applicable Federal and Maryland State taxes. Tax exemption certificate will be furnished if required. The County reserves the right to consider making payments via electronic funds transfers (EFT) on contracts for which this payment vehicle may be appropriate. Reservations The County reserves the right to reject, in whole or in part, any and all bids received, and to make a whole award, multiple awards, a partial award, or no award, to best service the public interest. The County may waive formalities in bids as the interests of the County may require. The County reserves the right to increase or decrease quantities by approximately twenty (20) percent to be purchased at the prices bid. The County reserves the right to award solicitations or place orders on a lump sum or individual item basis, or in such combination as to best serve the public interest. The county may waive minor differences, irregularities, and technicalities in the specifications, provided they neither violate the specifications intent, materially affect the operation for which the items or services are being purchased, nor increased estimated maintenance and repair costs to the County. At any time during normal business hours and as often as the County may deem necessary, the Contractor shall make available to and permit inspection and photocopying, by the County, its employees or agents, of all records, information and documentation of the Contractor related to the subject matter of this contract, including, but not limited to, all contracts, invoices, payroll, and financial audits. Notwithstanding any other terms or provisions of the contract, in the event the County is temporarily or permanentl Insurance Provisions Insurance Provisions GENERAL REQUIREMENTS Coverages Required: Unless otherwise required by the specifications or the contract, the Contractor/Vendor shall purchase and maintain the insurance coverages listed herein. Insurance Companies must be acceptable to Cecil County and have an A.M. Best Rating of A-, Class X or better. Verification of Insurance: Before starting work on the contract or prior to the execution of the Contract on those bid, the Contractor/Vendor shall provide Cecil County, Maryland with verification of insurance coverage evidencing the required coverages. Cecil County as Additional Insured: The coverage required, excluding Worker’s Compensation and Employers’ Liability and Medical Malpractice Liability/Professional Liability/Errors and Omissions Liability, must include Cecil County, Maryland as an additional insured. Contractor’s/Vendor’s Responsibility: The providing of any insurance herein does not relieve the Contractor/Vendor of any of the responsibilities or obligations the Contractor/Vendor has assumed in the contract or for which the contractor/Vendor may be liable by law or otherwise. Failure to Provide Insurance: Failure to provide and continue in force the required insurance shall be deemed a material breach of the contract. INSURANCE COVERAGES General Liability Insurance Minimum Limits of Coverage: General Liability: $2,000,000 Annual Aggregate $1,000,000 Each Occurrence $1,000,000 Products and Completed Operations $1,000,000 Personal Injury and Advertising Such insurance shall protect the Contractor/Vendor from claims which may arise out of, or result from, the Contractor’s/Vendor’s operations under the contract, whether such operations be by the Contractor/Vendor, any subcontractor, anyone directly or indirectly employed by the Contractor/Vendor or Subcontractor, or anyone for whose acts any of the above may be liable. Minimum Coverages to be included: Independent Contractor’s coverage; Completed Operations and Products Liability coverage; and Contractual Liability coverage Damages not to be Excluded: Such insurance shall contain no exclusions applying to operations
Published attachments
- Contract Agreement-sample - A
- MD SHA Specification
- SHA Utility Permit - SHA-2-CE-0188-23
- State of Maryland - Sales and Use Tax Admissions and Amusement Tax Laws and Regulations Issued
- County Holidays
- BID OPENING SCHEDULE CALENDAR YEAR 2026
- Plan Set - For Bidding Purposes
- PD I&I Final ESD Plan 11.19.26
- Measurement and Payment Updated 2026.11.20
- Manhole Details from original contract 1970
- Repair_Port_Deposit_I&I_-_Package_3_(Addendum_#2_Revision).pdf
Addenda and notices
Official Notice #1: Site Walk Through · 1
There is a scheduled a walk through/site visit for November 18, 2026 at 10:00AM . The address to meet is 129 S Main Street, Port Deposit, MD 21904.
Addendum #1 · 1
Addendum No. 1 is issued as part of the Contract Document, to inform and/or specify changes which take precedence over information contained in the original Contract Documents. Unless otherwise specifically noted or specified hereinafter, or shown on drawings or schedules accompanying this Addendum, all work required by this Addendum shall conform to the applicable provisions of the Contract Documents. It shall be the responsibility of the Respondent to include in their bid any cost implications of this Addendum. All Respondents are to indicate on the form of proposal submitted by them, acknowledgement of receipt and compliance with the contents of this Addendum No. 1. Any provision in any of the Contract Documents, which may be in conflict or be inconsistent with the contents of this Addendum, shall be void to the extent of such conflict or inconsistency. All Question & Answer responses are hereby made part of the Bid/Proposal Documents. Vendors will take this Addendum into consideration when preparing and submitting a bid/proposal and shall acknowledge receipt of this Addendum in the space provided in the Bid/Proposal Documents. On Bid Sheet, item number 8009 Rock Removal has been added. In Attachments, Measurement and Payment (attachment I) has been updated. Please use the See What Changed link to view all the changes made by this addendum.
Addendum #2 · 2
Addendum No. 2 is issued as part of the Contract Document, to inform and/or specify changes which take precedence over information contained in the original Contract Documents. Unless otherwise specifically noted or specified hereinafter, or shown on drawings or schedules accompanying this Addendum, all work required by this Addendum shall conform to the applicable provisions of the Contract Documents. It shall be the responsibility of the Respondent to include in their bid any cost implications of this Addendum. All Respondents are to indicate on the form of proposal submitted by them, acknowledgement of receipt and compliance with the contents of this Addendum No. 2. Any provision in any of the Contract Documents, which may be in conflict or be inconsistent with the contents of this Addendum, shall be void to the extent of such conflict or inconsistency. All Question & Answer responses are hereby made part of the Bid/Proposal Documents. Vendors will take this Addendum into consideration when preparing and submitting a bid/proposal and shall acknowledge receipt of this Addendum in the space provided in the Bid/Proposal Documents. Attachments "H" and "J" has been added to the solicitation. Submittal date has been moved to December 17, 2026 at 12:00PM. Please use the See What Changed link to view all the changes made by this addendum.
Public questions and answers
Are there prevailing wages on this project?
There are no prevailing wages on this project.
Could you please give nore of a description or explanation of Line Items 3001, 3002, 3003, 3004 and 8007. It is not clear to me for example with # 3002 what a CY of brick masonry would be. Or what 3003 Clean Existing pipe any size would be comprised of that we can price it accurately. Thank you !
3001-Flowable Backfill for Utility Cuts: Is used for encasing pipes and utilities if they are too close to surface or other utilities. See Pipe Encasement Detail on Sheet No. 3 (TD-1) of the plans. 3002-Brick Masonry for Miscellaneous Structures: Used to make up the difference in the bottom of proposed inlets or to temporarily seal opens. See Drainage Structure Details on Sheet No. 3 (TD-1) of the plans. 3003-Clean Existing Pipe any Size: This is to remove and sediment or debris in the specified pipes. 3004-Clean Existing Drainage Structures: This is to remove and sediment or debris in the specified structures. 8007-Sanitary Sewer Lateral Piping: This is to replace additional linear footage of existing sewer laterals that may be damaged outside of the original limits of work. The Specification and Measurement and Payment document has been revised to reflect the correct bid item numbers and will be issued in an addendum.
What are the testing requirements for this project. For example; How often will you require compaction tests?
Compaction testing for Cecil County Sewer follows the Standard Specifications for Water Mains and Sewer Mains - Link to the website is in the answer to question 4 Compaction testing requirements for storm drains follows the MD SHA Standard Specifications for Construction and Materials - Link to the website is in the answer to question 4
Can you provide any more specs?
Please refer to the MD SHA Standard Specifications for Construction and Materials (link attached) for Storm Drain work on MD 222. https://roads.maryland.gov/mdotsha/pages/sscm.aspx?PageId=853&lid=SSP Please refer to the Cecil County Standard Specifications for Water Mains and Sewer Mains for Sanitary Sewer work https://www.cecilcountymd.gov/DocumentCenter/View/754/Standard-Specifications-for-Water-Mains-and-Sewer-Mains-PDF?bidId=
As per detail on sheet 3 of 30, do ALL pipes need to be backfilled with flowable fill? or ONLY if the pipe is within the GAB?
3001-Flowable Backfill for Utility Cuts: Is used for encasing pipes and utilities if they are too close to surface or other utilities. See Pipe Encasement Detail on Sheet No. 3 (TD-1) of the plans.
Will there be a contingent unit cost for rock excavation?
Bid Item 8009 will be added to the contract. The Specification and Measurement and Payment document has been revised to reflect the correct bid item numbers and will be issued in an addendum.
Will there be an extension of the bid date since the signed bid drawings are not yet released?
Please see Addendum #2
Can the proposed 18" RCP between Ex I-1 and proposed I-2 be shifted completely out of the sidewalk to avoid the utility poles at approximate station 1+30 and 1+55 or can the county have the poles braced prior to construction?
After conferring with the engineer, the storm drain line needs to be installed where it is. Cecil County has reached out to Verizon who owns the poles and will enter into an agreement to have them brace the poles as the contractor excavates past them.
The existing SMH is brick laid on top of the three way sewer mains which are encased in concrete as the MH "base". What is the extent of the concrete base beyond the brick MH wall? Is the understanding that the concrete terminates at the outside manhole wall and there will be enough concrete once the existing clay pipe is removed to core a hole and install a core n seal gasket or open the hole for the pipe and mortar it closed? If the existing conditions do not allow for this installation, will a new manhole be installed as a change order?
Please see Addendum 2. A new manhole, if required, can be completed as a change order.
Will you be extending the bid at least a few days? I do not see the revised drawings yet and we have a Holiday in 3 days. Thank you.
Please see Addendum #2
Is Armorock an approved alternate bid item for the two 72" and one 60" manhole? If we are approved, will separate line items be added? Armorock will provide a fully corrosion proof manhole without the need for coatings and liners. Because of the near zero porosity of the structures, they are also highly resistant to I&I. Those combines with a 50 year corrosion proof warranty, the owner and rate payers will have a structure that will not need to be rehabilitated.
Not at this time. Please reach out to Cecil County to discuss the possibility for use on future projects.
Will there be a laydown area provided to stow materials and equipment?
Cecil County has a gravel parking area near 129 south main street that can be used to stage materials and equipment. During construction in the 2 parking lots the Town has said that space would be available during construction. For the work on Race Street Artesian has agreed that material can be staged on their property 6 Race Street. Staging areas would need to be restored once construction has been completed.
Will there be any daily time restrictions?
Standard work hours are 7-3:30, however extended hours may be approved on a case by case request. Work restrictions on MD 222 would be governed by the MD SHA lane closure permit that the contractor would obtain. On past projects, they allowed flagging operations during the standard work hours.