Skip to content
← Back to search

State and local · OpenGov

Opportunitypending

Replacement of Oil-Fired Heating Units at the Public Works Crew Garage

Description

The Town of Nantucket, through its Department of Public Works , invites qualified responders to submit quotes for the Replacement of Oil-Fired Heating Units at the Public Works Crew Garage . This Request for Quotes is made in accordance with Massachusetts General Laws, Ch. 149. PRICE PROPOSAL Proposed prices must include all charges for administration, labor, materials, supplies, equipment (including use of equipment whether owned or rented), use of tools, shipping/handling, delivery, unloading, insurance (during order, transportation, storage, and installation), and profit necessary to supply the items and service as listed within this Request for Quotes. Remove, furnish and replace two (2) oil-fired heating units (Units No. 1 and No. 2) in the Department of Public Works Crew Garage ("Building A"). ADD ALTERNATE Proposed prices must include all charges for administration, labor, materials, supplies, equipment (including use of equipment whether owned or rented), use of tools, shipping/handling, delivery, unloading, insurance (during order, transportation, storage, and installation), and profit necessary to supply the items and service as listed within this Request for Quotes. Remove, furnish and replace one (1) oil-fired heating unit (Unit No. 3) in the Department of Public Works Crew Garage ("Building A"). SCOPE OF SERVICE The Town and County of Nantucket , through its Department of Public Works, invites qualified responders to submit quotes for Replacement of Oil-Fired Heating Units at the Public Works Crew Garage . Terms of Service This successful bidder shall perform services as necessary from December 2026 to April 2027. This is intended to be a four (4) month contract. Location Department of Public Works Crew Garage ("Building A") located at 188 Madaket Road, Nantucket, MA 02554. Replacement of Oil-Fired Heating Units The Town of Nantucket (hereinafter referred to as the “Town”) is seeking a qualified HVAC contractor to remove and replace two (2) existing oil-fired heating units with new oil-fired heating units. The Town is also requesting an add alternate price for the removal and replacement of a third oil-fired heating unit. The scope of work shall include the complete removal and proper disposal of existing equipment, as well as the furnishing, installation, connection, startup, testing, and commissioning of the new commercial-grade replacement units. The Contractor shall provide all labor, supervision, materials, equipment, lifts, rigging, tools, permits, inspections, electrical work, fuel-oil connections, venting, controls, disposal, and incidental work necessary to provide complete and fully operational heating systems. Existing Oil-Fired Heating Units (2) Unit No. 1 – Modine Oil-Fired Unit Heater Existing equipment information: Manufacturer: Modine Model: POR145B 0101 Type: Oil-fired unit heater Output capacity: 145,000 BTU/hr Fuel input: 1.25 GPH Fuel: No. 2 heating oil Electrical: 115V / 60 Hz / single phase Total current: 11.2 amps Minimum circuit ampacity: 14 amps Maximum fuse: 15 amps Existing Modine unit is suspended from the ceiling approximately thirteen (13) feet. Unit No. 2 – Nordyne Oil-Fired Warm-Air Furnace Based on the equipment nameplate provided: Manufacturer: Nordyne Model: O4MD-140A-16-FA Serial No.: O4MD91116274 Type: Oil-fired warm-air furnace Fuel: No. 2 heating oil Input range: 0.75–1.10 GPH Output range: approximately 85,500–123,000 BTU/hr Maximum external static pressure: 1.00 in. w.c. Listed temperature rise: 60°F Burner model identified on nameplate: Beckett AFG The Contractor shall field-verify all nameplate information and existing operating conditions prior to ordering replacement equipment. Add Alternate – Replacement of Heating Unit No. 3 As an add alternate, the Contractor shall provide a separate price for the complete removal and replacement of the existing Public Works Heating Unit No. 3. Existing equipment information: Manufacturer: Modine Model: POR145B 0101 Type: Oil-fired unit heater Output capacity: 145,000 BTU/hr Fuel input: 1.25 GPH Fuel: No. 2 heating oil Electrical: 115V / 60 Hz / single phase Total current: 11.2 amps Minimum circuit ampacity: 14 amps Maximum fuse size: 15 amps Existing burner: Beckett oil burner Installation: Elevated, platform-mounted unit approximately eight (8) feet off the ground. If the Town elects to proceed with this alternate, the work shall include complete removal and proper disposal of the existing heater and installation of a new commercial-grade oil-fired unit heater appropriately sized for the space served. The Contractor shall provide all labor, equipment, lifts, rigging, materials, fuel-oil piping modifications, electrical connections, venting and flue modifications, controls, mounting hardware, structural supports, and other incidental work necessary for a complete and operational installation. The Contractor shall field-verify the condition and suitability of the existing elevated platform and supporting structure. Any modifications necessary to safely support the new equipment shall be included in the alternate price. The replacement shall also include connection or replacement of the existing oil burner components, oil filter, valves and associated fuel piping as necessary; connection to the existing electrical service and controls; modification or replacement of venting and chimney connections as required; and all necessary thermostatic and safety controls. Upon completion, the Contractor shall perform startup, combustion testing, burner adjustment, draft testing, safety-control testing, and verification of proper fan and thermostat operation. Written combustion test results shall be provided to the Town. Scope of Work The Contractor shall perform a site inspection and verify the existing equipment capacities, physical dimensions, heating requirements, electrical service, oil supply, venting and chimney connections, ductwork where applicable, thermostats and controls, equipment supports, clearances, and accessibility. The Contractor shall disconnect, remove, and legally dispose of the two (2) existing heating units included in the Base Bid, along with all associated components that will not be reused. Add Alternate: If accepted by the Town, the Contractor shall disconnect, remove, and legally dispose of the third existing heating unit and all associated components that will not be reused. Removal shall include all necessary rigging, lifting, scaffolding, aerial lifts, fall protection, and other equipment required due to the elevated locations. The Contractor shall furnish and install new commercial-grade oil-fired heating units suitable for their respective applications. Replacement equipment shall be appropriately sized for the spaces served and shall provide heating performance equal to or better than the equipment being replaced. The Contractor shall not rely solely upon the nameplate capacity of the existing equipment for sizing. The Contractor shall verify appropriate replacement capacity based upon existing conditions and the heating requirements of each space. The work shall include: Removal and legal disposal of existing heating units. Furnishing and installation new commercial-grade oil-fired heating units. New burners and burner controls. Connection and modification of existing No. 2 fuel-oil piping as necessary. Replacement or installation of oil filters, shutoff valves, fittings, flexible connections, and other required fuel-system components. Connection or modification of existing venting, flue piping, draft regulators, chimney connections, and related components. Replacement of deteriorated or incompatible venting components. Electrical disconnection of existing equipment and connection of new equipment. New wiring, conduit, disconnects, breakers, switches, relays, and other electrical components where required. Provision of new compatible thermostats and controls. New mounting brackets, hangers, structural supports, vibration isolation, and fastening systems as necessary. Modification of the existing elevated platform or equipment supports where necessary for the new equipment. Connection and modification of existing supply and return ductwork associated with the Nordyne furnace. Sheet-metal transitions, fittings, insulation, sealing, and other duct modifications necessary to properly connect the replacement furnace to the existing duct system. Adjustment of airflow and blower operation for the replacement warm-air furnace. Adjustment of discharge louvers and airflow for the replacement unit heaters. Patching and sealing of penetrations or openings created by removal or installation. Required firestopping. All miscellaneous components necessary to provide complete operational systems. For the ceiling-suspended unit, the Contractor shall inspect the existing supporting structure and suspension system before installation. New hangers, supports, or structural attachments shall be provided where required for the replacement equipment. For the Add Alternate unit located approximately eight (8) feet above the floor, the Contractor shall inspect the existing platform and mounting arrangement and make any modifications necessary to safely accommodate the replacement equipment. Startup, Testing and Commissioning Following installation, the Contractor shall start, test, adjust, and commission the two (2) heating systems included in the Base Bid in accordance with the equipment manufacturers' requirements. Add Alternate: If accepted by the Town, the Contractor shall also start, test, adjust, and commission the third heating system in accordance with the equipment manufacturer's requirements. Each oil burner shall receive a complete combustion analysis and adjustment. Testing shall include, as applicable, verification of: Proper combustion and burner operation Smoke and draft conditions Flue-gas conditions Proper oil pressure and burner setup Safety and limit controls Thermostat operation Fan/blower operation Supply and return airflow Temperature rise Oil-line integrity and absence of leaks Electrical operation Proper venting Proper shutdown and safety operation The Contractor shall provide the Town with written combustion-test results for each new unit. Permits and Closeout The Contractor shall obtain all permits and coordinate all inspections required for the work. Upon completion, the Contractor shall provide the Town with equipment submittals, manufacturer's warranties, operating and maintenance manuals, combustion reports, startup documentation, inspection approvals, and applicable permit closeout documentation. All work shall comply with applicable Massachusetts building, mechanical, electrical, fire, fuel-oil, and energy requirements; applicable NFPA requirements; manufacturer's installation instructions; and Town of Nantucket permitting and inspection requirements. INTRODUCTION Summary Background Contact Information Timeline GENERAL INFORMATION AND QUOTE SUBMISSION REQUIREMENTS The Town of Nantucket is an Affirmative Action/Equal Opportunity Employer. The Town encourages bids from qualified MBE/DBE/WBE firms. Bidders should be aware that the Town of Nantucket is no longer accepting bids by mail. All responses must be submitted electronically. Bids and specifications can be obtained from and will be accepted at the Town of Nantucket's e-Procurement Portal https://procurement.opengov.com/portal/nantucket until Tuesday, November 24, 2026 , at 2:00 pm and publicly opened forthwith for this Request for Quotes which is made in accordance with M.G.L. c 149. Responses must be submitted through OpenGov Procurement by clicking "Submit Response" and then follow the instructions to submit electronic bid. Bidders must register on the Town’s e-Procurement Portal and click "Follow" on the bid postings page in order to ensure receipt of any changes or addenda to the RFQ. The Town intends to award a contract within thirty (30) calendar days after bid opening unless otherwise stated in the specifications or the time for award is extended by mutual consent of all parties. All bids submitted shall be valid for a minimum period of sixty (60) calendar days following the date established for acceptance. If any changes are made to this RFQ, an addendum will be issued. Addenda notification will be emailed to all bidders who may follow the bid posting by clicking on "Follow" on the bid postings page . Each bidder shall acknowledge receipt of any and all addendum issued via the Town's e-Procurement portal. Failure to do so may cause rejection of the submittal as being non-responsive . Questions concerning this RFQ must be submitted via the Question & Answer feature of the Town's e-Procurement portal before 2:00 pm on Thursday, November 12, 2026 . Written responses will be posted on the Town's e-Procurement Portal in the form of Addenda if necessary and emailed to all bidders who may follow the RFQ. Attempts made by bidders to contact Town employees directly with questions subject the bidder to disqualification. It is the sole responsibility of the bidder to ascertain the existence of any addenda and/or modifications issued by the Town. As this RFQ has been published on the Town’s e-Procurement Portal, all bidders are responsible for checking the website for any addenda and/or modifications that are subsequently made to this RFQ. Bids may be modified, corrected or withdrawn by the bidder via the Towns e-Procurement Portal before Tuesday, November 24, 2026 , at 2:00 pm . After the bid opening, a bidder may not change any provision of the bid in a manner prejudicial to the interests of the Town of Nantucket or fair competition. In accordance with Section 5 of Chapter 30B of the Massachusetts General Laws, the procurement officer may waive minor informalities or allow the bidder to correct them. If a mistake and the intended bid are clearly evident on the face of the bid document, the mistake will be corrected to reflect the intended bid, and the bidder will be notified in writing; the bidder may not withdraw the bid. In accordance with M.G.L. c. 30B Section 5, a bidder may withdraw a bid if a mistake is clearly evident on the face of the bid, but the intended correct bid is not similarly evident. The Town of Nantucket reserves the right to reject any and all bids and to waive any informality in bids received whenever such rejection or waiver is in its best interest. The Town of Nantucket is exempt from all taxes, and they shall not be included in the quote. Quotes must include the complete price for all services, documentation, and other deliverables. The quote must include all costs including any estimated travel time, transportation, accommodations, meals, and incidentals. No additional costs will be accepted after the contract is signed. Poor references may be a basis for determining that a bidder is not responsible. Reference questions will include but may not be limited to work quality, customer service, and general customer satisfaction. Rule of Award : One (1) contract will be awarded to the responsible and eligible vendor offering the requested services at the lowest price per M.G.L. c. 149. The Tax Compliance Certification and the Certificate of Non-Collusion must be included with the bid response. The bid must be signed by the authorized individual(s). FAILURE TO SIGN AND UPLOAD BOTH FORMS WILL RESULT IN THE BID BEING CONSIDERED NON-RESPONSIVE AND WILL DISQUALIFY THE SUBMISSION PER MASSACHUSETTS GENERAL LAWS . A Town of Nantucket Contract Agreement will be required. The selected vendor is required to complete the Town of Nantucket Contract Agreement prior to any services rendered. A sample of this agreement is incorporated for reference as Exhibit A . Exceptions will not be made after the RFQ is awarded. QUALITY REQUIREMENT Bidders must meet with all of the requirements described in Scope of Services and comply with all of the submission requirements listed below: The signed Tax Compliance Certification must be included with the bid response. The signed Certificate of Non-Collusion must be submitted with the bid response. Current Certificate(s) of Insurance. Signature page from the Town’s contract, signed by an authorized individual as a good faith statement that the contractor is willing to enter into the Town’s standard contract form. References. W9 WORK SCHEDULE Contractor shall coordinate with the Paul Berard Jr. at the Department of Public Works , or their designee, a proposed work schedule prior to commencement of the project. Project may commence upon approval of work schedule. The Contractor is to provide both scheduled and unscheduled maintenance, upgrades, and emergency repair services. Bidders should note that per MA State Mandate, the Town of Nantucket does not pay deposits or any form of pre-payment in order for work to begin. One (1) contract will be awarded to the responsible and eligible vendor offering the requested services at the lowest price. The bid, and any subsequent contract for the services, is hereby issued in accordance with applicable Massachusetts General Laws. The selected bidder shall be expected to comply with all applicable state and federal laws in performance of service. PREVAILING WAGE & OSHA Pursuant to Massachusetts General Laws, chapter 149, sections 26 and 27, the Division of Occupational Safety (formerly the Department of Labor and Industries) has determined the Prevailing Wage Rates for this work. The enclosed rates apply only to this work. The Prevailing Wage shall become part of the contract signed between the successful bidder and the awarding authority or the contract is invalid. Prevailing Wages must be paid to all persons employed on the public works project, regardless of whether they are employed by the successful bidder or a subcontractor. The wage rates issued for each project shall be paid for the entire project. Payroll records must be kept by the successful bidder for all persons employed on the project. A separate Statement of Compliance must be submitted to the Division of Occupational Safety by every employer, including all prime contractors and subcontractors, when its portion of the work is completed. The enclosed form entitled “Weekly Payroll Records Report and Statement of Compliance" clearly details these requirements. A certified payroll must be submitted to the Board of Selectmen office for each week work is performed for the Town under this contract. Contractor must comply with: Chapter 306 of the Acts of 2004 § 1. That they are able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work; and Who shall certify that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least ten (10) hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and That all employees to be employed in the work subject to this bid have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least ten (10) hours in duration. Any employee found on a worksite subject to this section without documentation of successful completion of a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least ten (10) hours in duration shall be subject to immediate removal. SECTION 5 This act shall take effect on July 1, 2006 Note: Per M.G.L. c. 149, if the final contract price is $25,000 or more, the selected contractor shall be required to furnish the Town with a payment bond of at least fifty (50) percent of the contract

Plain text

OpenGov categories

  • 03151 · Furnaces, Central Heating Type (Forced Air, Gas Fired)